CN103046532A - Variable stiffness leveling prestressed pipe pile compound foundation - Google Patents

Variable stiffness leveling prestressed pipe pile compound foundation Download PDF

Info

Publication number
CN103046532A
CN103046532A CN2012105899626A CN201210589962A CN103046532A CN 103046532 A CN103046532 A CN 103046532A CN 2012105899626 A CN2012105899626 A CN 2012105899626A CN 201210589962 A CN201210589962 A CN 201210589962A CN 103046532 A CN103046532 A CN 103046532A
Authority
CN
China
Prior art keywords
foundation
pile
prestressed pipe
stiffness
spacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105899626A
Other languages
Chinese (zh)
Inventor
康景文
张东明
余远辉
陈云
崔同建
周其建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southwest Architectural Design and Research Institute Co Ltd
Original Assignee
China Southwest Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southwest Architectural Design and Research Institute Co Ltd filed Critical China Southwest Architectural Design and Research Institute Co Ltd
Priority to CN2012105899626A priority Critical patent/CN103046532A/en
Publication of CN103046532A publication Critical patent/CN103046532A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

Disclosed is a variable stiffness leveling prestressed pipe pile compound foundation. Prestressed pipe piles different in length and spacing are respectively disposed according to different stiffnesses of construction area foundations. If the foundation stiffness is large, the spacing of the prestressed pipe piles is larger and the length of pile bodies is small. If the foundation stiffness is small, the spacing of the prestressed pipe piles is small and the length of the pile bodies is large, and a gravel cushion is arranged above the prestressed pipe piles. Different characteristics of the foundation stiffness are fully considered, bearing capacity of pile adjacent soil is given to full play, foundation deformation can also be well coordinated, and nonuniform foundation settlement in the late stage of project can be prevented effectively.

Description

Variable-stiffness leveling type prestressed tubular pile composite foundation
Affiliated technical field
The present invention relates to a kind of the realm of building construction prestressed tubular pile composite foundation, specifically a kind of variable-stiffness leveling type prestressed tubular pile composite foundation.
Background technology
Be the raising bearing capacity of foundation soil, accelerating construction progress, prestressed concrete pipe pile is widely applied in engineering construction in recent years, but all is as pile foundation.The prestressed concrete pipe pile composite foundation can be given full play to the load-carrying properties of stake and inter-pile soil, effectively improves the foundation soil stress, improves bearing capacity of foundation soil, can reduce well again the distortion of ground.Currently used prestressed tubular pile composite foundation mostly be in the reinforcing area maximum load as design load, isometric, isometrical, equidistant design, the prestressed pipe pile length of design is all longer, and pile spacing is also less, and for considering the rigidity inhomogeneities of ground self.The composite foundation that designs by unified highest standard is in conservative, not only can cause the part stake long long for invalid stake, also increase simultaneously the originally inhomogeneities of inhomogeneous ground, in addition, too small pile spacing has also increased construction costs and difficulty of construction, has increased simultaneously the engineering unsafe factor.So both do not maximally utilised the natural ground inherent advantages, wasted the more resources of production, increased greatly again the technical difficulty of construction, and be unfavorable for reduce project cost and create conservation-minded society.
Summary of the invention
In order to solve the problem that prestressed tubular pile composite foundation exists in the existing building construction field, the invention provides a kind of variable-stiffness leveling type prestressed tubular pile composite foundation, this composite foundation can not only solve Lack of support and the uneven subsidence of ground, and can give full play to the intrinsic bearing capacity of natural ground, reduced raw-material use.
The technical solution adopted for the present invention to solve the technical problems: above pile for prestressed pipe, be provided with the broken stone cushion layer, and according to the difference of construction area foundation stiffness, set prestressed pipe pile length is all different with spacing, the large prestressed pipe pile spacing that then arranges of foundation stiffness is large and pile body length is shorter, and the little prestressed pipe pile spacing that then arranges of foundation stiffness is little and pile body length is longer.Take full advantage of the intrinsic load-carrying properties of natural ground, greatly saved the material usages such as reinforcing bar and concrete, thereby effectively reduced the construction period construction costs.
The invention has the beneficial effects as follows: can not only effectively solve the uneven subsidence in engineering foundation later stage, and distributing position and prestressed pipe pile length by pile for prestressed pipe rationally is set, so that the intrinsic bearing capacity of natural ground is effectively used, thereby reduced the consumption of the materials such as reinforcing bar and concrete, reduced construction period and construction costs, product structure is simple, and cost is low, easy construction is easily promoted the use of.
Description of drawings
The invention will be further described below in conjunction with accompanying drawing.
Fig. 1 is plane structure schematic diagram of the present invention.
Fig. 2 is A-A cross-sectional view among Fig. 1.
Fig. 3 is the second embodiment of the present invention.
Code description among the figure: 1-pile for prestressed pipe; The 2-pile for prestressed pipe; The 3-pile for prestressed pipe; 4-broken stone cushion layer; The Soft Soil Layer that 5-rigidity is lower; The incompetent bed that 6-rigidity is higher; 7-foundation stiffness change curve; The zone that 11-rigidity is lower; The zone that 22-rigidity is general; The zone that 33-rigidity is higher.
The specific embodiment
As shown in Figure 1 and Figure 2, the thick broken stone cushion layer (4) of 20 ~ 30cm is set above pile for prestressed pipe.Spacing at the lower zone of rigidity (11) pile for prestressed pipe (1) is less, length is longer, the quantity of the less then pile for prestressed pipe of spacing is also just more, long stake is long can guarantee that then pile for prestressed pipe gos deep into bearing stratum, obtains enough support forces, thus so that foundation stiffness reinforcement that should the zone.And in the more general zone of rigidity (22), spacing and the length of set pile for prestressed pipe (2) are all more moderate.In the higher zone of rigidity (33), the bearing capacity intrinsic owing to this zone natural ground is higher, therefore the spacing of set pile for prestressed pipe (3) is larger, stake is long then shorter, namely take full advantage of the intrinsic bearing capacity of this zone ground, reduced again density and length that pile for prestressed pipe arranges, effectively avoided invalid stake long, saved a large amount of raw material, simultaneously also so that construction period greatly shorten.When satisfying the loading capacity of engineering requirement, also avoided the differential settlement in engineering later stage.
In Practical Project, because the inhomogeneities of foundation soil, foundation stiffness change curve (5) as shown in Figure 3 can appear, this moment, spacing and the length of each regional pile for prestressed pipe all should arrange according to the designing requirement of building engineering, satisfied the demand of superstructure to guarantee bearing capacity of foundation soil and rigidity.

Claims (3)

1. variable-stiffness leveling type prestressed tubular pile composite foundation, it is to be provided with rubble cotton-padded mattress layer above pile for prestressed pipe, it is characterized in that: according to the difference of construction area foundation stiffness, set prestressed pipe pile length is all different with spacing.
2. variable-stiffness leveling type prestressed tubular pile composite foundation according to claim 1 is characterized in that: the prestressed pipe pile spacing that foundation stiffness greatly then arranges is large and pile body length is shorter.
3. variable-stiffness leveling type prestressed tubular pile composite foundation according to claim 1 is characterized in that: the little prestressed pipe pile spacing that then arranges of foundation stiffness is little and pile body length is longer.
CN2012105899626A 2012-12-31 2012-12-31 Variable stiffness leveling prestressed pipe pile compound foundation Pending CN103046532A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105899626A CN103046532A (en) 2012-12-31 2012-12-31 Variable stiffness leveling prestressed pipe pile compound foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105899626A CN103046532A (en) 2012-12-31 2012-12-31 Variable stiffness leveling prestressed pipe pile compound foundation

Publications (1)

Publication Number Publication Date
CN103046532A true CN103046532A (en) 2013-04-17

Family

ID=48059370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105899626A Pending CN103046532A (en) 2012-12-31 2012-12-31 Variable stiffness leveling prestressed pipe pile compound foundation

Country Status (1)

Country Link
CN (1) CN103046532A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107808026A (en) * 2017-09-14 2018-03-16 南京瑞迪建设科技有限公司 A kind of storage tank composite foundation variable-stiffness leveling Optimization Design
CN108775006A (en) * 2018-06-09 2018-11-09 广东博意建筑设计院有限公司 Pipe pile composite foundation
CN110952389A (en) * 2019-12-17 2020-04-03 同济大学 Pile combined structure construction method for controlling uneven settlement of transition section of high-speed railway bridge
CN116427417A (en) * 2023-03-15 2023-07-14 广州万构建筑工程设计有限公司 Construction method and system for controlling disturbance of existing adjacent pipelines in foundation pit excavation

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000001862A (en) * 1998-06-16 2000-01-07 Penta Ocean Constr Co Ltd Foundation structure
JP2006045793A (en) * 2004-07-30 2006-02-16 Sekkeishitsu Soil:Kk Structure of foundation
CN1876970A (en) * 2005-06-10 2006-12-13 李仁平 Long and short piles square units combination type combined pile foundation
CN101294396A (en) * 2008-06-13 2008-10-29 朱奎 Different-stiffness composite pile composite foundation and processing method
CN101392536A (en) * 2008-10-15 2009-03-25 朱奎 Composite foundation of composite pile with different stiffness
CN102296508A (en) * 2011-06-20 2011-12-28 江苏省交通科学研究院股份有限公司 Variable-stiffness composite foundation for highway
CN102493473A (en) * 2011-12-13 2012-06-13 中国建筑西南勘察设计研究院有限公司 Replacement composite foundation for shallow-layer jet-grouting reinforced piles and deep-layer plain concrete piles
CN102704462A (en) * 2012-06-28 2012-10-03 中铁十六局集团第五工程有限公司 Composite treatment grouped piles for soft foundation

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000001862A (en) * 1998-06-16 2000-01-07 Penta Ocean Constr Co Ltd Foundation structure
JP2006045793A (en) * 2004-07-30 2006-02-16 Sekkeishitsu Soil:Kk Structure of foundation
CN1876970A (en) * 2005-06-10 2006-12-13 李仁平 Long and short piles square units combination type combined pile foundation
CN101294396A (en) * 2008-06-13 2008-10-29 朱奎 Different-stiffness composite pile composite foundation and processing method
CN101392536A (en) * 2008-10-15 2009-03-25 朱奎 Composite foundation of composite pile with different stiffness
CN102296508A (en) * 2011-06-20 2011-12-28 江苏省交通科学研究院股份有限公司 Variable-stiffness composite foundation for highway
CN102493473A (en) * 2011-12-13 2012-06-13 中国建筑西南勘察设计研究院有限公司 Replacement composite foundation for shallow-layer jet-grouting reinforced piles and deep-layer plain concrete piles
CN102704462A (en) * 2012-06-28 2012-10-03 中铁十六局集团第五工程有限公司 Composite treatment grouped piles for soft foundation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
代国忠等: "长短桩组合多元复合桩基技术的应用研究", 《岩土力学》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107808026A (en) * 2017-09-14 2018-03-16 南京瑞迪建设科技有限公司 A kind of storage tank composite foundation variable-stiffness leveling Optimization Design
CN108775006A (en) * 2018-06-09 2018-11-09 广东博意建筑设计院有限公司 Pipe pile composite foundation
CN110952389A (en) * 2019-12-17 2020-04-03 同济大学 Pile combined structure construction method for controlling uneven settlement of transition section of high-speed railway bridge
CN116427417A (en) * 2023-03-15 2023-07-14 广州万构建筑工程设计有限公司 Construction method and system for controlling disturbance of existing adjacent pipelines in foundation pit excavation
CN116427417B (en) * 2023-03-15 2024-04-26 浙江聚贤建设股份有限公司 Construction method and system for controlling disturbance of existing adjacent pipelines in foundation pit excavation

Similar Documents

Publication Publication Date Title
CN101691724A (en) Liquefied soil foundation quake-proof road-bridge transition section structure of ballastless track of high-speed railway
CN101654899A (en) Liquified soil foundation-bed shock-resistant strengthening structure of high-speed railway
CN201598642U (en) Double-row pile foundation pit support structure
CN103046561B (en) Anchor draws campshed anchorage wall compound retaining structure
CN103046532A (en) Variable stiffness leveling prestressed pipe pile compound foundation
CN103821160B (en) Soft soil foundation combined pile net structure
CN202718081U (en) Concrete core dinas pile composite foundation
CN201530968U (en) High-speed railway liquefying soil foundation-roadbed seismic strengthening structure
CN202809501U (en) Reinforced load reducing structure of motorway high filling culvert in mountainous area
CN205046541U (en) Composite foundation
CN103074889A (en) Flexible pile cap for composite foundation
CN202323922U (en) Tilted stratum soft foundation reinforcing structure of high-speed railway
CN201695341U (en) Box girder prefabricated pedestal
CN203834512U (en) Combined type gravity retaining wall
CN203729175U (en) Pile-net composite foundation structure
CN2658220Y (en) Cement soil compound pile with abnormal concrete
CN204510190U (en) The three-dimensional composite foundation of a kind of Deep Thick Soft Ground
CN202969405U (en) Cup-shaped concrete foundation of wind power generation tower
CN106283949B (en) Medium-and low-speed maglev traffic engineering single line embankment location independence pier stud type support rail girder construction
CN213389547U (en) Deep soft soil roadbed structure
CN202954372U (en) Novel rubber cement soil pile composite foundation
CN202830674U (en) Strengthening structure of existing railway speed increasing subgrade
CN207760677U (en) A kind of novel reinforcement cushion composite foundation
CN203096751U (en) Long-short combined plain concrete displacement pile composite foundation in soil-rock area
CN201598646U (en) Digging type rod tower base

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130417