CN108775006A - Pipe pile composite foundation - Google Patents

Pipe pile composite foundation Download PDF

Info

Publication number
CN108775006A
CN108775006A CN201810590793.5A CN201810590793A CN108775006A CN 108775006 A CN108775006 A CN 108775006A CN 201810590793 A CN201810590793 A CN 201810590793A CN 108775006 A CN108775006 A CN 108775006A
Authority
CN
China
Prior art keywords
layer
pile
prefabricated tubular
tubular pile
composite foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810590793.5A
Other languages
Chinese (zh)
Inventor
苏程祥
胡伟政
许根才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Elite Architectural Co Ltd
Original Assignee
Elite Architectural Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Elite Architectural Co Ltd filed Critical Elite Architectural Co Ltd
Priority to CN201810590793.5A priority Critical patent/CN108775006A/en
Publication of CN108775006A publication Critical patent/CN108775006A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles

Abstract

The present invention relates to a kind of pipe pile composite foundations comprising lower layer and upper layer, the lower layer are prefabricated tubular pile layer, and upper layer is mattress layer, are spaced from each other between adjacent prefabricated tubular pile in prefabricated tubular pile layer;The prefabricated tubular pile top closure, the mattress layer are mixed by sandstone, and for mattress layer place mat on ground and prefabricated tubular pile top surface, mattress layer area coverage is more than prefabricated tubular pile location.Such pipe pile composite foundation is using prefabricated tubular pile instead of CFG or cement mixing pile, and, the top of prefabricated tubular pile is closed, saving duration, pile quality are guaranteed, simultaneously, it is again more more economical than common pipe pile foundation, more convenient to construct, is more more economical than common pipe pile foundation, it can speed up the work, save a large amount of durations, to generate substantial economics.

Description

Pipe pile composite foundation
Technical field
The present invention relates to building composite foundation, especially a kind of pipe pile composite foundations.
Background technology
At present generally there is foundation treatment mode in specification:CFG pile composite foundations, cement mixing pile composite foundation, rigid pile Composite foundation.These foundation treatment modes all have the shortcomings that one it is common:Time-consuming too long, cost of labor accounting is too big, is difficult to Ensure pile quality.Present cost of labor proportion in entire project cost alreadys exceed 30%, but also on continuing Rise.
Wherein, CFG, every stake machine can only make a call to 6 ~ 8 daily for cement mixing pile etc., and CFG, cement mixing pile beats Foundation trench could be excavated after at least waiting 28 days after complete stake, time-consuming, greatly improves building cost.
Invention content
The purpose of the present invention is to provide a kind of short construction period, reliable in quality, it is easy for construction, increase economic efficiency, have Effect ground improves the pipe pile composite foundation of foundation bearing capacity, with overcome common composite foundation take too long, cost of labor accounting it is too big, The shortcomings of being difficult to ensure pile quality.
The object of the present invention is achieved like this:
A kind of pipe pile composite foundation, including lower layer and upper layer, it is characterised in that:The lower layer is prefabricated tubular pile layer, and upper layer is cotton-padded mattress Bed course is spaced from each other between adjacent prefabricated tubular pile in prefabricated tubular pile layer;The prefabricated tubular pile top closure, the mattress layer by Sandstone mixes, and on ground and prefabricated tubular pile top surface, mattress layer area coverage is more than where prefabricated tubular pile mattress layer place mat Range.When design, stake top absolute altitude is lower 300 ~ 400mm than sole plate bottom absolute altitude(Because mattress layer thickness is 200 ~ 300mm, element Concrete mats layer thickness is 100mm).
The purpose of the present invention can also use following technical measures to solve:
As more specific scheme, distance is 3.5 to 4.5 times of prefabricated tubular pile diameter between the contiguous prefabricated pile pile.It is same Building concentration ground can squeeze into more prefabricated tubular piles, use and be welded to connect between two prefabricated tubular piles up and down of same position. Specific stake is long, stake diameter, stake spacing can carry out appropriately configured according to the result of calculation of disparity items, and stake top absolute altitude is the sole plate bottom of than Absolute altitude low 300 to 400mm.
As further embodiment, the prefabricated tubular pile top is equipped with sealing plate, and sealing plate closes prefabricated tubular pile top nozzle. The top of prefabricated tubular pile carries steel ring, and sealing plate uses the steel plate equal with prefabricated tubular pile diameter, the steel ring of steel plate and prefabricated tubular pile Firm welding.
Alternatively, the prefabricated tubular pile top is by filling sandwich layer closing.When stake top needs to cut stake, this side is taken Formula is by prefabricated tubular pile top closure.
The prefabricated tubular pile inner cavity, which corresponds to, fills sandwich layer equipped with sealing plate, and sealing plate seals the position of certain altitude in prefabricated tubular pile It closes.
The filling sandwich layer is C30 microdilatancy pea gravel concreten layers, thickness 500mm.
As further embodiment, the thickness of the mattress layer is 200mm to 300mm.
The mattress layer is coarse sand, middle sand, macadam gradating sandstone, and the grain size of rubble is less than or equal to 30mm, and mattress layer rams Degree of filling out(The ratio of mattress layer thickness and virtual resurfacing thickness after compacting)Less than or equal to 0.9.Rubble cannot use cobble.
Plain concrete cushion layer and sole plate are equipped on the mattress layer successively, plain concrete cushion layer is located at mattress layer area Within the scope of.
The mattress layer periphery has more 400mm or more than plain concrete cushion layer.
Beneficial effects of the present invention are as follows:
(1)Such pipe pile composite foundation uses prefabricated tubular pile instead of CFG or cement mixing pile, also, to prefabricated tubular pile Top is closed, and it is guaranteed to save duration, pile quality, meanwhile, and more more economical than common pipe pile foundation, more convenient apply It is work, more more economical than common pipe pile foundation, it can speed up the work, save a large amount of durations, to generate substantial economics;
(2)Prefabricated tubular pile pile quality used by such pipe pile composite foundation is secure, because pile pile is finished peg, in factory It is directly prefabricated;
(3)Prefabricated tubular pile used by such pipe pile composite foundation is more more economical than common pipe pile foundation, because comparing commonly Pile foundation, which eliminates, to be anchored into cushion cap or sole plate reinforcing bar, eliminates core grouted concrete;
(4)Such pipe pile composite foundation can once excavate in place, not need brick mold, facilitate construction;
(5)Such pipe pile composite foundation is suitable for the basement process of various types of multilayers or skyscraper(As long as being suitble to stake The soil property of base construction is all right).
Description of the drawings
Fig. 1 is one embodiment of the invention schematic cross-sectional view.
Fig. 2 is that Fig. 1 middle pipe stake tops portion connects enlarged structure schematic diagram.
Fig. 3 is to connect enlarged structure schematic diagram in the present invention at the top of another embodiment pile pile.
Specific implementation mode
The invention will be further described with reference to the accompanying drawings and embodiments.
Embodiment one, a kind of shown referring to Fig. 1 and Fig. 2, pipe pile composite foundation, including lower layer and upper layer, the lower layer are Prefabricated tubular pile layer, upper layer are mattress layer 4, are spaced from each other between the inner adjacent prefabricated tubular pile 1 of prefabricated tubular pile layer 3;The prefabricated pipe 1 top closure of stake, the mattress layer 4 are mixed by sandstone, and 4 place mat of mattress layer is on 1 top surface of ground 3 and prefabricated tubular pile, cotton-padded mattress 4 area coverage of bed course is more than 1 location of prefabricated tubular pile.
Distance is 3.5 to 4.5 times of 1 diameter d of prefabricated tubular pile between the contiguous prefabricated pile pile 1.
1 top of the prefabricated tubular pile is equipped with sealing plate 2, and sealing plate 2 closes 1 top nozzle of prefabricated tubular pile.Sealing plate 2 is 3mm thick Steel plate, diameter are suitable with 1 diameter of prefabricated tubular pile.Since 1 top of prefabricated tubular pile carries steel ring, when that need not cut, will seal Plate 2 is covered in 1 top of prefabricated tubular pile and firm welding.
The thickness of the mattress layer 4 is 200mm to 300mm.The mattress layer 4 be coarse sand, middle sand, macadam gradating sandstone, The grain size of rubble is less than or equal to 30mm, and mattress layer 4 rams degree of filling out and is less than or equal to 0.9.
Plain concrete cushion layer 5 is equipped on the mattress layer 4 successively(C15 element concrete bed courses)With sole plate 6, plain concrete pad Layer 5 is located within 4 areal extent of mattress layer.4 periphery of the mattress layer has more 400mm or more than plain concrete cushion layer 5.The element 5 periphery of concrete cushion has more 100 mm or more than sole plate 6.5 thickness of the plain concrete cushion layer is about 100mm.
For building wall or column 7 on the sole plate 6.
Embodiment two, with embodiment one difference lies in:It is shown in Figure 3, when needing to cut stake, the prefabricated tubular pile 1 It is closed by filling sandwich layer 8 on top.1 inner cavity of the prefabricated tubular pile, which corresponds to, fills sandwich layer 8 equipped with sealing plate 2, and sealing plate 2 will be in prefabricated tubular pile 1 It closes the position of certain altitude.
The filling sandwich layer 8 is C30 microdilatancy pea gravel concreten layers, thickness 500mm.

Claims (10)

1. a kind of pipe pile composite foundation, including lower layer and upper layer, it is characterised in that:The lower layer is prefabricated tubular pile layer, and upper layer is Mattress layer(4), prefabricated tubular pile layer(3)In adjacent prefabricated tubular pile(1)Between be spaced from each other;The prefabricated tubular pile(1)Top is sealed It closes, the mattress layer(4)It is mixed by sandstone, mattress layer(4)Place mat is on ground(3)And prefabricated tubular pile(1)On top surface, mattress Layer(4)Area coverage is more than prefabricated tubular pile(1)Location.
2. pipe pile composite foundation according to claim 1, it is characterised in that:The contiguous prefabricated pile pile(1)Between distance be Prefabricated tubular pile(1)3.5 to 4.5 times of diameter.
3. pipe pile composite foundation according to claim 1, it is characterised in that:The prefabricated tubular pile(1)Top is equipped with sealing plate (2), sealing plate(2)By prefabricated tubular pile(1)Top nozzle closing.
4. pipe pile composite foundation according to claim 1, it is characterised in that:The prefabricated tubular pile(1)Top is by filling sandwich layer (8)Closing.
5. pipe pile composite foundation according to claim 4, it is characterised in that:The prefabricated tubular pile(1)Inner cavity, which corresponds to, fills sandwich layer (8)Equipped with sealing plate(2), sealing plate(2)By prefabricated tubular pile(1)It closes the position of interior certain altitude.
6. the pipe pile composite foundation according to claim 4 or 5, it is characterised in that:The filling sandwich layer(8)It is thin for C30 microdilatancies Stone concrete layer, thickness 500mm.
7. pipe pile composite foundation according to claim 1, it is characterised in that:The mattress layer(4)Thickness be 200mm extremely 300mm。
8. pipe pile composite foundation according to claim 1, it is characterised in that:The mattress layer(4)For coarse sand, middle sand, rubble The grain size of graded sand and stone, rubble is less than or equal to 30mm, mattress layer(4)Rammer degree of filling out is less than or equal to 0.9.
9. pipe pile composite foundation according to claim 1, it is characterised in that:The mattress layer(4)On be equipped with plain coagulation successively Soil padding(5)And sole plate(6), plain concrete cushion layer(5)Positioned at mattress layer(4)Within areal extent.
10. pipe pile composite foundation according to claim 9, it is characterised in that:The mattress layer(4)Periphery is than plain concrete pad Layer(5)Have more 400mm or more.
CN201810590793.5A 2018-06-09 2018-06-09 Pipe pile composite foundation Pending CN108775006A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810590793.5A CN108775006A (en) 2018-06-09 2018-06-09 Pipe pile composite foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810590793.5A CN108775006A (en) 2018-06-09 2018-06-09 Pipe pile composite foundation

Publications (1)

Publication Number Publication Date
CN108775006A true CN108775006A (en) 2018-11-09

Family

ID=64025846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810590793.5A Pending CN108775006A (en) 2018-06-09 2018-06-09 Pipe pile composite foundation

Country Status (1)

Country Link
CN (1) CN108775006A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1556283A (en) * 2003-12-31 2004-12-22 广东省航盛工程有限公司 Method of reinforcing soft base using large diameter thin wall pipe pole composite ground
CN1619065A (en) * 2004-12-09 2005-05-25 天津大学 Composite ground and composite stake base of stake top setting full flexible stake pad and its construction method
CN201109912Y (en) * 2007-10-15 2008-09-03 南通建筑工程总承包有限公司 Pile composite foundation
CN103046532A (en) * 2012-12-31 2013-04-17 中国建筑西南勘察设计研究院有限公司 Variable stiffness leveling prestressed pipe pile compound foundation
RU132810U1 (en) * 2013-02-01 2013-09-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Поволжский государственный технологический университет" PILED FOUNDATION WITH INTERMEDIATE SAND PILLOW
CN204456162U (en) * 2015-02-12 2015-07-08 江苏建院营造有限公司 A kind of pulling-resistant type prefabricated tubular pile be connected with cushion cap
CN106337413A (en) * 2016-09-07 2017-01-18 东南大学 Water-draining stiff geo-textile bag cement-soil composite pile and construction method thereof
CN208586598U (en) * 2018-06-09 2019-03-08 广东博意建筑设计院有限公司 Pipe pile composite foundation

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1556283A (en) * 2003-12-31 2004-12-22 广东省航盛工程有限公司 Method of reinforcing soft base using large diameter thin wall pipe pole composite ground
CN1619065A (en) * 2004-12-09 2005-05-25 天津大学 Composite ground and composite stake base of stake top setting full flexible stake pad and its construction method
CN201109912Y (en) * 2007-10-15 2008-09-03 南通建筑工程总承包有限公司 Pile composite foundation
CN103046532A (en) * 2012-12-31 2013-04-17 中国建筑西南勘察设计研究院有限公司 Variable stiffness leveling prestressed pipe pile compound foundation
RU132810U1 (en) * 2013-02-01 2013-09-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Поволжский государственный технологический университет" PILED FOUNDATION WITH INTERMEDIATE SAND PILLOW
CN204456162U (en) * 2015-02-12 2015-07-08 江苏建院营造有限公司 A kind of pulling-resistant type prefabricated tubular pile be connected with cushion cap
CN106337413A (en) * 2016-09-07 2017-01-18 东南大学 Water-draining stiff geo-textile bag cement-soil composite pile and construction method thereof
CN208586598U (en) * 2018-06-09 2019-03-08 广东博意建筑设计院有限公司 Pipe pile composite foundation

Similar Documents

Publication Publication Date Title
CN204059124U (en) A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure
CN104153380B (en) A kind of antiseepage cofferdam structure and construction technology
CN105089061B (en) Ultra-deep foundation pit supporting method
CN104278608A (en) Novel highway embankment widened structure and construction method
CN206667278U (en) Lava crack Tunnel gushing treatment constructing structure
CN202898930U (en) By-river reinforced roadbed structure
CN108086343A (en) Overhanging type unilateral side wall mixed reinforcement and replacing structure and its construction method
CN113186766A (en) Shallow soft soil foundation foam light soil embankment structure and construction method
CN110578290A (en) Abutment back backfilling structure of bridgehead and construction method thereof
CN103061328A (en) Post-grouting gravel pile with sand wall wing plates and construction method
CN102877470B (en) Combined soil nailing construction method for supporting
CN103469701A (en) Construction method for preparing foamed light soil in site in integrated form to fill substructure of high-speed rail
CN108150175A (en) Shaft of vertical well passes through the supporting construction of the old dead zone in coal seam
CN206902734U (en) A kind of earth construction of soft foundation zone
CN108385612B (en) Construction method of concrete protective panel with good stability
CN208586598U (en) Pipe pile composite foundation
CN104328797B (en) High slope large curvy wall building construction engineering method
CN206902740U (en) A kind of retaining structure reinforced for weak soil cutting
CN101586341B (en) Water sealing method for civil engineering groundwork
CN110805031B (en) Cement mixing pile cap and construction method thereof
CN107881987A (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN108331002B (en) Design and construction method of foundation mattress layer
CN108775006A (en) Pipe pile composite foundation
CN207846454U (en) Overhanging type unilateral side wall mixed reinforcement and replacing structure
CN107558490A (en) Composite foundation reinforcement rockfill barrier wall structure and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination