CN206902734U - A kind of earth construction of soft foundation zone - Google Patents

A kind of earth construction of soft foundation zone Download PDF

Info

Publication number
CN206902734U
CN206902734U CN201720875559.8U CN201720875559U CN206902734U CN 206902734 U CN206902734 U CN 206902734U CN 201720875559 U CN201720875559 U CN 201720875559U CN 206902734 U CN206902734 U CN 206902734U
Authority
CN
China
Prior art keywords
pile
prestressed concrete
pile cover
concrete pipe
earth construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720875559.8U
Other languages
Chinese (zh)
Inventor
邹国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN AUBE ARCHITECTURAL ENGINEERING DESIGN Co Ltd
Original Assignee
SHENZHEN AUBE ARCHITECTURAL ENGINEERING DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN AUBE ARCHITECTURAL ENGINEERING DESIGN Co Ltd filed Critical SHENZHEN AUBE ARCHITECTURAL ENGINEERING DESIGN Co Ltd
Priority to CN201720875559.8U priority Critical patent/CN206902734U/en
Application granted granted Critical
Publication of CN206902734U publication Critical patent/CN206902734U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model is a kind of earth construction of soft foundation zone.Include prestressed concrete pipe pile, pile cover, chainless drives, wherein the lower end of prestressed concrete pipe pile enters severely-weathered supporting course, the stake top of prestressed concrete pipe pile enters in pile cover, and pile cover is earth construction stress layer with chainless drives composition reinforced concrete flat slab floor.Pile cover is directly connected to prestressed concrete pipe pile and chainless drives.The utility model is easy for construction, and strong adaptability, speed of application is fast, and economic and reliable, it is ensured that exhibition room ground and agent structure are without settlement difference during use.

Description

A kind of earth construction of soft foundation zone
Technical field
The utility model is a kind of earth construction of soft foundation zone, particularly a kind of soft foundation zone exhibitions exhibition room ground knot Structure, good economy performance, with the agent structure also new exhibition room earth construction way without obvious settlement difference, taken into account economy, can By property, and speed of application is fast.
Background technology
The characteristics of due to China's economic development, the flourishing area of domestic exhibition industry are normally at Yangtze River Delta and the Zhujiang River three Angle continent.Yangtze River Delta Area and Pearl River Delta area are alluvial plain, and its foundation soil is generally weak soil, or even some regions to fill out sea Epeirogenetic is formed.
The exhibition room of exhibitions building does not generally set ground below exhibition room for economics because its area is big, load weight Lower room, exhibition room ground are directly held on soil, and when the construction place of exhibitions project is soft clay area, exhibition room ground typically uses The method of foundation stabilization, to reach the requirement of working load.Conventional foundation stabilization scheme has cement mixing pile compoundly Base+rammed subgrade, pipe pile composite foundation+rammed subgrade, piling prepressing etc..Ground after treatment of soft foundation can be as exhibition room ground Supporting course uses, but it has the following disadvantages:Construction (can not be carried out soil layer to be rolled greatly by inside even from weather during bad weather Construction), engineering time length (layered rolling time long, basement periphery influenceed to construct by basement process process), ground Compacting factor is it is difficult to ensure that (compacting factor 0.95 or 0.96 is difficult to realize or can not realize), high (the layered rolling need of testing cost Layered weighting, the basement process stake of large area also need to detect), settlement after construction big (settlement after construction can reach 100mm) etc..Particularly Exhibition room ground overlaps the sedimentation in the cycle at it, will cause the disengaging on exhibition room ground and exhibition room agent structure, not only influences perception, The development of exhibitions activity will be influenceed when serious.
If exhibition room ground is made into structural floor, speed of application is fast, and quality can ensure;But its again often because economy compared with Difference and huge burden is brought to Construction Party.
The content of the invention
The purpose of this utility model is to provide a kind of earth construction of soft foundation zone.The utility model good economy performance, with The agent structure also new exhibition room earth construction way without obvious settlement difference, takes into account economy, reliability, and speed of application It hurry up.Not only it can be generalized to similar to Guiding Practice in the exhibitions exhibition room engineering under the conditions of geology, it is identical to geological conditions(Weak soil Base)Facility floor, the heavy duty such as warehouse floor and the ground without basement can promote the use of.
The technical solution of the utility model is:The earth construction of soft foundation zone of the present utility model, include prestressing force and mix Native pile tube, pile cover, chainless drives are coagulated, the wherein lower end of prestressed concrete pipe pile enters severely-weathered supporting course, prestressed concrete The stake top of pile tube enters in pile cover, and pile cover is earth construction stress layer with chainless drives composition reinforced concrete flat slab floor.
Base form of the utility model using pre-stressed concrete pipe pile foundation as exhibition room ground, stake end enter below soft base Supporting course(Generally strongly weathered sand-rock), stake top insertion pile cover in 100mm.Stake by arranged in squares in pile cover, stake spacing The form for being more than 3 times of stake footpaths is used according to cap size(Using 1 ~ 2 times away from pile cover side stake footpath of pile center as principle), to reduce pile cover Arrangement of reinforcement;Can also be more uniformly stressed the stake of end bay after widening pile tube spacing.The size and arrangement spacing of pile cover are according to use The requirement of load determines;Pile cover is directly connected to prestressed concrete pipe pile and chainless drives, in the sense that no longer setting typically Pile framing and structural column, that is, the bang path of load is shortened, save construction material and cost again;Meanwhile also reduce construction Process, accelerate the speed of construction.Chainless drives of the present utility model use the form of arch without beam, with general beam and slab type structure Compare, not only economy is more preferable for the utility model, and can reduce the formwork quantity and reinforcing bar colligation quantity of construction, accelerates construction Speed.
Brief description of the drawings
Fig. 1 is horizontal layout schematic diagram of the present utility model.
Fig. 2 is the A-A profiles in Fig. 1.
Embodiment
Embodiment 1:
The earth construction of soft foundation zone of the present utility model, include prestressed concrete pipe pile 1, pile cover 3, chainless drives 4, the wherein lower end of prestressed concrete pipe pile 1 enters severely-weathered supporting course, and the stake top of prestressed concrete pipe pile 1 enters pile cover In 3, it is earth construction stress layer that pile cover 3 forms reinforced concrete flat slab floor with chainless drives 4.Pile cover 3 is directly connected to pre- answer Power concrete tubular pile 1 and chainless drives 4.
In the present embodiment, the bottom of above-mentioned pile cover 3 is additionally provided with plain concrete cushion layer 2.Plain concrete cushion layer 2 is according to structural slab Whether make somebody a mere figurehead to decide whether to set at bottom.
In the present embodiment, the stake top of above-mentioned prestressed concrete pipe pile 1 enters 100mm in pile cover 3.
In the present embodiment, include some prestressed concrete pipe piles 1, some prestressed concrete pipe piles 1 are by just Square arrangement is in pile cover 3.
In the present embodiment, the stake spacing of above-mentioned prestressed concrete pipe pile 1 uses according to the size of cap 3 is more than 3 times of stakes The form in footpath(Using 1 ~ 2 times away from pile cover side stake footpath of pile center as principle), to reduce the arrangement of reinforcement of pile cover 3;Gone back after widening pile tube spacing Can be more uniformly stressed the stake of end bay.
In the present embodiment, include several pile covers 3, several pile covers 3 are by arranged in squares on chainless drives 4.It is some The horizontal layout of individual pile cover 3 is that the spacing between the geometric center of adjacent pile cover 3 is 9 meters × 9 meters.The size of pile cover 3 is 4.5 meters × 4.5 meters.
Above-mentioned pile cover 3 forms reinforced concrete flat slab floor top surface with chainless drives 4 and is provided with foam concrete backfill layer 5, bubble Foam concrete backfill layer 5 top surface is provided with backfill layer top armoured concrete slab 6, and backfill layer top armoured concrete slab 6 is pipe trench height The structure construction of scope;The top surface of backfill layer top armoured concrete slab 6 is provided with building coats 7, foam concrete backfill layer 5, backfill Layer top armoured concrete slab 6, building coats 7 are provided with equipment pipe trench 8, and pile cover 3 forms armored concrete without Liang Lou with chainless drives 4 Base face is provided with fill stratum or Stilt layer 9.
Exhibition room earth construction (using live load 50kN/m2) of the present utility model, according to rational structure cloth is calculated It is set to:The horizontal layout form of pile cover 3 is:Some pile covers 3 press arranged in squares on chainless drives 4, the geometry of adjacent pile cover 3 Spacing between center is 9 meters × 9 meters, and the size of pile cover 3 is 4.5 meters × 4.5 meters, and thickness takes 1150mm;Set in each pile cover 3 4 diameter 500mm prestressed concrete pipe pile 1 is put, the arrangement spacing of prestressed concrete pipe pile 1 is 2.5 meters × 2.5 meters; The thickness of chainless drives 4 takes 400mm;The discrepancy in elevation in this example between present situation ground and chainless drives 4 is 1.65 meters, between chainless drives with present situation ground Between 9 handled by the way of backfill, therefore the C15 plain concrete cushion layers of 100mm thickness are set in pile cover 3 and chainless drives 4 time 2.The top of chainless drives 4 sets foam concrete to backfill layer 5, and the top of foam concrete backfill layer 5 sets 200 thick C30 backfill layers Push up armoured concrete slab 6.The horizontal layout of this example as shown in Figure 1, arrange as shown in Figure 2 by section.
When present situation ground and the reinforced concrete flat slab floor discrepancy in elevation are smaller, fill stratum or Stilt layer 9 are to return Site Soil Exhibition room ground arch without beam bottom (advantage is ground elevation movement of the tube pile construction machinery after backfill, more convenient) is filled to, But its backfill is not required to propose the requirement (being defined by the walking of tube pile construction mechanical energy) of compacting factor.As present situation ground and Wu Lianglou When the base portion discrepancy in elevation is larger, backfill can be cancelled, the fill stratum at plate bottom or Stilt layer 9 are made into ground spacing, and (advantage is energy The duration and expense, shortcoming for saving backfill are that tube pile construction Mechanical Moving is influenceed by pile tube of having constructed, and need reasonable arrangement to apply Work order).Use backfill scheme or aerial scheme with construct branch and form removal it is convenient for standard.The above-mentioned present situation ground that refers both to is less than steel The situation of reinforced concrete arch without beam bottom, the construction of embankment case is referred back to when present situation ground is higher than arch without beam bottom.
When being banketed under chainless drives 4, plain concrete cushion layer 2 is set, and its effect is that surfacing is easy in colligation above Reinforcing bar, also function to and protect the concrete and rebar of bottom plate and pile cover not acted on by lower section water and soil pollution.When nothing is filled out under structural slab Soil(When using the scheme of ground spacing)When cancel plain concrete cushion layer 2.Foam concrete packed layer 5 is filled in pipe trench two Side, its compression under load action is smaller, and speed of application is fast;The intensity of foam concrete is to meet that exhibition room ground uses lotus Carrying requirement is advisable, unsuitable too high, is that advantageously condition is created in the possible transformation displacement of pipe trench.Foam concrete packed layer 5 Top sets armoured concrete slab 6, plate thickness about 200mm, by detailing requiments arrangement of reinforcement reinforcing bar, to meet that the use on exhibition room ground will Ask.
Chainless drives 4 use the form of arch without beam, and compared with general beam and slab type structure, not only economy is more preferable, and The formwork quantity and reinforcing bar colligation quantity of construction can be reduced, accelerates speed of application.

Claims (5)

  1. A kind of 1. earth construction of soft foundation zone, it is characterised in that include prestressed concrete pipe pile, pile cover, chainless drives, its The lower end of middle prestressed concrete pipe pile enters severely-weathered supporting course, and the stake top of prestressed concrete pipe pile enters in pile cover, stake Cap is earth construction stress layer with chainless drives composition reinforced concrete flat slab floor.
  2. 2. the earth construction of soft foundation zone according to claim 1, it is characterised in that the bottom of above-mentioned pile cover is additionally provided with element Concrete cushion.
  3. 3. the earth construction of soft foundation zone according to claim 1, it is characterised in that above-mentioned prestressed concrete pipe pile Stake top enters 100mm in pile cover.
  4. 4. the earth construction of the soft foundation zone according to any one of claims 1 to 3, it is characterised in that include some in advance Prestressed concrete pile tube, some prestressed concrete pipe piles are by arranged in squares in pile cover.
  5. 5. the earth construction of soft foundation zone according to claim 4, it is characterised in that include several pile covers, several Pile cover is by arranged in squares on chainless drives.
CN201720875559.8U 2017-07-19 2017-07-19 A kind of earth construction of soft foundation zone Expired - Fee Related CN206902734U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720875559.8U CN206902734U (en) 2017-07-19 2017-07-19 A kind of earth construction of soft foundation zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720875559.8U CN206902734U (en) 2017-07-19 2017-07-19 A kind of earth construction of soft foundation zone

Publications (1)

Publication Number Publication Date
CN206902734U true CN206902734U (en) 2018-01-19

Family

ID=61311913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720875559.8U Expired - Fee Related CN206902734U (en) 2017-07-19 2017-07-19 A kind of earth construction of soft foundation zone

Country Status (1)

Country Link
CN (1) CN206902734U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343077A (en) * 2018-04-23 2018-07-31 中铁二院昆明勘察设计研究院有限责任公司 A kind of Miniature anti-slide pile composite structure and its construction method
CN108978697A (en) * 2018-08-02 2018-12-11 五冶集团上海有限公司 Terrace template system and construction method
CN109989477A (en) * 2019-03-30 2019-07-09 李兆灿 Soft soil foundation for preventing building foundation from non-uniform settlement and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343077A (en) * 2018-04-23 2018-07-31 中铁二院昆明勘察设计研究院有限责任公司 A kind of Miniature anti-slide pile composite structure and its construction method
CN108978697A (en) * 2018-08-02 2018-12-11 五冶集团上海有限公司 Terrace template system and construction method
CN109989477A (en) * 2019-03-30 2019-07-09 李兆灿 Soft soil foundation for preventing building foundation from non-uniform settlement and construction method thereof

Similar Documents

Publication Publication Date Title
CN204059124U (en) A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
US8898996B2 (en) Method for forming a retaining wall, and corresponding retaining wall
CN105155558A (en) Combined retaining structure and construction method thereof
CN105648867B (en) A kind of construction method of comprehensive ecological roadbed system
CN106988178A (en) A kind of subgrade in soft soil zone widened structure and its construction method
CN113186766A (en) Shallow soft soil foundation foam light soil embankment structure and construction method
CN206902734U (en) A kind of earth construction of soft foundation zone
CN106676993A (en) Roadbed reinforcing system of reinforced gravel framework structure and reinforcing method of roadbed reinforcing system
KR101058892B1 (en) Retaining wall with prestressed concrete tie and method for constructing the same
CN107842036A (en) Composite foundation reinforcement gabion baffling structure and construction method
CN103572680B (en) The roadbed filling construction method of coal mine gob
CN112813757B (en) Foam light soil composite roadbed construction method for bridge head transition treatment
CN106836034B (en) High-fill cover plate culvert flexible load shedding system and construction method
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN110889235A (en) Underground pile foundation construction engineering design method
CN106245546A (en) A kind of corrugated steel Pipe rack
CN207452938U (en) Composite foundation reinforced cantilever retaining wall structure
CN110172988A (en) A kind of piling formula composite concrete placement ground and its construction method
CN215977211U (en) Structure is handled to compound foundation of tubular pile combination cement mixing pile
CN206667263U (en) A kind of foundation pit supporting construction
CN204940310U (en) A kind of combination retaining structure
CN108677999A (en) A kind of Muddy Bottoms packeted soil barrier wall structure and construction method
CN201605597U (en) Composite reinforced gabion retaining wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180119

CF01 Termination of patent right due to non-payment of annual fee