CN201598642U - Double-row pile foundation pit support structure - Google Patents
Double-row pile foundation pit support structure Download PDFInfo
- Publication number
- CN201598642U CN201598642U CN2010201218824U CN201020121882U CN201598642U CN 201598642 U CN201598642 U CN 201598642U CN 2010201218824 U CN2010201218824 U CN 2010201218824U CN 201020121882 U CN201020121882 U CN 201020121882U CN 201598642 U CN201598642 U CN 201598642U
- Authority
- CN
- China
- Prior art keywords
- double
- foundation pit
- row
- pile foundation
- row pile
- Prior art date
Links
- 238000010276 construction Methods 0.000 claims abstract description 16
- 239000011513 prestressed concrete Substances 0.000 claims abstract description 11
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 239000002689 soil Substances 0.000 description 7
- 238000005516 engineering processes Methods 0.000 description 3
- 239000011435 rock Substances 0.000 description 2
- 238000010586 diagrams Methods 0.000 description 1
- 239000011229 interlayers Substances 0.000 description 1
- 239000010410 layers Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Abstract
Description
Technical field
The utility model relates to a kind of foundation pit supporting construction, relates in particular to a kind of double-row pile foundation pit supporting construction.
Background technology
Retaining Structure with Double-row Piles is meant the parallel stake of two rows, the rectangular or quincuncial arrangement of front and back two campshed pile bodies is set in foundation soil.On two campsheds top collar tie beam is set, and connects with the contact beam.Along hole wall parallel direction, form door figure space structure.This structure is the space statically-indeterminate structure, and integral rigidity is big, can effectively limit foundation pit deformation.Under external load effect complicated and changeable, can adjust the internal force of supporting and protection structure itself automatically, make it to adapt to complicated and often unpredicted loading condition.
Traditional double-row pile generally adopts bored pile.Bored pile has the bearing capacity height, can passing through various complicated soil properties or soft or hard, to change big soil layer (as the rock stratum of all kinds of cohesive soils, sand, crushed gravel soil, decomposed rock and many interlayers), construction technology ripe and to advantages such as the surrounding buildings influence are little.But bored pile has simultaneously, and construction link is more, technical requirements is high, technology is complicated, construction and shortcomings such as curing time length, cost height.
The utility model content
Technical problem to be solved in the utility model provides a kind of simple and fast of constructing, system easy to control the quality, double-row pile foundation pit supporting construction that construction costs is cheap.
The utility model comprises two campsheds that are parallel to each other, and the stake top of described every campshed is provided with collar tie beam, and two campsheds connect by the contact beam, and described two campsheds are prestressed concrete pipe piles.
Stake footpath in the above-mentioned double-row pile foundation pit supporting construction is 400mm~600mm, and pile spacing is 2.5 times of stake footpaths, and array pitch is 3~5 times of stake footpaths.
The space truss structure of being made up of double prestressed concrete pipe pile is applicable to weak soil and various soil condition, and its integral rigidity is big, can effectively control foundation pit deformation, reduces the pile body moment of flexure.And the construction simple and fast of prestressed concrete pipe pile, system easy to control the quality, construction costs are cheap.
Description of drawings
Fig. 1 is the schematic diagram of double-row pile foundation pit supporting construction.
The specific embodiment
As shown in Figure 1, the double-row pile foundation pit supporting construction in the present embodiment comprises first row's prestressed concrete pipe pile 1 and second row's prestressed concrete pipe pile 2, and above-mentioned two row's prestressed concrete pipe piles are parallel to each other.
The stake top that first collar tie beam, 3, the second row's prestressed concrete pipe piles 2 are set on the stake top of above-mentioned first row's prestressed concrete pipe pile 1 is provided with second collar tie beam 4.Above-mentioned two row's prestressed concrete pipe piles connect by contact beam 5.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201218824U CN201598642U (en) | 2010-03-03 | 2010-03-03 | Double-row pile foundation pit support structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201218824U CN201598642U (en) | 2010-03-03 | 2010-03-03 | Double-row pile foundation pit support structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201598642U true CN201598642U (en) | 2010-10-06 |
Family
ID=42809692
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201218824U CN201598642U (en) | 2010-03-03 | 2010-03-03 | Double-row pile foundation pit support structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201598642U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102116031A (en) * | 2011-01-17 | 2011-07-06 | 东南大学 | Steel sheet pile and tubular pile combined base pit supporting structure and supporting method thereof |
CN102140798A (en) * | 2011-01-28 | 2011-08-03 | 东南大学 | Steel sheet pile and tubular pile combined base pit supporting structure and supporting method therefor |
CN102182192A (en) * | 2011-03-01 | 2011-09-14 | 浙江大学宁波理工学院 | Rear transverse septum type building foundation pit enclosure structure and construction method |
CN102877472A (en) * | 2012-10-26 | 2013-01-16 | 张子良 | Self-balance alternately-jacking-sinking pile and construction method thereof |
CN103758132A (en) * | 2014-01-08 | 2014-04-30 | 湖北中南勘察基础工程有限公司 | Construction technology of cantilever piling and supporting structure combined with sloping |
CN103806451A (en) * | 2014-03-12 | 2014-05-21 | 中国建筑西南勘察设计研究院有限公司 | Anchorage-type foundation pit reinforcing structure and construction method thereof |
CN103806450A (en) * | 2014-03-12 | 2014-05-21 | 中国建筑西南勘察设计研究院有限公司 | Double-row pile foundation pit reinforcement structure |
CN104895088A (en) * | 2015-04-07 | 2015-09-09 | 中国建筑第六工程局有限公司 | A method of reducing foundation pit asymmetrical pressure |
CN110565658A (en) * | 2019-08-27 | 2019-12-13 | 江苏省地质矿产局第三地质大队 | Double-row bottom-expanding long-short combined anti-slide pile for slope support |
-
2010
- 2010-03-03 CN CN2010201218824U patent/CN201598642U/en not_active IP Right Cessation
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102116031A (en) * | 2011-01-17 | 2011-07-06 | 东南大学 | Steel sheet pile and tubular pile combined base pit supporting structure and supporting method thereof |
CN102140798A (en) * | 2011-01-28 | 2011-08-03 | 东南大学 | Steel sheet pile and tubular pile combined base pit supporting structure and supporting method therefor |
CN102182192A (en) * | 2011-03-01 | 2011-09-14 | 浙江大学宁波理工学院 | Rear transverse septum type building foundation pit enclosure structure and construction method |
CN102877472A (en) * | 2012-10-26 | 2013-01-16 | 张子良 | Self-balance alternately-jacking-sinking pile and construction method thereof |
CN102877472B (en) * | 2012-10-26 | 2014-11-26 | 张子良 | Self-balance alternately-jacking-sinking pile and construction method thereof |
CN103758132A (en) * | 2014-01-08 | 2014-04-30 | 湖北中南勘察基础工程有限公司 | Construction technology of cantilever piling and supporting structure combined with sloping |
CN103758132B (en) * | 2014-01-08 | 2016-03-02 | 湖北中南勘察基础工程有限公司 | The construction technology of the cantilever soldier pile retaining structure on slope is put in a kind of combination |
CN103806451A (en) * | 2014-03-12 | 2014-05-21 | 中国建筑西南勘察设计研究院有限公司 | Anchorage-type foundation pit reinforcing structure and construction method thereof |
CN103806450A (en) * | 2014-03-12 | 2014-05-21 | 中国建筑西南勘察设计研究院有限公司 | Double-row pile foundation pit reinforcement structure |
CN103806451B (en) * | 2014-03-12 | 2016-05-25 | 中国建筑西南勘察设计研究院有限公司 | A kind of anchorage type foundation ditch strengthening structure and construction method thereof |
CN104895088A (en) * | 2015-04-07 | 2015-09-09 | 中国建筑第六工程局有限公司 | A method of reducing foundation pit asymmetrical pressure |
CN110565658A (en) * | 2019-08-27 | 2019-12-13 | 江苏省地质矿产局第三地质大队 | Double-row bottom-expanding long-short combined anti-slide pile for slope support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2647920Y (en) | Diagonal post supporting ground hole for construction | |
US20140205384A1 (en) | Segmented Ballast Base Support Structure and Rail and Trolley Structures for Unstable Ground | |
CN103741683B (en) | A kind of pouch expands end rigid-flexible mechanical arm and construction method | |
CN102839981B (en) | Backfilling stand shoring system of three-dimensional prestress wire of deep soft rock roadway | |
CN102839675B (en) | Method of long-span pre-stress fish belly sill for foundation pit support | |
CN103074898B (en) | Multi-row pile foundation pit support structure and construction method thereof | |
CN202831402U (en) | Concrete filled steel tubular column with inner-connected circular pipe and outer-sleeved concrete filled steel tube | |
CN203925895U (en) | For wind power generation stepped crab-bolt Changable type basis | |
CN100497844C (en) | Multi-anchoring point antisliding pile adapted to multilayer slide surface and deep sliding face | |
CN204311459U (en) | Oblique double soldier pile body structure before chair shape | |
CN2916024Y (en) | Anti-deformation high-voltage line tower in subsidence area | |
CN204418187U (en) | Subway protection region soil nail wall is in conjunction with double-row pile deep foundation ditch composite supporting construction | |
CN205329688U (en) | Resistance -increasing slip casting stock | |
CN102182163B (en) | Assembled type debris flow silt dam and construction method thereof | |
CN104294769B (en) | A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement | |
US20110067324A1 (en) | Method and apparatus for providing a segmented ballast base support structure for unstable ground installation | |
CN205205635U (en) | Stride footpath bailey frame steel suspension bridge structure greatly | |
CN205116194U (en) | Stake arched door type of administering landslide has just constructed structure | |
CN203855970U (en) | Assembly type foundation pit supporting double-row hollow pile structure | |
CN104912098A (en) | Combined construction method for supporting beam plate and structural plate of deep foundation pit | |
CN202492865U (en) | Correction device of transmission tower | |
CN201343733Y (en) | Ecological protection structure with steady rock side slope | |
CN104453274A (en) | Method for supporting underground layer increasing of existing building by supporting structure and underpinning structure | |
CN103711329B (en) | The method of outer subsides steel reinforced concrete framework method ruggedized construction | |
CN104389317A (en) | Ultralarge-sized oblique single-pile foundation structure of large-span arch bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101006 Termination date: 20160303 |