Prior art keywords
plain concrete
long
short
foundation
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220746991
Other languages
Chinese (zh)
Inventor
王成
颜光辉
章学良
贾鹏
陈展
李可一
康景文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southwest Architectural Design and Research Institute Co Ltd
Original Assignee
China Southwest Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southwest Architectural Design and Research Institute Co Ltd filed Critical China Southwest Architectural Design and Research Institute Co Ltd
Priority to CN 201220746991 priority Critical patent/CN203096751U/en
Application granted granted Critical
Publication of CN203096751U publication Critical patent/CN203096751U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A long-short combined plain concrete displacement pile composite foundation in a soil-rock area is composed of plain concrete piles which are different in length and are distributed in a cross mode. Short plain concrete piles and long plain concrete piles are arranged at equal intervals, and meanwhile macadam cushion layers are arranged at the tops of the plain concrete piles. The long-short combined plain concrete displacement pile composite foundation in the soil-rock area can use the long plain concrete piles and the short plain concrete piles to jointly process soft soil layers in different depths in the area. On the condition that the bearing capacity of the foundation is met, the purpose of controlling whole sedimentation of the foundation can be achieved by adjusting the lengths of the piles, the design of invalid long piles is prevented, the material utilization amount is reduced, unnecessary waste is reduced, and construction periods are shortened, and engineering cost is saved.

Description

Tu Yan place length combination plain concrete displacement pile composite foundation
Affiliated technical field
The utility model relates to a kind of the realm of building construction ground, specifically a kind of length combination plain concrete displacement pile composite foundation of handling Tu Yan place soft foundation.
Background technology
At present, extensively adopt plain concrete pile as the ground stabilization form at the realm of building construction, particularly the high speed passenger dedicated railway railway more than China speed per hour 300km/h has entered the Large scale construction stage, because of the high speed passenger dedicated railway railway track structure should have high reliability and high stability and high ride comfort, so require very high to the sedimentation and deformation of engineering foundation under the line.And China's soft foundation is commonplace, and when directly building engineering such as building, embankment on soft foundation, the sedimentation in later stage is difficult to meet the demands, and therefore, must carry out consolidation process to ground, with the uneven subsidence in solution engineering later stage.The plain concrete pile composite foundation is because of its high-bearing capacity that has, small deformation and compliance and good economic and social benefit have obtained development rapidly in recent years widely.At present widely-used plain concrete pile composite foundation solve the uneven subsidence of soft foundation, for reaching the requirement of superstructure load and distortion, present plain concrete pile composite foundation the time is all processed by demand the highest standard that ground meets design requirement in design and is designed, isometric equidistant placement plain concrete pile, the invalid stake that has formed part is long, both expend lot of materials, also increased construction period simultaneously, be unfavorable for reducing construction costs.
Summary of the invention
Handle the overproof problem of design that exists in order to solve existing ground, the utility model provides a kind of Tu Yan place length combination plain concrete displacement pile composite foundation, guaranteeing under the condition that bearing capacity of foundation soil satisfies, can improve the safety and the stability of building, reduced material usage simultaneously, significantly shorten the duration, reduced construction costs.
The technical scheme that its technical problem that solves the utility model adopts is: the rubble mattress layer by plain concrete pile and top constitutes jointly, include long plain concrete pile and short plain concrete pile in the plain concrete pile, and long plain concrete pile is arranged in a crossed manner with short plain concrete pile, equidistantly arrange with duration plain concrete pile and short plain concrete pile, and be provided with the thick rubble mattress layer of 20 ~ 30cm on the plain concrete pile top.Native rock stratum by different depth in long plain concrete pile and the common disposal field of short plain concrete pile, guaranteeing under the condition that bearing capacity of foundation soil satisfies, by adjusting the long purpose that reaches control ground bulk settling of stake, avoided invalid long stake design, reduced material usage, thereby reduce unnecessary waste, save construction period and construction costs.
The beneficial effects of the utility model are: not only can effectively solve the bearing capacity and the settlement issues of different depth weak soil layer, but also can avoid invalid long stake design, reduce material usage, save construction period and construction costs, product structure is simple, and easy construction is easily promoted the use of.
Description of drawings
The utility model is described in further detail below in conjunction with accompanying drawing.
Fig. 1 is present common plain concrete pile composite foundation vertical section structure schematic diagram.
Fig. 2 is a vertical section structure schematic diagram of the present utility model.
The long plain concrete pile of code description among the figure: 1-; 2-rubble mattress layer; The 3-shallow layer soft soil foundation; 4-deep layer soft rock foundation; The short plain concrete pile of 5-.
The specific embodiment
As shown in Figure 1, common plain concrete pile composite foundation all is equidistantly to be arranged on isometric plain concrete pile (1) in the soft foundation at present, be provided with rubble mattress layer (2) at the top of plain concrete pile, utilize plain concrete pile and shallow-layer soft foundation (3) and deep layer soft rock foundation (4) to bear upper load jointly, effectively prevent the differential settlement of superstructure.Because exist in this kind scheme a lot of invalid stakes long, concrete use amount is also bigger, so construction period and construction costs are all higher.
As shown in Figure 2, long plain concrete pile (1) and short plain concrete pile (5) intersect, the equidistant setting, and are provided with rubble mattress layer (2) at the top of plain concrete pile.In the utility model, utilize long plain concrete pile and short plain concrete pile to handle shallow layer soft soil foundation (3) and deep layer soft rock foundation (4) jointly, reach ground stabilization and prevent that the purpose of differential settlement from appearring in soft foundation.This kind Tu Yan place length combination plain concrete displacement pile composite foundation can effectively reduce the construction period of concrete use amount and plain concrete pile, saves construction costs.

Claims (3)

1. a Tu Yan place length combination plain concrete is replaced pile composite foundation, rubble mattress layer by plain concrete pile and top constitutes jointly, it is characterized in that: include long plain concrete pile and short plain concrete pile in the plain concrete pile, and long plain concrete pile is arranged in a crossed manner with short plain concrete pile.
2. a kind of Tu Yan according to claim 1 place length combination plain concrete displacement pile composite foundation, it is characterized in that: long plain concrete pile is equidistantly arranged with short plain concrete pile.
3. a kind of Tu Yan according to claim 1 place length combination plain concrete displacement pile composite foundation is characterized in that: be provided with the thick rubble mattress layer of 20 ~ 30cm on the plain concrete pile top.
CN 201220746991 2012-12-31 2012-12-31 Long-short combined plain concrete displacement pile composite foundation in soil-rock area Expired - Fee Related CN203096751U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220746991 CN203096751U (en) 2012-12-31 2012-12-31 Long-short combined plain concrete displacement pile composite foundation in soil-rock area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220746991 CN203096751U (en) 2012-12-31 2012-12-31 Long-short combined plain concrete displacement pile composite foundation in soil-rock area

Publications (1)

Publication Number Publication Date
CN203096751U true CN203096751U (en) 2013-07-31

Family

ID=48848168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220746991 Expired - Fee Related CN203096751U (en) 2012-12-31 2012-12-31 Long-short combined plain concrete displacement pile composite foundation in soil-rock area

Country Status (1)

Country Link
CN (1) CN203096751U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109267578A (en) * 2018-11-09 2019-01-25 北京城建五建设集团有限公司 A kind of inclined-plane plain concrete construction and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109267578A (en) * 2018-11-09 2019-01-25 北京城建五建设集团有限公司 A kind of inclined-plane plain concrete construction and its construction method
CN109267578B (en) * 2018-11-09 2023-12-08 北京城建五建设集团有限公司 Inclined plane plain concrete structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN202595591U (en) Micro steel pipe pile network structure for tunnel cavern roadbed in karst region
CN203096751U (en) Long-short combined plain concrete displacement pile composite foundation in soil-rock area
CN202830954U (en) Karst area light frame roadbed pile plate structure construction
CN202809637U (en) Fan basis embedded in rock foundation
CN102605758A (en) Pile type reinforcement system
CN102535500A (en) Reducing and sinking pile-supported embankment for treating soft soil foundation under large-area stacked load at ground and design method for reducing and sinking pile-supported embankment
CN203546743U (en) CFG pile composite foundation mattress layer
CN207130539U (en) A kind of non-fragment orbit high-speed railway expensive soil cutting ruggedized construction
CN206828906U (en) A kind of temporary pavement bedding structure for Metro Deep Excavation
CN202000221U (en) Ballastless track structure for steep slope subgrade
CN203625916U (en) Highway soft soil layer composite pile foundation
CN204510246U (en) A kind of pile foundation of bearing platform plinth structure of being reinforced by the single footing of existing building
CN103046532A (en) Variable stiffness leveling prestressed pipe pile compound foundation
CN201648879U (en) Mining area gabion structure railway embankment
CN205347889U (en) Concrete pile - plain concrete stake partition conbination formula composite foundation
CN103556620A (en) Method for enhancing bearing capacity of composite foundation and rigid pile thereof
CN204898682U (en) Foundation ditch underground continuous wall's counterfort supporting construction
CN204875406U (en) Vertical type foam light soil highway embankment
CN202577333U (en) Separate high-rise pile foundation bearing platform
CN202830674U (en) Strengthening structure of existing railway speed increasing subgrade
CN105544312A (en) Reinforced concrete pile-plain concrete pile partitioned combined composite foundation
CN103031833A (en) Rigidity-variable plain concrete pile composite foundation
CN202466612U (en) Composite slag foundation
CN207260158U (en) One layer of basement supporting construction
CN204626449U (en) A kind of steel reinforced concrete Cantilever Retaining Wall for high roadbed district

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130731

Termination date: 20131231