CN102966034B - 时速350km客专双线挖方桥台 - Google Patents

时速350km客专双线挖方桥台 Download PDF

Info

Publication number
CN102966034B
CN102966034B CN201210508537.XA CN201210508537A CN102966034B CN 102966034 B CN102966034 B CN 102966034B CN 201210508537 A CN201210508537 A CN 201210508537A CN 102966034 B CN102966034 B CN 102966034B
Authority
CN
China
Prior art keywords
abutment
excavation
tunnel
platform
roadbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210508537.XA
Other languages
English (en)
Other versions
CN102966034A (zh
Inventor
文望青
陈玉
罗世东
王庭正
陈一文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201210508537.XA priority Critical patent/CN102966034B/zh
Publication of CN102966034A publication Critical patent/CN102966034A/zh
Application granted granted Critical
Publication of CN102966034B publication Critical patent/CN102966034B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明公开了一种时速350km客专路堑地区使用的挖方桥台,所述挖方桥台包括台身、台顶和顶帽,所述挖方桥台的顶帽处连接桥梁桥跨结构,所述挖方桥台的台后连接路基或者隧道,所述路基或者隧道两侧设置第一排水沟,所述挖方桥台台身两侧设置有护坡锥体,所述护坡锥体从台尾相连的路基或者隧道延伸至台前,所述护坡锥体表面设有与第一排水沟相通的第二排水沟,所述台身前端的台前设有与第二排水沟相通的第三排水沟,所述第二排水沟与第三排水沟连接处设有缓冲池,所述台身前端与顶帽之间正中间设置竖直的梁部检查通道。本发明不仅能用于桥路相连处,同样适用于桥隧相连处,采用同一种桥台形式,既缩短了设计时间,也使施工更加方便。

Description

时速350km客专双线挖方桥台
技术领域
本发明属于涉及桥梁结构技术领域,具体地指一种时速350km客专双线挖方桥台。
背景技术
以前没有专门针对路堑地区桥台编制的标准图册,往往用最小填土高时的填方台来替代挖方台使用。由于各施工单位采用的填方台各不相同,造成改造后使用的挖方台也不同,实际应用较为随意,台身更是多种尺寸。由于缺乏统一的图纸和标准,造成施工很不方便,且遇到桥隧相连时,则完全不能使用。
适用于路堤地区使用的填方台经改造后用于路堑地区,不能解决桥路(隧)相连处台后排水的问题。积水在相接处无处可排,给路基和桥跨结构造成隐患,大大缩短结构物的使用寿命。
填方台一般在锥体设置平台,检查人员通过此平台经桥台顶帽上设的过人通道才能进入梁部或空心桥台内部进行检查。而挖方台填土一般较低,设计成空心桥台意义不大,采用实体台效果更好,且深入隧道内桥台也不能设置锥体,这时还在锥体及顶帽上设过人通道及采用空心桥台就显得很不合适,不仅使桥台尺寸较大,且施工也较复杂。
发明内容
本发明的目的就是要克服现有技术所存在的不足,提供一种时速350km客专路堑地区使用的挖方桥台。
为实现上述目的,本发明所设计的一种时速350km客专路堑地区使用的挖方桥台,所述挖方桥台包括台身、台顶和顶帽,所述挖方桥台的顶帽处连接桥梁桥跨结构,所述挖方桥台的台后连接路基或者隧道,所述路基或者隧道两侧设置第一排水沟,所述挖方桥台台身两侧设置有护坡锥体,所述护坡锥体从台尾相连的路基或者隧道(2)延伸至台前,所述护坡锥体表面设有与第一排水沟相通的第二排水沟,所述桥台台前设有与第二排水沟相通的第三排水沟,所述第二排水沟与第三排水沟连接处设有缓冲池,所述台身前端与顶帽之间正中间设置竖直的梁部检查通道。
进一步地,所述梁部检查通道设置有爬梯。
再进一步地,所述挖方桥台与隧道相接时电缆槽设置有过渡段,所述过渡段长度为2.5m,过渡段为台阶式过渡段。若与路基相接时,电缆槽无高差,过渡段为平段。
再进一步地,所述挖方桥台的台长d为3~6m。
本发明的有益效果在于:
本发明不仅能用于桥路相连处,同样适用于桥隧相连处,采用同一种桥台形式,既缩短了设计时间,也使施工更加方便。挖方桥台两侧护坡锥体及台前两侧设排水沟渠,与路基或者隧道处排水沟顺接,并在台前设缓冲池,及时将水排走,避免了台后积水,延长了结构物使用寿命。挖方桥台在顶帽正中间设置梁部检查通道,同时在台身中间配合梁部检查通道需要预留爬梯的检查空间。
附图说明
图1为时速350km客专双线挖方桥台立体结构接路基示意图;
图2为时速350km客专双线挖方桥台侧面结构示意图;
图3为时速350km客专双线挖方桥台正面结构示意图;
图4为时速350km客专双线挖方桥台桥隧相接时过渡段侧面结构示意图。
图5为时速350km客专双线挖方桥台桥隧相接时半桥台及隧道正面结构示意图。
图中,台顶1,路基或者隧道2,台身3,护坡锥体4,顶帽5,
缓冲池6,第二排水沟7,第三排水沟8,第一排水沟9,梁部检查通道10,爬梯11,过渡段12,台前13,桥梁桥跨14,桥台处电缆槽顶15,隧道处电缆槽顶16。
具体实施方式
以下结合附图和具体实施例对本发明作进一步的详细描述。
如图所示一种时速350km客专路堑地区使用的挖方桥台,所述挖方桥台包括台身3、台顶1和顶帽5,所述挖方桥台的顶帽5处连接桥梁桥跨14结构,所述挖方桥台的台后连接路基或者隧道2,所述路基或者隧道2两侧设置第一排水沟9。所述挖方桥台台身3两侧设置有护坡锥体4,所述护坡锥体4从台尾延伸至台前13,所述护坡锥体4表面设有与第一排水沟9相通的第二排水沟7,所述台身3前端的台前13设有与第二排水沟7通的第三排水沟8,所述第二排水沟7与第三排水沟8连接处设有缓冲池6,所述台身3前端与顶帽5之间正中间设置竖直的梁部检查通道10,桥台高采用定高:由所接桥跨梁高+支座垫石高+台前墙高1m确定。台顶布置与所接梁跨一致。
所述梁部检查通道设置有爬梯11。为了方便检查人员进入梁内进行检查。
所述挖方桥台与隧道相接时设置有过渡段12,所述过渡段12长度为2.5m,过渡段12为台阶式过渡段。过渡段是为解决桥台隧道相接处桥台处电缆槽顶15和隧道处电缆槽顶16的高差,使电缆槽顺接。若与路基相接时,电缆槽无高差,过渡段12为平段。
所述挖方桥台的台长d为3~6m。
挖方台两侧护坡锥体4表面的第二排水沟7及台前两侧第三排水沟8,与路基或者隧道2处第一排水沟9连通,并和缓冲池共同作用及时将水排走。
本发明实施可以运用到各铁路干线中,图中有挖方桥台设计说明,说明了此类桥台适用范围、设计原则、采用材料及施工中需注意问题。桥台总图中按不同梁跨,台顶采用的不同轨道结构和排水方式确定桥台具体尺寸。
尽管上述实施例对本发明做出了详尽的描述,但它仅仅是本发明一部分实施例,而不是全部实施例,人们还可以根据本实施例在不经创造性前提下获得其他实施例,这些实施例都属于本发明保护范围。

Claims (1)

1.一种时速350km客专路堑地区使用的挖方桥台,所述挖方桥台包括台身(3)、台顶(1)和顶帽(5),所述挖方桥台的顶帽(5)处连接桥梁桥跨(14)结构,所述挖方桥台的台后连接路基或者隧道(2),所述路基或者隧道(2)两侧设置第一排水沟(9),其特征在于:所述挖方桥台台身(3)两侧设置有护坡锥体(4),所述护坡锥体(4)从台尾相连的路基或者隧道(2)延伸至台前(13),所述护坡锥体(4)表面设有与第一排水沟(9)相通的第二排水沟(7),所述台身(3)前端的台前(13)设有与第二排水沟(7)相通的第三排水沟(8),所述第二排水沟(7)与第三排水沟(8)连接处设有缓冲池(6),所述台身(3)前端与顶帽(5)之间正中间设置竖直的梁部检查通道(10),所述梁部检查通道设置有爬梯(11),所述挖方桥台与隧道相接时设置有电缆槽过渡段(12),所述过渡段(12)长度为2.5m,所述过渡段(12)为台阶式过渡段,当所述挖方桥台与路基相接时,电缆槽无高差,过渡段(12)为平段;所述挖方桥台的台长d为3~6m。
CN201210508537.XA 2012-11-30 2012-11-30 时速350km客专双线挖方桥台 Active CN102966034B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210508537.XA CN102966034B (zh) 2012-11-30 2012-11-30 时速350km客专双线挖方桥台

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210508537.XA CN102966034B (zh) 2012-11-30 2012-11-30 时速350km客专双线挖方桥台

Publications (2)

Publication Number Publication Date
CN102966034A CN102966034A (zh) 2013-03-13
CN102966034B true CN102966034B (zh) 2015-06-03

Family

ID=47796447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210508537.XA Active CN102966034B (zh) 2012-11-30 2012-11-30 时速350km客专双线挖方桥台

Country Status (1)

Country Link
CN (1) CN102966034B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589505B (zh) * 2018-01-25 2023-06-27 中铁第六勘察设计院集团有限公司 一种桥梁、隧道、堤岸的复合结构
CN108551149A (zh) * 2018-05-16 2018-09-18 中铁第勘察设计院集团有限公司 高速铁路桥隧间电缆槽过渡结构
CN111877376A (zh) * 2020-08-08 2020-11-03 张俊中 一种岩锥体斜坡上的桥梁防护结构及其实施方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2256747C2 (ru) * 2002-04-22 2005-07-20 Сибирский государственный университет путей сообщения Способ изготовления сопряжения проезжей части моста с насыпью
CN202370536U (zh) * 2011-12-20 2012-08-08 中铁第四勘察设计院集团有限公司 高速铁路桥隧相连隧道结构
CN203007820U (zh) * 2012-11-30 2013-06-19 中铁第四勘察设计院集团有限公司 时速350km客专双线挖方桥台

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2256747C2 (ru) * 2002-04-22 2005-07-20 Сибирский государственный университет путей сообщения Способ изготовления сопряжения проезжей части моста с насыпью
CN202370536U (zh) * 2011-12-20 2012-08-08 中铁第四勘察设计院集团有限公司 高速铁路桥隧相连隧道结构
CN203007820U (zh) * 2012-11-30 2013-06-19 中铁第四勘察设计院集团有限公司 时速350km客专双线挖方桥台

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
"客运专线铁路桥台设计";李伟;《铁道工程学报》;20070410(第2期);第62页2.2节 *
"桥台水害工程治理的设计反思";戚铁;《铁道标准设计》;20010520;第21卷(第5期);第27页第4节 *
"长昆线桥隧相连设计研究";李冬生;《铁道工程学报》;20111231(第12期);第72-73页1.3节,图10、11 *

Also Published As

Publication number Publication date
CN102966034A (zh) 2013-03-13

Similar Documents

Publication Publication Date Title
CN103362073B (zh) 一种框架桥顶进方法
CN202832570U (zh) 隧道二次衬砌施工缝防水构造
CN104563158B (zh) 既有地铁车站与新建地铁车站站台层实现换乘的施工方法
CN102966034B (zh) 时速350km客专双线挖方桥台
CN204174530U (zh) 桥梁雨水排泄结构
CN203007820U (zh) 时速350km客专双线挖方桥台
CN103290752A (zh) 一种高速公路改扩建工程路堤渗水处治系统
CN2913433Y (zh) 立体交通线和利用路中、路边空间的高架轨道
CN105926391A (zh) 一种既有铁路路基的路肩加宽方法
CN207093138U (zh) 一种隧道二次衬砌水压力控制结构
CN206721699U (zh) 一种用于铁路站场的箱形涵结构
CN105927252B (zh) 一种利用矩形顶管开挖大断面地下空间结构体系转换方法
CN103696446B (zh) 轨道交通地下车站与出入口通道接头处的施工方法
CN204174481U (zh) 软土地区现代有轨电车桥台过渡板结构
CN108639066B (zh) 一种轨道交通的半曲线侧式站台及轨道结构
CN103397600A (zh) 箱体顶进过程中止水带设置方法
CN205530334U (zh) 一种中低速磁浮低置线路既有挡墙微扰动加固结构
CN214657217U (zh) 一种地下隧道出入地与高架桥连接的过渡段结构
CN204753534U (zh) 一种碾压混凝土坝内排水管网的构筑结构
CN210798971U (zh) 一种实现核心城区单台盾构掘进长度最大化的施工结构
CN107139936A (zh) 一种采用区间折返的轨道交通折返线结构
CN204151675U (zh) 地锚式悬索桥猫道承重索的转向架
CN107574830A (zh) 一种地铁车站结合管廊施工的降水方法
CN202628105U (zh) 适用于盾构隧道的圆形断面apm轨道结构
CN206841422U (zh) 一种采用区间折返的轨道交通折返线结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant