CN105926391A - 一种既有铁路路基的路肩加宽方法 - Google Patents
一种既有铁路路基的路肩加宽方法 Download PDFInfo
- Publication number
- CN105926391A CN105926391A CN201610410081.1A CN201610410081A CN105926391A CN 105926391 A CN105926391 A CN 105926391A CN 201610410081 A CN201610410081 A CN 201610410081A CN 105926391 A CN105926391 A CN 105926391A
- Authority
- CN
- China
- Prior art keywords
- curb
- widening
- slope
- shoulder
- roadbed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/04—Foundations produced by soil stabilisation
Abstract
一种既有铁路路基的路肩加宽方法,其步骤为:A、在铁路路基的路肩及路肩外的路基边坡上,沿线路纵向等间距开挖用于放置单元“┥”形构件的横向肋板的横槽;横槽的内端位于路肩与道床的交界处;所述横向肋板的长度等于加宽后的新路肩的宽度;B、在路基边坡上沿线路纵向切坡,形成用于放置单元“┥”形构件的纵向面板的边坡平台;C、将所述的单元“┥”形构件的横向肋板置于横槽内,其纵向面板即置于边坡平台上;D、在所述的纵向面板的内侧和横向肋板的两侧,分层回填土体并夯实,直至土体与路肩齐平,形成加宽后的新路肩。用该方法加宽路肩,路基土体稳定性高,对土体的扰动小,圬工数量小,施工工期短、成本低。
Description
技术领域
本发明涉及一种用于既有铁路路基的路肩加宽方法,属于路基工程技术领域。
背景技术
近年来因铁路的提速和运量的增大我国部分既有铁路技术要求已经不能满足发展的需要,造成常见的铁路路基沉降、翻浆冒泥和由此引发的一系列路基病害,不仅增加了铁路养护部门的工作量,而且严重影响铁路运输效率和运营安全,因此需要采取合理有效的整治措施进行处理。其中,路肩加宽的处理措施使用广泛:①既有线铁路路基存在不均匀沉降,路基顶面标高与设计值不一致,为了保持线路的平顺性,需要对沉降较大处道床进行垫砟,道床厚度增加,道床坡度的存在使现有路肩宽度不足,应根据需要加宽路肩;②既有线提速使列车的速度有了显著的提高,铁路设计标准相应提高,要求更大的路肩宽度;③随着养路机械化作业的普及,大型铁路养路机械运行需要在路基上设置特定的平台,路肩宽度不足,需要加宽。
目前,既有铁路路基加宽的常用方法主要有:1、边坡薄层路肩加宽方法:先对路肩外的边坡整体开挖,形成多级台阶,然后从下向上逐级以台阶为基础,填筑土体并夯实,并使填筑的土体宽度增加,达到加宽路肩的效果。边坡台阶的开挖可以使加宽薄层填土稳定性得到一定的提高,然而由于新增的土体路基原有土体仅靠夯实结合,其结合力差,土体稳定性差,在长久雨水冲刷的条件下易造成土体滑移,影响安全。2、干(浆)砌片石路肩矮挡墙加宽方法:在路肩加宽位置处边坡进行切坡开挖,形成挡土墙的基坑,再在基坑上构筑高出路肩的干(浆)砌片石重力式挡土墙,最后在重力式挡土墙内侧填筑并夯实土体,使其与路肩齐平,从而将路肩加宽至挡土墙内壁处。通过重力式挡土墙的自重将路基土体挡住,保证路基土体的稳定。但是其需在边坡土体进行整体开挖形成挡土墙的基坑,其开挖量大;且整体式的现浇构筑高出路肩的大面积重力式挡土墙,圬工量大,施工工期长、施工成本高。
发明内容
本发明的目的是提供一种既有铁路路基的路肩加宽方法,使用该方法加宽路肩后的路基,路基土体稳定性高,施工时对土体的扰动小,圬工数量小,施工工期短,施工成本低。
本发明为实现其目的采用的技术方案是,一种既有铁路路基的路肩加宽方法,其步骤为:
A、在铁路路基的路肩及路肩外的路基边坡上,沿线路纵向等间距开挖用于放置单元“┥”形构件的横向肋板的横槽;横槽的内端位于路肩与道床的交界处;所述横向肋板的长度等于加宽后的新路肩的宽度;
B、在路基边坡上沿线路纵向切坡,形成用于放置单元“┥”形构件的纵向面板的边坡平台;
C、将所述的单元“┥”形构件的横向肋板置于横槽内,其纵向面板即置于边坡平台上;
D、在所述的纵向面板的内侧和横向肋板的两侧,分层回填土体并夯实,直至土体与路肩齐平,形成加宽后的新路肩。
与现有技术相比,本发明的有益效果是:
一、通过深入路肩内部的横向肋板与横向肋板间的土体产生摩阻力来抵抗路基土体作用在纵向面板上的水平土压力,以维持路基边坡土体的稳定。保证了加宽路基的稳定性。
二、施工时,只需要向土体内沿纵向间距挖横槽,对土体的扰动小,不需要整体开挖,圬工数量大大降低。采用预制的横向肋板与纵向面板构成的单元“┥”形构件,减少了现浇需花费的时间,降低了施工工期,施工成本低。
进一步,本发明的边坡平台的横坡坡度满足4%的排水要求。
这样,可保证路基边坡的排水符合要求。
进一步,本发明D步中在分层回填土体并夯实以前,还先在相邻单元“┥”形构件的纵向面板的接缝处内侧布置可透水的土工布。
这样,可避免回填的土体从相邻纵向面板间的接缝处泄漏,同时又能将回填土体内的水顺利排出。
下面结合附图和具体实施方式对本发明进一步的详细说明。
附图说明:
图1是本发明的路肩加宽方法在未开挖之前的铁路路基剖视结构示意图。
图2是本发明的路肩加宽方法在完成横槽开挖与纵向切坡后的铁路路基剖视结构示意图。
图3是本发明的路肩加宽方法完成路基加宽后的铁路路基剖视结构示意图。
图4是本发明的路肩加宽方法完成路基加宽后的铁路路基俯视结构示意图。
具体实施方式:
实施例
图1-4示出,本发明的一种具体实施方式是,一种既有铁路路基的路肩加宽方法,其步骤为:
A、在铁路路基的路肩2及路肩2外的路基边坡3上,沿线路纵向等间距开挖用于放置单元“┥”形构件的横向肋板4a的横槽5;横槽5的内端位于路肩2与道床1的交界处;所述横向肋板4a的长度等于加宽后的新路肩2’的宽度;
B、在路基边坡3上沿线路纵向切坡,形成用于放置单元“┥”形构件的纵向面板4b的边坡平台3a;
C、将所述的单元“┥”形构件的横向肋板4a置于横槽5内,其纵向面板4b即置于边坡平台3a上;
D、在所述的纵向面板4b的内侧和横向肋板4a的两侧,分层回填土体并夯实,直至土体与路肩2齐平,形成加宽后的新路肩2’。
Claims (3)
1.一种既有铁路路基的路肩加宽方法,其步骤为:
A、在铁路路基的路肩(2)及路肩(2)外的路基边坡(3)上,沿线路纵向等间距开挖用于放置单元“┥”形构件的横向肋板(4a)的横槽(5);横槽(5)的内端位于路肩(2)与道床(1)的交界处;所述横向肋板(4a)的长度等于加宽后的新路肩(2’)的宽度;
B、在路基边坡(3)上沿线路纵向切坡,形成用于放置单元“┥”形构件的纵向面板(4b)的边坡平台(3a);
C、将所述的单元“┥”形构件的横向肋板(4a)置于横槽(5)内,其纵向面板(4b)即置于边坡平台(3a)上;
D、在所述的纵向面板(4b)的内侧和横向肋板(4a)的两侧,分层回填土体并夯实,直至土体与路肩(2)齐平,形成加宽后的新路肩(2’)。
2.根据权利要求1所述的一种既有铁路路基的路肩加宽方法,其特征在于:所述的边坡平台(3a)的横坡坡度满足4%的排水要求。
3.根据权利要求1所述的一种既有铁路路基的路肩加宽方法,其特征在于:所述的D步中在分层回填土体并夯实以前,还先在相邻单元“┥”形构件的纵向面板(4b)的接缝处内侧布置可透水的土工布。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610410081.1A CN105926391B (zh) | 2016-06-12 | 2016-06-12 | 一种既有铁路路基的路肩加宽方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610410081.1A CN105926391B (zh) | 2016-06-12 | 2016-06-12 | 一种既有铁路路基的路肩加宽方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105926391A true CN105926391A (zh) | 2016-09-07 |
CN105926391B CN105926391B (zh) | 2018-08-17 |
Family
ID=56832923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610410081.1A Active CN105926391B (zh) | 2016-06-12 | 2016-06-12 | 一种既有铁路路基的路肩加宽方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105926391B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374178A (zh) * | 2019-06-17 | 2019-10-25 | 长沙理工大学 | 一种新型边坡平台排水沟的施工方法 |
CN110846965A (zh) * | 2019-10-15 | 2020-02-28 | 中国科学院武汉岩土力学研究所 | 基于导电聚合物的土工格室加固拓宽路基方法 |
CN111041918A (zh) * | 2019-12-25 | 2020-04-21 | 西南交通大学 | 一种路堤拓宽方法 |
CN111172833A (zh) * | 2020-01-13 | 2020-05-19 | 西南交通大学 | 一种陡坡高路堤结构的构筑方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02157304A (ja) * | 1988-12-07 | 1990-06-18 | Tadao Takei | 運動場路盤舗装施工法 |
JP2001073305A (ja) * | 2000-08-18 | 2001-03-21 | Tenox Corp | 道路構築体 |
CN102619150A (zh) * | 2012-04-26 | 2012-08-01 | 石家庄铁道大学 | 一种锚固式道路路基加宽方法 |
CN203212964U (zh) * | 2013-04-19 | 2013-09-25 | 中交第一公路勘察设计研究院有限公司 | 一种富冰、饱冰路段片块石型高速公路路基拓宽结构 |
-
2016
- 2016-06-12 CN CN201610410081.1A patent/CN105926391B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02157304A (ja) * | 1988-12-07 | 1990-06-18 | Tadao Takei | 運動場路盤舗装施工法 |
JP2001073305A (ja) * | 2000-08-18 | 2001-03-21 | Tenox Corp | 道路構築体 |
CN102619150A (zh) * | 2012-04-26 | 2012-08-01 | 石家庄铁道大学 | 一种锚固式道路路基加宽方法 |
CN203212964U (zh) * | 2013-04-19 | 2013-09-25 | 中交第一公路勘察设计研究院有限公司 | 一种富冰、饱冰路段片块石型高速公路路基拓宽结构 |
Non-Patent Citations (2)
Title |
---|
刘志: "高速公路改扩建工程一般路基设计要点", 《贵州大学学报(自然科学版)》 * |
李昌斌: "高原冻土区既有线路基病害防治技术", 《铁道建筑》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374178A (zh) * | 2019-06-17 | 2019-10-25 | 长沙理工大学 | 一种新型边坡平台排水沟的施工方法 |
CN110846965A (zh) * | 2019-10-15 | 2020-02-28 | 中国科学院武汉岩土力学研究所 | 基于导电聚合物的土工格室加固拓宽路基方法 |
CN111041918A (zh) * | 2019-12-25 | 2020-04-21 | 西南交通大学 | 一种路堤拓宽方法 |
CN111172833A (zh) * | 2020-01-13 | 2020-05-19 | 西南交通大学 | 一种陡坡高路堤结构的构筑方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105926391B (zh) | 2018-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203960700U (zh) | 桩托u形槽封闭式路基结构 | |
CN102071607B (zh) | 一种不影响既有行车条件下铁路路基修复方法 | |
CN105696427B (zh) | 一种加固处理新建铁路岩溶地基的施工方法及其路基结构 | |
CN105421485A (zh) | 一种高填方预制现浇组合式桩板墙防护结构的施工方法 | |
CN205116217U (zh) | 一种高填方预制现浇组合式桩板墙防护结构 | |
CN207598248U (zh) | 一种山区高速铁路隧道护桥明洞结构 | |
CN105804119A (zh) | 一桩二用地下廊道结构及其施工方法 | |
CN205399090U (zh) | 一种上跨高速公路的桩基钢筋混凝土铁路路基结构 | |
CN105926391A (zh) | 一种既有铁路路基的路肩加宽方法 | |
CN109750571A (zh) | 一种道路塌方应急与永久支挡一体化结构及施工方法 | |
CN101838957B (zh) | 整体式t形外悬臂道路及其施工方法 | |
CN108611985A (zh) | 特殊地质超重框架桥顶进施工方法 | |
CN107841908A (zh) | 用于消除高速铁路陡坡高路堤横向差异沉降的路基结构 | |
CN206219897U (zh) | 中低速磁浮双线挖方地段桩基复合式承轨梁过渡段结构 | |
CN203547763U (zh) | 高回填抗滑移明洞结构 | |
CN103866788B (zh) | 一种柱式桥台前坡挡墙化改造的方法 | |
CN208649807U (zh) | 用于消除高速铁路陡坡高路堤横向差异沉降的路基结构 | |
CN105604088A (zh) | 一种中低速磁浮低置线路既有挡墙微扰动加固结构 | |
CN106988748B (zh) | 高位平行导坑构造及扩能改造为复线隧道的施工方法 | |
CN206157485U (zh) | 中低速磁浮单线挖方地段桩基复合式承轨梁过渡段结构 | |
CN205530334U (zh) | 一种中低速磁浮低置线路既有挡墙微扰动加固结构 | |
CN106758886A (zh) | 一种新型拆除既有桥涵结构的方法 | |
CN208184752U (zh) | 富水软弱地层重载铁路隧道的基底加固体系 | |
CN106555379A (zh) | 穿越既有线高路基组合式便桥施工方法 | |
CN206157478U (zh) | 中低速磁浮双线挖方地段桩基托梁式承轨梁过渡段结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |