CN102953557A - 一种用于蜂窝型网壳提升点的加固方法 - Google Patents
一种用于蜂窝型网壳提升点的加固方法 Download PDFInfo
- Publication number
- CN102953557A CN102953557A CN2012104614501A CN201210461450A CN102953557A CN 102953557 A CN102953557 A CN 102953557A CN 2012104614501 A CN2012104614501 A CN 2012104614501A CN 201210461450 A CN201210461450 A CN 201210461450A CN 102953557 A CN102953557 A CN 102953557A
- Authority
- CN
- China
- Prior art keywords
- lifting
- ball
- reinforcing
- net shell
- welded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000003014 reinforcing effect Effects 0.000 title claims abstract description 16
- 238000000034 method Methods 0.000 title abstract description 9
- 230000002787 reinforcement Effects 0.000 claims abstract description 9
- 238000003466 welding Methods 0.000 claims description 12
- 239000000725 suspension Substances 0.000 claims description 9
- 239000000203 mixture Substances 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 3
- 230000001413 cellular effect Effects 0.000 abstract description 2
- 230000000149 penetrating effect Effects 0.000 abstract 2
- 238000010586 diagram Methods 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 229910000679 solder Inorganic materials 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000002407 reforming Methods 0.000 description 1
- 238000002910 structure generation Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
一种用于蜂窝型网壳提升点的加固方法,包括如下步骤:1.根据网壳重量和大小布置提升吊点的位置并计算出各提升点的荷载;2.根据提升系统的提升范围和提升点的荷载工况计算出各加固杆件的长度、规格尺寸和增设球的规格;3.将各加固杆件的一端均与增设球相贯焊接,另一端分别与网壳各下弦球相贯焊接,在增设球两侧焊接吊耳组成组合式吊点;4.连接吊具及加固吊耳。该方法可解决焊接球网壳结构中提升吊点的加固问题,使之在提升过程中各杆件受力均衡,保证结构施工安全、可靠。
Description
技术领域
本发明属于一种钢结构建筑安装用装置,特别涉及一种用于蜂窝型网壳提升点的加固方法。
背景技术:
随着社会经济的发展及钢结构安装技术的不断改革创新,蜂窝型网壳结构也越来越多的被应用。由于其适用领域的空间要求,一般安装标高都较高,通常采用多点液压同步提升的方法进行安装。但是,因为蜂窝型网壳结构自身结构特点,提升点集中受力时容易造成提升点位置杆件应力变大而带来的局部变形,并且提升点多点绑扎受力时(附图1中钢丝绳组合S1---S5),设置一般都较为复杂,容易发生内力失衡,安全性较低,从而给整个工程带来安全、质量方面的隐患,对结构产生不利影响甚至破坏。
发明内容
本发明的目的就在于克服上述现有技术中存在的不足,而提供一种用于蜂窝型网壳提升点的加固方法,该方法可解决焊接球网壳结构中提升吊点的加固问题,使之在提升过程中各杆件受力均衡,保证结构施工安全、可靠。
如上构思,本发明的技术方案是:一种用于蜂窝型网壳提升点的加固方法,其特征在于:包括如下步骤:
1)根据网壳重量和大小布置提升吊点的位置并计算出各提升点的荷载;
2)根据提升系统的提升范围和提升点的荷载工况计算出各加固杆件的长度、规格尺寸和增设球的规格;
3)将各加固杆件的一端均与增设球相贯焊接,另一端分别与网壳各下弦球相贯焊接,在增设球两侧焊接吊耳组成组合式吊点;
4)连接吊具及加固吊耳。
本发明通过增设多根加固杆和增设球,并且使各加固杆件的一端均与增设球相贯焊接,另一端分别与网壳各下弦球相贯焊接,在增设球两侧焊接吊耳组成组合式吊点,最后连接吊具及加固吊耳。因此,可解决焊接球网壳结构中提升吊点的加固问题,使之在提升过程中各杆件受力均衡,保证结构施工安全、可靠。
附图说明:
图1是传统蜂窝型网壳结构提升方法示意图;
图2是本发明网壳提升点布置示意图;
图3是本发明提升点侧面加固示意图;
图4是本发明提升点立体加固示意图;
图5是本发明提升点效果示意图。
具体实施方式:
一种用于蜂窝型网壳提升点的加固方法,包括如下步骤:
1、根据网壳3重量和大小布置提升吊点的位置并计算出各提升点的荷载(如图2所示);
2、根据提升系统的提升范围和提升点的荷载工况计算出各加固杆件A1-A5的长度、规格尺寸和增设球Q1的规格;
3、将加固杆件A1-A5一端与增设球Q1相贯焊接,另一端与下弦球QX1、QX2、QX3、QX4、QX5相贯焊接,最后在增设球Q1两侧焊接吊耳D组成组合式吊点;(如图3、4所示)。
4、焊接加固点各杆件及球,连接吊具及加固吊耳D。(如图5所示)。
Claims (1)
1.一种用于蜂窝型网壳提升点的加固方法,其特征在于:包括如下步骤:
1)根据网壳重量和大小布置提升吊点的位置并计算出各提升点的荷载;
2)根据提升系统的提升范围和提升点的荷载工况计算出各加固杆件的长度、规格尺寸和增设球的规格;
3)将各加固杆件的一端均与增设球相贯焊接,另一端分别与网壳各下弦球相贯焊接,在增设球两侧焊接吊耳组成组合式吊点;
4)连接吊具及加固吊耳。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104614501A CN102953557A (zh) | 2012-11-14 | 2012-11-14 | 一种用于蜂窝型网壳提升点的加固方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104614501A CN102953557A (zh) | 2012-11-14 | 2012-11-14 | 一种用于蜂窝型网壳提升点的加固方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102953557A true CN102953557A (zh) | 2013-03-06 |
Family
ID=47762893
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012104614501A Pending CN102953557A (zh) | 2012-11-14 | 2012-11-14 | 一种用于蜂窝型网壳提升点的加固方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102953557A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103774861A (zh) * | 2014-01-26 | 2014-05-07 | 淮海工学院 | 一种网架结构杆件的加固方法 |
CN104060840A (zh) * | 2014-06-25 | 2014-09-24 | 广州市第三建筑工程有限公司 | 使用螺栓球桁架提升机提升大跨度穹顶网架的施工方法 |
CN109592551A (zh) * | 2018-12-10 | 2019-04-09 | 中国建筑第八工程局有限公司 | 筒状网壳结构的提升支架 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201843383U (zh) * | 2010-10-29 | 2011-05-25 | 中国石油集团川庆钻探工程有限公司 | 塔架吊点位置加固结构 |
CN102116051A (zh) * | 2009-12-30 | 2011-07-06 | 上海市机械施工有限公司 | 一种逐层悬挑结构的吊装方法 |
CN102425326A (zh) * | 2011-09-14 | 2012-04-25 | 徐州中煤百甲重钢结构有限公司 | 螺栓球网架筒壳储料仓逆安装施工工艺 |
CN102465602A (zh) * | 2010-11-18 | 2012-05-23 | 芜湖天航科技(集团)股份有限公司 | 柱面网壳旋转提升施工方法 |
CN102635162A (zh) * | 2012-04-09 | 2012-08-15 | 浙江东南网架股份有限公司 | 一种组合扭网壳及其施工方法 |
-
2012
- 2012-11-14 CN CN2012104614501A patent/CN102953557A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102116051A (zh) * | 2009-12-30 | 2011-07-06 | 上海市机械施工有限公司 | 一种逐层悬挑结构的吊装方法 |
CN201843383U (zh) * | 2010-10-29 | 2011-05-25 | 中国石油集团川庆钻探工程有限公司 | 塔架吊点位置加固结构 |
CN102465602A (zh) * | 2010-11-18 | 2012-05-23 | 芜湖天航科技(集团)股份有限公司 | 柱面网壳旋转提升施工方法 |
CN102425326A (zh) * | 2011-09-14 | 2012-04-25 | 徐州中煤百甲重钢结构有限公司 | 螺栓球网架筒壳储料仓逆安装施工工艺 |
CN102635162A (zh) * | 2012-04-09 | 2012-08-15 | 浙江东南网架股份有限公司 | 一种组合扭网壳及其施工方法 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103774861A (zh) * | 2014-01-26 | 2014-05-07 | 淮海工学院 | 一种网架结构杆件的加固方法 |
CN103774861B (zh) * | 2014-01-26 | 2016-01-27 | 淮海工学院 | 一种网架结构杆件的加固方法 |
CN104060840A (zh) * | 2014-06-25 | 2014-09-24 | 广州市第三建筑工程有限公司 | 使用螺栓球桁架提升机提升大跨度穹顶网架的施工方法 |
CN109592551A (zh) * | 2018-12-10 | 2019-04-09 | 中国建筑第八工程局有限公司 | 筒状网壳结构的提升支架 |
CN109592551B (zh) * | 2018-12-10 | 2023-11-21 | 中国建筑第八工程局有限公司 | 筒状网壳结构的提升支架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202080812U (zh) | 一种大型钢筋笼专用吊具系统 | |
CN102953557A (zh) | 一种用于蜂窝型网壳提升点的加固方法 | |
CN103466472A (zh) | 一种副臂系统以及履带起重机 | |
CN105480002B (zh) | 一种单层钢结构装饰树及其安装方法 | |
CN202936087U (zh) | 可调式吊装用钢管平衡梁 | |
CN203160142U (zh) | 顶升桥梁钢抱箍支架系统 | |
CN202745208U (zh) | 重组竹框架结构节点连接 | |
CN108487212B (zh) | 导管架裙桩套筒组合成片的吊装工艺 | |
CN202717499U (zh) | 吊装桥式起重机副小车用的简易吊架 | |
CN203159027U (zh) | 一种预制装配式铁塔基础吊具 | |
CN209685126U (zh) | 一种钢连廊整体提升吊耳装置 | |
CN204212261U (zh) | 柱与曲梁水平柔性连接空间结构体系 | |
CN204531180U (zh) | 控制大型构件钢筋绑扎精度的劲性骨架 | |
CN204211397U (zh) | 组装式标准节 | |
CN206476671U (zh) | 塔吊附着装置 | |
CN204959605U (zh) | 扣索联结器 | |
CN204681017U (zh) | 一种工字钢立柱底座 | |
CN105113426A (zh) | 一种扣索联结器及钢桁拱桥扣索联结的方法 | |
CN204551285U (zh) | 一种新型挂篮预压系统 | |
CN109956395A (zh) | 一种钢连廊整体提升吊耳结构 | |
CN202467303U (zh) | 分段式信号塔体 | |
CN202729573U (zh) | 悬臂板式吊耳 | |
CN203544128U (zh) | 一种设有排气管挂钩支架的前悬架副车架 | |
CN202466428U (zh) | 用于预制箱梁节段吊装的吊装结构 | |
CN203639970U (zh) | 双索双瓣疏浚抓斗吊挂结构的改进 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130306 |