CN102900098B - 基础预埋件调平施工工艺 - Google Patents

基础预埋件调平施工工艺 Download PDF

Info

Publication number
CN102900098B
CN102900098B CN201210453414.0A CN201210453414A CN102900098B CN 102900098 B CN102900098 B CN 102900098B CN 201210453414 A CN201210453414 A CN 201210453414A CN 102900098 B CN102900098 B CN 102900098B
Authority
CN
China
Prior art keywords
fitting
basic built
reinforcing bar
basic
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210453414.0A
Other languages
English (en)
Other versions
CN102900098A (zh
Inventor
陈亮
刘鹏
党万涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xinyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Xinyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xinyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201210453414.0A priority Critical patent/CN102900098B/zh
Publication of CN102900098A publication Critical patent/CN102900098A/zh
Application granted granted Critical
Publication of CN102900098B publication Critical patent/CN102900098B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明提供一种基础预埋件调平施工工艺,它包括以下步骤:在基层弹出基础预埋件的轴线,并分出边线和中线;在弹出的基础预埋件的轴线的角点处钻孔,在孔内植入钢筋,并校正所述钢筋的垂直度,在所述钢筋之间设置拉筋,然后在所述钢筋顶部侧面焊接螺母,最后,在所述螺母上旋接作为调节支撑的螺栓;将基础预埋件钢板标记好中线,对照轴线放在所述螺栓上,然后旋转所述螺栓调整所述基础预埋件钢板的标高,调平后将所述螺母和所述螺栓固定即可。本发明采用独立结构的调平方法,有效保证了基础预埋件的平整度;而且调节支撑与模板的加固设施不接触,有效避免了在混凝土的浇筑过程中产生的基础预埋件标高误差。

Description

基础预埋件调平施工工艺
技术领域
本发明涉及一种调平施工工艺,具体的说,涉及了一种基础预埋件调平施工工艺。
背景技术
在变电站的建造过程中,主变基础为现浇钢筋混凝土结构,上面预埋镀锌钢板。主变基础在浇筑时混凝土量非常大,对预埋件的平整度要求也高,同时浇筑产生的浮力也较大,这些都要求对主变基础预埋件进行精确的调平和定位。然而,主变基础预埋件是重量较大的钢板,其轴线位置和平整度很难进行控制。传统的埋件调平方法都是将拉丝直接焊接在埋件表面,将螺母固定在模板的加固设施上面,但是,这样的方法存在较多缺陷,如容易使埋件在电焊过程中因为局部受热而变形,容易破坏埋件的镀锌层,埋件的标高容易随着加固钢管的震动而出现错动。
为了解决以上存在的问题,人们一直在寻求一种理想的技术解决方案。
发明内容
本发明的目的是针对现有技术的不足,从而提供一种工艺流程简单、施工误差小和工作效率高的基础预埋件调平施工工艺。
为了实现上述目的,本发明所采用的技术方案是:一种基础预埋件调平施工工艺,它包括以下步骤:
步骤1:在基层弹出基础预埋件的轴线,并分出边线和中线;
步骤2:在弹出的基础预埋件的轴线的角点处钻孔,在孔内植入钢筋,并校正所述钢筋的垂直度,在所述钢筋之间设置拉筋,然后在所述钢筋顶部侧面焊接螺母,最后,在所述螺母上旋接作为调节支撑的螺栓;
步骤3:将基础预埋件钢板标记好中线,对照轴线放在所述螺栓上,然后旋转所述螺栓调整所述基础预埋件钢板的标高,调平后将所述螺母和所述螺栓固定即可。
本发明相对现有技术具有突出的实质性特点和显著进步,具体的说,本发明区别于传统的将拉丝直接焊接在基础预埋件表面,将螺母固定在模板的加固设施上面的调平方法,而采用独立结构的调平方法,从而避免了在基础预埋件上进行电焊施工,有效保证了基础预埋件的平整度,并且还保护了基础预埋件的镀锌层;而且调节支撑与模板的加固设施不接触,能有效避免在浇筑混凝土的过程中因为模板震动而产生的埋件标高误差。
具体实施方式
下面通过具体实施方式,对本发明的技术方案做进一步的详细描述。
一种基础预埋件调平施工工艺,它包括以下步骤:
步骤1:在基层弹出基础预埋件的轴线,并分出边线和中线;
步骤2:在所述基础预埋件的角点处钻孔,所钻孔的深度为3cm,然后向孔中植入φ25钢筋,并用靠尺校正所述钢筋的垂直度,所述钢筋之间设置拉筋,以保证所述钢筋的刚度和稳定性,接着在所述钢筋顶部侧面焊接螺母,所述螺母上旋接有作为调节支撑的螺栓,旋转调节螺栓的高度,使其在螺母上部的高度为4cm;
步骤3:将作为基础预埋件的钢板标记好中线,对照轴线放在所述螺栓上,然后旋转所述螺栓,通过水准仪抄平,调整所述基础预埋件钢板的标高,调平后,用电焊将所述螺母和所述螺栓焊接固定,能防止所述基础预埋件上下错动,最后为了防止基础预埋件的移位,可以通过焊接固定基础预埋件的锚筋来实现。
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制;尽管参照较佳实施例对本发明进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者对部分技术特征进行等同替换;而不脱离本发明技术方案的精神,其均应涵盖在本发明请求保护的技术方案范围当中。

Claims (1)

1.一种基础预埋件调平施工工艺,其特征在于,它包括以下步骤:
步骤1:在基层弹出基础预埋件的轴线,并分出边线和中线;
步骤2:在弹出的基础预埋件的轴线的角点处钻孔,在孔内植入钢筋,并校正所述钢筋的垂直度,在所述钢筋之间设置拉筋,然后在所述钢筋顶部侧面焊接螺母,最后,在所述螺母上旋接作为调节支撑的螺栓;
步骤3:将基础预埋件钢板标记好中线,对照轴线放在所述螺栓上,然后旋转所述螺栓调整所述基础预埋件钢板的标高,调平后将所述螺母和所述螺栓焊接固定即可。
CN201210453414.0A 2012-11-14 2012-11-14 基础预埋件调平施工工艺 Expired - Fee Related CN102900098B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210453414.0A CN102900098B (zh) 2012-11-14 2012-11-14 基础预埋件调平施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210453414.0A CN102900098B (zh) 2012-11-14 2012-11-14 基础预埋件调平施工工艺

Publications (2)

Publication Number Publication Date
CN102900098A CN102900098A (zh) 2013-01-30
CN102900098B true CN102900098B (zh) 2015-08-19

Family

ID=47572564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210453414.0A Expired - Fee Related CN102900098B (zh) 2012-11-14 2012-11-14 基础预埋件调平施工工艺

Country Status (1)

Country Link
CN (1) CN102900098B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385988A (zh) * 2018-03-20 2018-08-10 中国航天建设集团有限公司 平面预埋件调平装置及方法

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334496B (zh) * 2013-07-19 2018-03-16 中建八局第一建设有限公司 隔震支座下预埋钢板调平螺栓及使用方法
CN106088130B (zh) * 2016-08-23 2019-05-10 大庆石化工程有限公司 一种用于高压超高压管墩螺栓的定位装置及高压超高压管墩螺栓的定位方法
CN106320715B (zh) * 2016-08-26 2019-01-04 武汉一冶建筑安装工程有限责任公司 一种大型工字型斜面预埋件的安装施工方法
CN111760529A (zh) * 2020-07-07 2020-10-13 郑琼华 反应釜及反应釜安装方法
CN112441195A (zh) * 2020-10-23 2021-03-05 沪东中华造船(集团)有限公司 一种船舶通用系固装置的调平安装方法
CN114045860A (zh) * 2021-11-19 2022-02-15 上海宝冶集团有限公司 一种避免塔机基础预埋件下方混凝土空鼓的方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000008483A (ja) * 1998-06-24 2000-01-11 Ishikawa Koyo ベースプレート固定装置
JP2006249894A (ja) * 2005-03-07 2006-09-21 Kenjiro Ogata フレキシブルアンカーボルト
CN101725154A (zh) * 2009-11-16 2010-06-09 天津二十冶建设有限公司 轻型设备及钢结构的安装调整方法及其安装调整装置
CN101806069A (zh) * 2010-04-16 2010-08-18 天津二十冶建设有限公司 螺栓整体固定安装方法
CN201962804U (zh) * 2011-01-12 2011-09-07 陕西建工集团第六建筑工程有限公司 超长设备基础平台用预埋件埋置结构
CN102619235A (zh) * 2012-04-17 2012-08-01 中国建筑第五工程局有限公司 混凝土基础预埋螺栓支架及混凝土基础螺栓预埋方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000008483A (ja) * 1998-06-24 2000-01-11 Ishikawa Koyo ベースプレート固定装置
JP2006249894A (ja) * 2005-03-07 2006-09-21 Kenjiro Ogata フレキシブルアンカーボルト
CN101725154A (zh) * 2009-11-16 2010-06-09 天津二十冶建设有限公司 轻型设备及钢结构的安装调整方法及其安装调整装置
CN101806069A (zh) * 2010-04-16 2010-08-18 天津二十冶建设有限公司 螺栓整体固定安装方法
CN201962804U (zh) * 2011-01-12 2011-09-07 陕西建工集团第六建筑工程有限公司 超长设备基础平台用预埋件埋置结构
CN102619235A (zh) * 2012-04-17 2012-08-01 中国建筑第五工程局有限公司 混凝土基础预埋螺栓支架及混凝土基础螺栓预埋方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385988A (zh) * 2018-03-20 2018-08-10 中国航天建设集团有限公司 平面预埋件调平装置及方法
CN108385988B (zh) * 2018-03-20 2020-09-18 中国航天建设集团有限公司 平面预埋件调平方法

Also Published As

Publication number Publication date
CN102900098A (zh) 2013-01-30

Similar Documents

Publication Publication Date Title
CN102900098B (zh) 基础预埋件调平施工工艺
CN204040056U (zh) 一种预埋地脚螺栓的定位安装支架
CN204059395U (zh) 地脚螺栓的预埋定位结构
CN203320700U (zh) 一种钢结构柱脚连接结构
CN104389313B (zh) 双拼型工字钢格构柱的定位调垂装置及其定位调垂方法
CN201723388U (zh) 一种用于风力发电机基础与塔筒连接的基础环固定支架
CN104110140B (zh) 一种网架节点定位调节装置及定位调节方法
CN104141318B (zh) 一种大直径钢管柱柱脚安装施工方法
CN106065681A (zh) 一种基于bim技术的整体装配式建筑中叠合板现浇板带施工方法
CN101294399A (zh) 柱基纠偏方法
CN102926538A (zh) 反力箱和反力墙的施工方法
CN103061249A (zh) 一种桥梁钢管立柱快速定位施工装置及施工方法
CN109179222B (zh) 一种塔式起重机预埋节斜度及水平度控制施工方法
CN104452802B (zh) 一种海上风机基础的调平结构及调平方法
CN207048353U (zh) 一种预制柱安装标高控制装置
CN206986918U (zh) 一种用于风机锚栓基础灌浆的非对称模板
CN106088596B (zh) 一种无拉杆h型钢桁架u型槽侧模板加固体系
CN203113515U (zh) 一种滑模顶升一体化装置
CN202381269U (zh) 风力发电机基础环安装水平度的调整装置
CN206189607U (zh) 地脚螺栓定位结构
CN204343294U (zh) 双拼型工字钢格构柱的定位调垂装置
CN203160707U (zh) 可调式t型控制器
CN209368828U (zh) 逆作法施工钢管柱安装控制装置
CN206646842U (zh) 一种新型叠合板安装临时支撑系统
CN201891250U (zh) 一种地坪找平器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 100761 West Chang'an Avenue, Beijing, No. 86

Applicant after: State Grid Corporation of China

Applicant after: XINYANG POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co.

Address before: 464000 Jianshe Road, Henan, No. 88,

Applicant before: XINYANG POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co.

Applicant before: State Grid Corporation of China

Address after: 464000 Jianshe Road, Henan, No. 88,

Applicant after: XINYANG POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co.

Applicant after: State Grid Corporation of China

Address before: 464000 Jianshe Road, Henan, No. 88,

Applicant before: Xinyang Power Supply Company of Henan Electric Power Corp.

Applicant before: State Grid Corporation of China

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: XINYANG POWER SUPPLY COMPANY, STATE GRID HENAN ELECTRIC POWER COMPANY TO: STATE GRID CORPORATION OF CHINA

Free format text: CORRECT: APPLICANT; FROM: STATE GRID CORPORATION OF CHINA TO: XINYANG POWER SUPPLY COMPANY, STATE GRID HENAN ELECTRIC POWER COMPANY

Free format text: CORRECT: ADDRESS; FROM: 464000 XINYANG, HENAN PROVINCE TO: 100761 DONGCHENG, BEIJING

Free format text: CORRECT: APPLICANT; FROM: HENAN ELECTRIC POWER COMPANY XINYANG POWER SUPPLY BRANCH TO: XINYANG POWER SUPPLY COMPANY, STATE GRID HENAN ELECTRIC POWER COMPANY

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150819

CF01 Termination of patent right due to non-payment of annual fee