CN103334496B - 隔震支座下预埋钢板调平螺栓及使用方法 - Google Patents
隔震支座下预埋钢板调平螺栓及使用方法 Download PDFInfo
- Publication number
- CN103334496B CN103334496B CN201310306717.4A CN201310306717A CN103334496B CN 103334496 B CN103334496 B CN 103334496B CN 201310306717 A CN201310306717 A CN 201310306717A CN 103334496 B CN103334496 B CN 103334496B
- Authority
- CN
- China
- Prior art keywords
- leveling
- steel slab
- embedded steel
- isolating pedestal
- shock isolating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 62
- 239000010959 steel Substances 0.000 title claims abstract description 62
- 230000035939 shock Effects 0.000 title claims abstract description 56
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 title claims abstract description 50
- 238000000034 method Methods 0.000 title claims description 11
- 238000009413 insulation Methods 0.000 claims abstract description 6
- 238000005259 measurement Methods 0.000 claims description 3
- 238000011900 installation process Methods 0.000 abstract description 5
- 238000009434 installation Methods 0.000 description 3
- 230000006378 damage Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000002955 isolation Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Landscapes
- Vibration Prevention Devices (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本发明公开了一种隔震支座下预埋钢板调平螺栓,包括一调平螺杆和一调平螺母;所述调平螺杆的顶端形成螺纹部,所述调平螺杆的底端埋设于外部混凝土基础中;所述调平螺母形成与所述调平螺杆配合的内螺纹并螺接套设于所述螺纹部的外侧端部;所述调平螺母顶端支撑有一隔震支座下预埋钢板。由于采用了本发明的隔震支座下预埋钢板调平螺栓,实现了一种隔震支座下预埋钢板调平螺栓,能够很好的解决预埋钢板安装过程中的水平度控制难点,能够方便快捷的对支座下预埋钢板进行调节;且钢板调平完成后,钢板的水平度不受后续工序的影响,在隔震墩柱混凝土初凝前能够进行最终调节以此确保钢板的水平度;具有方便、快捷、精准的特点。
Description
技术领域
本发明涉及一种调平螺栓及使用方法,尤指一种隔震支座下预埋钢板调平螺栓及使用方法。
背景技术
地震对于建筑物的影响极大,在发生时带来极大的生命财产的损失。人们在长期的地震产生原因的研究中,总结了地震带来房屋倒塌的原因,得出了抗震设计的理论。在长期的实践过程中总结出采用抗震体系设计的建筑能够有效的规避地震对建筑物的损坏,保障人民的生命财产安全,且降低了建筑结构设计的工程造价。
隔震支座一般安装在建筑物的隔震层中,建筑物的上部结构与基础结构通过隔震支座进行连接,隔震支座能够有效的减轻的地震对于建筑物上部结构的破坏。隔震支座的安装要求较高,对于支座的水平度控制难度较大,在具体的安装过程中,首先要确保隔震支座下预埋钢板的水平度以此保证支座的水平度。而现有隔震支座下预埋钢板的螺栓不具备调平功能,从而不能快速精准的对钢板进行调平,加长了隔震支座安装的的工期和增加了工序的复杂度。
发明内容
本发明的目的在于克服现有技术的缺陷,而提供一种隔震支座下预埋钢板调平螺栓及使用方法,本发明隔震支座下预埋钢板调平螺栓能够很好的解决预埋钢板安装过程中的水平度控制难点,能够方便快捷的对支座下预埋钢板进行调节;且钢板调平完成后,钢板的水平度不受后续工序的影响,在隔震墩柱混凝土初凝前能够进行最终调节以此确保钢板的水平度。具有方便、快捷、精准的特点,并都够大量的节约隔震支座安装的工期,以此创造工程经济效益。
实现上述目的的技术方案是:
本发明的一种隔震支座下预埋钢板调平螺栓,包括一调平螺杆和一调平螺母;所述调平螺杆的顶端形成螺纹部,所述调平螺杆的底端埋设于外部混凝土基础中;所述调平螺母形成与所述调平螺杆配合的内螺纹并螺接套设于所述螺纹部的外侧端部;所述调平螺母顶端支撑有一隔震支座下预埋钢板。
本发明的进一步改进在于,所述调平螺母螺的顶端焊接有一半球体,所述半球体顶端支撑有所述隔震支座下预埋钢板。
本发明的一种隔震支座下预埋钢板调平螺栓的使用方法,包括如下步骤:
根据隔震支座下预埋钢板的安装信息选用合适尺寸和数量的调平螺栓;
在每一隔震支座下预埋钢板预安装位置下垂直预埋三根调平螺栓且所述调平螺栓呈等腰三角形布置;
将复数个调平螺母螺接安装至对应的所述调平螺杆的螺纹部顶端并将所述调平螺母调节至同一水平高度;
安装所述隔震支座下预埋钢板;
调整所述调平螺母将所述隔震支座下预埋钢板调整到预设标高和预设水平度;
对所述隔震支座下预埋钢板表面进行复测,并通过转动调平螺母,对标高进行修正,达到最终调平;
浇筑外部混凝土基础。
本发明的进一步改进在于,在所述将复数个所述调平螺杆的底端埋设于外部混凝土基础中步骤中,所述调平螺杆的顶端低于所述隔震支座下预埋钢板的一预设安装高度3cm。
本发明由于采用了以上技术方案,使其具有以下有益效果是:
调平螺杆和调平螺母的配合,解决预埋钢板安装过程中的水平度控制难点,能够方便快捷的对支座下预埋钢板进行调节。具有方便、快捷、精准的特点。
附图说明
图1为本发明单个调平螺栓与隔震支座下预埋钢板的连接结构示意图;
图2为本发明调平螺栓与隔震支座下预埋钢板的系统结构示意图;
图3为本发明隔震支座下预埋钢板与调平螺栓的连接结构仰视示意图。
具体实施方式
下面结合具体实施例对本发明作进一步说明。
请参阅图1、2,本发明的一种隔震支座下预埋钢板调平螺栓,包括一调平螺杆11和一调平螺母12;调平螺杆11的顶端形成螺纹部111,调平螺杆11的底端埋设于外部混凝土基础3中,其布置范围在隔震支座下部墩柱4的竖向主筋5内侧;调平螺母12形成与调平螺杆11配合的内螺纹并螺接套设于螺纹部111的外侧端部;调平螺母螺12的顶端焊接有一半球体13,半球体13表面光滑顶端支撑有隔震支座下预埋钢板2。
调平螺杆11和调平螺母12的配合,解决预埋钢板安装过程中的水平度控制难点,能够方便快捷的对支座下预埋钢板进行调节。具有方便、快捷、精准的特点。
请参阅图1-3,本发明的一种隔震支座下预埋钢板调平螺栓的使用方法,包括如下步骤:
根据隔震支座下预埋钢板2的安装信息选用合适尺寸和数量的调平螺栓1;具体包括:根据隔震支座下预埋钢板2的大小及数量计算调平螺栓1的数量;根据隔震支座下预埋钢板2的大小和重量及安装高度计算所需预埋调平螺栓1的长度和直径;
在每一隔震支座下预埋钢板2预安装位置下垂直预埋三根调平螺栓1且调平螺栓1呈等腰三角形布置;且调平螺栓1布置在隔震墩柱钢筋笼以内的边缘处;保证调平螺杆11的垂直度。同时调平螺杆11的顶端低于隔震支座下预埋钢板2的一预设安装高度3cm。
将复数个调平螺母12螺接安装至对应的调平螺杆11的螺纹部111顶端并将调平螺母12调节至同一水平高度;
安装隔震支座下预埋钢板2;
调整调平螺母12将隔震支座下预埋钢板2调整到预设标高和预设水平度;
对隔震支座下预埋钢板2表面进行复测,并通过转动调平螺母12,对标高进行修正,达到最终调平;
最后,浇筑外部混凝土基础3。
外部混凝土基础3浇筑前,根据隔震支座下预埋钢板2的数量、高度、重量确定调平螺杆11、调平螺母12、实心半球13的数量、高度、规格,将调平螺杆11呈等腰三角形布置在隔震墩柱5的竖向主筋5内侧,保证每块隔震支座下预埋钢板2以下布置三根调平螺栓1。其中调平螺杆11需要保持竖向垂直,调平螺母12和实心半球13需与调平螺杆11在同一个竖向轴线上。
以上结合附图实施例对本发明进行了详细说明,本领域中普通技术人员可根据上述说明对本发明做出种种变化例。因而,实施例中的某些细节不应构成对本发明的限定,本发明将以所附权利要求书界定的范围作为本发明的保护范围。
Claims (1)
1.一种隔震支座下预埋钢板调平螺栓的使用方法,其特征在于,
隔震支座下预埋钢板调平螺栓包括一调平螺杆和一调平螺母;所述调平螺杆的顶端形成螺纹部,所述调平螺杆的底端埋设于外部混凝土基础中;所述调平螺母形成与所述调平螺杆配合的内螺纹并螺接套设于所述螺纹部的外侧端部;所述调平螺母顶端支撑有一隔震支座下预埋钢板;
所述调平螺母的顶端焊接有一半球体,所述半球体顶端支撑有所述隔震支座下预埋钢板;
所述使用方法包括如下步骤:
根据隔震支座下预埋钢板的安装信息选用合适尺寸和数量的调平螺栓;
在每一隔震支座下预埋钢板预安装位置下垂直预埋三根调平螺栓且所述调平螺栓呈等腰三角形布置;
将复数个调平螺母螺接安装至对应的所述调平螺杆的螺纹部顶端并将所述调平螺母调节至同一水平高度;
安装所述隔震支座下预埋钢板;
调整所述调平螺母将所述隔震支座下预埋钢板调整到预设标高和预设水平度;
对所述隔震支座下预埋钢板表面进行复测,并通过转动调平螺母,对标高进行修正,达到最终调平;
浇筑外部混凝土基础。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310306717.4A CN103334496B (zh) | 2013-07-19 | 2013-07-19 | 隔震支座下预埋钢板调平螺栓及使用方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310306717.4A CN103334496B (zh) | 2013-07-19 | 2013-07-19 | 隔震支座下预埋钢板调平螺栓及使用方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103334496A CN103334496A (zh) | 2013-10-02 |
CN103334496B true CN103334496B (zh) | 2018-03-16 |
Family
ID=49242697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310306717.4A Active CN103334496B (zh) | 2013-07-19 | 2013-07-19 | 隔震支座下预埋钢板调平螺栓及使用方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103334496B (zh) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104120802B (zh) * | 2014-07-14 | 2017-01-25 | 昆明理工大学 | 一种隔震支座安装定位简易方法 |
CN105256894A (zh) * | 2015-10-23 | 2016-01-20 | 中国十七冶集团有限公司 | 一种减隔震支座预埋螺栓套筒精确安装的施工方法 |
CN106245884A (zh) * | 2016-08-31 | 2016-12-21 | 浙江亚厦装饰股份有限公司 | 收缝件以及装饰线条拼缝接口结构 |
CN107354874A (zh) * | 2017-08-30 | 2017-11-17 | 中交公局海威工程建设有限公司 | T梁梁底钢板调坡装置 |
CN108487650A (zh) * | 2018-03-28 | 2018-09-04 | 中国建筑第八工程局有限公司 | 隔震支座的下预埋板安装结构及下预埋板的安装方法 |
CN108723564B (zh) * | 2018-06-28 | 2024-01-09 | 中车西安车辆有限公司 | 一种封头找平跟踪切割装置 |
CN109571724B (zh) * | 2018-12-07 | 2021-03-12 | 湖南五新模板有限公司 | 一种可调式混凝土预制块模具 |
CN110158627B (zh) * | 2019-04-30 | 2024-05-28 | 国网浙江省电力有限公司金华供电公司 | 一种预制变电站配电装置楼的基础及施工方法 |
CN110304558A (zh) * | 2019-06-18 | 2019-10-08 | 上海建工七建集团有限公司 | 塔吊锚脚可调节支座及其安装方法 |
CN110965592A (zh) * | 2019-11-11 | 2020-04-07 | 黑龙江省地震办公室 | 一种基于万向球的隔震方法及系统 |
CN111549657A (zh) * | 2020-05-22 | 2020-08-18 | 贵州路桥集团有限公司 | 一种桥梁盆式橡胶支座的快速安装方法 |
CN112726835A (zh) * | 2020-12-30 | 2021-04-30 | 河北交源新材料科技有限公司 | 高度快速调整装置及其在隔震支座设置、调整或更换中的应用 |
CN113719181A (zh) * | 2021-08-16 | 2021-11-30 | 中建科工集团有限公司 | 连接组件以及连接方法 |
CN114517585A (zh) * | 2022-02-24 | 2022-05-20 | 中国十七冶集团有限公司 | 一种建筑隔震支座精准安装方法 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5152108A (en) * | 1989-09-11 | 1992-10-06 | Madl Jr Jos | Foundation system with integral bracing for manufacturing buildings |
JPH11323954A (ja) * | 1998-05-11 | 1999-11-26 | Okinawa Shintetsu Shoji:Kk | コンクリート製品設置用埋金具及びその設置方法並びにそれを用いたモルタル敷均し方法 |
JP4911823B2 (ja) * | 2001-02-19 | 2012-04-04 | 旭化成建材株式会社 | アンカーフレームの定着構造 |
JP2003221832A (ja) * | 2002-01-29 | 2003-08-08 | Toyo House Kk | レベルアンカーボルト |
CN101307605B (zh) * | 2008-06-06 | 2010-12-01 | 中冶天工上海十三冶建设有限公司 | 高精度设备底座安装方法 |
CN102032422B (zh) * | 2010-11-30 | 2012-08-08 | 攀钢集团工程技术有限公司 | 机械设备底座的调平安装方法 |
CN202023199U (zh) * | 2011-03-25 | 2011-11-02 | 国水投资集团包头风电科技有限公司 | 基础预应力锚板锚栓组合件 |
CN202578103U (zh) * | 2012-04-24 | 2012-12-05 | 中铁电气化局集团有限公司 | 铁路多功能抢修支柱 |
JP5165139B1 (ja) * | 2012-08-21 | 2013-03-21 | 黒沢建設株式会社 | 免震装置の取付方法と取付構造 |
CN102900098B (zh) * | 2012-11-14 | 2015-08-19 | 国家电网公司 | 基础预埋件调平施工工艺 |
-
2013
- 2013-07-19 CN CN201310306717.4A patent/CN103334496B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN103334496A (zh) | 2013-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103334496B (zh) | 隔震支座下预埋钢板调平螺栓及使用方法 | |
CN106639336A (zh) | 预制混凝土墙板安装就位导向调整装置及其施工方法 | |
CN202658909U (zh) | 逆作法钢柱定位架 | |
CN204001428U (zh) | 一种大直径钢管柱柱脚安装预埋定位结构及其柱脚结构 | |
CN104032969A (zh) | 一种隔震支座预埋板精确定位及过程调控装置 | |
CN104141318A (zh) | 一种大直径钢管柱柱脚安装施工方法 | |
CN102828469B (zh) | 斜腿钢箱三角刚构墩定位安装施工方法 | |
CN102587410A (zh) | 钢筋混凝土挡土墙设计施工方法 | |
CN206161011U (zh) | 调节式倒垂线组装支架结构 | |
CN206127746U (zh) | 一种隔震支座处理后预埋钢板准确定位结构 | |
CN203741866U (zh) | 一种混凝土基础内预埋螺杆的固定架结构 | |
CN103061249A (zh) | 一种桥梁钢管立柱快速定位施工装置及施工方法 | |
CN204001429U (zh) | 一种大直径钢管柱柱脚结构及其柱脚标高调节固定结构 | |
CN105756053A (zh) | 一种建筑桩 | |
CN204782197U (zh) | 一种新型35kV绝缘子支架柱脚安装结构 | |
CN205822792U (zh) | 一种用于砌体直埋的调节支架 | |
CN202273420U (zh) | 吊模定位支撑装置 | |
CN102653947A (zh) | 地下预埋钢构件限位调直施工方法 | |
CN205024724U (zh) | 一种可调节式井圈 | |
CN206971725U (zh) | 吊模的安装装置 | |
CN107859052A (zh) | 一种登机桥后立柱的可调式单桩基础及其施工方法 | |
CN204001427U (zh) | 一种钢管柱柱脚安装用定位环板的预埋定位支撑结构 | |
CN205483737U (zh) | 砂浆锚杆制作装置 | |
CN209723624U (zh) | 一种用现浇单面模板支撑结构 | |
CN208650088U (zh) | 一种路灯灯杆安装用钢筋混凝土预制基础结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |