CN102900021B - 一种拼装式桥梁湿接缝施工方法 - Google Patents

一种拼装式桥梁湿接缝施工方法 Download PDF

Info

Publication number
CN102900021B
CN102900021B CN201210372205.3A CN201210372205A CN102900021B CN 102900021 B CN102900021 B CN 102900021B CN 201210372205 A CN201210372205 A CN 201210372205A CN 102900021 B CN102900021 B CN 102900021B
Authority
CN
China
Prior art keywords
template
lifting
pull bar
pvc pipe
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210372205.3A
Other languages
English (en)
Other versions
CN102900021A (zh
Inventor
崔海珠
林冬
赵文龙
张华明
万为胜
马仁松
张辉
张明亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of CTCE Group
Original Assignee
First Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of CTCE Group filed Critical First Engineering Co Ltd of CTCE Group
Priority to CN201210372205.3A priority Critical patent/CN102900021B/zh
Publication of CN102900021A publication Critical patent/CN102900021A/zh
Application granted granted Critical
Publication of CN102900021B publication Critical patent/CN102900021B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明公开了一种拼装式桥梁湿接缝施工方法,包括有以下步骤:a、采用模板与拉杆固定的形式,运用小型卷扬机升降,预留模板安装与吊落孔,实现模板顺利的提升安装、模板的拆除吊落,先将模板与模板下方的方木钻眼,再将模板与拉杆固定牢靠;最后将吊绳与模板、方木钻眼穿过的钢丝绑紧,再将模板体系提升进行安装;b、将模板体系安提升就位,再用钢管做“搭桥”,配合使用蝴蝶扣,用螺母、垫片将拉杆与钢管套紧与T梁上的方木形成稳定体系;本发明以便于高空情况下的湿接缝作业,提高操作安全性,降低劳动强度,有效提高模板的安装与吊落的工作效率,且每套模板皆可循环利用。

Description

一种拼装式桥梁湿接缝施工方法
技术领域
本发明涉及高桥墩拼装式桥梁湿接缝施工施工方法,更具体地说是一种应用在公路、铁路拼装式桥梁湿接缝工程中,方便模板安装与拆卸的施工方法。
背景技术
随着现代桥梁施工技术的发展,桥梁高度逐渐增高,拼装式桥梁湿接缝施工的技术优越性也越来越重要,怎样使湿接缝的施工操作更安全,便捷,且效率更高,成为桥梁施工的一项重要内容。
现有的施工技术:一、需要人到梁底下进行施工,制作施工平台,从梁上通过爬梯到梁底下的工作平台上进行施工。二、用升降机械,形成操作平台,人员在操作平台上进行操作。第一种方法,成本较高,且模板安装或拆卸的运送比较繁琐,且施工人员的安全度较低;第二种方法,对机械的要求较高、桥下场地也受到限制,且操作空间小,不利于施工的进行。
本发明简便实用,既减少了地面机械的投入,又提高施工人员操作的安全性,在一定程度上降低了工人劳动强度,有效的提高了模板安装与拆除的效率,且提高了工装周转次数。
发明内容
本发明是为避免上述现有技术所存在的不足之处,提供一种拼装式桥梁湿接缝施工方法,以便于高空情况下的湿接缝作业,提高操作安全性,降低劳动强度,有效提高模板的安装与吊落的工作效率,且每套模板皆可循环利用。
本发明解决技术问题采用如下技术方案:
一种拼装式桥梁湿接缝施工方法,包括有以下步骤:
a、采用模板与拉杆固定的形式,运用小型卷扬机升降,预留模板安装与吊落孔,实现模板顺利的提升安装、模板的拆除吊落,先将模板与模板下方的方木钻眼,再将模板与拉杆固定牢靠;最后将吊绳与模板、方木钻眼穿过的钢丝绑紧,再将模板体系提升进行安装;
b、将模板体系安提升就位,再用钢管做“搭桥”,配合使用蝴蝶扣,用螺母、垫片将拉杆与钢管套紧与T梁上的方木形成稳定体系;
c、浇筑砼时注意预埋PVC管将拉杆包裹,PVC管直径要大于垫片和螺母外直径,预埋PVC管将铁丝包裹,PVC管直径要足够大,以免拆除时吊绳被卡住;
d、混凝土浇筑完毕后,达到拆除强度后,拆除模板:先将铁丝放松,且铁丝与吊绳捆绑牢固后,用小锤轻击拉杆上部,模板松动下落,将吊绳与通过预埋PVC管处穿过的钢丝3进行捆绑,然后利用小型卷扬机进行模板的吊落。
所述的吊落孔是由PVC管预留孔洞与内预置吊装、落铁丝组合。
与现有技术相比,本发明的有益效果如下:
1、改进模板与拉杆的连接,使拉杆下端与模板形成一个稳固整体,可周转使用,且便于模板安装和拆除;
2、改进模板体系,增加预留吊落孔,采用预埋PVC管,直径以不影响模板的吊落为准,并穿铁丝,形成模板吊落的固定位置体系。模板的提升不受约束,吊落要通过上述预留的吊落孔;
3、模板体系的施工操作方式,使用小型卷扬机提升或吊落模板,方便模板的安装和拆除。
附图说明
图1为湿接缝模板与拉杆固定安装示意图;
图2为湿接缝模板安装示意图;
图3为湿接缝施工平面示意图;
图4为模板的提升安装示意图;
图5为模板的拆卸吊落示意图。
具体实施方式
一种拼装式桥梁湿接缝施工方法,包括有以下步骤:
a、采用模板7与拉杆2固定的形式,运用小型卷扬机升降,预留模板安装与吊落孔,实现模板顺利的提升安装、模板的拆除吊落,先将模板与模板下方的方木钻眼,再将模板与拉杆固定牢靠;最后将吊绳与模板、方木钻眼穿过的钢丝绑紧,再将模板体系提升进行安装;
b、将模板体系安提升就位,再用钢管做“搭桥”,配合使用蝴蝶扣,用螺母8、垫片10将拉杆2与钢管套紧与T梁上的方木形成稳定体系;
c、浇筑砼时注意预埋PVC管11将拉杆包裹,PVC管直径要大于垫片10和螺母8外直径,预埋PVC管11将铁丝包裹,PVC管直径要足够大,以免拆除时吊绳被卡住;
d、混凝土浇筑完毕后,达到拆除强度后,拆除模板:先将铁丝放松,且铁丝与吊绳捆绑牢固后,用小锤轻击拉杆上部,模板松动下落,将吊绳与通过预埋PVC管处穿过的钢丝3进行捆绑,然后利用小型卷扬机进行模板的吊落。
所述的吊落孔是由PVC管预留孔洞与内预置吊装、落铁丝组合。
1、根据图1所示安装好模板体系中的拉杆2,拉杆2由螺母8、螺杆9、垫片10组成;
2、根据图1所示,先将模板7与模板下方木6钻眼,再将模板7与拉杆2固定牢靠;
3、根据图4所示,先将吊绳13与模板7、方木6钻眼穿过的钢丝3绑紧,再将模板体系提升进行安装;
4、根据图2所示,先将模板体系安提升就位,再用钢管1做“搭桥”,配合使用蝴蝶扣4,用螺母8、垫片10将拉杆2与钢管1套紧与T梁15上的方木5形成稳定体系;
5、浇筑砼时注意预埋PVC管11将拉杆包裹,PVC管11直径要大于垫片10和螺母8外直径,预埋PVC管14将铁丝3包裹,PVC管直径要足够大,以免拆除时吊绳13被卡住;
6、混凝土浇筑完毕后,达到拆除强度后,拆除模板:先将铁丝3放松,且铁丝与吊绳捆绑牢固后,用小锤轻击拉杆上部,模板松动下落,根据图4所示,将吊绳13与通过预埋PVC管14处穿过的钢丝3进行捆绑,然后利用小型卷扬机12进行模板的吊落。

Claims (1)

1.一种拼装式桥梁湿接缝施工方法,其特征是,包括有以下步骤:
a、采用模板与拉杆固定的形式,运用小型卷扬机升降,预留模板安装与吊落孔,实现模板顺利的提升安装、模板的拆除吊落,先将模板与模板下方的方木钻眼,再将模板与拉杆固定牢靠;最后将吊绳与模板、方木钻眼穿过的钢丝绑紧,再将模板体系提升进行安装;所述的吊落孔是由PVC管预留孔洞与内预置吊装、落铁丝组合;
b、将模板体系安提升就位,再用钢管做“搭桥”,配合使用蝴蝶扣,用螺母、垫片将拉杆与钢管套紧与T梁上的方木形成稳定体系;
c、浇筑砼时注意预埋PVC管将拉杆包裹,PVC管直径要大于垫片和螺母外直径,预埋PVC管将铁丝包裹,PVC管直径要足够大,以免拆除时吊绳被卡住;
d、混凝土浇筑完毕后,达到拆除强度后,拆除模板:先将铁丝放松,且铁丝与吊绳捆绑牢固后,用小锤轻击拉杆上部,模板松动下落,将吊绳与通过预埋PVC管处穿过的钢丝(3)进行捆绑,然后利用小型卷扬机进行模板的吊落。
CN201210372205.3A 2012-09-28 2012-09-28 一种拼装式桥梁湿接缝施工方法 Active CN102900021B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210372205.3A CN102900021B (zh) 2012-09-28 2012-09-28 一种拼装式桥梁湿接缝施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210372205.3A CN102900021B (zh) 2012-09-28 2012-09-28 一种拼装式桥梁湿接缝施工方法

Publications (2)

Publication Number Publication Date
CN102900021A CN102900021A (zh) 2013-01-30
CN102900021B true CN102900021B (zh) 2015-04-29

Family

ID=47572488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210372205.3A Active CN102900021B (zh) 2012-09-28 2012-09-28 一种拼装式桥梁湿接缝施工方法

Country Status (1)

Country Link
CN (1) CN102900021B (zh)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306205A (zh) * 2013-06-09 2013-09-18 中国十七冶集团有限公司 一种预制t梁或箱梁纵向湿接缝模板施工方法
CN103510466B (zh) * 2013-10-11 2015-07-01 中铁十九局集团有限公司 T形梁桥面系湿接缝施工方法
CN103758045B (zh) * 2014-02-20 2016-06-08 中铁十局集团第三建设有限公司 空间限制条件下箱梁湿接缝模板施工方法
CN104018422B (zh) * 2014-06-18 2015-11-18 上海市城市建设设计研究总院 用于预制拼装桥墩立柱与盖梁连接部位的湿接缝构造
CN110396932A (zh) * 2019-07-24 2019-11-01 中交一公局集团有限公司 一种桥梁拼接式湿接缝模板安拆循环装置及其施工方法
CN111731988A (zh) * 2020-07-07 2020-10-02 中国建筑第四工程局有限公司 一种t梁湿接缝模板的提升安装方法及装置
CN112160587B (zh) * 2020-10-09 2022-05-27 浙江省二建建设集团有限公司 建筑物外墙及楼板的滑模施工设备和施工方法
CN112647371B (zh) * 2021-01-14 2022-12-27 上海申通地铁集团有限公司 利用二次浇筑将预制单元板连接成整体道床的施工方法
CN113265946B (zh) * 2021-04-17 2022-10-04 北京市市政二建设工程有限责任公司 一种桥梁湿接缝可快速安装的自发热模板
CN114278086A (zh) * 2021-12-02 2022-04-05 上海建工四建集团有限公司 双t板的板缝灌浆施工的吊模体系及方法
CN114753253A (zh) * 2022-03-08 2022-07-15 武汉市市政建设集团有限公司 一种预制梁桥湿接缝飞模装置及施工方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5511268A (en) * 1994-08-08 1996-04-30 The United States Of America As Represented By The Secretary Of Commerce Construction of large structures by robotic crane placement of modular bridge sections
CN201447867U (zh) * 2009-05-19 2010-05-05 湖南望新建设集团股份有限公司 一种组装木制大模板
CN202064359U (zh) * 2011-05-13 2011-12-07 中国葛洲坝集团股份有限公司 大梁湿接缝悬吊施工装置
CN202299426U (zh) * 2011-08-25 2012-07-04 温州中城建设集团有限公司 一种建筑变形缝支模顶撑对拉机构
CN202248866U (zh) * 2011-09-09 2012-05-30 中交第四公路工程局有限公司第五工程处 湿接缝模板提升装置
CN202416184U (zh) * 2011-12-29 2012-09-05 中建七局第一建筑有限公司 箱梁纵向湿接缝模板施工装置

Also Published As

Publication number Publication date
CN102900021A (zh) 2013-01-30

Similar Documents

Publication Publication Date Title
CN102900021B (zh) 一种拼装式桥梁湿接缝施工方法
CN204370830U (zh) 一种电杆扶正器
CN201221193Y (zh) 高空马道天花施工作业平台
CN102733615B (zh) 非对称整体提升施工方法
CN103993735A (zh) 屋面斜梁板悬挑结构支撑体系及其施工方法
CN205036072U (zh) 一种用于高空悬挑结构的悬挑型钢支模架
CN204675621U (zh) 一种用于管柱吊装中快速脱钩的卸扣
CN202945798U (zh) 一种悬挑式脚手架角部装置
CN205348724U (zh) 悬挑外脚手架可拆卸式钢丝绳吊环锚固结构
CN205709343U (zh) 逆装型深基坑专用施工升降机
CN202785351U (zh) 塔式起重机附着操作平台
CN201102883Y (zh) 钢导索滑升装置
CN204343642U (zh) 悬挑脚手架用转角支撑架
CN203145430U (zh) 一种固定悬挑梁的可拆卸锚环结构
CN202744961U (zh) 防落梁挡块的吊装机构
CN202767493U (zh) 高层阳台升降脚手架
CN201722937U (zh) 网架安装滑移平台
CN202000647U (zh) 电梯井提升脚手架的底座装置
CN205134921U (zh) 建筑外墙混凝土构造柱悬挂施工平台
CN209835410U (zh) 一种在钢结构吊装中快速空中脱扣的装置
CN212223633U (zh) 一种用于高位小空间作业电动爬升吊篮
CN203288976U (zh) 隔离开关吊装装置
CN204023414U (zh) 一种新型大型少支点支架整体落架装置
CN204343647U (zh) 一种型钢悬挑脚手架用支撑架
CN102733612B (zh) 电动葫芦轨道安装方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant