CN103993735A - 屋面斜梁板悬挑结构支撑体系及其施工方法 - Google Patents
屋面斜梁板悬挑结构支撑体系及其施工方法 Download PDFInfo
- Publication number
- CN103993735A CN103993735A CN201410247155.5A CN201410247155A CN103993735A CN 103993735 A CN103993735 A CN 103993735A CN 201410247155 A CN201410247155 A CN 201410247155A CN 103993735 A CN103993735 A CN 103993735A
- Authority
- CN
- China
- Prior art keywords
- girder
- encorbelmenting
- support system
- steel pipe
- pipe scaffold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
本发明公开了一种屋面斜梁板悬挑结构支撑体系及其施工方法,其特点是,以承载悬挑工字钢主梁的混凝土楼板结构为依托;以悬挑工字钢主梁为支撑体系骨架;自悬挑工字钢主梁的混凝土楼板结构下层框架梁边开始,向建筑物外侧与主梁之间按≥45°设置槽钢斜支撑,作为支撑悬挑工字钢主梁的载体;设置角铁连接构件,分别与悬挑主梁和斜支撑焊接连接,连接构件与斜支撑垂直;由悬挑主梁、斜支撑和连接构件三者组成三角形钢支撑体系;高层屋面斜梁板支撑系统及混凝土重量均由该支撑体系承载;为了加强安全储备,在悬挑主梁端部设置¢14钢丝绳锚固于上层外框架梁上;这种支撑体系及施工方法具有安全可靠、施工方便、周转次数多,造价低廉、施工速度快等特点,可节约能耗、降低工程成本。
Description
技术领域:
本发明涉及建筑施工技术领域,具体地讲是屋面斜梁板悬挑结构支撑体系及其施工方法,用于高层悬挑结构模板支撑。
背景技术:
目前,高层建筑施工的模板支撑体系,普遍采用满堂钢管脚手架支撑;对于高层建筑,屋面悬挑结构设计长度较小的工程,一般采用钢管斜支撑外挑这种钢管脚手架支撑体系,就能满足施工要求;此项方案常常只适用于悬挑60厘米以内的建筑,适用范围窄,无法满足屋面悬挑结构长度大的工程。
发明内容:
本发明的目的是克服上述已有技术的不足,而提供一种屋面斜梁板悬挑结构支撑体系。
本发明的另一目的是提供一种屋面斜梁板悬挑结构支撑体系的施工方法。
本发明主要解决现有的高空悬挑支撑体系适用范围窄无法满足悬挑长度大的工程的问题。
本发明的技术方案是:屋面斜梁板悬挑结构支撑体系,其特殊之处在于,悬挑主梁通过主梁锚固环固定于砼楼板上,斜支撑下端与悬挑主梁下层的楼板外侧预埋铁件连接,上端与悬挑主梁通过连接铁件连接,连接构件下端与斜支撑连接,上端与悬挑主梁连接,在悬挑主梁外侧上部设置悬挑钢管脚手架,在悬挑钢管脚手架底部设置扫地杆,在悬挑主梁上部满铺木架板,在木架板上设置水平大扣网,在悬挑主梁外侧设置外墙防护架,在悬挑钢管脚手架上设剪刀撑,在悬挑主梁上层的梁上设钢丝绳锚固环,钢丝绳一端固定连接悬挑主梁端部,另一端固定连接钢丝绳锚固环;悬挑主梁上方是屋面悬挑结构;在外墙防护架上安装外墙防护密目网。
进一步的,所述的斜支撑与连接构件垂直。
本发明的屋面斜梁板悬挑结构支撑体系的施工方法,其特殊之处在于,工艺步骤如下:
a在悬挑主梁层预埋主梁锚固环,根据型钢平面布置图进行预埋;
b悬挑主梁安装时,使用塔吊吊装逐个安装,悬挑主梁穿入主梁锚固环后,用圆钢筋对主梁锚固环进行垂直焊接封闭固定;
c悬挑主梁安装完成后,安装斜支撑,斜支撑的支点处使用焊接的方式与预埋铁件满焊,斜支撑与悬挑主梁的连接点处通过分别焊接穿孔铁板形成连接铁件,使用螺丝及螺帽连接;
d为了增加悬挑结构的整体稳定性,在斜支撑与悬挑主梁之间焊接连接构件,连接构件与斜支撑垂直;
e拉结钢丝绳,钢丝绳需在悬挑主梁的上层预埋钢丝绳锚固环,在悬挑主梁端部焊接锚固环,钢丝绳拉紧牢固;
f悬挑主梁、斜支撑、连接构件及钢丝绳固定后,搭设悬挑钢管脚手架顺序由外向内,将悬挑钢管脚手架立杆固定于悬挑主梁上焊接的防位移立柱上,一个立柱对应一个立杆,水平方向先安装扫地杆,而后安装悬挑钢管脚手架水平横杆,水平横杆的步距不大于1.5米,悬挑钢管脚手架与主楼内满堂脚手架进行水平拉结,并在混凝土柱处设置拉结点,最外两排立杆的水平拉结点与框架柱单独设置,同时最外两排立杆在屋面悬挑结构完成后作为外墙防护架使用,不得拆除;
g考虑到悬挑钢管脚手架的整体稳定性,增设垂直地面方向剪刀撑,剪刀撑与悬挑主梁同向,间距4.5米搭设一道;
h悬挑钢管脚手架与楼层水平梁交接处,每跨梁设两道竖向拉结点;
i悬挑钢管脚手架扫地杆位置设在悬挑主梁上平20cm处,与主楼内满堂脚手架扫地杆不在同一水平面上,错位搭接,搭接距离不少于1m;
j在施工悬挑钢管脚手架之前,需在悬挑钢管脚手架下层,搭设钢管水平安全外墙防护架,设置水平大扣网和外墙防护密目网各一道,绕建筑物一周,防止在搭设过程中掉落卡子等物品。
本发明所述的屋面斜梁板悬挑结构支撑体系及其施工方法与已有技术相比具有突出的实质性特点和显著进步,1、采用三角钢支撑体系,适用于屋面悬挑结构长度大的建筑工程,扩大支撑体系的适用范围;2、支撑体系采用工字钢、槽钢等,可反复周转使用,经济性好,安全可靠,节约工期,提高工效,同时节约能源,降低能耗。
附图说明:
图1是本发明的结构示意图;
图2是本发明的悬挑主梁的结构示意图;
图3是本发明的钢丝绳锚固环结构示意图;
图4是本发明的主梁锚固环结构示意图;
图5是本发明的斜支撑连接示意图;
图6是本发明的预埋铁件的结构示意图;
图7是本发明的悬挑主梁与斜支撑连接示意图;
图8是本发明的连接铁件结构示意图。
其中,1悬挑主梁 2斜支撑 3连接构件 4预埋铁件 5主梁锚固环 6扫地杆 7木架板 8外墙防护架 9剪刀撑 10钢丝绳 11钢丝绳锚固环 12屋面悬挑结构 13水平大扣网 14外墙防护密目网 15悬挑钢管脚手架 16连接铁件。
具体实施方式:
为了更好地理解与实施,下面结合附图给出具体实施例详细说明本发明;所举实施例仅用于解释本发明,并非用于限制本发明的范围。
实施例1,参见图1、2、3、4、5、6、7、8,悬挑主梁1采用18#工字钢,将悬挑主梁1通过主梁锚固环5固定于砼楼板上;斜支撑2和连接构件3采用8#槽钢和∟50*3角铁,将斜支撑2下端与悬挑主梁1下层的楼板外侧预埋铁件4连接,上端与悬挑主梁1通过连接铁件16连接,再将连接构件3下端与斜支撑2连接,上端与悬挑主梁1连接,斜支撑2用于支撑悬挑主梁1,连接构件3分别与主梁1和斜支撑2焊接连接,连接构件3与斜支撑2垂直,由悬挑主梁、斜支撑和连接构件三者组成三角形钢支撑体系;在悬挑主梁1外侧上部设置悬挑钢管脚手架15,在悬挑钢管脚手架15底部设置扫地杆6,在悬挑主梁1上满铺木架板7,在木架板7上设置水平大扣网13,在悬挑主梁1外侧上部设置钢管外墙防护架8,在悬挑钢管脚手架15上安装剪刀撑9;为了安全储备,在悬挑主梁1上层的梁上固定安装钢丝绳锚固环11,钢丝绳10一端固定连接悬挑主梁1,另一端固定连接钢丝绳锚固环11;悬挑主梁1上方是屋面悬挑结构12;在外墙防护架8上安装外墙防护密目网14;形成本发明的屋面斜梁板悬挑结构支撑体系,高层屋面斜梁板支撑系统及混凝土重量均由该支撑体系承载。
本发明所述的屋面斜梁板悬挑结构支撑体系,施工工艺如下:
1、在悬挑主梁层预埋主梁锚固环,根据型钢平面布置图进行预埋;
2、悬挑主梁安装时,使用塔吊吊装逐个安装,悬挑主梁穿入主梁锚固环后,用圆钢筋对主梁锚固环进行垂直焊接封闭固定;
3、悬挑主梁安装完成后,安装斜支撑,斜支撑的支点处使用焊接的方式与预埋铁件满焊,斜支撑与悬挑主梁的连接点处通过分别焊接穿孔铁板形成连接铁件,使用螺丝及螺帽连接;
4、为了增加悬挑结构的整体稳定性,在斜支撑与悬挑主梁之间焊接连接构件,连接构件选用L50*3角铁,连接构件与斜支撑垂直;
5、拉结钢丝绳,钢丝绳需在悬挑主梁的上层预埋锚钢丝绳固环,在主梁端部焊接锚固环,钢丝绳采用花篮螺栓配合钢丝绳卡环拉紧牢固;
6、悬挑主梁、斜支撑、连接构件及钢丝绳固定后,搭设悬挑钢管脚手架顺序由外向内,将悬挑钢管脚手架立杆固定于悬挑主梁上焊接的防位移立柱上,一个立柱对应一个立杆,悬挑钢管脚手架水平方向先安装扫地杆,而后安装悬挑钢管脚手架水平横杆,水平横杆的步距不大于1.5米,悬挑钢管脚手架必须与主楼内满堂脚手架进行水平拉结,并在混凝土柱处设置拉结点,最外两排防护架立杆的水平拉结点与框架柱单独设置,同时最外两排立杆在屋面悬挑结构完成后作为外墙防护架使用,不得拆除;
7、考虑到悬挑钢管脚手架的整体稳定性,增设垂直地面方向剪刀撑,剪刀撑与悬挑主梁同向,间距4.5米搭设一道;
8、悬挑钢管脚手架与楼层水平梁交接处,每跨梁设两道竖向拉结点;
9、悬挑钢管脚手架扫地杆位置设在悬挑主梁上平20cm处,与主楼内满堂脚手架扫地杆不在同一水平面上,错位搭接,搭接距离不少于1m;
10、在施工悬挑脚手架之前,需在悬挑钢管脚手架下层,搭设钢管水平安全外墙防护架,设置水平大扣网和外墙防护密目网各一道,绕建筑物一周,防止在搭设过程中掉落卡子等物品;
11、搭设过程中在建筑物下方设置警戒线,非脚手架搭设人员不准越过警戒线,并在悬挑钢管脚手架安装过程中安排专职安全员进行脚手架的巡视。
本发明所述的屋面斜梁板悬挑结构支撑体系及其施工方法,悬挑工作原理:以承载悬挑工字钢主梁的混凝土楼板结构为依托;以悬挑工字钢主梁为支撑体系骨架;自悬挑工字钢主梁的混凝土楼板结构下层框架梁边开始,向建筑物外侧与主梁之间按≥45°设置槽钢斜支撑,作为支撑悬挑工字钢主梁的载体;设置角铁连接构件,分别与悬挑主梁和斜支撑焊接连接,连接构件与斜支撑垂直;由悬挑主梁、斜支撑和连接构件三者组成三角形钢支撑体系;高层屋面斜梁板支撑系统及混凝土重量均由该支撑体系承载。为了安全储备,在悬挑主梁端部设置¢14钢丝绳锚固于上层外框架梁上。
Claims (3)
1.屋面斜梁板悬挑结构支撑体系,其特征在于,悬挑主梁(1)通过主梁锚固环(5)固定于砼楼板上,斜支撑(2)下端与悬挑主梁(1)下层的楼板外侧预埋铁件(4)连接,上端与悬挑主梁(1)通过连接铁件(16)连接,连接构件(3)下端与斜支撑(2)连接,上端与悬挑主梁(1)连接,在悬挑主梁(1)外侧上部设置悬挑钢管脚手架(15),在悬挑钢管脚手架(15)底部设置扫地杆(6),在悬挑主梁(1)上部满铺木架板(7),在木架板(7)上设置水平大扣网(13),在悬挑主梁(1)外侧设置外墙防护架(8),在悬挑钢管脚手架(15)上设剪刀撑(9),在悬挑主梁(1)上层的梁上设钢丝绳锚固环(11),钢丝绳(10)一端固定连接悬挑主梁(1)端部,另一端固定连接钢丝绳锚固环(11);悬挑主梁(1)上方是屋面悬挑结构(12);在外墙防护架(8)上安装外墙防护密目网(14)。
2.根据权利要求1所述的屋面斜梁板悬挑结构支撑体系,其特征在于,所述的斜支撑(2)与连接构件(3)垂直。
3.权利要求1或2所述的屋面斜梁板悬挑结构支撑体系的施工方法,其特征在于,工艺步骤如下:
a在悬挑主梁层预埋主梁锚固环,根据型钢平面布置图进行预埋;
b悬挑主梁安装时,使用塔吊吊装逐个安装,悬挑主梁穿入主梁锚固环后,用圆钢筋对主梁锚固环进行垂直焊接封闭固定;
c悬挑主梁安装完成后,安装斜支撑,斜支撑的支点处使用焊接的方式与预埋铁件满焊,斜支撑与悬挑主梁的连接点处通过分别焊接穿孔铁板形成连接铁件,使用螺丝及螺帽连接;
d为了增加悬挑结构的整体稳定性,在斜支撑与悬挑主梁之间焊接连接构件,连接构件与斜支撑垂直;
e拉结钢丝绳,钢丝绳需在悬挑主梁的上层预埋钢丝绳锚固环,在悬挑主梁端部焊接锚固环,钢丝绳拉紧牢固;
f悬挑主梁、斜支撑、连接构件及钢丝绳固定后,搭设悬挑钢管脚手架顺序由外向内,将悬挑钢管脚手架立杆固定于悬挑主梁上焊接的防位移立柱上,一个立柱对应一个立杆,水平方向先安装扫地杆,而后安装悬挑钢管脚手架水平横杆,水平横杆的步距不大于1.5米,悬挑钢管脚手架与主楼内满堂脚手架进行水平拉结,并在混凝土柱处设置拉结点,最外两排立杆的水平拉结点与框架柱单独设置,同时最外两排立杆在屋面悬挑结构完成后作为外墙防护架使用,不得拆除;
g考虑到悬挑钢管脚手架的整体稳定性,增设垂直地面方向剪刀撑,剪刀撑与悬挑主梁同向,间距4.5米搭设一道;
h悬挑钢管脚手架与楼层水平梁交接处,每跨梁设两道竖向拉结点;
i悬挑钢管脚手架扫地杆位置设在悬挑主梁上平20cm处,与主楼内满堂脚手架扫地杆不在同一水平面上,错位搭接,搭接距离不少于1m;
j在施工悬挑钢管脚手架之前,需在悬挑钢管脚手架下层,搭设钢管水平安全外墙防护架,设置水平大扣网和外墙防护密目网各一道,绕建筑物一周,防止在搭设过程中掉落卡子等物品。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410247155.5A CN103993735A (zh) | 2014-06-06 | 2014-06-06 | 屋面斜梁板悬挑结构支撑体系及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410247155.5A CN103993735A (zh) | 2014-06-06 | 2014-06-06 | 屋面斜梁板悬挑结构支撑体系及其施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103993735A true CN103993735A (zh) | 2014-08-20 |
Family
ID=51308049
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410247155.5A Pending CN103993735A (zh) | 2014-06-06 | 2014-06-06 | 屋面斜梁板悬挑结构支撑体系及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103993735A (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105019639A (zh) * | 2015-05-28 | 2015-11-04 | 河南国基建设集团有限公司 | 高空悬挑模架及其施工方法 |
CN106337555A (zh) * | 2016-09-26 | 2017-01-18 | 山东金城建设有限公司 | 建筑外墙悬挑结构三角钢支撑施工方法 |
CN106968432A (zh) * | 2017-04-17 | 2017-07-21 | 中国十七冶集团有限公司 | 超大悬臂阳台结构模板支撑体系及其施工方法 |
CN107476200A (zh) * | 2017-09-25 | 2017-12-15 | 中铁五局集团有限公司 | 一种满堂支架错位套搭结构及方法 |
CN107489265A (zh) * | 2016-06-13 | 2017-12-19 | 宜兴市周铁镇生力钻探机械厂 | 一种悬挑式脚手架的施工方法 |
CN109898821A (zh) * | 2019-03-21 | 2019-06-18 | 陕西建工第九建设集团有限公司 | 一种高空悬挑模板支撑架体的施工方法 |
CN111441579A (zh) * | 2019-01-17 | 2020-07-24 | 倡创(上海)咨询管理事务所 | 高层悬挑结构支模体系及施工方法 |
CN111576833A (zh) * | 2020-06-01 | 2020-08-25 | 北京天润建设有限公司 | 一种悬挑结构作业支撑体系及其施工方法 |
CN114482506A (zh) * | 2022-01-26 | 2022-05-13 | 中国建筑第五工程局有限公司 | 悬挑与落地式组合外脚手架的施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11148220A (ja) * | 1997-11-17 | 1999-06-02 | Alinco Inc | 枠組足場用荷受けステージの取付装置 |
JP2000328777A (ja) * | 1999-05-13 | 2000-11-28 | Otis Elevator Co | エレベータ据付用足場構造 |
CN202324616U (zh) * | 2011-11-17 | 2012-07-11 | 长业建设集团有限公司 | 高空大悬挑结构三角钢桁架支模体系 |
CN102733606A (zh) * | 2011-04-08 | 2012-10-17 | 中国建筑第八工程局有限公司 | 高空大悬挑结构的施工方法 |
CN103147582A (zh) * | 2013-03-19 | 2013-06-12 | 成军 | 高空悬挑模架的施工方法 |
CN203867181U (zh) * | 2014-06-06 | 2014-10-08 | 山东义泰建设工程有限公司 | 屋面斜梁板悬挑结构支撑体系 |
-
2014
- 2014-06-06 CN CN201410247155.5A patent/CN103993735A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11148220A (ja) * | 1997-11-17 | 1999-06-02 | Alinco Inc | 枠組足場用荷受けステージの取付装置 |
JP2000328777A (ja) * | 1999-05-13 | 2000-11-28 | Otis Elevator Co | エレベータ据付用足場構造 |
CN102733606A (zh) * | 2011-04-08 | 2012-10-17 | 中国建筑第八工程局有限公司 | 高空大悬挑结构的施工方法 |
CN202324616U (zh) * | 2011-11-17 | 2012-07-11 | 长业建设集团有限公司 | 高空大悬挑结构三角钢桁架支模体系 |
CN103147582A (zh) * | 2013-03-19 | 2013-06-12 | 成军 | 高空悬挑模架的施工方法 |
CN203867181U (zh) * | 2014-06-06 | 2014-10-08 | 山东义泰建设工程有限公司 | 屋面斜梁板悬挑结构支撑体系 |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105019639B (zh) * | 2015-05-28 | 2017-07-14 | 河南国基建设集团有限公司 | 高空悬挑模架及其施工方法 |
CN105019639A (zh) * | 2015-05-28 | 2015-11-04 | 河南国基建设集团有限公司 | 高空悬挑模架及其施工方法 |
CN107489265A (zh) * | 2016-06-13 | 2017-12-19 | 宜兴市周铁镇生力钻探机械厂 | 一种悬挑式脚手架的施工方法 |
CN106337555A (zh) * | 2016-09-26 | 2017-01-18 | 山东金城建设有限公司 | 建筑外墙悬挑结构三角钢支撑施工方法 |
CN106968432A (zh) * | 2017-04-17 | 2017-07-21 | 中国十七冶集团有限公司 | 超大悬臂阳台结构模板支撑体系及其施工方法 |
CN107476200A (zh) * | 2017-09-25 | 2017-12-15 | 中铁五局集团有限公司 | 一种满堂支架错位套搭结构及方法 |
CN107476200B (zh) * | 2017-09-25 | 2023-03-14 | 中铁五局集团有限公司 | 一种满堂支架错位套搭结构及方法 |
CN111441579B (zh) * | 2019-01-17 | 2022-02-15 | 倡创(上海)咨询管理事务所 | 高层悬挑结构支模体系及施工方法 |
CN111441579A (zh) * | 2019-01-17 | 2020-07-24 | 倡创(上海)咨询管理事务所 | 高层悬挑结构支模体系及施工方法 |
CN109898821A (zh) * | 2019-03-21 | 2019-06-18 | 陕西建工第九建设集团有限公司 | 一种高空悬挑模板支撑架体的施工方法 |
CN109898821B (zh) * | 2019-03-21 | 2019-12-17 | 陕西建工第九建设集团有限公司 | 一种高空悬挑模板支撑架体的施工方法 |
CN111576833A (zh) * | 2020-06-01 | 2020-08-25 | 北京天润建设有限公司 | 一种悬挑结构作业支撑体系及其施工方法 |
CN114482506A (zh) * | 2022-01-26 | 2022-05-13 | 中国建筑第五工程局有限公司 | 悬挑与落地式组合外脚手架的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103993735A (zh) | 屋面斜梁板悬挑结构支撑体系及其施工方法 | |
CN203867181U (zh) | 屋面斜梁板悬挑结构支撑体系 | |
CN101736893B (zh) | 悬挑式脚手架支撑系统 | |
CN102864936B (zh) | 大型高中空建筑钢结构屋盖组合吊装施工方法 | |
CN108643544B (zh) | 一种高空悬挑施工平台支架体系及施工方法 | |
CN102535845A (zh) | 一种连廊结构承重架的施工方法 | |
CN104453197A (zh) | 高空大悬挑砼结构型钢支撑平台 | |
CN107245953B (zh) | 一种多层桥梁结构的交叉施工方法 | |
CN107152160A (zh) | 一种模板支撑悬挑脚手架施工平台搭设方法 | |
CN102888979A (zh) | 大悬臂阳台处悬挑脚手架的节点处理施工方法 | |
CN106848938A (zh) | 一种高空平台下电缆桥架吊挂安装方法 | |
CN102392532B (zh) | 高耸构筑物内置悬空脚手架施工方法 | |
CN202214974U (zh) | 5.8米超高外爬架 | |
CN104153586B (zh) | 一种用悬索吊来安装檩条的施工方法 | |
CN203487767U (zh) | 一种十字盘塔梯 | |
CN110778094A (zh) | 高空大跨度拉索网操作平台及施工方法 | |
CN204062152U (zh) | 高压泵管固定装置 | |
CN203499259U (zh) | 工具式悬挑卸料平台 | |
CN211597658U (zh) | 一种移动悬挑脚手架 | |
CN204826867U (zh) | 一种钢绳结构的建筑施工防护栏 | |
CN209179519U (zh) | 一种体育馆顶吊辅助安装用的桁架拼接钢结构胎架 | |
CN103485524A (zh) | 牛腿式悬挑脚手架及其搭设时的施工工法 | |
CN109113354B (zh) | 一种全程索道式防风实时拉结缆风系统及其施工方法 | |
CN111764623A (zh) | 高空大悬挑钢屋架的下挂施工平台模块及施工方法 | |
CN202788017U (zh) | 高层建筑型钢水平悬挑密闭硬防护棚 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140820 |