CN110396932A - 一种桥梁拼接式湿接缝模板安拆循环装置及其施工方法 - Google Patents

一种桥梁拼接式湿接缝模板安拆循环装置及其施工方法 Download PDF

Info

Publication number
CN110396932A
CN110396932A CN201910670585.0A CN201910670585A CN110396932A CN 110396932 A CN110396932 A CN 110396932A CN 201910670585 A CN201910670585 A CN 201910670585A CN 110396932 A CN110396932 A CN 110396932A
Authority
CN
China
Prior art keywords
formwork
wet joint
pole
vertical
disassembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910670585.0A
Other languages
English (en)
Inventor
陈金山
朱曈
林怀玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
CCCC First Highway Xiamen Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
CCCC First Highway Xiamen Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, CCCC First Highway Xiamen Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201910670585.0A priority Critical patent/CN110396932A/zh
Publication of CN110396932A publication Critical patent/CN110396932A/zh
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明属于湿接缝施工技术领域,具体涉及一种桥梁拼接式湿接缝模板安拆循环装置及其施工方法,包括模板和牵引件,模板的上板面上设有数个立杆,立杆的长度方向垂直于模板的上板面,模板的下板面下设有数个横杆,横杆的长度方向与模板的下板面平行,立杆的下端贯穿模板与横杆的侧壁固定连接,立杆外围套设螺母,螺母位于模板上板面上方,立杆侧壁设有与螺母配合使用的外螺纹,所述的一横杆上还固定连接牵引绳,所述的牵引件包括手持杆,手持杆的下端通过连接绳连接三爪钩,本发明结构简单,施工方便。

Description

一种桥梁拼接式湿接缝模板安拆循环装置及其施工方法
技术领域
本发明属于湿接缝施工技术领域,具体涉及一种桥梁拼接式湿接缝模板安拆循环装置及其施工方法。
背景技术
近年来,随着我国经济快速地发展,我国基础设施建设也进入高峰期,高速公路逐渐伸向地势陡峭山区、江河湖泊和跨线等地方。而目前传统的桥面系湿接缝施工:一、在梁底搭设施工平台,人从梁顶通过爬梯到梁底下的施工平台进行施工。二、在桥面上通过卷扬机运送模板,人员在桥上桥下进行操作。这两种施工方法对模板安装、拆卸及周转都比较麻烦,而且施工效率低,成本较高,且施工人员的安全度较低,若桥下场地受到限制,施工难度大,因此现有技术需要进一步的改进。
发明内容
本发明的目的在于提供一种结构简单,施工方便的桥梁拼接式湿接缝模板安拆循环装置及其施工方法。
基于上述目的,本发明采取如下技术方案:
一种桥梁拼接式湿接缝模板安拆循环装置,包括模板和牵引件,模板的上板面上设有数个立杆,立杆的长度方向垂直于模板的上板面,模板的下板面下设有数个横杆,横杆的长度方向与模板的下板面平行,立杆的下端贯穿模板与横杆的侧壁固定连接,立杆外围套设螺母,螺母位于模板上板面上方,立杆侧壁设有与螺母配合使用的外螺纹,所述的一横杆上还固定连接牵引绳,所述的牵引件包括手持杆,手持杆的下端通过连接绳连接三爪钩。
进一步的,所述的立杆为三根,三根立杆沿直线的排列方式均匀等间距排列,三根立杆排列的方向与模板的长度方向相同,横杆为三根,三根横杆的长度方向在同一平面内平行,三根横杆的长度方向与模板的宽度方向相同。
进一步的,所述的立杆的下端与横杆的中段侧壁固定连接。
进一步的,所述的牵引绳位于模板的中心位置处。
一种使用所述的桥梁拼接式湿接缝模板安拆循环装置的施工方法,包括以下步骤:
(1)使用拉绳连接立杆的上端,施工者手持牵引绳,使模板的立杆向下,模板自桥面的防撞护栏一侧下放,手持杆从第一湿接缝向下伸出,晃动手持杆,三爪钩勾住拉绳,使模板向第一湿接缝移动,向上提拉,安装固定模板,浇筑后,拆卸模板,施工者拉住拉绳将模板下放;
(2)与第一湿接缝相邻一侧的湿接缝为第二湿接缝,手持杆自第二湿接缝向下伸出,晃动手持杆,三爪钩勾住模板下方的牵引绳,通过拉动手持杆将模板向第二湿接缝移动,并使其模板立杆朝上,安装固定模板于第二湿接缝上并进行浇筑。
本发明结构简单,使用时,操作简单,大大减低了施工时间,制作简单。
附图说明
图1为模板的结构示意图;
图2为图1的俯视图;
图3为横杆与模板的位置关系图;
图4为牵引件的结构示意图;
图5-8为浇筑模板的施工示意图。
具体实施方式
如图1-4所示的一种桥梁拼接式湿接缝模板安拆循环装置,包括模板1和牵引件2,模板1的上板面上设有数个立杆3,立杆3的长度方向垂直于模板1的上板面,模板1的下板面下设有数个横杆4,横杆4的长度方向与模板1的下板面平行,立杆3的下端贯穿模板1与横杆4的侧壁固定连接,立杆3外围套设螺母5,螺母5位于模板1上板面上方且与上板面之间设有垫片7,立杆3侧壁设有与螺母5配合使用的外螺纹,所述的横杆4上还固定连接牵引绳6,所述的牵引件2包括手持杆21,手持杆21的下端通过连接绳22连接三爪钩23,所述的立杆3为三根,三根立杆3沿直线的排列方式均匀等间距排列,三根立杆3排列的方向与模板1的长度方向相同,横杆4为三根,三根横杆4的长度方向在同一平面内平行,三根横杆4的长度方向与模板1的宽度方向相同,所述的立杆3的下端与横杆4的中段侧壁固定连接,所述的牵引绳6位于模板1的中心位置处。所述的模板1应满足质量轻、变形小、足够强度。
如5-8所示的使用所述的桥梁拼接式湿接缝模板安拆循环装置的施工方法,包括以下步骤:
(1)使用拉绳8连接立杆3的上端,施工者手持牵引绳6,使模板1的立杆3向下,模板1自桥面10的防撞护栏一侧下放,手持杆21从第一湿接缝11向下伸出,晃动手持杆21,三爪钩23勾住拉绳8,使模板1向第一湿接缝11移动,向上提拉,安装固定模板1,浇筑后,拆卸模板1,施工者拉住拉绳8将模板1下放;
(2)与第一湿接缝11相邻一侧的湿接缝为第二湿接缝12,手持杆21自第二湿接缝12向下伸出,晃动手持杆21,三爪钩23勾住模板1下方的牵引绳6,通过拉动手持杆21将模板1向第二湿接缝12移动,并使其模板1立杆3朝上,安装固定模板1于第二湿接缝12上并进行浇筑。

Claims (5)

1.一种桥梁拼接式湿接缝模板安拆循环装置,其特征在于,包括模板和牵引件,模板的上板面上设有数个立杆,立杆的长度方向垂直于模板的上板面,模板的下板面下设有数个横杆,横杆的长度方向与模板的下板面平行,立杆的下端贯穿模板与横杆的侧壁固定连接,立杆外围套设螺母,螺母位于模板上板面上方,立杆侧壁设有与螺母配合使用的外螺纹,所述的一横杆上还固定连接牵引绳,所述的牵引件包括手持杆,手持杆的下端通过连接绳连接三爪钩。
2.根据权利要求1所述的桥梁拼接式湿接缝模板安拆循环装置,其特征在于,所述的立杆为三根,三根立杆沿直线的排列方式均匀等间距排列,三根立杆排列的方向与模板的长度方向相同,横杆为三根,三根横杆的长度方向在同一平面内平行,三根横杆的长度方向与模板的宽度方向相同。
3.根据权利要求1所述的桥梁拼接式湿接缝模板安拆循环装置,其特征在于,所述的立杆的下端与横杆的中段侧壁固定连接。
4.根据权利要求1所述的桥梁拼接式湿接缝模板安拆循环装置,其特征在于,所述的牵引绳位于模板的中心位置处。
5.一种使用权利要求1所述的桥梁拼接式湿接缝模板安拆循环装置的施工方法,其特征在于,包括以下步骤:
(1)使用拉绳连接立杆的上端,施工者手持牵引绳,使模板的立杆向下,模板自桥面的防撞护栏一侧下放,手持杆从第一湿接缝向下伸出,晃动手持杆,三爪钩勾住拉绳,使模板向第一湿接缝移动,向上提拉,安装固定模板,浇筑后,拆卸模板,施工者拉住拉绳将模板下放;
(2)与第一湿接缝相邻一侧的湿接缝为第二湿接缝,手持杆自第二湿接缝向下伸出,晃动手持杆,三爪钩勾住模板下方的牵引绳,通过拉动手持杆将模板向第二湿接缝移动,并使其模板立杆朝上,安装固定模板于第二湿接缝上并进行浇筑。
CN201910670585.0A 2019-07-24 2019-07-24 一种桥梁拼接式湿接缝模板安拆循环装置及其施工方法 Pending CN110396932A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910670585.0A CN110396932A (zh) 2019-07-24 2019-07-24 一种桥梁拼接式湿接缝模板安拆循环装置及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910670585.0A CN110396932A (zh) 2019-07-24 2019-07-24 一种桥梁拼接式湿接缝模板安拆循环装置及其施工方法

Publications (1)

Publication Number Publication Date
CN110396932A true CN110396932A (zh) 2019-11-01

Family

ID=68324898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910670585.0A Pending CN110396932A (zh) 2019-07-24 2019-07-24 一种桥梁拼接式湿接缝模板安拆循环装置及其施工方法

Country Status (1)

Country Link
CN (1) CN110396932A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113279337A (zh) * 2021-06-29 2021-08-20 中铁四局集团第二工程有限公司 一种湿接缝模板安拆体系及安拆施工方法
CN114753253A (zh) * 2022-03-08 2022-07-15 武汉市市政建设集团有限公司 一种预制梁桥湿接缝飞模装置及施工方法
CN114775447A (zh) * 2022-05-26 2022-07-22 中国十七冶集团有限公司 一种高墩柱桥梁湿接缝模板制作与施工方法
CN115030038A (zh) * 2022-06-06 2022-09-09 中水电四局南方(珠海)工程有限公司 一种海域滩涂段桥面系湿接缝翻模施工方法
CN116427289A (zh) * 2023-05-26 2023-07-14 山西路桥第四工程有限公司 一种桥面系湿接缝甩模施工方法
CN116905353A (zh) * 2023-05-23 2023-10-20 中国一冶集团有限公司 一种桥梁湿接缝模板安拆装置及其施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900021A (zh) * 2012-09-28 2013-01-30 中铁四局集团第一工程有限公司 一种拼装式桥梁湿接缝施工方法
CN203768803U (zh) * 2014-04-10 2014-08-13 中核华泰建设有限公司 一种桥梁湿接缝模板吊装设备
CN105525569A (zh) * 2014-10-22 2016-04-27 五冶集团上海有限公司 桥梁翼缘板湿接缝吊模施工方法
CN205822018U (zh) * 2016-06-27 2016-12-21 中铁建大桥工程局集团第三工程有限公司 一种湖泊沟壑区桥梁湿接缝双面模翻转安拆组合装置
CN205954488U (zh) * 2016-08-17 2017-02-15 中国建筑第六工程局有限公司 用于桥梁湿接缝模板安装的工作小车
CN210529505U (zh) * 2019-07-24 2020-05-15 中交一公局集团有限公司 一种桥梁拼接式湿接缝模板安拆循环装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900021A (zh) * 2012-09-28 2013-01-30 中铁四局集团第一工程有限公司 一种拼装式桥梁湿接缝施工方法
CN203768803U (zh) * 2014-04-10 2014-08-13 中核华泰建设有限公司 一种桥梁湿接缝模板吊装设备
CN105525569A (zh) * 2014-10-22 2016-04-27 五冶集团上海有限公司 桥梁翼缘板湿接缝吊模施工方法
CN205822018U (zh) * 2016-06-27 2016-12-21 中铁建大桥工程局集团第三工程有限公司 一种湖泊沟壑区桥梁湿接缝双面模翻转安拆组合装置
CN205954488U (zh) * 2016-08-17 2017-02-15 中国建筑第六工程局有限公司 用于桥梁湿接缝模板安装的工作小车
CN210529505U (zh) * 2019-07-24 2020-05-15 中交一公局集团有限公司 一种桥梁拼接式湿接缝模板安拆循环装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄远芳: "上跨铁路预制梁桥湿接缝传递式平移滑模施工技术", 《铁道建筑》, no. 11, pages 52 - 54 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113279337A (zh) * 2021-06-29 2021-08-20 中铁四局集团第二工程有限公司 一种湿接缝模板安拆体系及安拆施工方法
CN113279337B (zh) * 2021-06-29 2025-02-11 中铁四局集团有限公司 一种湿接缝模板安拆体系及安拆施工方法
CN114753253A (zh) * 2022-03-08 2022-07-15 武汉市市政建设集团有限公司 一种预制梁桥湿接缝飞模装置及施工方法
CN114775447A (zh) * 2022-05-26 2022-07-22 中国十七冶集团有限公司 一种高墩柱桥梁湿接缝模板制作与施工方法
CN115030038A (zh) * 2022-06-06 2022-09-09 中水电四局南方(珠海)工程有限公司 一种海域滩涂段桥面系湿接缝翻模施工方法
CN116905353A (zh) * 2023-05-23 2023-10-20 中国一冶集团有限公司 一种桥梁湿接缝模板安拆装置及其施工方法
CN116427289A (zh) * 2023-05-26 2023-07-14 山西路桥第四工程有限公司 一种桥面系湿接缝甩模施工方法

Similar Documents

Publication Publication Date Title
CN108360380B (zh) 一种桥梁墩柱施工作业平台及其施工方法
CN102251483B (zh) 自提升附着式吊机吊装钢管混凝土格构桥墩的施工方法
CN111809528B (zh) 一种墩柱竖向背笼平台通道施工方法及背笼平台通道装置
CN104444909A (zh) 一种小车式电缆井盖开启器
CN211596364U (zh) 一种多功能防撞墙施工台车
CN201401005Y (zh) 滑升模板装置
CN100476146C (zh) 高空浇筑钢柱内混凝土操作平台架
CN216515141U (zh) 一种新悬挑施工爬模装置
CN210529505U (zh) 一种桥梁拼接式湿接缝模板安拆循环装置
CN211689948U (zh) 一种斜拉桥塔部挂索施工悬挂操作平台装置
CN210239139U (zh) 挑檐模板支撑装置
CN221973125U (zh) 一种预制楼梯施工用可调型爬梯
CN204983692U (zh) 一种混凝土墙板的吊装装置
CN221031335U (zh) 一种屋面构架层的爬架附着钢立柱和爬升系统
CN215630118U (zh) 一种可移动式铝模板管廊连续浇筑成型结构
CN209760761U (zh) 一种核心筒内施工平台和电梯核心筒施工结构
CN208122298U (zh) 一种用于结构缺失层的整体模架体系
CN216474585U (zh) 一种桥体加宽施工装置
CN216515147U (zh) 一种一体式桥梁湿接缝模板装置
CN116902740A (zh) 一种预制t梁模板吊装辅助装置及使用方法
CN110205939A (zh) 用于移动式拆装桥梁护栏模板的小车及方法
CN211228141U (zh) 一种新型t梁横隔板施工平台横撑
CN211923448U (zh) 一种钢结构的施工装置
CN116905353A (zh) 一种桥梁湿接缝模板安拆装置及其施工方法
CN201896016U (zh) 储罐检修用吊篮装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191101