CN102852132B - The construction treating methods of high frequency static pressure compaction draining slip casting composite foundation - Google Patents

The construction treating methods of high frequency static pressure compaction draining slip casting composite foundation Download PDF

Info

Publication number
CN102852132B
CN102852132B CN201110178036.5A CN201110178036A CN102852132B CN 102852132 B CN102852132 B CN 102852132B CN 201110178036 A CN201110178036 A CN 201110178036A CN 102852132 B CN102852132 B CN 102852132B
Authority
CN
China
Prior art keywords
construction
static pressure
soil
casting
draining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110178036.5A
Other languages
Chinese (zh)
Other versions
CN102852132A (en
Inventor
常雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Kaitai Construction Engineering Co.,Ltd.
Original Assignee
常雷
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 常雷 filed Critical 常雷
Priority to CN201110178036.5A priority Critical patent/CN102852132B/en
Publication of CN102852132A publication Critical patent/CN102852132A/en
Application granted granted Critical
Publication of CN102852132B publication Critical patent/CN102852132B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of construction treating methods of high frequency static pressure compaction draining slip casting composite foundation, it be very original position soft soil is carried out fast, superpressure, compacted compacting, Active Drainage, initiatively slip casting construction technology, the soil body after Combined Treatment has the complex ground treatment layer of the closely knit composite crust of certain thickness; This programme can promote the overall vertical bearing capacity of the composite foundation soil body and water resistant equals sideslip ability, can effectively solve " spongy soil " that cause because outside subsidiary stress is excessive, effective control settlement after construction and the excessive bad phenomenon of relative settlement, effectively avoid large area soft soil to break away the phenomenon of caving in; The repeatedly repeated contamination can saved the combined heap load precompacting earthwork 100%, construction period 50% can be shortened, construction cost more than 50% can be reduced, a large amount of earthwork Mining Transport can be avoided to bring.

Description

The construction treating methods of high frequency static pressure compaction draining slip casting composite foundation
Technical field
The present invention relates to a kind of construction treating methods of high frequency static pressure compaction draining slip casting composite foundation, its method is applicable to all kinds of weak soil, backfill, blows the complex ground treatment of silt backfill, can be formed fast and there is shallow closely knit duricrust composite foundation layer in certain thickness soft soil, noise and vibration effect index keep under strict control region construction advantage larger.
Background technology
At present, all kinds of weak soil of known process, in the method for backfill, traditional soft base construction method is on the basis of the band drain squeezed into, carry out vacuum water covering prepressing or combined vacuum and surcharge preloading, vacuum water covering prepressing method because of the effective subsidiary stress provided limited, the Free water in deep soft soil and Bound moisture can not be discharged very well, settlement after construction and relative settlement is excessive exceeds standard, combined vacuum and surcharge preloading, although promote to some extent the bearing capacity of foundation soil of deep soft soil, but cost is high, a large amount of cubic metre of earth and stone heaped loads and unloading need be employed, cause meaningless waste and transport secondary pollution not environmentally, the composite foundation after the process of original position soft soil can not be made to have shallow closely knit duricrust composite foundation layer in the certain thickness original position soil body.
In order to overcome the deficiency that above-mentioned conventional method exists in work progress, reduce construction cost, improve efficiency of construction, secondary conveying is avoided to pollute, accomplish environmental protection, accomplish that settlement after construction and relative settlement really meet design and construction requirement, adapt to the construction demand in different soil and place, just become the technical problem that the art of this patent scheme will solve.
Summary of the invention
For the problems referred to above, the present invention aims to provide a kind of construction treating methods of high frequency static pressure compaction draining slip casting composite foundation.
For realizing this technical purpose: the construction treating methods of high frequency static pressure compaction draining slip casting composite foundation, static pressure compaction draining grouting equipment comprises three parts, Part I is made up of the static pressure fixture association with high-frequency hydraulic static pressure hammer, flange, special fixture chute crossbeam, moving telescopic chuck, Part II is made up of static pressure compaction firming plate and steel pile casting, and Part III is connected transverse tube formed by the high-pressure slip-casting pipe group arranged at the bottom of the drain pipe system that steel pile casting inwall is arranged, firming plate, high-pressure slip-casting; Its construction sequence is as follows:
A, mark off some different pretreatment construction block according to mechanics index of physics in design working drawing and geological mapping report, and bury and put telltale mark well.
B, pretreatment construction block in, first squeezing into band drain to soil layer design elevation place by design working drawing, bassets and is connected to draining on drainage duct in band drain top.
C, increase by one group of light-duty tube well dewatering system of deep layer again and be placed into soil layer design elevation place in pretreatment construction block, reduce the water level under operation side quickly.
D, startup high-frequency hydraulic static pressure hammer 1by flange and special fixture chute crossbeam, the moving telescopic chuck of connection, the quick compacted compacting original position soft soil of exerting pressure that shakes is executed on the top of clamping static pressure compaction firming plate and steel pile casting, start the drain pipe system that steel pile casting inwall is arranged simultaneously and implement Active Drainage, start the high-pressure slip-casting pipe group arranged at the bottom of firming plate subsequently and implement high-pressure slip-casting construction.
After e, above-mentioned operation complete, start high-frequency hydraulic static pressure hammer, by flange and special fixture chute crossbeam, the moving telescopic chuck of connection, static pressure compaction draining grouting equipment of extricating oneself from a predicament and brace oneself up to action at a slow speed is constructed to next process place.
F, on processed good ground to recently backfill, blow become silted up backfill weak soil directly carry out dehydration high frequency roll shake extrude close construction.
Concrete further as this patent, also comprise the vacuum drainage guard system that steel pile casting inwall is arranged, it implements Active Drainage for the original position soft soil in construction.
Concrete further as this patent, also comprise the high-pressure slip-casting pipe group arranged at the bottom of firming plate, it implements high-pressure slip-casting construction for the static pressure compaction soil in construction.
Concrete further as this patent, the soil body after Combined Treatment has the closely knit composite crust layer of certain thickness middle-shallow layer foundation soil.
The comprehensive use of the present invention program, except the soil body after Combined Treatment has the closely knit composite crust layer of certain thickness middle-shallow layer foundation soil, also greatly can improve the physical mechanics of the weak undisturbed soil of middle-shallow layer original position and structural property and resistance to compression, shearing modulus, overall vertical bearing capacity and the water resistant that can improve composite foundation soil equal sideslip ability, the combined heap load precompacting earthwork 100% can be saved, construction period 50% can be shortened, construction cost more than 50% can be reduced, the repeated contamination of a large amount of earthwork Mining Transport can be avoided, this method adapts to different soft layers and complex region field construction.
Accompanying drawing explanation
Fig. 1 is composite technology principle schematic of the present invention.
Fig. 2 is static pressure compaction draining grouting equipment layout schematic diagram of the present invention.
Fig. 3 is that band drain draining of the present invention and light-duty tube well dewatering arrange schematic diagram.
Its description of reference numerals: high-frequency hydraulic static pressure is hammered into shape 1, flange 2, special fixture chute crossbeam 3, moving telescopic chuck 4, static pressure compaction firming plate 5, steel pile casting 6, drain pipe system that steel pile casting inwall is arranged 7, the high-pressure slip-casting pipe group that arranges at the bottom of firming plate 8, high-pressure slip-casting pipe group connect transverse tube 9, by after static pressure compaction draining slip casting composite foundation soil 10, be passed the soil of discharge along steel pile casting inwall 11, original position soft soil 12, the connector that is welded and fixed between firming plate and steel pile casting 13, band drain 14, light-duty pipe well 15.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the technology of the present invention is described in further details:
As accompanying drawing 1,2,3, shown in, the present invention is to provide one and first pass through band drain 14method improves deep soft foundation soil bearing capacity of foundation soil, then by the light-duty pipe well of mid-deep strata 15precipitation method improves middle level soft subgrade soil bearing capacity of foundation soil, after restart high-frequency hydraulic static pressure hammer 1, by the flange connected 2with special fixture chute crossbeam 3, moving telescopic chuck 4, to static pressure compaction firming plate 5and steel pile casting 6top clamping exert pressure, make weak foundation soil 12compacted by fast compacting, the compacted soil of partial compaction to be boosted casting along steel pile casting inwall 11and discharge unnecessary subsidiary stress energy, start the drain pipe system that steel pile casting inwall is arranged simultaneously 7active Drainage, starts the high-pressure slip-casting pipe group arranged at the bottom of firming plate subsequently 8implement mortar depositing construction, the final construction technology forming the closely knit composite crust layer of middle-shallow layer foundation soil.
When constructing, marking off some different pretreatment construction block according to design working drawing and geological mapping report mechanics index of physics, and burying and put telltale mark well; In pretreatment construction block, first squeeze into band drain by design working drawing 14to soil layer design elevation place, band drain 14basset and be connected to draining on drainage duct in top; One group of light-duty pipe well of deep layer is increased again in construction block 15precipitation system is also placed into soil layer design elevation place, reduces the water level under operation side quickly; Start high-frequency hydraulic static pressure hammer 1, by the flange connected 2with special fixture chute crossbeam 3, moving telescopic chuck 4, clamping static pressure compaction firming plate 5and steel pile casting 6top execute that shaking exerts pressure makes original position soft soil 12by quick static pressure compaction compacting, start the drain pipe system that steel pile casting inwall is arranged simultaneously 7implement Active Drainage, start the high-pressure slip-casting pipe group arranged bottom firming plate subsequently 8implement mortar depositing construction.
After above-mentioned operation completes, start high-frequency hydraulic static pressure hammer 1, by the flange connected 2with special fixture chute crossbeam 3, moving telescopic chuck 4, static pressure compaction draining grouting equipment of extricating oneself from a predicament and brace oneself up to action at a slow speed is constructed to next process place.
On processed good ground to recently backfill, blow become silted up backfill weak soil directly carry out dehydration high frequency roll shake extrude close construction.
Static pressure compaction draining grouting equipment in the present embodiment is mainly divided into three part compositions: Part I is for hammer into shape with high-frequency hydraulic static pressure 1, flange 2, special fixture chute crossbeam 3, moving telescopic chuck 4static pressure fixture association composition; Part II is static pressure compaction firming plate 5and steel pile casting 6composition; Part III is the drain pipe system that steel pile casting inwall is arranged 7, the high-pressure slip-casting pipe group that arranges at the bottom of firming plate 8, high-pressure slip-casting pipe connect transverse tube 9composition.
The present invention program has the feature of casting, in position soft soil 12during by quick static pressure compaction compacting, the compacted soil of partial compaction 11along steel pile casting 6inwall is boosted casting, avoids " spongy soil " phenomenon in construction to occur.
In practice of construction, construction method of the present invention specifically adopts following steps:
A kind of construction treating methods of high frequency static pressure compaction draining slip casting composite foundation comprises following construction sequence:
A, mark off some different pretreatment construction block according to mechanics index of physics in design working drawing and geological mapping report, and bury and put telltale mark well.B, pretreatment construction block in, first squeezing into band drain to soil layer design elevation place by design working drawing, bassets and is connected to draining on drainage duct in band drain top.
C, increase by one group of light-duty tube well dewatering system of deep layer again and be placed into soil layer design elevation place in construction block, reduce the water level under operation side quickly.
D, startup high-frequency hydraulic static pressure hammer 1, by the flange connected 2with special fixture chute crossbeam 3, moving telescopic chuck 4, clamping static pressure compaction firming plate 5and steel pile casting 6top execute the quick compacted compacting original position soft soil of exerting pressure that shakes 12, start the drain pipe system that steel pile casting inwall is arranged simultaneously 7implement Active Drainage, start the high-pressure slip-casting pipe group arranged at the bottom of firming plate subsequently 8implement mortar depositing construction.
After e, above-mentioned operation complete, start high-frequency hydraulic static pressure hammer 1, by the flange connected 2with special fixture chute crossbeam 3, moving telescopic chuck 4, static pressure compaction draining grouting equipment of extricating oneself from a predicament and brace oneself up to action at a slow speed is constructed to next process place.
F, on processed good ground to recently backfill, blow become silted up backfill weak soil directly carry out dehydration high frequency roll shake extrude close construction.
Specific implementation method and result
1) draining slip casting Composite foundation construction facture type
A, mark off some different pretreatment construction block according to mechanics index of physics in design working drawing and geological mapping report, and bury and put telltale mark well.
B, pretreatment construction block in, by design working drawing insert band drain 14to soil layer design elevation place, basset and be connected to draining on drainage duct in band drain top.
C, process construction block in increase by one group of light-duty precipitation system of deep layer again 15and be placed into soil layer design elevation place, reduce the water level under operation side quickly.
D, startup high-frequency hydraulic static pressure hammer 1, by the flange connected 2with special fixture chute crossbeam 3, moving telescopic chuck 4, clamping static pressure compaction firming plate 5and steel pile casting 6top execute the quick compacted compacting original position soft soil of exerting pressure that shakes 12, start the drain pipe system that steel pile casting inwall is arranged simultaneously 7to the original position soft soil in construction 12implement Active Drainage.
The high-pressure slip-casting pipe group arranged at the bottom of e, startup firming plate 8to the soft soil after static pressure compaction 10implement mortar depositing construction.
After f, above-mentioned operation complete, start high-frequency hydraulic static pressure hammer 1, by the flange connected 2with special fixture chute crossbeam 3, moving telescopic chuck 4, static pressure compaction draining grouting equipment of extricating oneself from a predicament and brace oneself up to action at a slow speed is constructed to next process place.
G, on processed good ground to recently backfill, blow become silted up backfill weak soil directly carry out dehydration high frequency roll shake extrude close construction.
2) the Composite foundation construction facture type of a slip casting
A, mark off some different pending construction blocks according to mechanics index of physics in design working drawing and geological mapping report, and bury and put telltale mark well.
B, startup mobile unit, open high-frequency hydraulic static pressure hammer 1, by the flange connected 2with special fixture chute crossbeam 3, moving telescopic chuck 4, clamping static pressure compaction firming plate 5and steel pile casting 6the top of equipment executes that shaking exerts pressure makes original position soft soil 12by quick static pressure compaction compacting, the compacted soil of partial compaction 11along steel pile casting 6inwall is boosted casting discharge unnecessary subsidiary stress energy.
The high-pressure slip-casting pipe group arranged bottom c, startup firming plate 8mortar depositing construction is implemented to the soft soil after static pressure compaction.
After d, above-mentioned operation complete, start high-frequency hydraulic static pressure hammer 1, by the flange connected 2with special fixture chute crossbeam 3, moving telescopic chuck 4, static pressure compaction draining grouting equipment of extricating oneself from a predicament and brace oneself up to action at a slow speed is constructed to next process place.
The above; be only better case study on implementation in the technology of the present invention constructure scheme; every above case study on implementation is done according to patented technology of the present invention the trickle amendment of any essence, equivalently replace and improve, within the protection domain that all should be included in art solutions of the present invention.

Claims (4)

1. the construction treating methods of a high frequency static pressure compaction draining slip casting composite foundation: static pressure compaction draining grouting equipment comprises three parts, Part I hammers (1) into shape by with high-frequency hydraulic static pressure, flange (2), special fixture chute crossbeam (3), the static pressure fixture association composition of moving telescopic chuck (4), Part II is made up of static pressure compaction firming plate (5) and steel pile casting (6), Part III is by the drain pipe system that steel pile casting inwall is arranged (7), the high-pressure slip-casting pipe group (8) arranged at the bottom of firming plate, high-pressure slip-casting connects transverse tube (9) composition, its construction sequence is as follows:
A, mark off some different pretreatment construction block according to mechanics index of physics in design working drawing and geological mapping report, and bury and put telltale mark well;
B, pretreatment construction block in, first squeezing into band drain to soil layer design elevation place by design working drawing, bassets and is connected to draining on drainage duct in band drain top;
C, increase by one group of light-duty tube well dewatering system of deep layer again and be placed into soil layer design elevation place in pretreatment construction block, reduce the water level under operation side quickly;
D, startup high-frequency hydraulic static pressure hammer (1), by flange (2) and special fixture chute crossbeam (3), the moving telescopic chuck (4) of connection, quick compacted compacting original position soft soil (12) of exerting pressure of shaking is executed on the top of clamping static pressure compaction firming plate (5) and steel pile casting (6), start the drain pipe system (7) that steel pile casting inwall is arranged simultaneously and implement Active Drainage, start the high-pressure slip-casting pipe group (8) arranged at the bottom of firming plate subsequently and implement mortar depositing construction;
After e, above-mentioned operation complete, start high-frequency hydraulic static pressure hammer (1), by flange (2) and special fixture chute crossbeam (3), the moving telescopic chuck (4) of connection, static pressure compaction draining grouting equipment of extricating oneself from a predicament and brace oneself up to action at a slow speed is constructed to next process place;
F, on processed good ground to recently backfill, blow become silted up backfill weak soil directly carry out dehydration high frequency roll shake extrude close construction.
2. construction treating methods according to claim 1, is characterized in that: on steel pile casting (6) inwall, be provided with drain pipe system.
3. construction treating methods according to claim 1, is characterized in that: static pressure compaction firming plate (5) end is provided with high-pressure slip-casting pipe group.
4. construction treating methods according to claim 1, is characterized in that: the soil body after Combined Treatment has the closely knit composite crust layer of certain thickness middle-shallow layer foundation soil.
CN201110178036.5A 2011-06-28 2011-06-28 The construction treating methods of high frequency static pressure compaction draining slip casting composite foundation Active CN102852132B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110178036.5A CN102852132B (en) 2011-06-28 2011-06-28 The construction treating methods of high frequency static pressure compaction draining slip casting composite foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110178036.5A CN102852132B (en) 2011-06-28 2011-06-28 The construction treating methods of high frequency static pressure compaction draining slip casting composite foundation

Publications (2)

Publication Number Publication Date
CN102852132A CN102852132A (en) 2013-01-02
CN102852132B true CN102852132B (en) 2015-10-14

Family

ID=47399076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110178036.5A Active CN102852132B (en) 2011-06-28 2011-06-28 The construction treating methods of high frequency static pressure compaction draining slip casting composite foundation

Country Status (1)

Country Link
CN (1) CN102852132B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112593612B (en) * 2020-11-19 2022-04-12 浙江二十冶建设有限公司 Existing building peripheral precipitation method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0688329A (en) * 1992-07-06 1994-03-29 Nit Co Ltd Ground stabilization building device/having injection rod in polygon cross section
CN1213726A (en) * 1997-10-07 1999-04-14 孙五奇 High effective dredging strengthening method of soft foundation
JP2000192445A (en) * 1998-12-24 2000-07-11 Ohbayashi Corp Consolidation construction method for soft ground
CN101191328A (en) * 2006-12-01 2008-06-04 上海港湾软地基处理工程有限公司 Method for treating soft foundation by fast ''information high vacuum impacting dense''

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7651302B2 (en) * 2006-04-07 2010-01-26 University Of South Florida Method of enhanced end bearing capacity via post construction preload/reload

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0688329A (en) * 1992-07-06 1994-03-29 Nit Co Ltd Ground stabilization building device/having injection rod in polygon cross section
CN1213726A (en) * 1997-10-07 1999-04-14 孙五奇 High effective dredging strengthening method of soft foundation
JP2000192445A (en) * 1998-12-24 2000-07-11 Ohbayashi Corp Consolidation construction method for soft ground
CN101191328A (en) * 2006-12-01 2008-06-04 上海港湾软地基处理工程有限公司 Method for treating soft foundation by fast ''information high vacuum impacting dense''

Also Published As

Publication number Publication date
CN102852132A (en) 2013-01-02

Similar Documents

Publication Publication Date Title
CN103031836B (en) A kind of method of building road on new hydraulically filled sludge ground fast
CN102226335A (en) Foundation treatment method for controlling post-construction settlement and deformation of soft soil
CN100480472C (en) Quick reinforcing method and reinforcing device for super soft weak soil
CN102561308A (en) Light-well plastic-strip superposition vacuum preloading method for soft soil foundation
CN101250868A (en) Precipitation prepressing association motivation induration deep densification method
CN101718089A (en) Combined vacuum preloading method foundation treatment construction method
CN103074883B (en) Active piling prepressing united consolidated subsoil method
CN101666083A (en) Soft soil foundation treatment reinforcement method and device thereof
CN103741670A (en) Negative skin friction (NSF) removing foundation treatment method
CN102220756B (en) Long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method
CN100572688C (en) The method of consolidating soft soil ground foundation by dynamic pre drainage consolidation
CN102720180A (en) Soft foundation treatment method employing 'cutting drainage deep-layer preloading and dynamic consolidating'
CN109778625A (en) A kind of express highway roadbed structure that dregs class building castoff fills
CN104790404B (en) A kind of dam foundation high-pressure grouting structure and grouting method
CN106703053A (en) Construction method for reinforced soil drainage composite revetment structure
CN101666099A (en) Layer-by-layer foundation consolidating method based on barrel-type foundation negative pressure technology
CN101831898A (en) Horizontal shallow layer negative-pressure consolidation working cushion layer technique
CN102852132B (en) The construction treating methods of high frequency static pressure compaction draining slip casting composite foundation
CN106638684B (en) A kind of piping lane backfill soil processing method of Collapsible Loess District
CN102677681A (en) Layering processing method for rapid backfill of large-scale earthwork
CN108277794A (en) A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system
CN105568956B (en) Well-points dewatering combined heap load precompacting bracing means and its application method for roadbed
CN202767051U (en) Special apparatus for treatment of soft foundation soil through rapid compaction, drainage and grouting
CN208803456U (en) A kind of structure for reinforcing peat soil using sand pile and drain bar
CN208293556U (en) A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210513

Address after: 102308 046, 6th floor, building 2, yard 5, Longxing south 2nd Road, Mentougou District, Beijing

Patentee after: Beijing Kaitai Construction Engineering Co.,Ltd.

Address before: 518031 1-205, Jinhua xinju, HUAFA South Road, Futian District, Shenzhen City, Guangdong Province

Patentee before: Chang Lei