CN208293556U
CN208293556U CN201820360239.3U CN201820360239U CN208293556U CN 208293556 U CN208293556 U CN 208293556U CN 201820360239 U CN201820360239 U CN 201820360239U CN 208293556 U CN208293556 U CN 208293556U
Authority
CN
China
Prior art keywords
vertical drainage
tube body
drainage tube
compound vertical
binder course
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820360239.3U
Other languages
Chinese (zh)
Inventor
李伟
温欣
倪福来
王亮
张晓彬
邹卫东
王炳麟
刘春良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201820360239.3U priority Critical patent/CN208293556U/en
Application granted granted Critical
Publication of CN208293556U publication Critical patent/CN208293556U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system, solve the problems, such as that the prior art cannot be effectively reduced the preceding water level of rammer and significantly improve soft soil foundation deep layer weak soil intensity.Compound vertical drainage tube body (2) has been positioned apart from the initial binder course of graded broken stone (3) of 200 millimeters thicks, vertical drainage core pipe (9) are provided in compound vertical drainage tube body (2), tubulose filter membrane (10) are provided between the lateral wall of vertical drainage core pipe (9) and the inner sidewall of compound vertical drainage tube body (2), the top of vertical drainage core pipe (9) is connected with horizontal vacuum drinking-water pipe (8) and vacuum water pump (7), nail type hammer ram (12) is provided between the adjacent compound vertical drainage tube body (2) of two on the top surface of the initial binder course of graded broken stone (3) of 200 millimeters thicks.Soft base soil body settlement after construction after processing is controllable, foundation bearing capacity is obviously improved.

Description

A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system
Technical field
The present invention relates to a kind of Soft Ground system, in particular to a kind of deep blowing filling soft soil foundation of large area it is true Empty dynamic consolidation composite drainage system.
Background technique
Currently, China's Coastal Areas economic construction is quickly grown, reclamation by pumping filling is insufficient to solve industrial land on beach, It is currently widely used method.The soil body in reclamation by pumping filling region mainly has following characteristics on beach: original state soil body major embodiment For mud or muddy soft soil, show that shearing strength is low, compressibility is big, void ratio is big, water content is high, rheological characteristic is strong and infiltration Property difference design feature;The material composition of barged-in fill is more complicated, and majority is dredging silt, clay or silt, has and naturally contains The soft modeling that water is high, void ratio is big, compressibility is high, shearing strength is low and infiltration coefficient is small moulds configuration state to stream.Therefore, ground Large deformation and stable problem be the soil body processing when be badly in need of the central issue to be solved.Conventional soft-soil foundation treatment method has The methods of preloading, vacuum method, dynamic consolidation method, Dynamic Drainage Consolidation Method, the processing method of these soft soil foundations In the presence of improving, soft base soil body foundation capability is limited, ground effective reinforcement depth is smaller, settlement difference is excessive, it is tight to set requirement The problems such as lattice, construction cost are expensive, construction takes a long time.Currently, being badly in need of developing one kind and capable of sufficiently meeting covering on high-moisture percentage Water before rammer can be effectively reduced in the soft foundation processing intensity of barged-in fill and the consolidation process system and method for deformation requirements, this method Position significantly improves soft soil foundation deep layer weak soil intensity, and constructing should be convenient and efficient.
Summary of the invention
The present invention provides a kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage systems, solve the prior art not The technical issues of preceding water level of rammer can be effectively reduced and significantly improve soft soil foundation deep layer weak soil intensity.
The present invention is to solve the above technical problem by the following technical programs:
A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system, including original state Soft Soil Layer, in original state Soft Soil Layer On be provided with the initial binder courses of graded broken stone of 200 millimeters thicks, the compartment of terrain on the initial binder course of graded broken stone of 200 millimeters thicks It is provided with compound vertical drainage tube body, is provided with vertical drainage core pipe in compound vertical drainage tube body, in compound vertical drainage pipe It is provided with water inlet on the tube wall of body, water sucking mouth is provided on the tube wall of vertical drainage core pipe, in vertical drainage Tubulose filter membrane is provided between the lateral wall of core pipe and the inner sidewall of compound vertical drainage tube body, the top of vertical drainage core pipe connects It is connected to horizontal vacuum drinking-water pipe, the other end of horizontal vacuum drinking-water pipe is linked together with vacuum water pump;It is compound vertical Drainage conduit body is laid in matrix form, and the spacing between the compound vertical drainage tube body of adjacent two is 8-12 meters;In 200 millis It is provided with nail type hammer ram between two adjacent compound vertical drainage tube bodies on the top surface of the thick initial binder course of graded broken stone of rice, Nail type hammer ram is in wire nail shape, and the diameter of the upper cylinder of nail type hammer ram is 2-3 meters, the lower cylinder of nail type hammer ram Diameter is 1-1.5 meters.
On the initial binder course of graded broken stone of 200 millimeters thicks, by sequence from top to bottom, it is disposed with two-way enhancing Horizontal grate and the secondary binder course of the graded broken stone of 150 millimeters thicks;It is arranged on the secondary binder course of graded broken stone of 150 millimeters thicks There is hydraulic reclamation soil layer.
The distance between top and the top surface of hydraulic reclamation soil layer of compound vertical drainage tube body are 100-200 millimeters;
A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system and construction technology, comprising the following steps:
The first step, the compound vertical drainage tube body of production take length longer than foundation treatment depth according to foundation treatment depth Outer tube of 200 millimeters of the pipe as compound vertical drainage tube body, compartment of terrain processes water inlet on the tube wall of the outer tube, according to Foundation treatment depth takes length 200 millimeters of pipe longer than foundation treatment depth as vertical drainage core pipe, in vertical drainage core pipe Tube wall on compartment of terrain process water sucking mouth, vertical drainage core pipe is inserted into the outer tube of compound vertical drainage tube body, and Tubulose filter membrane is provided between the lateral wall of vertical drainage core pipe and the inner sidewall of compound vertical drainage tube body;
Second step, the initial binder course of graded broken stone that 200 millimeters thicks are laid on original state Soft Soil Layer;
Third step, using manually or mechanically mode, plugged on the initial binder course of graded broken stone make it is compound vertical Drainage conduit body, the lower end of compound vertical drainage tube body are inserted into the projected depth of basement process, the top of compound vertical drainage tube body End is higher than 150 millimeters of the top surface of the initial binder course of graded broken stone;Compound vertical drainage tube body be in cells arranged in matrix, adjacent two Spacing between horizontal vacuum drinking-water pipe is 8-12 meters;
The top of each vertical drainage core pipe is connected together by the 4th step by horizontal vacuum drinking-water pipe, then again and very Empty pump water pump links together;;
5th step carries out first vacuum Yield rainfall relation operation, when the soil solidifying degree of original state Soft Soil Layer reaches 40%, and surpasses When pore water pressure elimination reaches 85%, tamping energy dynamic consolidation is carried out to the soil body by nail type hammer ram, tamping force is 6,000,000 Ox/every square metre, until the soil solidifying degree of original state Soft Soil Layer reaches 80%;
6th step, the smooth tamping pit of backfill, remove horizontal vacuum drinking-water pipe and vacuum water pump, complete first vacuum power row Water consolidation, sleeping crust layer under formation realize the large deformation dynamic water-drainage consolidation of the soft base soil body;
7th step, the two-way enhancing horizontal grate of the soil body topping laying on the initial binder course of graded broken stone and 150 millimeters The thick secondary binder course of graded broken stone;
8th step is lifted up compound vertical drainage tube body, and the top of compound vertical drainage tube body is made to be higher than graded broken stone The top of each compound vertical drainage tube body is connected to by horizontal vacuum drinking-water pipe one by 150 millimeters of the top surface of secondary binder course It links together after rising with vacuum water pump, carries out the operation of secondary vacuum Yield rainfall relation;
9th step reaches 60% when the hydraulic reclamation soil layer degree of consolidation, and when excess pore water pressure elimination reaches 85%, passes through nail type Hammer ram carries out low energy dynamic consolidation to the soil body, and tamping force is 2,000,000 Ns/every square metre, until the soil solidifying degree of hydraulic reclamation soil layer Reach 90%, tamping pit is backfilled smooth, removes horizontal vacuum drinking-water pipe and vacuum water pump, extract compound vertical drainage tube body, seal Foundation drainage pore is closed, secondary vacuum dynamic water-drainage consolidation is completed, realizes the small deformation dynamic water-drainage consolidation of weak soil;
Tenth step, with bull-dozer, to treated, soft soil foundation region carries out levelling of the land, and smooth laggard action edge rolls It is rolled with static(al).
The bore of compound vertical drainage tube body is 70 millimeters.
The present invention can effectively realize the discharging consolidation of the reclaimed ground with deep soft soil, duration shortening, cost Rationally, and after processing soft base soil body settlement after construction is controllable, foundation bearing capacity is obviously improved.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the present invention in main view direction;
Fig. 2 is structural schematic diagram of the present invention in overlook direction;
Fig. 3 is the sectional view along A-A in Fig. 2;
Fig. 4 is the structural schematic diagram of the casing 2 that vertically draws water of the invention;
Fig. 5 is the structural schematic diagram of nail type hammer ram 12 of the invention;
Fig. 6 is the structural schematic diagram of nail type hammer ram 12 of the invention in attached apparent direction.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing:
A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system, including original state Soft Soil Layer 1, in original state Soft Soil Layer The initial binder course 3 of graded broken stone of 200 millimeters thicks is provided on 1, on the initial binder course 3 of graded broken stone of 200 millimeters thicks between Ground is provided with compound vertical drainage tube body 2, is provided with vertical drainage core pipe 9 in compound vertical drainage tube body 2, compound vertical It is provided with water inlet 11 on the tube wall of drainage conduit body 2, is provided with water sucking mouth on the tube wall of vertical drainage core pipe 9, It is provided with tubulose filter membrane 10 between the lateral wall of vertical drainage core pipe 9 and the inner sidewall of compound vertical drainage tube body 2, it is vertical to arrange The top of water core pipe 9 is connected with horizontal vacuum drinking-water pipe 8, and the other end of horizontal vacuum drinking-water pipe 8 is connect with vacuum water pump 7 Together;Compound vertical drainage tube body 2 is laid in matrix form, between the compound vertical drainage tube body 2 of adjacent two Spacing is 8-12 meters;The two adjacent compound vertical drainage pipes on the top surface of the initial binder course 3 of graded broken stone of 200 millimeters thicks Nail type hammer ram 12 is provided between body 2, nail type hammer ram 12 is in wire nail shape, and the diameter of the upper cylinder of nail type hammer ram 12 is 2-3 meters, the diameter of the lower cylinder 13 of nail type hammer ram 12 is 1-1.5 meters, and water outlet through-hole 14 is provided on nail type hammer ram 12. The transfer of compound vertical drainage tube body 2 is 9 meters, and advance is 9 meters, and the outer diameter of compound vertical drainage tube body 2 is 0.07 meter.
On the initial binder course 3 of graded broken stone of 200 millimeters thicks, by sequence from top to bottom, it is disposed with two-way increasing The secondary binder course 5 of graded broken stone of the strong millimeters thick of horizontal grate 4 and 150;In the secondary binder course 5 of the graded broken stone of 150 millimeters thicks On be provided with hydraulic reclamation soil layer 6.
The distance between top and the top surface of hydraulic reclamation soil layer 6 of compound vertical drainage tube body 2 are 100-200 millimeters;
A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system and construction technology, comprising the following steps:
The first step, the compound vertical drainage tube body 2 of production take length longer than foundation treatment depth according to foundation treatment depth Outer tube of 200 millimeters of the pipe as compound vertical drainage tube body 2, compartment of terrain processes water inlet 11 on the tube wall of the outer tube, According to foundation treatment depth, takes length 200 millimeters of pipe longer than foundation treatment depth as vertical drainage core pipe 9, vertically arranging Compartment of terrain processes water sucking mouth on the tube wall of water core pipe 9, and vertical drainage core pipe 9 is inserted into the outer of compound vertical drainage tube body 2 Guan Zhong, and tubulose filter membrane is provided between the lateral wall of vertical drainage core pipe 9 and the inner sidewall of compound vertical drainage tube body 2 10;
The initial binder course 3 of second step, the graded broken stone that 200 millimeters thicks are laid on original state Soft Soil Layer 1;
Third step, using manually or mechanically mode, plugged on the initial binder course 3 of graded broken stone make it is compound vertical Drainage conduit body 2, the lower end of compound vertical drainage tube body 2 are inserted into the compound vertical drainage tube body 2 of projected depth of basement process Top is higher than 150 millimeters of the top surface of the initial binder course 3 of graded broken stone;Compound vertical drainage tube body 2 is in cells arranged in matrix, phase Spacing between adjacent two horizontal vacuum drinking-water pipes 8 is 8-12 meters;
The top of each vertical drainage core pipe 9 is connected together by horizontal vacuum drinking-water pipe 8 by the 4th step, then again with Vacuum water pump 7 links together;;
5th step carries out first vacuum Yield rainfall relation operation, the vacuum Yield rainfall relation radial direction shadow of each compound vertical drainage tube body 2 Ringing range is a border circular areas 15, and when the soil solidifying degree of original state Soft Soil Layer 1 reaches 40%, and excess pore water pressure elimination reaches When to 85%, tamping energy dynamic consolidation is carried out to the soil body by nail type hammer ram 12, high energy tamping force is 6,000,000 Ns/every square metre, Until the soil solidifying degree of original state Soft Soil Layer 1 reaches 80%, this step using " primary plug, continue precipitation, a drop one is rammed, Repeatedly ram " technology characteristics;The dynamic consolidation radial direction coverage of each nail type hammer ram 12 is another border circular areas 16.
6th step, the smooth tamping pit of backfill, remove horizontal vacuum drinking-water pipe 8 and vacuum water pump 7, complete first vacuum power Discharging consolidation, sleeping crust layer under formation realize the large deformation dynamic water-drainage consolidation of the soft base soil body;
The two-way milli of enhancing horizontal grate 4 and 150 of 7th step, the soil body topping laying on the initial binder course 3 of graded broken stone The thick secondary binder course 5 of graded broken stone of rice;
8th step is lifted up compound vertical drainage tube body 2, so that the top of compound vertical drainage tube body 2 is higher than gradation broken The top of each compound vertical drainage tube body 2 is connected to by 150 millimeters of the top surface of the secondary binder course 5 of stone by horizontal vacuum drinking-water pipe 8 It links together after together with vacuum water pump 7, carries out the operation of secondary vacuum Yield rainfall relation;
9th step reaches 60% when 6 degree of consolidation of hydraulic reclamation soil layer, and when excess pore water pressure elimination reaches 85%, passes through nail Type hammer ram 12 carries out low energy dynamic consolidation to the soil body, and tamping force is 2,000,000 Ns/every square metre, until the soil body of hydraulic reclamation soil layer 6 The degree of consolidation reaches 90%, and tamping pit is backfilled to smooth, dismounting horizontal vacuum drinking-water pipe 8 and vacuum water pump 7, the compound vertical row of extraction Water pipe body 2 closes ground drain tube holes, completes secondary vacuum dynamic water-drainage consolidation, realizes that the small deformation dynamic drainage of weak soil is solid Knot;
Tenth step, with bull-dozer, to treated, soft soil foundation region carries out levelling of the land, and smooth laggard action edge rolls It is rolled with static(al).
The bore of compound vertical drainage tube body 2 is 70 millimeters.

Claims (3)

1. a kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system, including original state Soft Soil Layer (1), in original state Soft Soil Layer (1) the initial binder course of graded broken stone (3) of 200 millimeters thicks is provided on, which is characterized in that in the graded broken stone of 200 millimeters thicks It has been positioned apart from compound vertical drainage tube body (2) on initial binder course (3), has been provided in compound vertical drainage tube body (2) perpendicular To draining core pipe (9), water inlet (11) are provided on the tube wall of compound vertical drainage tube body (2), in vertical drainage core It manages and is provided with water sucking mouth on the tube wall of (9), lateral wall and compound vertical drainage tube body (2) in vertical drainage core pipe (9) Inner sidewall between be provided with tubulose filter membrane (10), the top of vertical drainage core pipe (9) is connected with horizontal vacuum drinking-water pipe (8), The other end of horizontal vacuum drinking-water pipe (8) is linked together with vacuum water pump (7);Compound vertical drainage tube body (2) is Be square laying, and the spacing between the compound vertical drainage tube body (2) of adjacent two is 8-12 meters;In the gradation of 200 millimeters thicks There are nail type hammer ram (12), nail type between two adjacent compound vertical drainage tube bodies (2) on the top surface of the initial binder course of rubble (3) Hammer ram (12) is in wire nail shape, and the diameter of the upper cylinder of nail type hammer ram (12) is 2-3 meters, the lower part of nail type hammer ram (12) The diameter of cylindrical body (13) is 1-1.5 meters.
2. a kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system according to claim 1, which is characterized in that On the initial binder course of graded broken stone (3) of 200 millimeters thicks, by sequence from top to bottom, it is horizontal to be disposed with two-way enhancing The secondary binder course of graded broken stone (5) of grid (4) and 150 millimeters thicks;In the secondary binder course of the graded broken stone of 150 millimeters thicks (5) On be provided with hydraulic reclamation soil layer (6).
3. a kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system according to claim 2, which is characterized in that The distance between top and the top surface of hydraulic reclamation soil layer (6) of compound vertical drainage tube body (2) are 100-200 millimeters.
CN201820360239.3U 2018-03-16 2018-03-16 A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system Active CN208293556U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820360239.3U CN208293556U (en) 2018-03-16 2018-03-16 A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820360239.3U CN208293556U (en) 2018-03-16 2018-03-16 A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system

Publications (1)

Publication Number Publication Date
CN208293556U true CN208293556U (en) 2018-12-28

Family

ID=64694523

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820360239.3U Active CN208293556U (en) 2018-03-16 2018-03-16 A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system

Country Status (1)

Country Link
CN (1) CN208293556U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277794A (en) * 2018-03-16 2018-07-13 中铁二十局集团第六工程有限公司 A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system
CN110130314A (en) * 2019-04-04 2019-08-16 中国电建集团华东勘测设计研究院有限公司 A kind of drop pump synergy vacuum pre-press reinforcing structure of soft soil foundation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277794A (en) * 2018-03-16 2018-07-13 中铁二十局集团第六工程有限公司 A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system
CN110130314A (en) * 2019-04-04 2019-08-16 中国电建集团华东勘测设计研究院有限公司 A kind of drop pump synergy vacuum pre-press reinforcing structure of soft soil foundation

Similar Documents

Publication Publication Date Title
CN101851914B (en) Method for regulating and controlling ventilating transformation and quickly reinforcing dredger fill in vacuum
CN109797769B (en) Collapsible loess area underground comprehensive pipe gallery foundation structure and construction method thereof
CN101806055B (en) Vacuum pre-pressed joint rigid pile composite foundation reinforcing method
CN107217683B (en) Drainage pipeline foundation filling seepage-proofing collapse-proofing structure and construction method thereof
WO2021072941A1 (en) Method for replacing and reinforcing coastal silt soft soil foundation by performing two-time dynamic rubble compaction
CN104878739A (en) Drainage material assembly capable of being transversely connected with plastic drainage boards and method for constructing drainage material assembly
CN108277794A (en) A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system
CN208293556U (en) A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN101634139B (en) Dynamic compaction method for backfill foundation with drainage layer
CN114108597A (en) Vacuum drainage grouting method
CN107100182A (en) Soft foundation cluster type layering precipitation no-arbitrary pricing pipe rams system and its construction method
CN103215945B (en) The three-dimensional assembly power drain consolidation system of heterogeneous body place soft soil foundation and method
CN108442356A (en) The construction technology of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system
CN207003459U (en) Soft foundation cluster type layering precipitation no-arbitrary pricing pipe rams system
CN106049413B (en) A kind of composite power drain consolidation system and construction method applied to deep layer foundation in saturated soft soil
CN101886384A (en) Vacuum and dynamic compaction synchronization method
CN106869153A (en) A kind of method of the quick soft soil foundation treatment of well-points dewatering
CN1121973A (en) Double compounded crushed stone pile and concrete cast-in-place pile foundation and its construction method
CN202023185U (en) Concrete tubular pile
CN105970909B (en) Well point plastic strip vacuum preloading seepage consolidation joint precipitating, pre-pressing dynamic consolidation method
CN106013046B (en) Varying stress path well point plastic strip vacuum preloading seepage consolidation hierarchical loading method
CN105926577B (en) Vacuum preloading seepage consolidation method
CN104712000A (en) Pressure reduction and water drainage system under ultra-deep underground space structure bottom plate
CN204982857U (en) Three -dimensional multichannel drainage combination tamping unit of low level negative pressure

Legal Events

Date Code Title Description
GR01 Patent grant