CN102220756B - Long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method - Google Patents

Long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method Download PDF

Info

Publication number
CN102220756B
CN102220756B CN201110094942A CN201110094942A CN102220756B CN 102220756 B CN102220756 B CN 102220756B CN 201110094942 A CN201110094942 A CN 201110094942A CN 201110094942 A CN201110094942 A CN 201110094942A CN 102220756 B CN102220756 B CN 102220756B
Authority
CN
China
Prior art keywords
long
transverse
short
vacuum
plastic draining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110094942A
Other languages
Chinese (zh)
Other versions
CN102220756A (en
Inventor
潘秉忠
谭再坤
杨耀明
景本玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Sheng Hong Engineering Survey Design Co., Ltd.
Original Assignee
China Hong Kong Foundation (beijing) Geotechnical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Hong Kong Foundation (beijing) Geotechnical Technology Co Ltd filed Critical China Hong Kong Foundation (beijing) Geotechnical Technology Co Ltd
Priority to CN201110094942A priority Critical patent/CN102220756B/en
Publication of CN102220756A publication Critical patent/CN102220756A/en
Application granted granted Critical
Publication of CN102220756B publication Critical patent/CN102220756B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention provides a long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method, which comprises the following main steps of: laying geotextile or woven cloth on the surface of a foundation to be processed; arranging shallow longitudinal short plastic drainage plates in a striking manner; arranging a transverse drainage system for the short plastic drainage plates; laying a vacuum sealing membrane; removing water and gas in the transverse drainage body for the short plastic drainage plates by using a vacuum pump; stripping away the vacuum sealing membrane; arranging deep longitudinal long plastic drainage plates in a striking manner; arranging a transverse drainage system for the long plastic drainage plates; laying a vacuum sealing membrane; and synchronously removing the water and gas in the transverse drainage systems for the long and the short plastic drainage plates by using the vacuum pump. By using the technology, an early-stage shallow preloading system and later-stage deep processing are organically combined, the time for solidification of foundation soil is shortened, the effect of reinforcing is enhanced, and a fast and efficient construction process is realized.

Description

The secondary vacuum prepressing ground foundation treatment method that the length plastic draining board combines
Technical field
The present invention is a kind of foundation treatment technology, mainly is applicable to soft foundation, belongs to the geotechnical engineering field.
Background technology
Coastal large-scale Scale Sea Reclamation Project of China and littoral zone exploration project are flourish.Dalian, Tianjin, Jiangsu, Zhejiang and Guangdong etc. are coastal all at reclaiming land around sea on a large scale.Mostly these areas are the mud matter class weak soil of high-moisture, high-compressibility.The economic construction of China's high speed development is badly in need of wanting subgrade treatment technologies quick, efficient, energy-saving and environmental protection.In the eighties mid-term in last century, the technique of soft soil foundation treatment that grows up is through the development of nearly two more than ten years and constantly perfect.Develop into vacuum combined stack-load, the vacuum combined worker's methods such as water treatment, low position vacuum preloading, directly discharging type vacuum prepressing of covering from single vacuum method.Make it in practical applications, obtain success, and be widely used in the treatment of soft foundation engineering of Scale Sea Reclamation Project.
Find through practical application,, also have bigger limitation though conventional vacuum preloading law technology is a kind of effective soft foundation processing technology.For the ultra-soft foundation of just accomplishing hydraulic reclamation, consolidation process need consume a large amount of hydraulic reclamation layers of sand and fill out mountain skin soil as course with artificial shop, guarantees the running job of conventional vacuum preloading construction machinery.This just needs a large amount of electric energy of consumption and needs the long construction period.If carrying out superficial part (behind 4.0~6.0m) processing and the formation crust layer, carries out conventional vacuum preloading again and handles.This technology needs to solve a practice of construction difficult problem, but the shallow-layer band drain that early stage, construction processing was used goes out of use, and has caused the construction cost increase bigger, and the processing time is often longer, has satisfied not the needs of engineering practical application.Therefore, research and development subgrade a kind of fast, efficient, energy-saving and environmental protection is handled the active demand that new technology is the existing market development.The present invention makes full use of the material that stays when superficial part is handled simultaneously through improved transverse drainage system, shallow-layer is handled to handle with the deep layer precompressed organically combining, and has saved resource, has accelerated soil solidifying, has shifted to an earlier date the duration.Also improved the consolidation effect that deep soft foundation is handled simultaneously.
Summary of the invention
The present invention is in order to overcome a large amount of medium coarse sand bed courses that use in the conventional vacuum preloading, to consume ample resources; For improve shallow-layer handle discarded plastic draining board repeat utilize again; In order to quicken the fixed of the soil body.With realize fast, the purpose of efficient, energy-saving and environmental protection.
For realizing above-mentioned purpose; The scheme that patent of the present invention adopts provides the secondary vacuum prepressing ground foundation treatment method that a kind of length plastic draining board combines, and dark band drain was mainly handled and inserted to this technology by the shallow-layer of inserting short band drain two systems of deep level of processing realize.
This method may further comprise the steps: the foundation surface in that needs are handled is laid geotextiles or woven cloth; Set the vertically short plastic draining board of shallow-layer; Short plastic draining board transverse drainage system is set; Shop vacuum seal film; The water that utilizes vacuum pump to get rid of in the short plastic draining board transverse row water body is gentle; Take the vacuum seal film off; Set the vertically long plastic draining board of deep layer; Long plastic draining board transverse drainage system is set; Shop vacuum seal film; Utilize the water in the vacuum pump long and short band drain transverse drainage of the eliminating synchronously system gentle.Long and short band drain transverse drainage plate system is horizontally disposed transverse drainage plate, and its two ends are connected with main filter pipe, and main filter pipe is connected with vacuum pump.Step is further specialized:
⑴, the short band drain vacuum preloading of shallow-layer are handled.Through laying geotextiles or woven cloth, the artificial short plastic draining board that sets shallow-layer above that, construction depth 4~6m; To expose the draining wrench and directly sandwich transverse horizontal between the transverse row water body that two plastic draining boards of overlapping placement form and fixing; The transverse drainage end of body is connected to form the transverse drainage system with main filter pipe through connector again, is connected on the vacuum pump shop film sealing at last; Vacuumize and carry out the shallow-layer precompressed, form superficial part duricrust working lining.
⑵ the secondary vacuum precompressed that, depth layer combine is handled.Accomplish on the shallow-layer precompressed processing basis, setting the long plastic draining board of deep layer, setting end through the plastic draining board board-plugging device.Long plastic draining board wrench and transverse horizontal is also fixing between the transverse row water body of two plastic draining boards formation of overlapping placement, and transverse drainage end of body and main filter pipe are connected to form the transverse drainage system.Transverse drainage system with long and short plastic draining board is connected on the vacuum pump simultaneously at last, repaves the film sealing and vacuumizes.Carrying out the secondary vacuum precompressed soft foundation dark, that shallow-layer is synchronous handles.Utilize this technology fully in earlier stage the shallow-layer precompressed system and the deep level of processing in later stage to be organically combined, the foundation soil consolidation time improves consolidation effect, has realized the quick, efficient of work progress.
This invention is in improving the traditional vacuum precompressed, to insert short band drain with first shallow-layer to carry out after vacuum preloading finishes dealing with, and the slotting long plastic draining board of deep layer of the equipment of going up again carries out deep level of processing.After invention is handled through shallow-layer, when carrying out deep level of processing, can combine the short band drain of discarded shallow-layer organically to make up.Can save the consumption of medium coarse sand pad, minimizing vacuum chimney filter in the construction, reach the saving cost 30%, realize the target of energy-saving and environmental protection; The depth layer after-treatment technology that adopts the length plate to combine can be accelerated soil solidifying, and the reduction of erection time is near 40%The invention technology mainly is applicable to weak soil (ultra-soft soil) foundation engineering in the building projects such as harbour, iron fall, highway, water conservancy, airport.
Description of drawings
Fig. 1:Organigram of the present invention.
Among the figure: 1, vacuum extractor, 2, short band drain transverse row water body, 3, working cushion layer, 4, short band drain, 5, diaphragm seal, 6, long band drain transverse row water body, 7, long band drain.
The specific embodiment
, the short band drain preliminary treatment of shallow-layer
⑴, through machinery the field is flattened, planeness reaches 5 ‰.
⑵, laying one deck woven cloth; If handle ultra-soft foundation, then arrange the 200-300g geotextiles, utilize the plastic foam of filter membrane parcel to enclose low bank between fields as manual work.
⑶, carry out the longitudinal drainage body construction, calculate spacing, the degree of depth and the employed band drain specifications and models of confirming to set plastic draining board according to geological conditions.The plastic draining board protruded length is confirmed according to spacing, is generally 40~60cm, and wrench and parcel filter cloth require complete, concordant, and must not having into, the mud phenomenon occurs.
⑷ the setting of, transverse drainage system; Two overlapping placements of wide cut plastic draining board of adopting thickness 4.0 ± 0.2mm, width 100 ± 2mm, vertical water-flowing amount >=60cm3/s, transmission coefficient >=5 * 10-3cm/s, effective aperture (in O98) 80~100 μ m are as the transverse row water body; The transverse row water body is positioned over two row's longitudinal drainage plates; The longitudinal drainage wrench that both sides are exposed folds up between overlapping transverse row water body; Wrench is placed relatively, and the outside is fixed itself and transverse row water body with nailing, makes it to form an integral body at the external side parcel of transverse drainage filter membrane.In the both side ends of transverse row water body, link to each other with main filter pipe with connector, form a transverse drainage system.
⑸, laying diaphragm seal, the diaphragm seal quality adheres to specification, in factory's heat seal one-shot forming.With the diaphragm seal of prior compression moulding, divide two-layer laying, to consider that sedimentation causes the deformation requirements to film during the film of shop.The two layers of plastic film all should be imbedded and press backfill compacting in the unconcerned ditch.
⑹, peace jet pump, vacuum suction.Arrange jet vacuum pump by designing requirement, turn on pump carries out vacuum suction.Through 30 days, make top layer 4~6m sclerosis, can satisfy the construction machinery construction operation.
, deep layer band drain construction
⑴, the vacuum filter membrane that stays when removing the shallow-layer preliminary treatment;
⑵, carry out deep layer longitudinal drainage body construction, according to calculating the spacing that sets plastic draining board, the degree of depth and the employed band drain specifications and models of confirming.Be generally 40~60cm, wrench and parcel filter cloth require complete, concordant, and must not having into, the mud phenomenon occurs.
⑶ the setting of, transverse drainage system, long plastic draining board wrench and transverse horizontal is also fixing between the transverse row water body of two plastic draining boards formation of overlapping placement, and transverse drainage end of body and main filter pipe are connected to form the transverse drainage system.
⑷, laying diaphragm seal with the diaphragm seal of prior compression moulding, divide two-layer laying, will consider that sedimentation causes the deformation requirements to film during the film of shop.The two layers of plastic film all should be imbedded and press backfill compacting in the unconcerned ditch.
The secondary vacuum precompressed that , depth layer combine is handled.
On the basis of the laying of accomplishing diaphragm seal.At last the horizontal connector of long and short plastic draining board is connected on the vacuum pump simultaneously and vacuumizes, carried out the synchronous vacuum preloading of long and short band drain about 90 days.

Claims (1)

1. the secondary vacuum prepressing ground foundation treatment method that the length plastic draining board combines is characterized in that may further comprise the steps: in the foundation surface laying geotextiles or the woven cloth of needs processing; Set the vertically short plastic draining board of shallow-layer; Short plastic draining board transverse drainage system is set; Shop vacuum seal film; The water that utilizes vacuum pump to get rid of in the short plastic draining board transverse row water body is gentle; Take the vacuum seal film off; Set the vertically long plastic draining board of deep layer; Long plastic draining board transverse drainage system is set; Shop vacuum seal film; Utilize the water in the vacuum pump long and short band drain transverse drainage of the eliminating synchronously system gentle; Long and short band drain transverse drainage plate system is horizontally disposed transverse drainage plate, and its two ends are connected with main filter pipe, and main filter pipe is connected with vacuum pump; Utilize vacuum pump to carry out deep level of processing and get rid of water in the transverse row water body when gentle, keep the transverse drainage system of the short band drain of shallow-layer, the water of getting rid of synchronously in the long and short band drain transverse row water body is gentle.
CN201110094942A 2011-04-15 2011-04-15 Long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method Expired - Fee Related CN102220756B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110094942A CN102220756B (en) 2011-04-15 2011-04-15 Long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110094942A CN102220756B (en) 2011-04-15 2011-04-15 Long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method

Publications (2)

Publication Number Publication Date
CN102220756A CN102220756A (en) 2011-10-19
CN102220756B true CN102220756B (en) 2012-08-29

Family

ID=44777447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110094942A Expired - Fee Related CN102220756B (en) 2011-04-15 2011-04-15 Long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method

Country Status (1)

Country Link
CN (1) CN102220756B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733371B (en) * 2012-07-18 2015-06-24 温州大学 Closed direct-sucking sectional vacuum preloading foundation treatment method
CN102900067B (en) * 2012-10-31 2015-05-06 上海大学 Processing method for reinforcing soft clay ground through vacuum preloading in combination with electro-osmosis method
CN103074884A (en) * 2013-01-11 2013-05-01 温州大学 Deep decompression anatonosis type vacuum preloading foundation treatment method
CN103074883B (en) * 2013-01-11 2016-01-06 温州大学 Active piling prepressing united consolidated subsoil method
CN105862712B (en) * 2016-04-21 2018-09-07 中交第三航务工程局有限公司江苏分公司 A kind of no sand vacuum pre-pressed soft soil foundation reinforcement means
CN112459043A (en) * 2020-12-10 2021-03-09 中铁四局集团第一工程有限公司 Three-dimensional disturbance type vacuum preloading foundation treatment system
CN112878308B (en) * 2021-01-18 2022-07-22 江苏鑫泰岩土科技有限公司 High-load ultralow-position precipitation vacuum preloading method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1858361A (en) * 2006-06-09 2006-11-08 华南理工大学 Quick reinforcing method and its reinforcing device super soft weak soil
CN101255688A (en) * 2008-03-19 2008-09-03 中交水运规划设计院有限公司 Directly ventilated type non-subcrust vacuum prepressing ground strengthening method
CN101906772A (en) * 2010-07-26 2010-12-08 李燕青 Fast consolidation method of blow-filled soft soil for land reclamation

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100882835B1 (en) * 2007-07-03 2009-02-10 (주)지구환경전문가그룹 Sump tank for separation of air and water in suction drain method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1858361A (en) * 2006-06-09 2006-11-08 华南理工大学 Quick reinforcing method and its reinforcing device super soft weak soil
CN101255688A (en) * 2008-03-19 2008-09-03 中交水运规划设计院有限公司 Directly ventilated type non-subcrust vacuum prepressing ground strengthening method
CN101906772A (en) * 2010-07-26 2010-12-08 李燕青 Fast consolidation method of blow-filled soft soil for land reclamation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
任燚等.真空预压工艺处理超软基冬季施工.《中国港湾建设》.2010,(第6期),51-53. *

Also Published As

Publication number Publication date
CN102220756A (en) 2011-10-19

Similar Documents

Publication Publication Date Title
CN102220756B (en) Long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method
CN102116022B (en) Method for treating soft foundation through overpressure vacuum densification
CN102561308B (en) Light-well plastic-strip superposition vacuum preloading method for soft soil foundation
CN102011391B (en) Reinforcement processing method of soft foundation
CN101736735B (en) Composite reinforcing method for combining soft foundation light well point pipe with plastic drainage plate
CN100480472C (en) Quick reinforcing method and reinforcing device for super soft weak soil
CN102226335A (en) Foundation treatment method for controlling post-construction settlement and deformation of soft soil
CN101666083A (en) Soft soil foundation treatment reinforcement method and device thereof
CN103806437B (en) Double-layer vacuum preloading and hydraulic reclamation soft foundation processing method
CN102900067B (en) Processing method for reinforcing soft clay ground through vacuum preloading in combination with electro-osmosis method
CN101718089A (en) Combined vacuum preloading method foundation treatment construction method
CN102660936A (en) Method for realizing seepage prevention of bridge wall by means of polyvinyl chloride film
CN201165659Y (en) Direct discharging type vacuum preloading reinforced soft soil function structure
CN102776877B (en) Stepped vacuum drainage consolidation method for ultra-soft soil foundation
CN101016739A (en) Deep strengthening method of vacuum electroosmosis dewatering and low-energy dynamic compaction
CN102733370A (en) Novel vacuum-heaped combined soft soil foundation pre-loading and reinforcing method
CN105019425A (en) Construction method of drainage body and solidified layer combined foundation structure
CN102116021B (en) Method for treating soft foundation through vacuum transverse drainage
CN101831898B (en) Horizontal shallow layer negative-pressure consolidation working cushion layer technique
CN108277794B (en) Vacuum power consolidation composite drainage system for hydraulic filling soft soil foundation
CN103774516B (en) The underlayment stabilized treatment method of soft base cut subgrade
CN204875755U (en) Drainage body and solidification stratum society foundation structure
CN101130953B (en) Deep vacuum vibration processing method for soft ground base
CN201908293U (en) Vacuum transverse drainage
CN102140793B (en) Filter pipe tread-in vacuum drainage super-soft soil reinforcing technical method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HEIBEI SHENGGANG ENGINEERING SURVEY DESIGN CO., LT

Free format text: FORMER OWNER: REDLAND (BEIJING) GEOTECHNICAL TECHNOLOGY CO., LTD.

Effective date: 20130305

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: HUAIROU, BEIJING TO: 061001 CANGZHOU, HEBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130305

Address after: 061001 No. 6 Jiefang West Road, canal zone, Hebei, Cangzhou

Patentee after: Hebei Sheng Hong Engineering Survey Design Co., Ltd.

Address before: No. 308 West Zhuang village, Huai Huairou District, Beijing, Beizhen

Patentee before: China Hong Kong Foundation (Beijing) geotechnical Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120829

Termination date: 20190415