CN101906772A - Fast consolidation method of blow-filled soft soil for land reclamation - Google Patents

Fast consolidation method of blow-filled soft soil for land reclamation Download PDF

Info

Publication number
CN101906772A
CN101906772A CN 201010236279 CN201010236279A CN101906772A CN 101906772 A CN101906772 A CN 101906772A CN 201010236279 CN201010236279 CN 201010236279 CN 201010236279 A CN201010236279 A CN 201010236279A CN 101906772 A CN101906772 A CN 101906772A
Authority
CN
China
Prior art keywords
vacuum
soft soil
pontoon bridge
plastic
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010236279
Other languages
Chinese (zh)
Other versions
CN101906772B (en
Inventor
李燕青
曾国海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Taichang Harbor Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010102362795A priority Critical patent/CN101906772B/en
Publication of CN101906772A publication Critical patent/CN101906772A/en
Application granted granted Critical
Publication of CN101906772B publication Critical patent/CN101906772B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to a fast consolidation method of blow-filled soft soil for land reclamation, comprising the following process steps of: erecting a floating bridge; paving a plastic woven cloth; paving a main pipe and a branch pipe; inserting a plastic drainage plate; embedding a joint and a vacuum degree meter of a vacuum pump and a pore pressure meter monitoring device; paving a geotextile; paving a vacuum film; distributing the vacuum pump and trying to vacuumize; vacuumizing; monitoring construction; and carrying out vacuum water covering united pre-loading and unloading detection, wherein the step of erecting the floating bridge comprises: erecting the floating bridge on the blow-filled soft soil requiring the treatment and building a construction platform and a channel on mud. The invention has the advantages that construction members carry out operations of paving the plastic woven cloth, inserting the plastic drainage plate, laying pipes, paving the geotextile and the like on the floating bridge, thereby the technical problem that the follow-up treatment on the new blow-filled soft soil cannot be instantly carried out by using the traditional soft soil foundation treatment technology is solved, and 2-5 years for consolidating the new blow-filled soft soil naturally before retreatment are saved.

Description

Fast consolidation method of blow-filled soft soil for land reclamation
(1) technical field
The present invention relates to a kind of blow-filled soft soil for land reclamation quick consolidation method.Belong to the foundation treatment technology field.
(2) background technology
In recent years, along with coastal area economy, fast development of society, the construction land imbalance between supply and demand becomes increasingly conspicuous, develop to the sea, the abundant beach resource in development and use coastal area, become these areas and solve land resources main path in short supply, enclosing extra large reclamation by pumping filling is the main mode of coastal from now on beach area land development.The barged-in fill of coastal area is mud and muddy soft soil substantially, the characteristics that have that water content height, poor permeability, intensity are low, personnel and machinery can't be marched into the arena directly.Conventional treatment of soft foundation worker method can't be implemented, and has brought new difficulty for the development ﹠ construction of coastal area.
Before the present invention, the conventional place of reclaiming fields from the sea, after hydraulic reclamation was finished, the place needed nature fixed 2~5 years, after surface layer on the scene again takes to spread technical measures such as mao bamboon, plastic woven cloth, layer of sand, can go up people and light-duty machinery equipment and carry out the ground processing.But this is in short supply with the various places construction land, and the requirement of being badly in need of land used behind hydraulic reclamation contradicts.
(3) summary of the invention
The objective of the invention is to overcome above-mentioned deficiency, provide a kind of after hydraulic reclamation is finished, can follow up rapidly and handle the fast consolidation method of blow-filled soft soil for land reclamation of weak soil.
The object of the present invention is achieved like this: a kind of fast consolidation method of blow-filled soft soil for land reclamation, and described method comprises following processing step:
Step 1, set up pontoon bridge
On the saturated dredger soft soil that need are handled, set up pontoon bridge, construct operation platform and passage on the mud, pontoon bridge has many, every pontoon bridge is made up of column, crosspiece, railing, pontoon bridge plate and panel, column has some, some root posts are divided into two rows and vertically insert the saturated dredger soft soil that needs processing, and at 4~5m, the column upper end is exposed the saturated dredger soft soil surface and is not less than 0.9m with the spacing between adjacent two root posts of row; Described crosspiece and railing all have two, and crosspiece is fixedly connected on the inboard of the column of saturated dredger soft soil top, and railing is fixedly connected on the inboard, upper end of column; Described pontoon bridge plate and panel have polylith, and pontoon bridge plate fixed mount is located between the crosspiece of two row's column inboards, and panel is laid on the pontoon bridge plate, and the width of monolithic pontoon bridge plate is at 1.0~1.5m, and thickness is not less than 10cm, and area is not less than 2m 2, reserve pull rope for four jiaos on the pontoon bridge plate,
Step 2, shop plastic woven cloth
Completely spread plastic woven cloth on the saturated dredger soft soil surface, at plastic woven cloth upper berth pontoon bridge plate, the plastic woven cloth that the constructor stands on the pontoon bridge plate rolling opens forward, and mobile subsequently pontoon bridge plate opens plastic woven cloth forward again,
Step 3, shop are responsible for and arm
The constructor is responsible for and arm on pontoon bridge plate upper berth, and the person in charge's cloth tube pitch is at 10~15m, and the every person in charge goes up and reserves the interface that is no less than a vacuum pump; The cloth tube pitch of arm connects and is responsible for and arm at 0.8~2m,
Step 4, the slotting plastic draining board of beating
The constructor beats plastic draining board from vertical the inserting in hydraulic reclamation weak soil surface on the pontoon bridge plate, plastic draining board adopts the quincunx alternate layout of little spacing length plate, the spacing of plastic draining board is at 0.5~1.0m, the saturated dredger soft soil surface is exposed in the plastic draining board upper end, oblique loose raising around being connected adopted with arm in the plastic draining board upper end, long plastic draining board length is greater than saturated dredger soft soil thickness, and short plastic draining board length is at 1-2.0m
Step 5, the joint of burying vacuum pump underground, vacuum meter, pore pressure cell monitoring equipment,
Step 6, shop geotextiles
In the shop, plastic woven cloth surface of the joint of burying vacuum pump underground and vacuum meter, pore pressure cell monitoring equipment geotextiles,
Step 7, shop vacuum diaphragm
In shop, geotextiles surface vacuum diaphragm, vacuum diaphragm thickness is not less than 0.14mm, adopts duplicature, and the vacuum diaphragm edge is pressed into the sealing ditch around the saturated dredger soft soil,
Step 8, cloth vacuum pump, examination are taken out
The branch level Four tries to be drawn into capable vacuum load step by step, and primary load takes each pump impeller stream to load.Primary load pump quantity opens 20%, and examination is found time and is controlled at 7-9 days; Second level load pump is opened quantity 40%, examination is found time and is controlled at 5-7 days, third level load pump quantity opens 60%, examination is taken out and is controlled at time 3-5 days, fourth stage load pump quantity is opened more than 80%, and examination is taken out and is controlled at time 1-3 days, all loads to try to exhaust to become to be no less than 20 days, simultaneously monitor under the film step by step, vacuum on the pump, check the sealing effectiveness of vacuum system and the operation conditions of equipment.Vacuum must increase and improve gradually along with loading progression under the film.The vacuum of vacuum pump must be more than 96kpa when examination was taken out and loaded, and loaded to finish that vacuum must reach more than the 80kpa under the film.
Step 9, vacuumize
When hierarchical loading examination exhausts, vacuum is greater than 80kpa under the film, and vacuum pump is opened quantity and reached design more than 90%, and the place enters formal vacuumizing phase.
Step 10, construction monitoring
Construction whole process is carried out vacuum, saturated dredger soft soil mesopore water pressure and the monitoring of surface settlement aspect, place in vacuum, the plastic draining board under vacuum, the film on the pump,
Step 11, vacuum are covered the water joint preloading
After vacuum pressure reaches more than the 80kPa under film, continue voltage regulation operation 7 days, beginning is provided with water-retaining cofferdam and the saturated dredger soft soil overlying water in the cofferdam at the sealing limes marginis, the cofferdam adopts the earth bag height at 0.3m ± 0.1m, the earth bag upstream face need be spread waterproof plastic sheeting, cover water depth at 0.3~0.5m, carry out vacuum and cover the compound precompressed of water
Step 12, unloading detect
Draw sedimentation-time curve and hole pressure-time graph, when sedimentation-time graph and hole pressure-time graph tend towards stability, place sedimentation in continuous 4 days is less than 2mm, and total pumpdown time is not less than 90 days, can unload detection, the bearing capacity in place is greater than 50kpa after the consolidation process.
The invention has the beneficial effects as follows:
1, the present invention adopts the technology of pontoon bridge auxiliary construction on the mud, has realized people's construction on the saturated dredger soft soil of zero bearing capacity.
The constructor spreads plastic woven cloth, inserts operations such as plastic draining board, stringing, shop geotextiles on pontoon bridge.Overcome the technical barrier that traditional soft foundation processing technology can not follow up at once and handle on new saturated dredger soft soil, saving new saturated dredger soft soil needs time of handling again behind the fixed 2-5 of nature.
2, the present invention adopts vacuum tube with the direct link technique of plastic draining board, has cancelled the sand cushion of traditional vacuum precompressed technology, has reduced the loss that vacuum pressure transmits in sand cushion, has reduced the difficulty of construction of sanding on the mud.Compare with traditional technique of soft soil foundation treatment, simplified construction technology, reduced cost, slow down the rate of decay of vacuum in the plastic draining board of knowing clearly, improved the place consolidation effect.
3, the present invention adopts length to harden to close little spacing cloth plate technique and vacuum fractionation loading technique, overcome the place and handled inhomogeneous technical barrier.
The present invention is according to blast-filled ground soil, along cohesion features of smaller between bigger characteristics of the fixed naturally otherness of depth direction and the place soil, adds short slab in the middle of adopting long slab, with plastic draining board hypotelorism in the shallow-layer fine grained silt soil; Technical measures such as vacuum fractionation Loading Control vacuum load speed have been proposed simultaneously; Eliminate the little earth pillar phenomenon of plastics row edges of boards, improved the uniformity that handle in the place.
4, the present invention adopts plastic draining board and the oblique loose technology that curls up of arm, and adopts double-deck filter film technology, has overcome technical barriers such as plastic draining wrench and the obstruction of arm connecting portion mud.
5, the present invention behind the vacustat, adopts water covering prepressing and vacuum preloading to combine under film, has improved vacuum under prefabricating load and the film, has avoided vacuum diaphragm to be directly exposed under the sun, has delayed its aging speed.
(4) description of drawings
Fig. 1 is a fast consolidation method of blow-filled soft soil for land reclamation perspective view of the present invention.
Fig. 2 is a pontoon structure elevational schematic view of the present invention.
Fig. 3 is a pontoon structure floor map of the present invention.
Reference numeral among the figure:
Long plastic draining board 1, short plastic draining board 2, horizontal plastic draining board 3, arm 4, the person in charge 5, plastic woven cloth 6, geotextiles 7, vacuum diaphragm 8, vacuum pump 9, crosspiece (level) 10, column 11, pontoon bridge plate 12, panel 13, railing 14.
(5) specific embodiment
Referring to Fig. 1~3, Fig. 1 is a fast consolidation method of blow-filled soft soil for land reclamation perspective view of the present invention.Fig. 2 is a pontoon structure elevational schematic view of the present invention.Fig. 3 is a pontoon structure floor map of the present invention.By Fig. 1, Fig. 2 and Fig. 3 as can be seen, fast consolidation method of blow-filled soft soil for land reclamation of the present invention, described method comprises following processing step:
Step 1, pontoon bridge are set up
1) according to processing region shape, size and topography and geomorphology, divide the construction blocks of cells, planning construction pontoon bridge passage is measured setting-out, and the unit construction block area of general saturated dredger soft soil is at 1~20,000 m 2
2) set up pontoon bridge
On the saturated dredger soft soil that need are handled, set up pontoon bridge, construct operation platform and passage on the mud, pontoon bridge has many, every pontoon bridge is made up of column, crosspiece, railing, pontoon bridge plate and panel, column has some, some root posts are divided into two rows and vertically insert the saturated dredger soft soil that needs processing, and at 4~5m, the column upper end is exposed the saturated dredger soft soil surface and is not less than 0.9m with the spacing between adjacent two root posts of row; Described crosspiece and railing all have two, and crosspiece is fixedly connected on the inboard of the column of saturated dredger soft soil top, and railing is fixedly connected on the inboard, upper end of column; Described pontoon bridge plate and panel also have polylith, and pontoon bridge plate fixed mount is located between the crosspiece of two row's column inboards, and panel is laid on the pontoon bridge plate.The width of monolithic pontoon bridge plate is at 1.0~1.5m, and thickness is not less than 10cm, and area is not less than 2m 2Reserve pull rope for four jiaos on the pontoon bridge plate, conveniently to move flexibly and to be connected on the scenely.After pontoon bridge sets up and finishes, must can use after sample bearing capacity detection and total length walking detection are qualified, the requirement for bearing capacity of pontoon bridge is greater than 0.6kpa.
Step 2, shop plastic woven cloth
Plastic woven cloth is completely spread on the saturated dredger soft soil surface.The plastic woven cloth fabric width is 3.8M, adopts on-the-spot splicing, and its specification is at 160g/m 2-200g/m 2At plastic woven cloth upper berth come-up bridge plate, the plastic woven cloth that the constructor stands on the pontoon bridge plate rolling opens forward, and mobile subsequently pontoon bridge plate opens plastic woven cloth forward again.
Step 3, shop are responsible for and arm
The constructor is responsible for and arm on pontoon bridge plate upper berth, and the person in charge's cloth tube pitch is controlled at 10~15m, and the every person in charge goes up and reserves the interface that is no less than 1 vacuum pump; The cloth tube pitch of arm is controlled at 0.8~2m, connects to be responsible for and arm.The person in charge and arm generally adopt the ripple chimney filter of HDPE or PPR, and caliber is at φ 53-60mm, and ring stiffness is more than 15kpa.Be responsible for domestic demand and add the anti-flat interior support of inhaling.
Step 4, the slotting plastic draining board of beating
The constructor beats plastic draining board from vertical the inserting in hydraulic reclamation weak soil surface on the pontoon bridge plate, plastic draining board adopts the alternate quincuncial arrangement that is of little spacing length plate, the saturated dredger soft soil surface is exposed in the plastic draining board upper end, oblique loose raising around being connected adopted with arm in the plastic draining board upper end, the spacing of plastic draining board is at 0.5~1.0m, long plastic draining board length is greater than saturated dredger soft soil thickness, and short plastic draining board length is at 1-2.0m.
Step 5, the joint of burying vacuum pump underground and vacuum meter, pore pressure cell monitoring equipment
The pre-buried membrane union of interface of vacuum pump on being responsible for is buried the probe of pore pressure cell and vacuum meter underground according to designing requirement.
Step 6, shop geotextiles
In the shop, plastic woven cloth surface of the joint of burying vacuum pump underground and vacuum meter, pore pressure cell monitoring equipment geotextiles, geotextiles is chopped fiber needle-punched worker's handwoven cloth, and regular size is at 150g/m 2~250/m 2
Step 7, shop vacuum diaphragm
In shop, geotextiles surface vacuum diaphragm, vacuum diaphragm thickness is not less than 0.14mm, generally adopts duplicature.The vacuum diaphragm edge is pressed into the sealing ditch around the saturated dredger soft soil.
Step 8, cloth vacuum pump, examination are taken out
The branch level Four tries to be drawn into capable vacuum load step by step, and primary load takes each pump impeller stream to load.Primary load pump quantity opens 20%, and examination is found time and is controlled at 7-9 days; Second level load pump is opened quantity 40%, examination is found time and is controlled at 5-7 days, third level load pump quantity opens 60%, examination is taken out and is controlled at time 3-5 days, fourth stage load pump quantity is opened more than 80%, and examination is taken out and is controlled at time 1-3 days, all loads to try to exhaust to become to be no less than 20 days, simultaneously monitor under the film step by step, vacuum on the pump, check the sealing effectiveness of vacuum system and the operation conditions of equipment.Vacuum must increase and improve gradually along with loading progression under the film.The vacuum of vacuum pump must be more than 96kpa when examination was taken out and loaded, and loaded to finish that vacuum must reach more than the 80kpa under the film.
Step 9, vacuumize
When hierarchical loading examination exhausts, vacuum is greater than 80kpa under the film, and vacuum pump is opened quantity and reached design more than 90%, and the place enters formal vacuumizing phase.
Step 10, construction monitoring
Construction whole process is carried out aspect monitorings such as vacuum, saturated dredger soft soil mesopore pressure, place surface settlement in vacuum, the plastic draining board under vacuum, the film on the pump.
Step 11, vacuum are covered the water joint preloading
After vacuum pressure reaches more than the 80kPa under film, continue voltage regulation operation 7 days, beginning is provided with water-retaining cofferdam and the saturated dredger soft soil overlying water in the cofferdam at the sealing limes marginis, the cofferdam adopts the earth bag height at 0.3m ± 0.1m, the earth bag upstream face need be spread waterproof plastic sheeting, cover water depth at 0.3~0.5m, carry out vacuum and cover the compound precompressed of water.
Step 12, unloading detect
Draw sedimentation-time curve and hole pressure-time graph, when sedimentation-time graph and hole pressure-time graph tend towards stability, place sedimentation in continuous 4 days is less than 2mm, and total pumpdown time be not less than 90 days, can unload detection.The bearing capacity in place is greater than 50kpa after the consolidation process.

Claims (1)

1. fast consolidation method of blow-filled soft soil for land reclamation is characterized in that described method comprises following processing step:
Step 1, set up pontoon bridge
On the saturated dredger soft soil that need are handled, set up pontoon bridge, construct operation platform and passage on the mud, pontoon bridge has many, every pontoon bridge is made up of column, crosspiece, railing, pontoon bridge plate and panel, column has some, some root posts are divided into two rows and vertically insert the saturated dredger soft soil that needs processing, and at 4~5m, the column upper end is exposed the saturated dredger soft soil surface and is not less than 0.9m with the spacing between adjacent two root posts of row; Described crosspiece and railing all have two, and crosspiece is fixedly connected on the inboard of the column of saturated dredger soft soil top, and railing is fixedly connected on the inboard, upper end of column; Described pontoon bridge plate and panel have polylith, and pontoon bridge plate fixed mount is located between the crosspiece of two row's column inboards, and panel is laid on the pontoon bridge plate, and the width of monolithic pontoon bridge plate is at 1.0~1.5m, and thickness is not less than 10cm, and area is not less than 2m 2, reserve pull rope for four jiaos on the pontoon bridge plate,
Step 2, shop plastic woven cloth
Completely spread plastic woven cloth on the saturated dredger soft soil surface, at plastic woven cloth upper berth pontoon bridge plate, the plastic woven cloth that the constructor stands on the pontoon bridge plate rolling opens forward, and mobile subsequently pontoon bridge plate opens plastic woven cloth forward again,
Step 3, shop are responsible for and arm
The constructor is responsible for and arm on pontoon bridge plate upper berth, and the person in charge's cloth tube pitch is at 10~15m, and the every person in charge goes up and reserves the interface that is no less than a vacuum pump; The cloth tube pitch of arm connects and is responsible for and arm at 0.8~2m,
Step 4, the slotting plastic draining board of beating
The constructor beats plastic draining board from vertical the inserting in hydraulic reclamation weak soil surface on the pontoon bridge plate, plastic draining board adopts the quincunx alternate layout of little spacing length plate, the spacing of plastic draining board is at 0.5~1.0m, the saturated dredger soft soil surface is exposed in the plastic draining board upper end, oblique loose raising around being connected adopted with arm in the plastic draining board upper end, long plastic draining board length is greater than saturated dredger soft soil thickness, and short plastic draining board length is at 1-2.0m
Step 5, the joint of burying vacuum pump underground, vacuum meter, pore pressure cell monitoring equipment,
Step 6, shop geotextiles
In the shop, plastic woven cloth surface of the joint of burying vacuum pump underground and vacuum meter, pore pressure cell monitoring equipment geotextiles,
Step 7, shop vacuum diaphragm
In shop, geotextiles surface vacuum diaphragm, vacuum diaphragm thickness is not less than 0.14mm, adopts duplicature, and the vacuum diaphragm edge is pressed into the sealing ditch around the saturated dredger soft soil,
Step 8, cloth vacuum pump, examination are taken out
The branch level Four tries to be drawn into capable vacuum load step by step, and primary load takes each pump impeller stream to load, and primary load pump quantity opens 20%, and examination is found time and is controlled at 7-9 days; Second level load pump is opened quantity 40%, examination is found time and is controlled at 5-7 days, third level load pump quantity opens 60%, examination is taken out and is controlled at time 3-5 days, fourth stage load pump quantity is opened more than 80%, examination is taken out and is controlled at time 1-3 days, all load and try to exhaust to become to be no less than 20 days, simultaneously monitor under the film step by step, vacuum on the pump, check the sealing effectiveness of vacuum system and the operation conditions of equipment, vacuum increases and improves gradually along with loading progression under the film, and examination is taken out the vacuum of vacuum pump when loading more than 96kpa, loading finishes that vacuum reaches more than the 80kpa under the film
Step 9, vacuumize
When hierarchical loading examination exhausts, vacuum is greater than 80kpa under the film, and vacuum pump is opened quantity and reached design more than 90%, and the place enters formal vacuumizing phase,
Step 10, construction monitoring
Construction whole process is carried out vacuum, saturated dredger soft soil mesopore water pressure and the monitoring of surface settlement aspect, place in vacuum, the plastic draining board under vacuum, the film on the pump,
Step 11, vacuum are covered the water joint preloading
After vacuum pressure reaches more than the 80kPa under film, continue voltage regulation operation 7 days, beginning is provided with water-retaining cofferdam and the saturated dredger soft soil overlying water in the cofferdam at the sealing limes marginis, the cofferdam adopts the earth bag height at 0.3m ± 0.1m, the earth bag upstream face need be spread waterproof plastic sheeting, cover water depth at 0.3~0.5m, carry out vacuum and cover the compound precompressed of water
Step 12, unloading detect
Draw sedimentation-time curve and hole pressure-time graph, when sedimentation-time graph and hole pressure-time graph tend towards stability, place sedimentation in continuous 4 days is less than 2mm, and total pumpdown time is not less than 90 days, unloading detects, and the bearing capacity in place is greater than 50kpa after the consolidation process.
CN2010102362795A 2010-07-26 2010-07-26 Fast consolidation method of blow-filled soft soil for land reclamation Expired - Fee Related CN101906772B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102362795A CN101906772B (en) 2010-07-26 2010-07-26 Fast consolidation method of blow-filled soft soil for land reclamation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102362795A CN101906772B (en) 2010-07-26 2010-07-26 Fast consolidation method of blow-filled soft soil for land reclamation

Publications (2)

Publication Number Publication Date
CN101906772A true CN101906772A (en) 2010-12-08
CN101906772B CN101906772B (en) 2011-08-17

Family

ID=43262346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102362795A Expired - Fee Related CN101906772B (en) 2010-07-26 2010-07-26 Fast consolidation method of blow-filled soft soil for land reclamation

Country Status (1)

Country Link
CN (1) CN101906772B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102220756A (en) * 2011-04-15 2011-10-19 中港基业(北京)岩土技术有限公司 Long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method
CN103422490A (en) * 2012-05-21 2013-12-04 中交上海航道局有限公司 Non-sand-cushion vacuum preloading ultra soft soil foundation treatment technology
CN103643672A (en) * 2013-11-12 2014-03-19 浙江江南春建设集团有限公司 Vacuum preloading foundation treatment construction method
CN103696414A (en) * 2012-09-28 2014-04-02 上海宝冶集团有限公司 Method for constructing ultra-deep plastic drainage plate in seaside beach area
CN103924578A (en) * 2014-04-22 2014-07-16 上海市基础工程集团有限公司 Arrangement and operation method of vacuum pumps for efficient large-area foundation treatment
CN105887902A (en) * 2016-06-01 2016-08-24 上海建研地基基础工程有限公司 Well point plastic strip power solidification method with combination of vacuum preloading and precipitation preloading
CN105926577A (en) * 2016-06-01 2016-09-07 上海建研地基基础工程有限公司 Vacuum prepressing seepage consolidation method
CN105970908A (en) * 2016-06-01 2016-09-28 上海建研地基基础工程有限公司 Well point plastic draining pipe type vacuum dewatering preloading power consolidation method
CN105970909A (en) * 2016-06-01 2016-09-28 上海建研地基基础工程有限公司 Well point plastic draining pipe type vacuum preloading seepage consolidation and dewatering preloading power consolidation combined method
CN105970910A (en) * 2016-06-01 2016-09-28 上海建研地基基础工程有限公司 Well point plastic draining pipe film coating type vacuum preloading and dewatering preloading combined power consolidation method
CN106013047A (en) * 2016-06-01 2016-10-12 上海建研地基基础工程有限公司 Underwater foundation seepage consolidation method in vacuum preloading mode
CN106013048A (en) * 2016-06-01 2016-10-12 上海建研地基基础工程有限公司 Super-soft foundation seepage consolidation method combining vacuum preloading and dewatering preloading
CN106013046A (en) * 2016-06-01 2016-10-12 上海建研地基基础工程有限公司 Grading loading method for variable-stress path well point plastic drainage vacuum preloading seepage consolidation
CN106436683A (en) * 2016-11-09 2017-02-22 浙江水利水电学院 Dredger fill plastic drainage plate planting device
CN106677158A (en) * 2017-03-01 2017-05-17 杭州亿东岩土工程有限公司 Recent quick uniform treatment method and structure for blown filled muck shallow strata
CN107419717A (en) * 2017-06-19 2017-12-01 龙元建设集团股份有限公司 It is pressurized compound vacuum pre-pressed soft soil foundation processing constructing device and technique

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392448A (en) * 2011-09-28 2012-03-28 上海强劲地基工程股份有限公司 Soft foundation reinforced structure combined by long and short drain boards and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04293813A (en) * 1991-03-20 1992-10-19 Penta Ocean Constr Co Ltd Soft ground improving method
JP4112100B2 (en) * 1998-11-19 2008-07-02 丸山工業株式会社 Improvement method of soft ground in cold region.
CN101591907A (en) * 2009-06-26 2009-12-02 上海大学 Rapid treatment method of conjoined vacuum preloading for dredging and filling mud foundation
CN201362845Y (en) * 2008-10-30 2009-12-16 曾国海 Plastic draining board and composite negative pressure well point pipe concreting system for soft soil foundation
CN101748721A (en) * 2009-12-31 2010-06-23 曾国海 Large-area soft soil foundation duplex negative pressure consolidation processing method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04293813A (en) * 1991-03-20 1992-10-19 Penta Ocean Constr Co Ltd Soft ground improving method
JP4112100B2 (en) * 1998-11-19 2008-07-02 丸山工業株式会社 Improvement method of soft ground in cold region.
CN201362845Y (en) * 2008-10-30 2009-12-16 曾国海 Plastic draining board and composite negative pressure well point pipe concreting system for soft soil foundation
CN101591907A (en) * 2009-06-26 2009-12-02 上海大学 Rapid treatment method of conjoined vacuum preloading for dredging and filling mud foundation
CN101748721A (en) * 2009-12-31 2010-06-23 曾国海 Large-area soft soil foundation duplex negative pressure consolidation processing method

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102220756A (en) * 2011-04-15 2011-10-19 中港基业(北京)岩土技术有限公司 Long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method
CN102220756B (en) * 2011-04-15 2012-08-29 中港基业(北京)岩土技术有限公司 Long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method
CN103422490A (en) * 2012-05-21 2013-12-04 中交上海航道局有限公司 Non-sand-cushion vacuum preloading ultra soft soil foundation treatment technology
CN103696414A (en) * 2012-09-28 2014-04-02 上海宝冶集团有限公司 Method for constructing ultra-deep plastic drainage plate in seaside beach area
CN103643672A (en) * 2013-11-12 2014-03-19 浙江江南春建设集团有限公司 Vacuum preloading foundation treatment construction method
CN103643672B (en) * 2013-11-12 2016-05-11 浙江江南春建设集团有限公司 A kind of Soft Ground Improved By Vacuum Preloading is processed construction method
CN103924578A (en) * 2014-04-22 2014-07-16 上海市基础工程集团有限公司 Arrangement and operation method of vacuum pumps for efficient large-area foundation treatment
CN106013047A (en) * 2016-06-01 2016-10-12 上海建研地基基础工程有限公司 Underwater foundation seepage consolidation method in vacuum preloading mode
CN106013047B (en) * 2016-06-01 2018-06-15 上海建研地基基础工程有限公司 Underwater vacuum preloading seepage consolidation method
CN105970908A (en) * 2016-06-01 2016-09-28 上海建研地基基础工程有限公司 Well point plastic draining pipe type vacuum dewatering preloading power consolidation method
CN105970909A (en) * 2016-06-01 2016-09-28 上海建研地基基础工程有限公司 Well point plastic draining pipe type vacuum preloading seepage consolidation and dewatering preloading power consolidation combined method
CN105970910A (en) * 2016-06-01 2016-09-28 上海建研地基基础工程有限公司 Well point plastic draining pipe film coating type vacuum preloading and dewatering preloading combined power consolidation method
CN105887902A (en) * 2016-06-01 2016-08-24 上海建研地基基础工程有限公司 Well point plastic strip power solidification method with combination of vacuum preloading and precipitation preloading
CN106013048A (en) * 2016-06-01 2016-10-12 上海建研地基基础工程有限公司 Super-soft foundation seepage consolidation method combining vacuum preloading and dewatering preloading
CN106013046A (en) * 2016-06-01 2016-10-12 上海建研地基基础工程有限公司 Grading loading method for variable-stress path well point plastic drainage vacuum preloading seepage consolidation
CN106013046B (en) * 2016-06-01 2018-12-28 上海建研地基基础工程有限公司 Varying stress path well point plastic strip vacuum preloading seepage consolidation hierarchical loading method
CN105887902B (en) * 2016-06-01 2018-08-21 上海建研地基基础工程有限公司 Well point plastic strip vacuum pre-pressed joint precipitating, pre-pressing dynamic consolidation method
CN105970908B (en) * 2016-06-01 2018-06-26 上海建研地基基础工程有限公司 Well point plastic strip vacuum dewatering preloading dynamic consolidation method
CN105970909B (en) * 2016-06-01 2018-06-15 上海建研地基基础工程有限公司 Well point plastic strip vacuum preloading seepage consolidation joint precipitating, pre-pressing dynamic consolidation method
CN106013048B (en) * 2016-06-01 2018-06-15 上海建研地基基础工程有限公司 Ultra-soft foundation vacuum preloading seepage consolidation combines precipitating, pre-pressing concretion method
CN105926577A (en) * 2016-06-01 2016-09-07 上海建研地基基础工程有限公司 Vacuum prepressing seepage consolidation method
CN105926577B (en) * 2016-06-01 2018-06-15 上海建研地基基础工程有限公司 Vacuum preloading seepage consolidation method
CN105970910B (en) * 2016-06-01 2018-06-19 上海建研地基基础工程有限公司 Well point plastic strip overlay film vacuum pre-pressed joint precipitating, pre-pressing dynamic consolidation method
CN106436683A (en) * 2016-11-09 2017-02-22 浙江水利水电学院 Dredger fill plastic drainage plate planting device
CN106677158A (en) * 2017-03-01 2017-05-17 杭州亿东岩土工程有限公司 Recent quick uniform treatment method and structure for blown filled muck shallow strata
CN106677158B (en) * 2017-03-01 2019-02-22 杭州亿东岩土工程有限公司 A method and structure for fast and uniform treatment of superficial layer of newly blown and filled silt
CN107419717A (en) * 2017-06-19 2017-12-01 龙元建设集团股份有限公司 It is pressurized compound vacuum pre-pressed soft soil foundation processing constructing device and technique

Also Published As

Publication number Publication date
CN101906772B (en) 2011-08-17

Similar Documents

Publication Publication Date Title
CN101906772B (en) Fast consolidation method of blow-filled soft soil for land reclamation
CN101270571B (en) Reinforcing method for layered dead weight, prepressing water discharge concretion combination dynamic consolidation soft ground base
CN204112306U (en) Recently hydraulic reclamation soft foundation rapid reinforcement process structure
CN100549304C (en) A kind of nothing sealing fast vacuum prepressing method
CN101457519B (en) Rapid 'stereo high vacuum water covering prepressing' superficial layer flexible foundation treatment method
CN103628468B (en) A kind of water penetration pile combined vacuum prepressing ground foundation treatment method
CN104120710B (en) A kind of highway on soft ground method of vacuum pre-pressed joint serous fluid of dredger fill
CN101220598A (en) Vacuum preloading method for non-water discharge sand cushion
CN102817354B (en) Method for dredging soft foundation by dredger fill and reinforcement
CN107419717A (en) It is pressurized compound vacuum pre-pressed soft soil foundation processing constructing device and technique
CN101806057B (en) Rapid treatment method of modified vacuum preloading combined with water-covered preloading for ultra-soft foundation with blown fill
CN102127908A (en) Method for quickly reinforcing ultra-soft soil foundation by using bagged sand cushion
CN101591905B (en) Newly hydraulically filled mucky soil soft foundation straw mattress preloading consolidation method
CN102220757A (en) Immediate processing method for drainage solidifying of super soft soil shallow surface space
CN112411518A (en) Soft foundation section vacuum combined surcharge preloading construction method
CN102051875B (en) Method for reinforcing deep silt foundation
CN101666082B (en) Laminated consolidation method for reinforcing muddy soft soil foundation
CN105239554A (en) Vacuum and preloading drainage structure with low-permeability sand layers and construction method
CN109295969A (en) Construction Technology of Duplex Pressurized Vacuum Preloading Soft Soil Foundation with Drainage Plates of Different Lengths
CN101182708B (en) Covering type composite vacuum electroosmosis, method for forced ramming reinforcing foundation and device thereof
CN86107233A (en) Vacuum combined surcharge preloading method for strengthening soft soil foundation
CN102888833A (en) Method for reinforcing soft ground by combining vacuum preloading and surcharge vibration rolling
CN104762951B (en) Secondary directly discharging type vacuum prepressing processes the construction method of new hydraulically filled sludge epeirogenetic
CN201785743U (en) Vacuum preloading consolidated soft soil foundation for combining sand wells and water discharging plates
CN201411682Y (en) Pre-pressing solidifying device of new blown-filled mucky soil soft ground straw mattress

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WENZHOU TAICHANG HARBOR ENGINEERING CO., LTD.

Free format text: FORMER OWNER: LI YANQING

Effective date: 20120925

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120925

Address after: 325000, No. 101, Zhenjiang Road, Wenzhou Industrial Park, Wenzhou, Zhejiang (room 2, building 8)

Patentee after: Wenzhou Taichang Harbor Engineering Co. Ltd.

Address before: 325000 room 7-408, Jiahong garden, College East Road, Lucheng District, Zhejiang, Wenzhou

Patentee before: Li Yanqing

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110817

Termination date: 20160726

CF01 Termination of patent right due to non-payment of annual fee