CN104790404B - A kind of dam foundation high-pressure grouting structure and grouting method - Google Patents

A kind of dam foundation high-pressure grouting structure and grouting method Download PDF

Info

Publication number
CN104790404B
CN104790404B CN201510221545.XA CN201510221545A CN104790404B CN 104790404 B CN104790404 B CN 104790404B CN 201510221545 A CN201510221545 A CN 201510221545A CN 104790404 B CN104790404 B CN 104790404B
Authority
CN
China
Prior art keywords
grouting
dam foundation
grout hole
dividing plate
grout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510221545.XA
Other languages
Chinese (zh)
Other versions
CN104790404A (en
Inventor
冯树荣
蒋中明
钟辉亚
王江营
李学政
曾祥喜
李跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN ZHONGNAN HYDROPOWER AND WATER CONSERVANCY CONSTRUCTION Co Ltd
PowerChina Zhongnan Engineering Corp Ltd
Original Assignee
PowerChina Zhongnan Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Zhongnan Engineering Corp Ltd filed Critical PowerChina Zhongnan Engineering Corp Ltd
Priority to CN201510221545.XA priority Critical patent/CN104790404B/en
Publication of CN104790404A publication Critical patent/CN104790404A/en
Application granted granted Critical
Publication of CN104790404B publication Critical patent/CN104790404B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of dam foundation high-pressure grouting structure and grouting method.Described dam foundation high-pressure grouting structure includes the grout hole offered downwards from dam foundation surface of bedrock, and this grout hole top is provided with only starches structure, and this grout hole is arranged at joint fissure or crushed zone;Grout pipe, through described structure of only starching, and the port of export of grout pipe is arranged on and only starches in the grout hole below structure;Removable hood weight, is supported on above basement rock by gripper shoe, and is provided with antiseepage dividing plate between gripper shoe and basement rock upper surface.The present invention is not on the premise of affecting High Pressure Consolidation Grouting quality, accelerating construction progress, effectively reduce cost, the advantage not only having " having lid weight " and " uncovered weight " grouting technique concurrently, and overcome the shortcoming of the two, the most reasonable in design, technique is simple and convenient to operate.

Description

A kind of dam foundation high-pressure grouting structure and grouting method
Technical field
The invention belongs to High Pressure Consolidation Grouting field, be specifically related to a kind of dam foundation high-pressure grouting structure and grouting method.
Background technology
Typically will use the method for High Pressure Consolidation Grouting that it is processed after dam foundation excavation, to improve the physical and mechanical property of joint fissure or crushed zone, and then reduce the permeability of the dam foundation.The way of dam foundation High Pressure Consolidation Grouting comparative maturity is to use to have lid to be heavily in the milk, and this method is owing to needing to pour thicker concrete layer as lid weight, and therefore the duration is longer, but also can cause unnecessary waste, increase cost.For accelerating construction progress cost-effective, some engineerings use nongravity capping concretion grouting.
At present conventional uncovered weight grouting technique has: 1. at the surface-closed formula nongravity capping concretion grouting filling out pool closed concrete or leveling concrete surface is carried out;2. the thin cover-plate type nongravity capping concretion grouting carried out on blinding concrete or thin cover plate (toe board);3. the naked rock consolidation grouting directly carried out on naked scar.
Wherein, 1., 2. two ways be possible to prevent serosity to overflow, but under bigger grouting pressure effect, the thin cover plate in top layer or enclosed construction are easily broken off;3. the plant mode then can cause the dam foundation surface grout phenomenon occur, and grouting effect is undesirable, and the dam foundation water penetration after grouting treatment is the biggest.
It follows that uncovered weight grouting technique is because lacking covering weight, so relatively low grouting pressure can only be used at dam foundation top layer (0 ~ 5m), and it is very easy to produce grout phenomenon.Although injection rate large hole section can being taked current limliting, limit the quantity, wait measures such as coagulating, but the effect of these measures being the most very limited, the most also grouting quality can be caused certain negative effect.
Summary of the invention
Cover, to upper, the present situation that weight excessively relies on for existing High Pressure Consolidation Grouting technology, it is desirable to provide a kind of dam foundation high-pressure grouting structure and grouting method, this grouting structure and grouting method propose one and have the dam foundation High Pressure Consolidation Grouting technical scheme of " having lid weight " and " uncovered weight " grouting technique advantage concurrently, can reach and improve grouting efficiency and reduce the purpose of construction cost.
To achieve these goals, the technical solution adopted in the present invention is:
A kind of dam foundation high-pressure grouting structure, it is structurally characterized in that, including
The grout hole offered downwards from dam foundation surface of bedrock, this grout hole top is provided with only starches structure, and this grout hole is arranged at joint fissure or crushed zone;
Grout pipe, through described structure of only starching, and the port of export of grout pipe is arranged on and only starches in the grout hole below structure;
Removable hood weight, is supported on above basement rock by gripper shoe, and is provided with antiseepage dividing plate between gripper shoe and basement rock upper surface.
Thus, under " having lid weight " effect of removable hood weight, high pressure can be used to carry out being in the milk without producing grout phenomenon, slurry is injected in joint fissure or crushed zone by grout hole, can effectively ensure grouting quality, prevent the dam foundation from seeping water.
It is below the technical scheme of further improvement of the present invention:
Further, described antiseepage dividing plate and gripper shoe are removable frame, and thus, after this grout hole is in the milk, recyclable antiseepage dividing plate, gripper shoe and removable hood are reused in next grout hole grouting.
Preferably, described only slurry structure is stop grouting plug.
Further, described antiseepage dividing plate is rubber antiseepage dividing plate, is provided with releasing agent between lower surface and the basement rock upper surface of this antiseepage dividing plate.
Further, present invention also offers a kind of method using above-mentioned dam foundation high-pressure grouting structure that the dam foundation is carried out high-pressure grouting, it comprises the steps:
S1, the grout hole offered downwards at dam foundation surface of bedrock, and install only slurry structure and grout pipe;
S2, antiseepage dividing plate is set at basement rock upper surface, antiseepage dividing plate arranges gripper shoe, removable hood weight is set in gripper shoe;
S3, this grout hole being carried out by grout pipe high-pressure grouting from top to bottom, grouting plus-pressure is 1MPa-5MPa.
Thus, serosity solidifies in being injected into joint fissure or crushed zone by grout hole, can be effectively prevented dam foundation infiltration.
After the grouting of step S3 terminates, antiseepage dividing plate, gripper shoe and removable hood are heavily moved above the most next grout hole and next grout hole is in the milk.
Compared with prior art, the invention has the beneficial effects as follows: the present invention, by reasonable Arrangement antiseepage dividing plate on the dam foundation, support plate and removable hood weight, i.e. accelerating construction progress, effectively can reduce cost on the premise of not affecting High Pressure Consolidation Grouting quality.The i.e. present invention not only has the advantage of " having lid weight " and " uncovered weight " grouting technique concurrently, and overcomes the shortcoming of the two, and the most reasonable in design, technique is simple and convenient to operate.
Below in conjunction with drawings and Examples, the present invention is further elaborated.
Accompanying drawing explanation
Fig. 1 is the structure principle chart of one embodiment of the invention.
In the drawings
1-grout hole;2-grout pipe;3-stop grouting plug;4-antiseepage dividing plate;5-steel plate;6-removable hood weight;7-joint fissure or crushed zone.
Detailed description of the invention
A kind of dam foundation high-pressure grouting structure, as it is shown in figure 1, include that grout hole 1, grout pipe 2, antiseepage dividing plate 4, gripper shoe 5 and removable hood weigh 6.
Grout hole 1 top offered downwards from dam foundation surface of bedrock is provided with stop grouting plug 3, this grout hole 1 is arranged at joint fissure or crushed zone 7, the general grout hole degree of depth is according to geological conditions, such as the degree of crushing of rock, depth of weathering, crack size, dam dam type and height and the multiple condition such as the distribution of basis stress and size, depending on considering;Generally 5-10m, aperture is generally 50-91mm.Described grout pipe 2 is through described stop grouting plug 3, and the port of export of grout pipe 2 is arranged on and only starches in the grout hole 1 below structure.Described removable hood weighs 6 and is supported on above basement rock by gripper shoe 5, and is provided with antiseepage dividing plate 4 between gripper shoe 5 and basement rock upper surface.Described antiseepage dividing plate 4 is rubber antiseepage dividing plate, is provided with releasing agent between lower surface and the basement rock upper surface of this antiseepage dividing plate 4.It can be precast concrete block, truck or other preloading that described lid weighs 6.
During grouting, grout hole 1, grout pipe 2 and stop grouting plug 3 is arranged at the dam foundation, coverage according to serosity lays rubber antiseepage dividing plate 4 on dam foundation top layer, brushing releasing agent between antiseepage dividing plate 4 and basement rock, on antiseepage dividing plate 4, lay steel plate 5 successively and removable hood weighs 6, its middle cover weighs 6 can make corresponding adjustment according to the condition of the size of grouting pressure and job site, and makes it be evenly arranged on steel plate 5, carries out high-pressure grouting the most from top to bottom.
The present invention is by arranging that on the dam foundation rubber antiseepage dividing plate 4, steel plate 5 weigh 6 with removable hood, and just can reach routine has the effect of lid weight High Pressure Consolidation Grouting, it is possible to effectively control earth's surface lifting and the grout phenomenon caused because of grouting.But, removable hood weight is cast-in-place without using concrete to carry out, but prefabricated concrete block, truck or other heap carrier material, it is possible to substantially reduction of erection time, accelerating construction progress;Can reclaim after high-pressure grouting terminates reuse additionally, rubber antiseepage dividing plate 4, steel plate 5 and removable hood weigh 6, effectively control cost, waste can't be caused.
The content that above-described embodiment illustrates should be understood to that these embodiments are only used for being illustrated more clearly that the present invention, rather than restriction the scope of the present invention, after having read the present invention, those skilled in the art each fall within the application claims limited range to the amendment of the various equivalent form of values of the present invention.

Claims (7)

1. a dam foundation high-pressure grouting structure, it is characterised in that include
The grout hole (1) offered downwards from dam foundation surface of bedrock, this grout hole (1) top is provided with only starches structure, and this grout hole (1) is arranged on joint fissure or crushed zone (7) place;
Grout pipe (2), through described structure of only starching, and the port of export of grout pipe (2) is arranged on and only starches in the grout hole (1) below structure;
Removable hood weight (6), is supported on above basement rock by gripper shoe (5), and is provided with antiseepage dividing plate (4) between gripper shoe (5) and basement rock upper surface.
Dam foundation high-pressure grouting structure the most according to claim 1, it is characterised in that described antiseepage dividing plate (4) and gripper shoe (5) are removable frame.
Dam foundation high-pressure grouting structure the most according to claim 1, it is characterised in that described only slurry structure is stop grouting plug (3).
Dam foundation high-pressure grouting structure the most according to claim 1, it is characterised in that described antiseepage dividing plate (4) is rubber antiseepage dividing plate, is provided with releasing agent between lower surface and the basement rock upper surface of this antiseepage dividing plate (4).
5., according to the dam foundation high-pressure grouting structure one of claim 1-4 Suo Shu, it is characterised in that the degree of depth of described grout hole (1) is 5m-10m, aperture is 50mm-91mm.
6. the method that the dam foundation high-pressure grouting structure using one of claim 1-5 described carries out high-pressure grouting to the dam foundation, it is characterised in that comprise the steps:
S1, the grout hole (1) offered downwards at dam foundation surface of bedrock, and install only slurry structure and grout pipe (2);
S2, antiseepage dividing plate (4) is set at basement rock upper surface, antiseepage dividing plate (4) arranges gripper shoe (5), removable hood weight (6) is set in gripper shoe (5);
S3, this grout hole (1) being carried out by grout pipe (2) high-pressure grouting from top to bottom, grouting plus-pressure is 1MPa-5MPa.
The method the most according to claim 6 dam foundation being carried out high-pressure grouting, it is characterized in that, after the grouting of step S3 terminates, and to next grout hole (1) top next grout hole (1) is in the milk mobile to antiseepage dividing plate (4), gripper shoe (5) and removable hood weight (6).
CN201510221545.XA 2015-05-05 2015-05-05 A kind of dam foundation high-pressure grouting structure and grouting method Active CN104790404B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510221545.XA CN104790404B (en) 2015-05-05 2015-05-05 A kind of dam foundation high-pressure grouting structure and grouting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510221545.XA CN104790404B (en) 2015-05-05 2015-05-05 A kind of dam foundation high-pressure grouting structure and grouting method

Publications (2)

Publication Number Publication Date
CN104790404A CN104790404A (en) 2015-07-22
CN104790404B true CN104790404B (en) 2016-08-24

Family

ID=53555559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510221545.XA Active CN104790404B (en) 2015-05-05 2015-05-05 A kind of dam foundation high-pressure grouting structure and grouting method

Country Status (1)

Country Link
CN (1) CN104790404B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594369B (en) * 2014-11-27 2017-12-05 中国电建集团贵阳勘测设计研究院有限公司 Karst high pressure group hole replacement grouting method and its structure
CN107882036B (en) * 2017-10-31 2023-12-05 中国电建集团华东勘测设计研究院有限公司 Cover weight device, consolidation grouting system with cover weight and grouting method
CN109162660A (en) * 2018-10-30 2019-01-08 中国电建集团成都勘测设计研究院有限公司 Interior anchor formula orifice closing device
CN109778859B (en) * 2019-03-12 2023-12-12 长江勘测规划设计研究有限责任公司 Concrete high dam all-dam non-bin surface consolidation grouting method and structure

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0691041B2 (en) * 1986-06-25 1994-11-14 日本電気株式会社 Reactive sputter etching method
JPH0635528A (en) * 1992-07-14 1994-02-10 Fanuc Ltd Cnc axis control distribution system
CN102535472B (en) * 2012-02-29 2014-06-11 中国水电顾问集团中南勘测设计研究院 Pored-tube filling and high-pressure impacting extruding grouting method
CN102817361B (en) * 2012-09-10 2014-11-05 广东省水利水电第三工程局 Double bushing top cover for broken rock curtain grouting and construction method of double bushing top cover
CN102839650B (en) * 2012-09-19 2014-10-15 中国电建集团中南勘测设计研究院有限公司 Integral drilling and filling top-bottom high-pressure impact extrusion grouting system
CN103046513A (en) * 2012-12-20 2013-04-17 长江勘测规划设计研究有限责任公司 Method for coating and sealing fracture of bed rock in uncovered heavy consolidation grouting
CN103603689B (en) * 2013-11-04 2015-07-08 葛洲坝集团基础工程有限公司 Curtain grouting construction method for treating mined-out areas
CN204590034U (en) * 2015-05-05 2015-08-26 中国电建集团中南勘测设计研究院有限公司 A kind of dam foundation high pressure grouting structure

Also Published As

Publication number Publication date
CN104790404A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN104790404B (en) A kind of dam foundation high-pressure grouting structure and grouting method
CN101858077B (en) Construction method of composite foundation with bagged compacting and slurry cementing small-diameter gravel pile
CN2911010Y (en) Fast reinforcing apparatus for blowing-filling sludge ground
CN104278667A (en) Underground karst cave filling treatment method
CN203546678U (en) Asphalt concrete core-wall rockfill dam structure
CN101220589B (en) Soil engineering bag and method for dynamically squeezing and synthetically reinforcing soft groundwork
CN203808088U (en) Gabion gully detention structure for top of hydropower station slag yard
CN107859041A (en) The construction method of collapsible loess zanjon high roadbed structure
CN105421328B (en) The method of construction of collapsible loess area roadbed basement process structure
CN101634139B (en) Dynamic compaction method for backfill foundation with drainage layer
CN106368176B (en) The high dam structure being built on earth material scarcity area deeply covered layer
CN100516374C (en) Movable feeding and constructing method for dynamic reinforcing surface layer of large area flabbiness foundation
CN110512591A (en) A kind of reinforcement means of vacuum preloading benefit conduit stake gas injection carbonization ultra-soft foundation
CN204590034U (en) A kind of dam foundation high pressure grouting structure
CN1115447C (en) Anchor-spraying concrete for treating water and support
CN104652411B (en) Composite foundation treatment method based on reinforcement, pretreatment and dynamic compaction of sandy soil
CN203808020U (en) Concrete face rock-fill dam structure with mudstone damming materials
CN106869153B (en) A kind of method of the quick soft soil foundation treatment of well-points dewatering
CN203320578U (en) Waterproof treatment structure of reinforced concrete cast-in-place pile head
CN108824412A (en) Based on gabion wall reinforced earth and strong tamping combined soft base processing method
CN105421498B (en) A kind of foundation ditch water-impervious and subsidence control method based on three-dimensional curtain gang of wells system
CN201915385U (en) Compacted pile for foundation treatment of collapsed loess in tunnel
CN208803456U (en) A kind of structure for reinforcing peat soil using sand pile and drain bar
RU121274U1 (en) ARTIFICIAL REINFORCED BASIS FOR ESTABLISHED OR RECONSTRUCTED BUILDING
CN104652404B (en) Method for carrying out resource utilization on caustic slag after physical dehydrating

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180514

Address after: No. 16, camphor East Road, Yuhua District, Changsha, Hunan

Co-patentee after: Hunan Zhongnan Hydropower and Water Conservancy Construction Co., Ltd.

Patentee after: Company limited of Central-South survey and design research institute of electricity Jian group of China

Address before: No. 16, camphor East Road, Yuhua District, Changsha, Hunan

Patentee before: Company limited of Central-South survey and design research institute of electricity Jian group of China

TR01 Transfer of patent right