CN109778625A - A kind of express highway roadbed structure that dregs class building castoff fills - Google Patents

A kind of express highway roadbed structure that dregs class building castoff fills Download PDF

Info

Publication number
CN109778625A
CN109778625A CN201811434975.XA CN201811434975A CN109778625A CN 109778625 A CN109778625 A CN 109778625A CN 201811434975 A CN201811434975 A CN 201811434975A CN 109778625 A CN109778625 A CN 109778625A
Authority
CN
China
Prior art keywords
embankment
roadbed
slope
fills
building castoff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811434975.XA
Other languages
Chinese (zh)
Inventor
朱斌泉
贾远辉
张军辉
彭俊辉
黎峰
周思峰
黄启
丰保卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201811434975.XA priority Critical patent/CN109778625A/en
Publication of CN109778625A publication Critical patent/CN109778625A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of express highway roadbed structure that dregs class building castoff fills, the lower section of roadbed is successively changed by big gun debris and fills out basic, lower embankment, upper embankment is constructed.Prefabricated hollow six square of side slope is laid with along the side of roadbed, lower embankment, upper embankment and roadbed;Prefabricated hollow six square of side slope is equipped with the slope foot gutter along slope surface;Big gun debris, which is changed, fills out basic making on ground;Ground is equipped with slope foot gutter, and slope foot gutter is connected to slope drainage ditch.Roadbed, upper embankment and lower embankment are filled by building castoff;It is implanted with turf in prefabricated hollow six square of side slope to slope protection, makes full use of local building castoff, reduces subgrade construction soil, stable structure is had excellent performance, construction is simple, application easy to promote large-scale.The influence to existing environment is effectively reduced in full impregnated water route base simultaneously, meets the ecological requirements in national sponge city.

Description

A kind of express highway roadbed structure that dregs class building castoff fills
Technical field
The present invention relates to road structure technical field more particularly to a kind of highways that dregs class building castoff fills Road structure.
Background technique
As Urbanization in China is constantly accelerated, can all there be a large amount of structure to close on service life every year and be removed, add Part building it is destroyed by natural calamities such as earthquakes, produce a large amount of building castoff.China's building castoff is produced per year About 3,500,000,000 tons of amount, but comprehensive utilization ratio is less than 5%, far below European Union (90%), Japanese (97% or more) and South Korea (97% with On) etc. developed countries and regions.Traditional construction waste substance treating method mainly transports countryside air storage or landfill to, occupies A large amount of soils destroy ecological environment, and have exceeded the disposing capacity of urban architecture waste, the processing of the building castoff of flood tide Problem seriously restricts the propulsion of Process of Urbanization Construction.Expressway construction mileage is necessarily required to a large amount of during continuous expand Construction material, and huge destruction may be caused to the ecosystem by obtaining these construction materials.
Substantially impervious water inside traditional soil property or native stone roadbed, rainwater are fallen on highway, will form ponding, so valuable Rainwater is discharged into the road ditch of both sides of highway, is not suitable with the environmental requirement of recharge of groundwater.
Beijing area subgrade construction Tu Yuan is few, takes native hardly possible, and building site neighboring buildings waste storage is more, and majority is torn open for one-storey house It moves, brick is more.Due to building castoff good water permeability, rainwater can be made to rapidly permeate into underground, restore underground water, keep soil wet It is not influenced by rainy season construction when spending, while constructing, accelerates construction speed.
Summary of the invention
The object of the present invention is to provide a kind of express highway roadbed structures filled using dregs class building castoff, sufficiently Using local building castoff, subgrade construction soil is reduced, stable structure is had excellent performance, and construction is simple is easy to promote large-scale Using.The influence to existing environment is effectively reduced in full impregnated water route base simultaneously, meets the ecological requirements in national sponge city.
The present invention is achieved through the following technical solutions:
A kind of express highway roadbed structure that dregs class building castoff fills, it is characterised in that: the lower section of roadbed (1) It is successively changed by big gun debris and fills out basic (4), lower embankment (3), upper embankment (2) are constructed.Prefabricated hollow six square (5) of side slope is along roadbed (1), the side of lower embankment (4), upper embankment (3) and roadbed (2) is laid with;Prefabricated hollow six square (5) of side slope is equipped with along slope surface Slope foot gutter (8);Big gun debris, which is changed, fills out basic (4) making on ground (7);Ground (7) is equipped with slope foot gutter (6), slope foot Gutter (6) is connected to slope drainage ditch (8).
Roadbed (1), upper embankment (2) and lower embankment (3) are filled by building castoff;Prefabricated hollow six square of side slope (5) turf is implanted in slope protection.
The roadbed (1) is the roadbed part of road surface structare layer or less 0.8m or 1.2m thickness range;
The upper embankment (2), lower embankment (3) are above the filled-up ground part of original ground, upper embankment (2) be roadbed with The embankment part of lower 0.7m thickness range, the lower embankment (3) refer to the embankment between embankment (2) and big gun debris basic (4) Part.
The big gun debris, which changes and fills out basic (4), to be formed using building castoff direct filling, and big gun debris is by manually picking After the sundries such as organic waste, reinforcing bar inside building castoff, super large block of material therein is crushed using quartering hammer, big gun Debris change fill out in basic (4) fill object maximum particle diameter changed no more than big gun debris fill out basic (4) it is thick 2/3.
Compared with prior art, the present invention has following technical advantage.
The present invention makes full use of local building castoff, reduces subgrade construction soil, and stable structure is had excellent performance, and constructs Simply, application easy to promote large-scale.The influence to existing environment is effectively reduced in full impregnated water route base simultaneously, meets national sponge city The ecological requirements in city.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is plan view of the invention.
Fig. 3 is the relation schematic diagram with a distance from cross-sectional pipe nozzle between accumulative settling amount.
Fig. 4 is the relation schematic diagram between the depth of fill and settling amount.
Attached drawing mark: 1, roadbed;2, upper embankment;3, lower embankment;4, big gun debris, which is changed, fills out basis;5, hollow six side of prefabricated side slope Block;6, slope drainage ditch;7, ground;8, slope foot gutter.
Specific embodiment
Calculating content of the invention is understood in order to clearer, and the embodiment of the present invention is carried out below in conjunction with attached drawing Detailed description.
As shown in Figs. 1-2, a kind of express highway roadbed structure that dregs class building castoff fills, it is characterised in that: road The lower section of bed (1) is successively changed by big gun debris and fills out basic (4), lower embankment (3), upper embankment (2) are constructed.Prefabricated hollow six side of side slope Block (5) is laid with along the side of roadbed (1), lower embankment (4), upper embankment (3) and roadbed (2);On prefabricated hollow six square (5) of side slope Equipped with the slope foot gutter (8) along slope surface;Big gun debris, which is changed, fills out basic (4) making on ground (7);Ground (7) is equipped with slope foot side Ditch (6), slope foot gutter (6) are connected to slope drainage ditch (8).
Roadbed (1), upper embankment (2) and lower embankment (3) are filled by building castoff;Prefabricated hollow six square of side slope (5) turf is implanted in slope protection.
The roadbed (1) is the roadbed part of road surface structare layer or less 0.8m or 1.2m thickness range;
The upper embankment (2), lower embankment (3) are above the filled-up ground part of original ground, upper embankment (2) be roadbed with The embankment part of lower 0.7m thickness range, the lower embankment (3) refer to the embankment between embankment (2) and big gun debris basic (4) Part.
The big gun debris, which changes and fills out basic (4), to be formed using building castoff direct filling, and big gun debris is by manually picking After the sundries such as organic waste, reinforcing bar inside building castoff, super large block of material therein is crushed using quartering hammer, big gun Debris change fill out in basic (4) fill object maximum particle diameter changed no more than big gun debris fill out basic (4) it is thick 2/3.
It is removal region present invention is generally directed to newly-built or reorganization and expansion highway surrounding area, building castoff can scene The case where obtaining and handling provides a kind of express highway roadbed structure that dregs class building castoff fills, includes the following steps:
Step 1, building castoff fills out pre-treatment and big gun debris changes and fills out foundation construction:
Satisfy the need original ground surface layer fertile soil, surface soil, turf etc. within the scope of width is cleared up, and embankment should be by roadbed substrate range Interior tree root, which is all excavated, to be cleared up and hole is filled and led up compacting.After clear table, by design requirement progress basement process, after base treatment Bearing capacity should meet design requirement, and substrate strength should be uniform.Embankment location should also be flattened by design requirement and is compacted, and reach rule After fixed compactness, measures elevation and management is asked to be checked and accepted.By following construction procedure:
Clear table, smooth location → surveying setting-out → detection water content → impact-rolling → detection roll rear settling amount and compacting It spends → fills 60cm big gun debris or brick slag → secondary pulse rolls (heavy tamping treatment) → detection and rolls rear settling amount → earthwork construction.
Step 2, embankment and roadbed are constructed:
Building castoff takes excavator material straight through the broken dregs class building castoff for being processed into maximum particle diameter 40mm It is hinged with and is transported to construction site discharging into dumper;It is slightly put down using bull-dozer, land leveller essence is flat to carry out the construction that paves;Then using vibration Dynamic road roller carries out roller compaction construction, and compaction technology is determined by test section;Circulation construction is filled to design altitude.
Step 3, side slope protection and drainage construction process:
In six square instrumentation of precast hollow, centainly it is noted that the smooth and compacting situation of slope surface, avoids placement from completing There is differential settlement in part afterwards.Pay attention to controlling the smooth of hollow block plane in instrumentation, be carried out by design drawing hollow The placement of block.Reduce from bottom to top, is successively laid with, hollow block is criss-cross with hollow block, is connected, and snap fastener is tight between block It is close, the fissure of displacement without straight joint, must not bond and floating plug, hollow block surface should save smooth, beautiful.Hollow block and rhone junction hole Gap is clogged using C25 concrete.It earths up after the completion of placement, each six ribs block domestic demand fills dregs class building castoff.Training Band sundries cannot be contained during soil in soil property, need to understand extra soil property outside slope protection out after the completion of ridging, the cleaning of guarantee slope protection, It is beautiful.
As shown in Figure 3-4, by the sedimentation on road surface after record construction it is found that structure of the invention and method guarantee pavement structure Settling amount.

Claims (5)

1. a kind of express highway roadbed structure that dregs class building castoff fills, it is characterised in that: the lower section of roadbed (1) is successively It is changed by big gun debris and fills out basic (4), lower embankment (3), upper embankment (2) are constructed;Prefabricated hollow six square (5) of side slope along roadbed (1), under The side of embankment (4), upper embankment (3) and roadbed (2) is laid with;Prefabricated hollow six square (5) of side slope is equipped with the slope foot along slope surface Gutter (8);Big gun debris, which is changed, fills out basic (4) making on ground (7);Ground (7) is equipped with slope foot gutter (6), slope foot gutter (6) It is connected to slope drainage ditch (8);
Roadbed (1), upper embankment (2) and lower embankment (3) are filled by building castoff;Prefabricated hollow six square (5) of side slope In be implanted with turf to slope protection.
2. the express highway roadbed structure that a kind of dregs class building castoff according to claim 1 fills, feature exist In: the roadbed (1) is the roadbed part of road surface structare layer or less 0.8m or 1.2m thickness range.
3. the express highway roadbed structure that a kind of dregs class building castoff according to claim 1 fills, feature exist In: the upper embankment (2), lower embankment (3) are above the filled-up ground part of original ground, and upper embankment (2) is roadbed or less 0.7m The embankment part of thickness range, the lower embankment (3) refer to the embankment part between embankment (2) and big gun debris basic (4).
4. the express highway roadbed structure that a kind of dregs class building castoff according to claim 1 fills, feature exist In: the big gun debris, which changes and fills out basic (4), to be formed using building castoff direct filling, and big gun debris is useless by manually picking building After the sundries such as organic waste, reinforcing bar inside gurry, super large block of material therein is crushed using quartering hammer, big gun debris is changed Fill out in basic (4) fill object maximum particle diameter changed no more than big gun debris fill out basic (4) it is thick 2/3.
5. the express highway roadbed structure that a kind of dregs class building castoff according to claim 1 fills, feature exist Include the following steps in: the construction of the structure,
Step 1, building castoff fills out pre-treatment and big gun debris changes and fills out foundation construction:
Satisfy the need original ground surface layer fertile soil, surface soil, turf etc. within the scope of width is cleared up, and embankment should will be within the scope of roadbed substrate Tree root, which is all excavated, to be cleared up and hole is filled and led up compacting;After clear table, basement process, holding after base treatment are carried out by design requirement Design requirement should be met by carrying power, and substrate strength should be uniform;Embankment location should also be flattened by design requirement and is compacted, and reach defined After compactness, measures elevation and management is asked to be checked and accepted;By following construction procedure:
Clear table, smooth location → surveying setting-out → detection water content → impact-rolling → detection roll rear settling amount and compactness → It fills 60cm big gun debris or brick slag → secondary pulse rolls (heavy tamping treatment) → detection and rolls rear settling amount → earthwork construction;
Step 2, embankment and roadbed are constructed:
Building castoff takes excavator material directly to fill through the broken dregs class building castoff for being processed into maximum particle diameter 40mm Enter dumper and is transported to construction site discharging;It is slightly put down using bull-dozer, land leveller essence is flat to carry out the construction that paves;Then using vibration pressure Road machine carries out roller compaction construction, and compaction technology is determined by test section;Circulation construction is filled to design altitude;
Step 3, side slope protection and drainage construction process:
In six square instrumentation of precast hollow, centainly it is noted that the smooth and compacting situation of slope surface, avoids office after the completion of placement There is differential settlement in portion;Pay attention to controlling the smooth of hollow block plane in instrumentation, carries out hollow block by design drawing Placement;Reduce from bottom to top, be successively laid with, hollow block is criss-cross with hollow block, is connected, and snap fastener is close between block, wrong Seam without straight joint, must not bond and floating plug, hollow block surface should save smooth, beautiful;Hollow block is adopted with rhone junction hole It is clogged with C25 concrete;It earths up after the completion of placement, each six ribs block domestic demand fills dregs class building castoff;It earthed up Band sundries cannot be contained in journey in soil property, need to understand extra soil property outside slope protection out after the completion of ridging, guarantee slope protection cleaning, beauty It sees.
CN201811434975.XA 2018-11-28 2018-11-28 A kind of express highway roadbed structure that dregs class building castoff fills Withdrawn CN109778625A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811434975.XA CN109778625A (en) 2018-11-28 2018-11-28 A kind of express highway roadbed structure that dregs class building castoff fills

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811434975.XA CN109778625A (en) 2018-11-28 2018-11-28 A kind of express highway roadbed structure that dregs class building castoff fills

Publications (1)

Publication Number Publication Date
CN109778625A true CN109778625A (en) 2019-05-21

Family

ID=66496496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811434975.XA Withdrawn CN109778625A (en) 2018-11-28 2018-11-28 A kind of express highway roadbed structure that dregs class building castoff fills

Country Status (1)

Country Link
CN (1) CN109778625A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700231A (en) * 2019-11-01 2020-01-17 陕西建工第六建设集团有限公司 Detection method for building construction brick slag replacement layer compaction index
CN111827031A (en) * 2020-07-15 2020-10-27 中国二十冶集团有限公司 Construction method of stone-filled embankment
CN113006103A (en) * 2021-03-08 2021-06-22 浙江华恒交通建设监理有限公司 Roadbed structure based on polyurethane solidified waste slurry material
CN114481735A (en) * 2022-03-03 2022-05-13 西安公路研究院有限公司 Roadbed renewable resource filling method for road reconstruction and expansion

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002363904A (en) * 2001-06-07 2002-12-18 Yamatatsu Kosan:Kk Method of manufacturing upper layer bed material using excavated soil and upper layer bed material manufactured by the method
CN101105034A (en) * 2007-07-24 2008-01-16 江西省公路管理局 Ecological protection method for sand-filling road foundation hollow block
CN107740317A (en) * 2017-09-27 2018-02-27 中铁十局集团第三建设有限公司 Application process of the building waste in road fills
CN107938452A (en) * 2017-12-07 2018-04-20 中冶京诚工程技术有限公司 The method that urban roadbed is filled using slag
CN211142675U (en) * 2018-11-28 2020-07-31 中交一公局集团有限公司 Roadbed structure of expressway filled with muck type construction waste

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002363904A (en) * 2001-06-07 2002-12-18 Yamatatsu Kosan:Kk Method of manufacturing upper layer bed material using excavated soil and upper layer bed material manufactured by the method
CN101105034A (en) * 2007-07-24 2008-01-16 江西省公路管理局 Ecological protection method for sand-filling road foundation hollow block
CN107740317A (en) * 2017-09-27 2018-02-27 中铁十局集团第三建设有限公司 Application process of the building waste in road fills
CN107938452A (en) * 2017-12-07 2018-04-20 中冶京诚工程技术有限公司 The method that urban roadbed is filled using slag
CN211142675U (en) * 2018-11-28 2020-07-31 中交一公局集团有限公司 Roadbed structure of expressway filled with muck type construction waste

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700231A (en) * 2019-11-01 2020-01-17 陕西建工第六建设集团有限公司 Detection method for building construction brick slag replacement layer compaction index
CN111827031A (en) * 2020-07-15 2020-10-27 中国二十冶集团有限公司 Construction method of stone-filled embankment
CN113006103A (en) * 2021-03-08 2021-06-22 浙江华恒交通建设监理有限公司 Roadbed structure based on polyurethane solidified waste slurry material
CN113006103B (en) * 2021-03-08 2022-06-07 浙江华恒交通建设监理有限公司 Roadbed structure based on polyurethane solidified waste slurry material
CN114481735A (en) * 2022-03-03 2022-05-13 西安公路研究院有限公司 Roadbed renewable resource filling method for road reconstruction and expansion

Similar Documents

Publication Publication Date Title
CN110306616A (en) A kind of construction method of sewage conduct
CN109778625A (en) A kind of express highway roadbed structure that dregs class building castoff fills
CN105862710B (en) A kind of drain bar and construction method for Tidal Flat Inning Area processing
CN101713291A (en) Filling-reclaiming method for building land in coal mining subsidence areas
CN105178125B (en) A kind of lake region High-filled emkankment is blown sand embankments construction method and embankment structure
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN109610435B (en) Loess high fill valley foundation drainage structure and laying method thereof
CN109137872B (en) Reinforced structure bag and method for processing soft foundation by using reinforced structure bag
CN108486976A (en) Mountain highway, which is filled out, digs intersection road structure and its construction method
CN104514216A (en) Fill channel anti-frost heaving and anti-seepage structure and construction method
CN110777819A (en) High and steep mine mountain reconstruction ecological restoration method
CN110080051A (en) A kind of soil engineering bag bridge-type embankment structure and its construction method
CN111648383A (en) Internal drainage method for loess high-fill side slope
CN205399440U (en) Inflation dirt road moat structure
CN110820456A (en) Anti-settling and replacement-filling alternate airport runway and construction method thereof
CN101418565A (en) Qinghai-tibet railway permafrost wetland ground treatment technique
CN106638684B (en) A kind of piping lane backfill soil processing method of Collapsible Loess District
CN112854254A (en) Construction method for existing railway field level subgrade support in deep artificial waste slag area
CN208455387U (en) Mountain highway, which is filled out, digs intersection road structure
CN102704437A (en) Coal mining subsidence area cultivation water source reconstruction method suitable for complex mountain area
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN216865196U (en) Sealing covering structure of municipal solid waste landfill
CN109797730A (en) Ground heddle combined pressure reality dam filling construction is made in a kind of Gullied Rolling Loess Region embankment
CN211142675U (en) Roadbed structure of expressway filled with muck type construction waste
CN114457855A (en) Sunken horizontal seepage-proofing and perpendicular seepage-proofing integrated configuration

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190521