CN102817483A - Diffusion wheel-pressure reinforcement construction method for floorslab on hoisting machinery and diffusion wheel-pressure reinforcement plate - Google Patents

Diffusion wheel-pressure reinforcement construction method for floorslab on hoisting machinery and diffusion wheel-pressure reinforcement plate Download PDF

Info

Publication number
CN102817483A
CN102817483A CN2012102893187A CN201210289318A CN102817483A CN 102817483 A CN102817483 A CN 102817483A CN 2012102893187 A CN2012102893187 A CN 2012102893187A CN 201210289318 A CN201210289318 A CN 201210289318A CN 102817483 A CN102817483 A CN 102817483A
Authority
CN
China
Prior art keywords
gusset plate
wheel load
diffusion
floor
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102893187A
Other languages
Chinese (zh)
Other versions
CN102817483B (en
Inventor
李毅
杨正军
陈华周
吕黄兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science And Industry Co ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201210289318.7A priority Critical patent/CN102817483B/en
Publication of CN102817483A publication Critical patent/CN102817483A/en
Application granted granted Critical
Publication of CN102817483B publication Critical patent/CN102817483B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a diffusion wheel-pressure reinforcement construction method for a floorslab on hoisting machinery. The method comprises the following steps of: step 1, confirming if the floorslab through which the hoisting machinery passes needs to be diffused and wheel-pressed or not, if yes, carrying out step 2, and if not, carrying out step 4; step 2, confirming the thickness of earthing soil on the floorslab and the thickness of a reinforcement plate on the earthing soil according to the type of the hoisting machinery; step 3, paving the earthing soil and the reinforcement plate on the floorslab according to the thicknesses confirmed by the step 2; and step 4, loading the floorslab by the hoisting machinery. The embodiment of the invention also provides a diffusion wheel-pressure reinforcement plate applied in the construction method, the reinforcement plate comprises a frame and a top plate arranged on the frame. Compared with reinforcement only through earthing or a scaffold, the construction method and the reinforcement plate are capable of saving more measure fee.

Description

Floor diffusion wheel load reinforced construction method and diffusion wheel load gusset plate on the lifting machine
Technical field
The invention belongs to building field, relate in particular to floor diffusion wheel load reinforced construction method and diffusion wheel load gusset plate on a kind of lifting machine.
Background technology
Because steel work has satisfied the requirement of building three elements " suitable, firm, attractive in appearance "; Innovation along with the Construction of Steel Structure mounting technique simultaneously breaks through; Steel work showed great vitality in recent years, but in Construction of Steel Structure, because the needs that some heavy components are installed; Must select that flooring lifts on lifting machine such as the large automobile crane for use; And large automobile crane is big because of its wheel load load numerical value, active position is uncertain and the short extremely concern of construction safety of general action time, all should carry out consolidation of concrete structure in the flooring zone of mobile crane process, in order to avoid floor is because of excessive cracking of loading.At present; Therefore construction enterprises mostly adopt quite conservative reinforcement means because can not accurate Calculation to the automobile wheel load, for example under flooring, take very close full hall Scaffold construction; This job practices needs a large amount of scaffold rental charge and labour cost; Simultaneously also can delay construction speed, and the wheel of the out-of-flatness property of flooring and lifting machine acts directly on the floor, owing to excessive being easy to of wheel load caused damage to floor; Existing another kind of method is on flooring, to fill out very thick soil, and the method for this earthing need be used a large amount of soil, also needs a large amount of manual works to tamp.
Summary of the invention
Technical problem to be solved by this invention is, floor diffusion wheel load reinforced construction method and diffusion wheel load gusset plate on a kind of lifting machine easy to implement are provided.
The present invention is achieved in that provides floor diffusion wheel load reinforced construction method on a kind of lifting machine, comprising:
Step 1: determine whether to carry out the floor of lifting machine process the wheel load diffusion; If desired, then carry out step 2; Otherwise directly carry out step 4;
Step 2: confirm earthing and the thickness of the gusset plate on the said earthing on the said floor according to the type of said lifting machine;
Step 3: the said thickness according to said step 2 is confirmed is laid said earthing and said gusset plate on said floor;
Step 4: the above floor of said lifting machine.
Further, said gusset plate is a steel plate; When said earthing and said gusset plate thickness were enough, said wheel load diffusion was as shown in the table with the relation of said earthing, said gusset plate thickness:
The lifting machine type 300KN 550KN 1000KN 1500KN 3000KN
Load/kN/m 2 8.3 11.3 13.5 13.7 14.1
Thickness of earth covering minimum value/mm 30 30 40 50 50
Steel plate thickness minimum value/mm 8 8 12 12 20
Further, said step 2 further comprises: for the floor that carries out with said earthing and said gusset plate also needing reinforcement after the said wheel load diffusion, the intensity of checking computations scaffold; Further be included in said underfloor in the said step 3 and take said scaffold.
The present invention also provides a kind of diffusion wheel load gusset plate that is used for above-mentioned job practices, and it comprises framework and is arranged on the top board on the said framework.
Further, said framework comprises housing.
Further, said framework also comprises a plurality of first reinforcing ribs and a plurality of second reinforcing rib; Said a plurality of first reinforcing rib is arranged in the said housing; Each second reinforcing rib connects between two adjacent said first reinforcing ribs and with two adjacent said first reinforcing rib diagonal angles.
Further, said framework is formed through welding by many i iron.
Further, said top board is fixedly to take the steel plate of putting on said framework, and welds together through discontinuous welding and said framework.
Further, said gusset plate also comprises base plate; Said base plate, said top board are fixedly taken the relative both sides of putting at said framework respectively, and welded together through discontinuous welding and said framework respectively.
Adopt job practices of the present invention and gusset plate; Compare an earthing or only with scaffold is reinforced, can save more measure expense; As only adopt scaffold to reinforce; Because wheel load spreads seldom, thus the scaffold that flooring need be taken down in length and breadth with step pitch all seldom, therefore need a large amount of scaffold rental charge and labour cost; As adopting the reinforcement means of an earthing, the requirement of soil is very big, also needs a large amount of manual works to tamp, and also influential to environment, adopts job practices of the present invention and gusset plate, more than these shortcomings can overcome basically.
Description of drawings
Fig. 1 is the sketch map of diffusion wheel load gusset plate in one embodiment of the invention.
The specific embodiment
In order to make technical problem to be solved by this invention, technical scheme and beneficial effect clearer,, the present invention is further elaborated below in conjunction with accompanying drawing and embodiment.Should be appreciated that specific embodiment described herein only in order to explanation the present invention, and be not used in qualification the present invention.
In one embodiment of the invention on the lifting machine floor diffusion wheel load reinforced construction method comprise:
Step 1: floor need also promptly to determine whether the diffusion wheel load to reinforce because of excessive whether can the cracking of loading when calculating lifting machine (like automobile) walking; If desired, then carry out step 2; Otherwise directly carry out step 4;
Step 2: confirm earthing and the thickness of the diffusion wheel load gusset plate on the earthing on the floor according to dissimilar lifting machines;
Step 3: the thickness according to step 2 is confirmed is laid earthing and gusset plate on floor;
Step 4: floor on the lifting machine.
Wherein, step 1 can adopt existing computational methods, in order to determine whether spreading reinforcing.
In step 2; The earthing on the structure floor and the thickness of gusset plate have diffusion to the lifting machine wheel load, earthing and gusset plate thick more (within the specific limits), automotive wheels companding more abundant (the wheel pressure angle of flare that looses; Can be in concrete or gusset plate by 45 ° of considerations; Can be in earthing by 30 ° of considerations), when overburden layer thickness and gusset plate thickness reached enough thick, automobile wheel load load can be considered by evenly distributed load.Can calculate the wheel load load of automobile by the average load of automobile in reasonable projected area scope.(wherein enough thickness of earth covering numerical value should confirm according to engineering experience, when no reliable design experience, can be not less than in the diffusion area of rear axle wheel load in the automobile projected area of loading ratio division and confirm that corresponding thickness of earth covering is h Min, as actual thickness of earth covering h>=h MinThe time, can think that thickness of earth covering is enough.)。In one embodiment, when earthing and gusset plate thickness were enough, the relation of gusset plate thickness was as shown in the table on wheel load diffusion and earthing, the earthing:
The lifting machine type 300KN 550KN 1000KN 1500KN 3000KN
Load/kN/m 2 8.3 11.3 13.5 13.7 14.1
Thickness of earth covering minimum value/mm 30 30 40 50 50
Steel plate thickness minimum value/mm 8 8 12 12 20
After step 2, can on floor, lay earthing and gusset plate according to gusset plate thickness on determined thickness of earth covering, the earthing; Can make floor on the lifting machine afterwards.
In addition, step 2 also can further comprise: for the floor that carries out with earthing and gusset plate also needing reinforcement after the wheel load diffusion, the intensity of checking computations scaffold; Correspondingly, then further be included in the underfloor scaffolding in the step 3.At this moment, adopted earthing and gusset plate that wheel load is spread, wheel load seldom, so scaffold is all very big with step pitch in length and breadth, the expense of reinforcing also seldom, the scaffold of reinforcing usefulness does not have too big damage to floor yet.
As stated; In one embodiment of the invention on the lifting machine floor diffusion wheel load reinforced construction method adopt earthing and gusset plate that wheel load is spread, wheel load is reduced greatly, floor need not be reinforced basically like this; Even reinforce; Because the wheel load on the floor is little, the expense of reinforcing also seldom, the scaffold of reinforcing usefulness does not have too big damage to floor yet.Simultaneously; In one embodiment of the invention on the lifting machine floor diffusion wheel load reinforced construction method can avoid scaffolding below the floor to influence the advantages such as construction speed of civil engineering in addition; Guaranteed the harmony of steel work and civil engineering and reporting to the leadship after accomplishing a task property each other like this, this has very big effect to guaranteeing the duration.
The diffusion wheel load gusset plate that is adopted in the above-mentioned job practices can be steel plate, and the gusset plate structure in the present embodiment is as shown in Figure 1, and it comprises top board 130 and framework 150.Wherein, top board 130 is arranged on the framework 150.
Particularly, framework 150 can be formed through welding by many i iron.Framework 150 can comprise housing 152, first reinforcing rib 153 and second reinforcing rib 155.In the present embodiment, housing 152 is roughly rectangular; A plurality of first reinforcing ribs 153 are arranged in the housing 152 along the first direction such as the width of housing 152, and a plurality of first reinforcing rib 153 is parallel to each other on the second direction of housing 152 such as length direction and is provided with at interval.A plurality of second reinforcing ribs 155 are arranged in the housing 152, and each second reinforcing rib 155 connects between two first adjacent reinforcing ribs 153 and with two adjacent first reinforcing rib, 153 diagonal angles; In other words, adjacent two first reinforcing ribs 153 and second reinforcing rib 155 between the two roughly are " N " shape or " Z " shape, so that spread wheel load more equably.
Top board 130 is to be located at the steel plate on the framework 150, and can be welded together through discontinuous welding and framework 150.Top board 130 can be according to the type of lifting machine and the decision of the overburden layer thickness on the flooring with the concrete size of framework 150.In one embodiment, the thickness of top board 130 can be 20mm, and the sectional dimension of the i iron that framework 150 adopts can be H400*400*13*12mm.
In another embodiment of the present invention, gusset plate can further comprise base plate 120; Base plate 120, top board 130 can fixedly be taken the relative both sides of putting at framework 150, and can be welded together through discontinuous welding and framework 150, also are that framework 150 is folded between base plate 120 and the top board 130, with the diffusion of further enhancing gusset plate to wheel load.
Adopt job practices of the present invention and gusset plate; Compare an earthing or only with scaffold is reinforced, can save more measure expense; As only adopt scaffold to reinforce; Because wheel load spreads seldom, thus the scaffold that flooring need be taken down in length and breadth with step pitch all seldom, therefore need a large amount of scaffold rental charge and labour cost; As adopting the reinforcement means of an earthing, the requirement of soil is very big, also needs a large amount of manual works to tamp, and also influential to environment, adopts job practices of the present invention and gusset plate, more than these shortcomings can overcome basically.
The above is merely preferred embodiment of the present invention, not in order to restriction the present invention, all any modifications of within spirit of the present invention and principle, being done, is equal to and replaces and improvement etc., all should be included within protection scope of the present invention.

Claims (9)

1. floor diffusion wheel load reinforced construction method on the lifting machine is characterized in that said job practices comprises:
Step 1: determine whether to carry out the floor of lifting machine process the wheel load diffusion; If desired, then carry out step 2; Otherwise directly carry out step 4;
Step 2: confirm earthing and the thickness of the gusset plate on the said earthing on the said floor according to the type of said lifting machine;
Step 3: the said thickness according to said step 2 is confirmed is laid said earthing and said gusset plate on said floor;
Step 4: the above floor of said lifting machine.
2. floor diffusion wheel load reinforced construction method is characterized in that said gusset plate is a steel plate on the lifting machine as claimed in claim 1; When said earthing and said gusset plate thickness were enough, said wheel load diffusion was as shown in the table with the relation of said earthing, said gusset plate thickness:
The lifting machine type 300KN 550KN 1000KN 1500KN 3000KN Load/kN/m 2 8.3 11.3 13.5 13.7 14.1 Thickness of earth covering minimum value/mm 30 30 40 50 50 Steel plate thickness minimum value/mm 8 8 12 12 20
3. floor diffusion wheel load reinforced construction method on the lifting machine as claimed in claim 1; It is characterized in that; Said step 2 further comprises: for the floor that carries out with said earthing and said gusset plate also needing reinforcement after the said wheel load diffusion, the intensity of checking computations scaffold; Further be included in said underfloor in the said step 3 and take said scaffold.
4. a diffusion wheel load gusset plate that is used for job practices as claimed in claim 1 is characterized in that, said gusset plate comprises framework and is arranged on the top board on the said framework.
5. diffusion wheel load gusset plate as claimed in claim 4 is characterized in that said framework comprises housing.
6. diffusion wheel load gusset plate as claimed in claim 5 is characterized in that, said framework also comprises a plurality of first reinforcing ribs and a plurality of second reinforcing rib; Said a plurality of first reinforcing rib is arranged in the said housing; Each second reinforcing rib connects between two adjacent said first reinforcing ribs and with two adjacent said first reinforcing rib diagonal angles.
7. like any one described diffusion wheel load gusset plate in the claim 4 to 6, it is characterized in that said framework is formed through welding by many i iron.
8. like any one described diffusion wheel load gusset plate in the claim 4 to 6, it is characterized in that said top board is fixedly to take the steel plate of putting on said framework, and welds together through discontinuous welding and said framework.
9. like any one described diffusion wheel load gusset plate in the claim 4 to 6, it is characterized in that said gusset plate also comprises base plate; Said base plate, said top board are fixedly taken the relative both sides of putting at said framework respectively, and welded together through discontinuous welding and said framework respectively.
CN201210289318.7A 2012-08-07 2012-08-07 The diffusion wheel load reinforced plate of floor slab construction on lifting machine Active CN102817483B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210289318.7A CN102817483B (en) 2012-08-07 2012-08-07 The diffusion wheel load reinforced plate of floor slab construction on lifting machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210289318.7A CN102817483B (en) 2012-08-07 2012-08-07 The diffusion wheel load reinforced plate of floor slab construction on lifting machine

Publications (2)

Publication Number Publication Date
CN102817483A true CN102817483A (en) 2012-12-12
CN102817483B CN102817483B (en) 2015-12-16

Family

ID=47301893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210289318.7A Active CN102817483B (en) 2012-08-07 2012-08-07 The diffusion wheel load reinforced plate of floor slab construction on lifting machine

Country Status (1)

Country Link
CN (1) CN102817483B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115749346A (en) * 2022-11-04 2023-03-07 中建八局第二建设有限公司 Garage roof load dispersion construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101913533A (en) * 2010-04-19 2010-12-15 沈炎源 Design improvement of crane heavy-duty truck traveling steel rail base
KR101013090B1 (en) * 2010-03-16 2011-02-14 정규환 A reinforcement construction methods for slab using a reinforcement mortar
CN201778511U (en) * 2010-09-07 2011-03-30 中国核工业华兴建设有限公司 Mobile container type air compressor room
CN201901526U (en) * 2010-12-17 2011-07-20 徐州重型机械有限公司 Mobile crane and supporting-foot base plate thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101013090B1 (en) * 2010-03-16 2011-02-14 정규환 A reinforcement construction methods for slab using a reinforcement mortar
CN101913533A (en) * 2010-04-19 2010-12-15 沈炎源 Design improvement of crane heavy-duty truck traveling steel rail base
CN201778511U (en) * 2010-09-07 2011-03-30 中国核工业华兴建设有限公司 Mobile container type air compressor room
CN201901526U (en) * 2010-12-17 2011-07-20 徐州重型机械有限公司 Mobile crane and supporting-foot base plate thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
丰建国: "新桥国际机场轨行式塔吊加固设计及施工监控", 《合肥工业大学学报(自然科学版)》, vol. 33, no. 8, 31 August 2010 (2010-08-31) *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115749346A (en) * 2022-11-04 2023-03-07 中建八局第二建设有限公司 Garage roof load dispersion construction method

Also Published As

Publication number Publication date
CN102817483B (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN102134907B (en) Construction method of steel bar truss floor support plate
CN206233102U (en) A kind of packaged type faces side operation work platform
CN204780933U (en) Shoring of trench landing stage system
CN103552800B (en) Large-scale can-like equipment shift method
CN105040830A (en) Construction method of beam longitudinal bar anchorage for stiffened steel structural column-beam column joints
CN202273169U (en) Trestle
CN103244143B (en) A kind of underground construction excavating construction method and underground station
CN106930315B (en) Mobile tower crane foundation structure and construction method
CN108708284A (en) A kind of steel trestle construction method for resisting flood discharge bed scour
CN102817483A (en) Diffusion wheel-pressure reinforcement construction method for floorslab on hoisting machinery and diffusion wheel-pressure reinforcement plate
CN104863374A (en) Slip mechanism of long-span steel structure and slip method of same
CN103470285A (en) Construction device for in-situ maintenance or extension of highway tunnel
CN206769047U (en) A kind of steel lattice column and bored concrete pile attachment structure
CN206768833U (en) A kind of concrete support and steel lattice column attachment structure
JP2012112104A (en) Tunnel leg reinforcing structure
CN201671063U (en) Movable steel base for construction precast beams and standard knot thereof
CN204173804U (en) A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure
CN104612412A (en) Construction method of steel structure exit passageway
CN104294762A (en) Beam-arch synchronous three-dimensional crossing construction method
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN210002853U (en) turnover formwork system for horizontal member construction of reverse construction method
CN204040058U (en) Combined tower crane foundation structure
CN104481050B (en) Buckling-restrained steel plate wall and concrete shear force wall built-in type node and construction method thereof
CN103898835B (en) The anti-back of the body of bridge draws load-bearing construction bracket and construction method
CN206681761U (en) Tunnel gunite concrete shaping equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Diffusion wheel-pressure reinforcement plate for construction of floorslab on hoisting machinery

Effective date of registration: 20180129

Granted publication date: 20151216

Pledgee: Bank of Beijing Limited by Share Ltd. Shenzhen branch

Pledgor: China Construction Steel Structure Corp.,Ltd.

Registration number: 2018440020010

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Science And Industry Co.,Ltd.

Address before: Shenzhen City, Guangdong province water building 518040 Futian District Che Kung Temple Tairan eight road building 17-19

Patentee before: China Construction Steel Structure Corp.,Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221207

Granted publication date: 20151216

Pledgee: Bank of Beijing Limited by Share Ltd. Shenzhen branch

Pledgor: China Construction Steel Structure Corp.,Ltd.

Registration number: 2018440020010