CN102817483B - The diffusion wheel load reinforced plate of floor slab construction on lifting machine - Google Patents

The diffusion wheel load reinforced plate of floor slab construction on lifting machine Download PDF

Info

Publication number
CN102817483B
CN102817483B CN201210289318.7A CN201210289318A CN102817483B CN 102817483 B CN102817483 B CN 102817483B CN 201210289318 A CN201210289318 A CN 201210289318A CN 102817483 B CN102817483 B CN 102817483B
Authority
CN
China
Prior art keywords
reinforced
wheel load
reinforced plate
plate
lifting machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210289318.7A
Other languages
Chinese (zh)
Other versions
CN102817483A (en
Inventor
李毅
杨正军
陈华周
吕黄兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201210289318.7A priority Critical patent/CN102817483B/en
Publication of CN102817483A publication Critical patent/CN102817483A/en
Application granted granted Critical
Publication of CN102817483B publication Critical patent/CN102817483B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The construction method that on lifting machine, floor diffusion wheel load is reinforced, comprising: step 1: determine whether to need the floor to lifting machine process to carry out wheel load diffusion; If needed, then carry out step 2; Otherwise directly carry out step 4; Step 2: the thickness determining the earthing on described floor and the reinforced plate on described earthing according to the type of described lifting machine; Step 3: the described thickness determined according to described step 2 lays described earthing and described reinforced plate on described floor; Step 4: described floor on described lifting machine.One embodiment of the invention also provides a kind of for the diffusion wheel load reinforced plate in above-mentioned construction method, the top board that described reinforced plate comprises framework and arranges on said frame.Adopt construction method of the present invention and reinforced plate, compare an earthing or only can save more measure expense with scaffold is reinforced.

Description

The diffusion wheel load reinforced plate of floor slab construction on lifting machine
Technical field
The invention belongs to building field, particularly relate to a kind of diffusion wheel load reinforced plate of floor slab construction on lifting machine.
Background technology
" be suitable for because steel structure meets the three elements of architecture, firm, attractive in appearance " requirement, simultaneously along with the strategic structural of Construction of Steel Structure field engineering, steel structure showed great vitality in recent years, but in Construction of Steel Structure, due to the needs that some heavy components are installed, lifting machine such as flooring on large automobile crane must be selected to lift, and large automobile crane because of its wheel load numerical value large, active position is uncertain and the general action time is shorter and concern that is extremely construction safety, the reinforcing of concrete structure all should be carried out in the floor area of wheel crane process, in order to avoid floor ftractures because load is excessive.At present, construction enterprises are due to can not accurate Calculation to automobile wheel load, therefore quite conservative reinforcement means is mostly adopted, under flooring, such as take the construction method of very close full hall scaffold, this construction method needs a large amount of scaffold lease rents and labour cost, also construction speed can be delayed, and the wheel of the unfairness of flooring and lifting machine acts directly on floor, is easy to cause damage to floor because wheel load is excessive simultaneously; Existing another kind of method is on flooring, fill out very thick soil, and the method for this earthing needs, with a large amount of soil, also to need a large amount of manually tamping.
Summary of the invention
Technical matters to be solved by this invention is, provides floor diffusion wheel load reinforced construction method and diffusion wheel load reinforced plate on a kind of lifting machine easy to implement.
The present invention is achieved in that provides floor diffusion wheel load reinforced construction method on a kind of lifting machine, comprising:
Step 1: determine whether to need the floor to lifting machine process to carry out wheel load diffusion; If needed, then carry out step 2; Otherwise directly carry out step 4;
Step 2: the thickness determining the earthing on described floor and the reinforced plate on described earthing according to the type of described lifting machine;
Step 3: the described thickness determined according to described step 2 lays described earthing and described reinforced plate on described floor;
Step 4: described floor on described lifting machine.
Further, described reinforced plate is steel plate; When described earthing and described reinforced plate thickness enough time, the diffusion of described wheel load is as shown in the table with the relation of described earthing, described reinforced plate thickness:
Lifting machine type 300KN 550KN 1000KN 1500KN 3000KN
Load/kN/m 2 8.3 11.3 13.5 13.7 14.1
Thickness of earth covering minimum value/mm 30 30 40 50 50
Steel plate thickness minimum value/mm 8 8 12 12 20
Further, described step 2 comprises further: for the floor also needed reinforcement after carrying out described wheel load diffusion with described earthing and described reinforced plate, the intensity of checking computations scaffold; Be included in described underfloor in described step 3 further and take described scaffold.
The present invention also provides a kind of for the diffusion wheel load reinforced plate in above-mentioned construction method, it top board comprising framework and arrange on said frame.
Further, described framework comprises housing.
Further, described framework also comprises multiple first reinforced rib and multiple second reinforced rib; Described multiple first reinforced rib is arranged in described housing; Each second reinforced rib between adjacent two described first reinforced ribs and by adjacent two described first reinforced rib diagonal angles connect.
Further, described framework is formed by welding by many I-beam sections.
Further, described top board is fixedly take the steel plate put on said frame, and by discontinuous welding together with described frame welding.
Further, described reinforced plate also comprises base plate; The relative both sides of putting at described framework fixedly taken respectively by described base plate, described top board, and respectively by discontinuous welding and described framework solder together.
Adopt construction method of the present invention and reinforced plate, compare an earthing or only can save more measure expense with scaffold is reinforced, reinforce as only adopted scaffold, because wheel load spreads seldom, so need the scaffold taken all little with step pitch in length and breadth under flooring, therefore need a large amount of scaffold lease rents and labour cost; As adopted the reinforcement means of an earthing, the requirement of soil is very large, and also need a large amount of manually tamping, and also have impact to environment, adopt construction method of the present invention and reinforced plate, these shortcomings above can overcome substantially.
Accompanying drawing explanation
Fig. 1 is the schematic diagram spreading wheel load reinforced plate in one embodiment of the invention.
Detailed description of the invention
In order to make technical matters to be solved by this invention, technical scheme and beneficial effect clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
In one embodiment of the invention, on lifting machine, floor diffusion wheel load reinforced construction method comprises:
Namely step 1: calculate floor when lifting machine (as automobile) is walked and whether can ftracture because load is excessive, also determine whether to need diffusion wheel load to reinforce; If needed, then carry out step 2; Otherwise directly carry out step 4;
Step 2: according to the thickness of the earthing on dissimilar lifting machine determination floor and the diffusion wheel load reinforced plate on earthing;
Step 3: the thickness determined according to step 2 lays earthing and reinforced plate on floor;
Step 4: floor on lifting machine.
Wherein, step 1 can adopt existing method of calculating, in order to determine whether that needs carry out diffusion and reinforce.
In step 2, earthing on structure floor and the thickness of reinforced plate have diffusion to lifting machine wheel load, earthing and reinforced plate thicker (within the specific limits), automotive wheels companding falls apart more abundant (wheel pressure angle of diffusion, can by 45 ° of considerations in cement concrete or reinforced plate, can by 30 ° of considerations in earthing), when overburden layer thickness and reinforced plate thickness reach enough thick, automobile wheel load can be considered by uniform load.The wheel load of automobile can be calculated by the average load of automobile within the scope of reasonable area of conter.(wherein enough thickness of earth covering numerical value should be determined according to engineering experience, when without Reliable Design experience, can be not less than determine that corresponding thickness of earth covering is h by the automobile area of conter of loading ratio cut partition by the diffusion area of rear axle wheel load min, as actual thickness of earth covering h>=h mintime, can think that thickness of earth covering is enough.)。In one embodiment, earthing and reinforced plate thickness enough time, wheel load diffusion is with earthing, the relation of reinforced plate thickness is as shown in the table on earthing:
Lifting machine type 300KN 550KN 1000KN 1500KN 3000KN
Load/kN/m 2 8.3 11.3 13.5 13.7 14.1
Thickness of earth covering minimum value/mm 30 30 40 50 50
Steel plate thickness minimum value/mm 8 8 12 12 20
After step 2, earthing and reinforced plate can be laid according to reinforced plate thickness on determined thickness of earth covering, earthing on floor; Floor on lifting machine can be made afterwards.
In addition, step 2 also can comprise further: for the floor also needed reinforcement after carrying out wheel load diffusion with earthing and reinforced plate, the intensity of checking computations scaffold; Correspondingly, then underfloor scaffolding is included in further in step 3.Now, adopted earthing and reinforced plate to spread wheel load, wheel load is little, so scaffold is all very large with step pitch in length and breadth, the expense of reinforcing is also little, and the scaffold reinforced does not have too large damage to floor yet.
As mentioned above, in one embodiment of the invention, on lifting machine, floor diffusion wheel load reinforced construction method adopts earthing and reinforced plate to spread wheel load, wheel load can be made greatly to reduce, such floor need not be reinforced substantially, even if reinforce, because the wheel load on floor is little, the expense of reinforcing is also little, and the scaffold reinforced does not have too large damage to floor yet.Simultaneously, in one embodiment of the invention, on lifting machine, floor diffusion wheel load reinforced construction method can avoid scaffolding below floor to affect the advantages such as the construction speed of civil engineering in addition, this ensure that the harmony of steel structure and civil engineering and mutually intersection property, this is to ensureing that there is very large effect the duration.
The diffusion wheel load reinforced plate adopted in above-mentioned construction method can be steel plate, and as shown in Figure 1, it comprises top board 130 and framework 150 to the reinforced plate structure in the present embodiment.Wherein, top board 130 is arranged on framework 150.
Particularly, framework 150 can be formed by welding by many I-beam sections.Framework 150 can comprise housing 152, first reinforced rib 153 and the second reinforced rib 155.In the present embodiment, housing 152 is roughly rectangular; Multiple first reinforced rib 153 is arranged in housing 152 along first direction such as the Width of housing 152, and multiple first reinforced rib 153 housing 152 second direction as length direction is parallel to each other and interval arrange.Multiple second reinforced rib 155 is arranged in housing 152, and two adjacent first reinforced rib 153 diagonal angles to connect by each second reinforced rib 155 between adjacent two the first reinforced ribs 153; In other words, two adjacent the first reinforced ribs 153 and the second reinforced rib 155 are between the two roughly " N " shape or " Z " shape, so that spread wheel load more equably.
Top board 130 for being located at the steel plate on framework 150, and by discontinuous welding and framework 150 solder together.Top board 130 can determine according to the overburden layer thickness on the type of lifting machine and flooring with the concrete size of framework 150.In one embodiment, the thickness of top board 130 can be 20mm, and the sectional dimension of the I-beam section that framework 150 adopts can be H400*400*13*12mm.
In another embodiment of the invention, reinforced plate can comprise base plate 120 further; Base plate 120, top board 130 fixedly can take the relative both sides of putting at framework 150, and by discontinuous welding and framework 150 solder together, also namely framework 150 is folded between base plate 120 and top board 130, with further strengthen plate to the diffusion of wheel load.
Adopt construction method of the present invention and reinforced plate, compare an earthing or only can save more measure expense with scaffold is reinforced, reinforce as only adopted scaffold, because wheel load spreads seldom, so need the scaffold taken all little with step pitch in length and breadth under flooring, therefore need a large amount of scaffold lease rents and labour cost; As adopted the reinforcement means of an earthing, the requirement of soil is very large, and also need a large amount of manually tamping, and also have impact to environment, adopt construction method of the present invention and reinforced plate, these shortcomings above can overcome substantially.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.

Claims (4)

1. the diffusion wheel load reinforced plate of floor slab construction on lifting machine, is characterized in that, the top board that described reinforced plate comprises framework and arranges on said frame;
Described framework comprises housing;
Described framework also comprises multiple first reinforced rib and multiple second reinforced rib; Described multiple first reinforced rib is arranged in described housing along the first direction of described housing, and is parallel to each other and interval setting along the second direction of described housing; Each second reinforced rib between adjacent two described first reinforced ribs and by adjacent two described first reinforced rib diagonal angles connect.
2. diffusion wheel load reinforced plate as claimed in claim 1, it is characterized in that, described framework is formed by welding by many I-beam sections.
3. diffusion wheel load reinforced plate as claimed in claim 1, it is characterized in that, described top board is fixedly take the steel plate put on said frame, and by discontinuous welding together with described frame welding.
4. diffusion wheel load reinforced plate as claimed in claim 1, it is characterized in that, described reinforced plate also comprises base plate; The relative both sides of putting at described framework fixedly taken respectively by described base plate, described top board, and respectively by discontinuous welding and described framework solder together.
CN201210289318.7A 2012-08-07 2012-08-07 The diffusion wheel load reinforced plate of floor slab construction on lifting machine Active CN102817483B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210289318.7A CN102817483B (en) 2012-08-07 2012-08-07 The diffusion wheel load reinforced plate of floor slab construction on lifting machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210289318.7A CN102817483B (en) 2012-08-07 2012-08-07 The diffusion wheel load reinforced plate of floor slab construction on lifting machine

Publications (2)

Publication Number Publication Date
CN102817483A CN102817483A (en) 2012-12-12
CN102817483B true CN102817483B (en) 2015-12-16

Family

ID=47301893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210289318.7A Active CN102817483B (en) 2012-08-07 2012-08-07 The diffusion wheel load reinforced plate of floor slab construction on lifting machine

Country Status (1)

Country Link
CN (1) CN102817483B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115749346A (en) * 2022-11-04 2023-03-07 中建八局第二建设有限公司 Garage roof load dispersion construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101913533A (en) * 2010-04-19 2010-12-15 沈炎源 Design improvement of crane heavy-duty truck traveling steel rail base
CN201778511U (en) * 2010-09-07 2011-03-30 中国核工业华兴建设有限公司 Mobile container type air compressor room

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101013090B1 (en) * 2010-03-16 2011-02-14 정규환 A reinforcement construction methods for slab using a reinforcement mortar
CN201901526U (en) * 2010-12-17 2011-07-20 徐州重型机械有限公司 Mobile crane and supporting-foot base plate thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101913533A (en) * 2010-04-19 2010-12-15 沈炎源 Design improvement of crane heavy-duty truck traveling steel rail base
CN201778511U (en) * 2010-09-07 2011-03-30 中国核工业华兴建设有限公司 Mobile container type air compressor room

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
丰建国.新桥国际机场轨行式塔吊加固设计及施工监控.《合肥工业大学学报(自然科学版)》.2010,第33卷(第8期),1223-1225,1240. *

Also Published As

Publication number Publication date
CN102817483A (en) 2012-12-12

Similar Documents

Publication Publication Date Title
CN102134907B (en) Construction method of steel bar truss floor support plate
CN102251606B (en) Outer partition wall built by adopting light concrete partition wall boards and construction method thereof
CN103924711A (en) Assembled type gridding shearing wall structural system and construction technology of assembled type gridding shearing wall structural system
CN111519665A (en) Gapless filling method for foundation post-cast strip
CN204780933U (en) Shoring of trench landing stage system
CN206816265U (en) A kind of air channel arch combined retaining structure
CN102817483B (en) The diffusion wheel load reinforced plate of floor slab construction on lifting machine
CN105040810B (en) Suitable for the connecting node of frame supported shear wall structure reverse construction
CN104831750B (en) Underground garage roof design load and engineering vehicle load comparison construction method
CN103967332B (en) The construction method of a kind of building site enclosing
CN206769047U (en) A kind of steel lattice column and bored concrete pile attachment structure
CN202745062U (en) Foundation pit supporting structure closely adjacent to built-up underground structure
CN103437349B (en) The construction method of steel concrete perfusion shaped pile
CN203729304U (en) Soil nailing wall supporting structure
CN204851265U (en) Bearing structure in work well under high water pressure condition
CN203755451U (en) Connecting device for dual-layer full-steel structure floor embedded with channel steel beam and column
CN203755171U (en) Bridge back-pulling bearing construction support
CN104612412A (en) Construction method of steel structure exit passageway
CN205421273U (en) Utilize supporting construction's basement cavity combination outer wall
CN103898835B (en) The anti-back of the body of bridge draws load-bearing construction bracket and construction method
CN205134604U (en) Strengthen muddy whole anti -seismic performance's in house of retail shop's brick device along street
CN202850471U (en) Lifting type operation platform for elevator well
CN207110586U (en) A kind of component plate of low layer multi-storied garage
CN206328760U (en) A kind of foundation pit construction structure
CN206034297U (en) Post stretching precast beam pedestal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Diffusion wheel-pressure reinforcement plate for construction of floorslab on hoisting machinery

Effective date of registration: 20180129

Granted publication date: 20151216

Pledgee: Bank of Beijing Limited by Share Ltd. Shenzhen branch

Pledgor: China Construction Steel Structure Corp.,Ltd.

Registration number: 2018440020010

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Engineering Group Co.,Ltd.

Address before: Shenzhen City, Guangdong province water building 518040 Futian District Che Kung Temple Tairan eight road building 17-19

Patentee before: China Construction Steel Structure Corp.,Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221207

Granted publication date: 20151216

Pledgee: Bank of Beijing Limited by Share Ltd. Shenzhen branch

Pledgor: China Construction Steel Structure Corp.,Ltd.

Registration number: 2018440020010