CN108708284A - A kind of steel trestle construction method for resisting flood discharge bed scour - Google Patents

A kind of steel trestle construction method for resisting flood discharge bed scour Download PDF

Info

Publication number
CN108708284A
CN108708284A CN201810506336.3A CN201810506336A CN108708284A CN 108708284 A CN108708284 A CN 108708284A CN 201810506336 A CN201810506336 A CN 201810506336A CN 108708284 A CN108708284 A CN 108708284A
Authority
CN
China
Prior art keywords
pile
steel
shaped steel
trestle
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810506336.3A
Other languages
Chinese (zh)
Other versions
CN108708284B (en
Inventor
李二伟
王英
刘建伟
郝云超
桂文才
冯小敏
徐旭升
邢闯锋
朱卫威
周成新
杨秀清
吕建源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Survey and Design Research Institute of China Railway Seventh Group Co Ltd
Original Assignee
Survey and Design Research Institute of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Survey and Design Research Institute of China Railway Seventh Group Co Ltd filed Critical Survey and Design Research Institute of China Railway Seventh Group Co Ltd
Priority to CN201810506336.3A priority Critical patent/CN108708284B/en
Publication of CN108708284A publication Critical patent/CN108708284A/en
Application granted granted Critical
Publication of CN108708284B publication Critical patent/CN108708284B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/06Placing concrete under water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/40Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Architecture (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Earth Drilling (AREA)
  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of steel trestle construction method for resisting flood discharge bed scour, basis includes vertical bridge to spaced apart large and small steel-pipe pile, installation hood type connection system between adjacent direction across bridge steel-pipe pile;Small steel-pipe pile base opening inserting piling is embedded in distribution beam by stake top groove and trestle girder is closely connected to scar;After large steel pipe stake base opening inserting piling to scar, first interim bracket is welded to both sides in pile body along bridge, distribution beam is put again and trestle girder is closely connected, when trestle toward not less than 2 times holes of assembled length in front of row steel-pipe pile across when, percussive drill is set on the trestle girder of row's steel-pipe pile position, casing hole milling is done using large steel pipe stake and with proceeding to designed elevation in rock stratum, cut off interim bracket, again formal bracket is welded, it is concordant with trestle girder to cut large steel pipe stake top mouth, and anti-anchoring pile is formed in large steel pipe stake lower end filling underwater concrete.Quick construction of the present invention, can quickly form channel waterborne, carry out anti-anchoring pile construction by land, operating environment is good, and fund input is few.

Description

A kind of steel trestle construction method for resisting flood discharge bed scour
Technical field
The present invention relates to technical field of bridge construction, and flood discharge can be resisted by riding upon mining under reservoir region more particularly, to one kind The steel trestle construction method of bed scour.
Background technology
In water during bridge foundation construction, logical two sides are generally drawn by the way of setting up steel trestle, form work waterborne Industry channel is passed through for Material Transportation and construction equipment.Due to the advantages that steel-pipe pile inserting piling is simple for process, structure stress is strong It is usually used in steel trestle infrastructure in water.If but in the construction of mining under reservoir region, riverbed washes away lower no weakness in reservoir spillway Coating, surface layer is mostly gravel, cobble, and when being rock stratum condition down, the infrastructure of trestle is all using inserting piling formula in water The shortcomings that steel-pipe pile is that valid bonding length is short, is easily impacted by flood discharge torrent speed in short-term, and steel trestle overall stability is caused to be deteriorated, Unstability is in turn resulted in the negative consequences such as to collapse;And it is connected reinforced concrete drilling stake under steel-pipe pile and then needs to make in large area water Industry, not only long construction period, and marine equipment and goods and materials input are more, personnel's job safety risk height.
Invention content
The purpose of the present invention is to provide a kind of speed of applications soon, steel trestle infrastructure is stable, can resist flood discharge torrent The steel trestle construction method of impact.
To achieve the above object, the present invention can take following technical proposals:
The steel trestle construction method of the present invention for resisting flood discharge bed scour, including the setting of construction underwater foundation and laying dress With formula floorings, Specific construction step is:
The first step is designed according to steel trestle, prepares II shape steel tube of the I shaped steel pile pile and diameter 426mm of diameter 920mm respectively Stake, wherein the base opening of II shaped steel pile pile carries pile top, top opening offers the groove for embedding distribution beam;
Second step, by design requirement, by crawler crane erect-position in beach on the bank or bridge floor of having constructed using I shape steel tube of outstanding play pair Stake and II shaped steel pile pile staggeredly carry out inserting piling successively, wherein I shaped steel pile pile direction across bridge interval inserting piling two, II shaped steel pile pile cross-bridges To interval inserting piling three;
Third walk, after the pile top inserting piling to rock top surface of II shaped steel pile pile, distribution beam is embedded in its top groove, top and Girder is closely connected, installs hood type connection system between the adjacent two II shaped steel pile pile of direction across bridge later;
4th step is faced along bridge to the welding in I shape steel tube stake top mouth both sides after I shaped steel pile pile base opening inserting piling to rock top surface When bracket, then put that distribution beam is closely connected with girder, the girder top surface between two I shaped steel pile piles is laid with assembled steel bridge floor later Plate, wherein I shape steel tube stake top portion leaves a blank, width >=1 meter of leaving a blank;
5th step, when trestle toward not less than 2 times holes of assembled length in front of row steel-pipe pile across when, close to the I shaped steel pile pile of row Assembled steel floorings on percussive drill is set, doing casing using I shaped steel pile pile hole milling and designed with proceeding in rock stratum Absolute altitude;Then it removes distribution beam and cuts off the interim bracket of the 4th step welding, by designed elevation position again on I shaped steel pile pile Formal bracket is welded, then puts distribution beam;It is closely knit with steel plate pad between distribution beam and girder, cut I shape steel tube stake top Mouth is concordant with girder;
6th step forms anti-anchoring pile from the I inside pouring underwater concrete of shape steel tube stake top mouth to rock top surface;Then in cross-bridges It is to hood type connection is installed between two I shaped steel pile piles;It is laid with assembled steel floorings at the place of leaving a blank;
7th step repeats second step to the 6th step, completes entire steel trestle construction.
Depth >=5 meter for the anti-anchoring pile being perfused in 6th step.
The advantage of the invention is that quick construction, when construction, can quickly form channel waterborne, carry out anti-anchoring pile by land and apply Work, operating environment is good, and fund input is few;The design of steel trestle infrastructure is more reasonable, economical, the steel trestle lower part base constructed Plinth is stablized, and I shaped steel pile pile being relatively large in diameter is as strong stake, and II smaller shaped steel pile pile of diameter is as weak stake, strong, weak stake interval cloth It sets, has not only met the stress needs of trestle under prevailing state, but also the impact of torrent speed flow in short-term can be resisted, ensure that reservoir spillway At present the safety of trestle.
Description of the drawings
Fig. 1 is steel trestle Construction State schematic diagram of the present invention.
Fig. 2 is steel trestle operation state schematic diagram of the present invention.
Fig. 3 is the A-A of Fig. 2 to cutaway view Amplified image.
Fig. 4 is the B-B direction cutaway view Amplified image of Fig. 2.
Specific implementation mode
More detailed explanation is done to the present invention below in conjunction with the accompanying drawings.
The steel trestle construction method of the present invention for resisting flood discharge bed scour, including the setting of construction underwater foundation and paving If unit construction bridge panel, Specific construction step is:
The first step is designed according to steel trestle, prepares II shape steel tube of the I shaped steel pile pile 1 and diameter 426mm of diameter 920mm respectively Stake 2, wherein the base opening of II shaped steel pile pile 2 carries pile top, top opening offers the groove for embedding distribution beam(Due to I shaped steel pile pile, 1 He The diameter of II shaped steel pile pile 2 is different, and corresponding, the distribution beam model being placed on I shaped steel pile pile 1 can be larger, and place Distribution beam model on II shaped steel pile pile 2 can be smaller, not only needs the load-bearing requirements for meeting whole steel trestle, but also more pass through Ji.Distribution beam can be prefabricated in advance according to design requirement);
Second step, as shown in Figure 1, design requirement is pressed, by 3 erect-position of crawler crane in beach on the bank or bridge floor of having constructed(Fig. 1 is shown Be erect-position on bridge floor of having constructed)Inserting piling is staggeredly carried out using I shaped steel pile pile 1 of outstanding play pair and II shaped steel pile pile 2 successively, In I shaped steel pile pile, 1 direction across bridge interval inserting piling two, II shaped steel pile pile, 2 direction across bridge interval inserting piling three;
Third walks, after the pile top of II shaped steel pile pile 2 passes through 4 inserting piling of boulder bed to 5 top surface of rock, ting model distribution beam 6 is embedding Enter in its top groove, top and girder 7 are closely connected, install hood type between the adjacent two II shaped steel pile pile 2 of direction across bridge later Connection is 8, as shown in Figure 1, Figure 3;
4th step is welded along bridge in I shaped steel pile pile, 1 top opening both sides after I shaped steel pile pile, 1 base opening inserting piling to 5 top surface of rock Interim bracket 9, then put big model distribution beam 10 and girder 7 is closely connected, the girder top surface between two I shaped steel pile piles 1 is spread later If assembled steel floorings 11, wherein I shape steel tube stake top portion leaves a blank, distance of leaving a blank is not less than 1 meter;
5th step, when trestle toward not less than 2 times holes of assembled length in front of row steel-pipe pile across when(As shown in Figure 1), it is somebody's turn to do close Setting percussive drill 12 on the assembled steel floorings 11 of I shaped steel pile pile 1 is arranged, doing casing using I shaped steel pile pile 1 carries out hole milling simultaneously With proceeding to designed elevation in rock stratum 4;Then it removes big model distribution beam 10 and cuts off the interim bracket 9 of the 4th step welding, by setting Meter elevation location welds formal bracket 13 on I shaped steel pile pile 1 again(As shown in Figure 2), then big model distribution is put again Beam 10;And it is closely knit with 14 pad of steel plate between distribution beam 10 and girder 7, cutting I shaped steel pile pile, 1 top opening is concordant with girder 7;
6th step forms anti-anchoring pile 15 from the inside pouring underwater concrete of I shaped steel pile pile, 1 top opening to rock top surface(It is let out to resist The impact of torrent when big vast, under normal circumstances, the depth of anti-anchoring pile 15 want >=5 meters);Then between two I shaped steel pile pile 1 of direction across bridge It is 16 to install hood type connection, as shown in Figure 4;Finally assembled steel floorings 11 are laid at the place of leaving a blank;
7th step repeats second step to the 6th step, completes entire steel trestle construction.
The steel trestle to put into effect after the completion of constructing is as shown in Figure 2.

Claims (3)

1. a kind of steel trestle construction method for resisting flood discharge bed scour, including the setting of construction underwater foundation and laying unit construction bridge Panel, it is characterised in that:Specific construction step is:
The first step is designed according to steel trestle, prepares II shape steel tube of the I shaped steel pile pile and diameter 426mm of diameter 920mm respectively Stake, wherein the base opening of II shaped steel pile pile carries pile top, top opening offers the groove for embedding distribution beam;
Second step, by design requirement, by crawler crane erect-position in beach on the bank or bridge floor of having constructed using I shape steel tube of outstanding play pair Stake and II shaped steel pile pile staggeredly carry out inserting piling successively, wherein I shaped steel pile pile direction across bridge interval inserting piling two, II shaped steel pile pile cross-bridges To interval inserting piling three;
Third walk, after the pile top inserting piling to rock top surface of II shaped steel pile pile, distribution beam is embedded in its top groove, top and Girder is closely connected, installs hood type connection system between the adjacent two II shaped steel pile pile of direction across bridge later;
4th step is faced along bridge to the welding in I shape steel tube stake top mouth both sides after I shaped steel pile pile base opening inserting piling to rock top surface When bracket, then put that distribution beam is closely connected with girder, the girder top surface between two I shaped steel pile piles is laid with assembled steel bridge floor later Plate, wherein I shape steel tube stake top portion leaves a blank;
5th step, when trestle toward not less than 2 times holes of assembled length in front of row steel-pipe pile across when, close to the I shaped steel pile pile of row Assembled steel floorings on percussive drill is set, doing casing using I shaped steel pile pile hole milling and designed with proceeding in rock stratum Absolute altitude;Then it removes distribution beam and cuts off the interim bracket of the 4th step welding, by designed elevation position again on I shaped steel pile pile Formal bracket is welded, then puts distribution beam;It is closely knit with steel plate pad between distribution beam and girder, cut I shape steel tube stake top Mouth is concordant with girder;
6th step forms anti-anchoring pile from the I inside pouring underwater concrete of shape steel tube stake top mouth to rock top surface;Then in cross-bridges It is to hood type connection is installed between two I shaped steel pile piles;It is laid with assembled steel floorings at the place of leaving a blank;
7th step repeats second step to the 6th step, completes entire steel trestle construction.
2. the steel trestle construction method according to claim 1 for resisting flood discharge bed scour, it is characterised in that:Described 4th I shape steel tube stake top portion leaves a blank width >=1 meter in step.
3. the steel trestle construction method according to claim 1 for resisting flood discharge bed scour, it is characterised in that:Described 6th Depth >=5 meter for the anti-anchoring pile being perfused in step.
CN201810506336.3A 2018-05-24 2018-05-24 A kind of steel trestle construction method for resisting flood discharge bed scour Active CN108708284B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810506336.3A CN108708284B (en) 2018-05-24 2018-05-24 A kind of steel trestle construction method for resisting flood discharge bed scour

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810506336.3A CN108708284B (en) 2018-05-24 2018-05-24 A kind of steel trestle construction method for resisting flood discharge bed scour

Publications (2)

Publication Number Publication Date
CN108708284A true CN108708284A (en) 2018-10-26
CN108708284B CN108708284B (en) 2019-11-05

Family

ID=63870529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810506336.3A Active CN108708284B (en) 2018-05-24 2018-05-24 A kind of steel trestle construction method for resisting flood discharge bed scour

Country Status (1)

Country Link
CN (1) CN108708284B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409281A (en) * 2019-08-12 2019-11-05 中交隧道工程局有限公司 A kind of deep water drift net steel trestle
CN111576222A (en) * 2020-05-06 2020-08-25 广州市市政工程设计研究总院有限公司 Construction method of steel pipe pile stacked road type road
CN116856408A (en) * 2023-09-04 2023-10-10 中交第一航务工程局有限公司 Sinking method of steel casing suitable for deepwater bare rock area
CN117071452A (en) * 2023-10-13 2023-11-17 中国建筑第六工程局有限公司 Flood protection method for trestle bridge in high-drop water level construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120072650A (en) * 2010-12-24 2012-07-04 주식회사 케이티 Device for supporting rack of earthquake resistance
CN104404861A (en) * 2014-11-05 2015-03-11 中交第二航务工程局有限公司 Steel trestle provided with steel anchor pile and construction method of steel trestle
CN205046537U (en) * 2015-09-21 2016-02-24 中铁建大桥工程局集团第一工程有限公司 Naked rock platform of deep water
CN106192774A (en) * 2015-09-11 2016-12-07 中铁四局集团有限公司 Steel trestle construction facility
CN107142926A (en) * 2017-06-12 2017-09-08 广西路建工程集团有限公司 The supratectal steel trestle steel-pipe pile antiscour construction method of shallow water riverbed thickness erratic boulder

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120072650A (en) * 2010-12-24 2012-07-04 주식회사 케이티 Device for supporting rack of earthquake resistance
CN104404861A (en) * 2014-11-05 2015-03-11 中交第二航务工程局有限公司 Steel trestle provided with steel anchor pile and construction method of steel trestle
CN106192774A (en) * 2015-09-11 2016-12-07 中铁四局集团有限公司 Steel trestle construction facility
CN205046537U (en) * 2015-09-21 2016-02-24 中铁建大桥工程局集团第一工程有限公司 Naked rock platform of deep water
CN107142926A (en) * 2017-06-12 2017-09-08 广西路建工程集团有限公司 The supratectal steel trestle steel-pipe pile antiscour construction method of shallow water riverbed thickness erratic boulder

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
何锦章: "复杂海域条件下浅覆盖层深水基础施工方案设计", 《西部交通科技》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409281A (en) * 2019-08-12 2019-11-05 中交隧道工程局有限公司 A kind of deep water drift net steel trestle
CN110409281B (en) * 2019-08-12 2024-03-15 中交隧道工程局有限公司 Deepwater bare rock steel trestle
CN111576222A (en) * 2020-05-06 2020-08-25 广州市市政工程设计研究总院有限公司 Construction method of steel pipe pile stacked road type road
CN116856408A (en) * 2023-09-04 2023-10-10 中交第一航务工程局有限公司 Sinking method of steel casing suitable for deepwater bare rock area
CN116856408B (en) * 2023-09-04 2023-11-07 中交第一航务工程局有限公司 Sinking method of steel casing suitable for deepwater bare rock area
CN117071452A (en) * 2023-10-13 2023-11-17 中国建筑第六工程局有限公司 Flood protection method for trestle bridge in high-drop water level construction

Also Published As

Publication number Publication date
CN108708284B (en) 2019-11-05

Similar Documents

Publication Publication Date Title
CN104533446B (en) Construction method and its structure that a kind of big cross section Support System in Soft Rock Tunnels bilayer pre- Geological disaster prevention of preliminary bracing occurs
CN108708284B (en) A kind of steel trestle construction method for resisting flood discharge bed scour
CN102535474B (en) A kind of construction method of deep-foundation pit excavation
CN112502777B (en) Method for treating tunnel inrush roof collapse and door closing
CN101761068A (en) Box-raft pressure-bearing type foundation underpinning and construction reinforcing method for tunnel across pile foundation of bridge above river
CN107524141B (en) Construction method of cast-in-situ bored pile of rock soil foundation
CN105178327A (en) Composite retaining structure of foundation pit project and construction method thereof
CN107939415A (en) Stay the micro- two step constructions method of Core Soil in the soft plastic clay tunnel of Shallow-buried Large-span
CN106498957A (en) Steel sheet pile cofferdam construction platform and integral construction method
CN108797404A (en) A kind of underground pipe gallery is across river section river water flow guiding structure and its construction method
CN107142926A (en) The supratectal steel trestle steel-pipe pile antiscour construction method of shallow water riverbed thickness erratic boulder
CN208280155U (en) A kind of steel trestle infrastructure structure for resisting the impact of flood discharge torrent speed
CN100513705C (en) Underground Beam-Pile Frame Structure for Slope Reinforcement
CN102235007B (en) Method for supporting deep foundation with upper nail-lower pile combination
CN206428707U (en) A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN106978814A (en) A kind of Fabricated Structure for Support of Excavation
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN111828018B (en) Construction method for preventing tunnel gushing water and bypassing pit
CN101994314A (en) Longhole rectangular terraced antiskid pile jump-preventing excavating construction
CN211144498U (en) Novel shield cutter head
CN110529120B (en) Construction method for removing invasion limiting structure by chiseling VI-level surrounding rock shallow-buried underground excavation loess tunnel
CN110258600B (en) Vertical cofferdam construction method suitable for deepwater area
CN208870053U (en) Deep well dado steel construction supports
CN210163910U (en) Pipeline pipe jacking receiving well foundation pit supporting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant