CN208280155U - A kind of steel trestle infrastructure structure for resisting the impact of flood discharge torrent speed - Google Patents

A kind of steel trestle infrastructure structure for resisting the impact of flood discharge torrent speed Download PDF

Info

Publication number
CN208280155U
CN208280155U CN201820780754.7U CN201820780754U CN208280155U CN 208280155 U CN208280155 U CN 208280155U CN 201820780754 U CN201820780754 U CN 201820780754U CN 208280155 U CN208280155 U CN 208280155U
Authority
CN
China
Prior art keywords
fashioned iron
tubular pole
iron tubular
steel
trestle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820780754.7U
Other languages
Chinese (zh)
Inventor
李二伟
王英
赵少强
刘建伟
郝云超
桂文才
冯小敏
赵威
王旭东
徐旭升
邢闯锋
朱卫威
周成新
杨秀清
吕建源
宗广辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Survey and Design Research Institute of China Railway Seventh Group Co Ltd
Original Assignee
Survey and Design Research Institute of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Survey and Design Research Institute of China Railway Seventh Group Co Ltd filed Critical Survey and Design Research Institute of China Railway Seventh Group Co Ltd
Priority to CN201820780754.7U priority Critical patent/CN208280155U/en
Application granted granted Critical
Publication of CN208280155U publication Critical patent/CN208280155U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a kind of steel trestle infrastructure structures of resistance flood discharge torrent speed impact, including indulging bridge to spaced apart steel-pipe pile, the steel-pipe pile includes the I fashioned iron tubular pole and II fashioned iron tubular pole of successively interlaced arrangement, and the diameter of the I fashioned iron tubular pole is greater than the diameter of II fashioned iron tubular pole;The downward inserting piling of base opening of the I fashioned iron tubular pole extends in rock, is perfused with anti-anchor concrete in the I fashioned iron tubular pole in rock;The base opening inserting piling of the II fashioned iron tubular pole is to scar.The utility model has the advantage of quick constructions, operating environment is good, capital investment is few, steel trestle infrastructure after construction is stablized, and can resist the impact of torrent speed water flow in short-term, I fashioned iron tubular pole being relatively large in diameter is as strong stake, the lesser II fashioned iron tubular pole of diameter is as weak stake, by force, weak stake arranged for interval, had not only met the stress needs of trestle under prevailing state, but also can guarantee the safety of reservoir spillway trestle at present;Guarantee that the infrastructure design of steel trestle is more reasonable, economical.

Description

A kind of steel trestle infrastructure structure for resisting the impact of flood discharge torrent speed
Technical field
The utility model relates to bridge foundation construction technologies, more particularly, to a kind of steel stack of resistance flood discharge torrent speed impact Bridge infrastructure structure.
Background technique
In water during bridge foundation construction, logical two sides are generally drawn by the way of setting up steel trestle, form work waterborne Industry channel, it is current for Material Transportation and construction equipment.Due to steel-pipe pile inserting piling simple process, structure stress is strong the advantages that It is usually used in steel trestle infrastructure in water.If but in the construction of mining under reservoir region, riverbed washes away lower no weakness in reservoir spillway Coating, surface layer are mostly gravel, cobble, under when being rock stratum condition, the infrastructure of trestle all uses inserting piling formula in water The shortcomings that steel-pipe pile is that valid bonding length is short, is impacted vulnerable to flood discharge torrent speed in short-term, and steel trestle overall stability is caused to be deteriorated, Unstability is in turn resulted in the negative consequences such as to collapse;And it is connected reinforced concrete drilling stake under steel-pipe pile and then needs to make in large area water Industry, not only long construction period, and marine equipment and goods and materials investment are more, personnel's operation safety risk height.
Summary of the invention
That the purpose of this utility model is to provide a kind of speed of applications is fast, less investment, stability are good and to resist flood discharge anxious The steel trestle infrastructure structure of flow velocity impact.
To achieve the above object, the utility model can take following technical proposals:
The steel trestle infrastructure structure described in the utility model for resisting the impact of flood discharge torrent speed, including bridge is indulged to interval The steel-pipe pile of arrangement, the steel-pipe pile include the I fashioned iron tubular pole and II fashioned iron tubular pole of successively interlaced arrangement, the I fashioned iron tubular pole Diameter be greater than II fashioned iron tubular pole diameter;The downward inserting piling of base opening of the I fashioned iron tubular pole extends in rock, is located in rock I fashioned iron tubular pole in be perfused with anti-anchor concrete;The base opening inserting piling of the II fashioned iron tubular pole is to scar.
I fashioned iron tubular pole direction across bridge arranged for interval two is provided with hood type connection system between two I fashioned iron tubular poles; II fashioned iron tubular pole direction across bridge arranged for interval three is provided with hood type connection system between adjacent two II fashioned iron tubular poles.
Perfusion depth >=5 meter of the anti-anchor concrete.
The diameter of the I fashioned iron tubular pole is 920mm, and the diameter of the II fashioned iron tubular pole is 426mm.
The base opening of the II fashioned iron tubular pole is provided with pile top.
The utility model has the advantage of quick constructions, and operating environment is good, and capital investment is few, the steel trestle lower part after construction Base fixed can resist the impact of torrent speed water flow in short-term, and I fashioned iron tubular pole being relatively large in diameter is as strong stake, diameter lesser II For fashioned iron tubular pole as weak stake, strong, weak stake arranged for interval had not only met the stress needs of trestle under prevailing state, but also can guarantee reservoir The safety of flood discharge trestle at present;Guarantee that the infrastructure design of steel trestle is more reasonable, economical.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is Fig. 1 A-A to cutaway view Amplified image.
Fig. 3 is Fig. 1 B-B direction cutaway view Amplified image.
Specific embodiment
As shown in Figure 1, the steel trestle infrastructure structure described in the utility model for resisting the impact of flood discharge torrent speed, including Along the vertical I fashioned iron tubular pole 1 that is relatively large in diameter and diameter lesser II fashioned iron tubular pole 2 of the bridge to successively interlaced arrangement, it is contemplated that safety Factor, under normal circumstances, the diameter of I fashioned iron tubular pole 1 select 920mm, and the diameter of II fashioned iron tubular pole 2 selects 426mm, can make in this way The vertical bearing capacity of bridge is by I, II fashioned iron tubular pole (strong and weak stake) shared, and the horizontal force that flow force generates is then by I fashioned iron The strong stake of tubular pole 1() it undertakes.When construction, the base opening of I fashioned iron tubular pole 1 passes through the downward inserting piling of boulder bed 3 and extends at least five in rock 4 Meter, at least 5 meters of the perfusion depth of the anti-anti- anchor concrete 5 of anchor concrete 5(is perfused in the I fashioned iron tubular pole in rock);Ⅱ The base opening of fashioned iron tubular pole 2 is provided with pile top 6,6 inserting piling of pile top to scar;Due to being relatively large in diameter for I fashioned iron tubular pole 1, direction across bridge Arranged for interval two, it is 1.1 that hood type connection is provided between two I fashioned iron tubular poles 1, as shown in Figure 2;II shape steel tube 2 diameters of stake are smaller, and direction across bridge needs arranged for interval three, and hood type company is again provided between adjacent two II fashioned iron tubular poles 2 Connecing is 2.1, as shown in Figure 3.
Construct steel trestle when, first by crawler crane erect-position in constructed bridge floor or on the bank beach using outstanding play to I type Steel-pipe pile 1 and II fashioned iron tubular pole 2 carry out inserting piling, and the lesser II fashioned iron tubular pole 2 of diameter passes through boulder bed 3 by the pile top 6 of base opening The top surface for reaching rock 4, it is fluted in the top opening setting of II fashioned iron tubular pole 2, for the insertion of distribution beam, distribution beam and trestle master Beam is closely connected, and installing hood type connection between II fashioned iron tubular pole 2 of adjacent direction across bridge later is 2.1;I fashioned iron tubular pole, 1 base opening is inserted It beats to behind the top surface of rock 4, first welds interim bracket to two sides along bridge, then put distribution beam and trestle girder is closely connected, later Trestle girder top surface is laid with assembled steel floorings, but I fashioned iron tubular pole, 1 top side location is not laid with assembled steel floorings, when to Assembled trestle girder is more than the I shape steel tube row of piles of the row away from greater than the assembled behind two holes, near the I fashioned iron tubular pole 1 of row Percussive drill is set on steel bridge deck, using I fashioned iron tubular pole 1 do casing carry out hole milling and with proceeding to designed elevation in rock stratum 4, cut Except interim bracket, above moves to designed elevation position and weld formal bracket with tubular pole again, adopted between distribution beam and trestle girder Closely knit with steel plate pad, cutting I fashioned iron tubular pole, 1 top opening is concordant with trestle girder, fills inside I fashioned iron tubular pole, 1 lower end later Anti- anchor concrete 5 forms anti-anchoring pile, and it is 1.1 that hood type connection is finally installed between adjacent I fashioned iron tubular pole 1 of direction across bridge, completes All constructions.

Claims (5)

1. a kind of steel trestle infrastructure structure for resisting the impact of flood discharge torrent speed, including vertical bridge is to spaced apart steel-pipe pile, It is characterized by: the steel-pipe pile includes the I fashioned iron tubular pole and II fashioned iron tubular pole of successively interlaced arrangement, the I fashioned iron tubular pole Diameter is greater than the diameter of II fashioned iron tubular pole;The downward inserting piling of base opening of the I fashioned iron tubular pole extends in rock, in rock Anti- anchor concrete is perfused in I fashioned iron tubular pole;The base opening inserting piling of the II fashioned iron tubular pole is to scar.
2. the steel trestle infrastructure structure according to claim 1 for resisting the impact of flood discharge torrent speed, it is characterised in that: institute I fashioned iron tubular pole direction across bridge arranged for interval two is stated, hood type connection system is provided between two I fashioned iron tubular poles;II fashioned iron Tubular pole direction across bridge arranged for interval three is provided with hood type connection system between adjacent two II fashioned iron tubular poles.
3. the steel trestle infrastructure structure according to claim 1 for resisting the impact of flood discharge torrent speed, it is characterised in that: institute State perfusion depth >=5 meter of anti-anchor concrete.
4. the steel trestle infrastructure structure according to claim 1 for resisting the impact of flood discharge torrent speed, it is characterised in that: institute The diameter for stating I fashioned iron tubular pole is 920mm, and the diameter of the II fashioned iron tubular pole is 426mm.
5. the steel trestle infrastructure structure according to claim 1 for resisting the impact of flood discharge torrent speed, it is characterised in that: institute The base opening for stating II fashioned iron tubular pole is provided with pile top.
CN201820780754.7U 2018-05-24 2018-05-24 A kind of steel trestle infrastructure structure for resisting the impact of flood discharge torrent speed Active CN208280155U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820780754.7U CN208280155U (en) 2018-05-24 2018-05-24 A kind of steel trestle infrastructure structure for resisting the impact of flood discharge torrent speed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820780754.7U CN208280155U (en) 2018-05-24 2018-05-24 A kind of steel trestle infrastructure structure for resisting the impact of flood discharge torrent speed

Publications (1)

Publication Number Publication Date
CN208280155U true CN208280155U (en) 2018-12-25

Family

ID=64730719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820780754.7U Active CN208280155U (en) 2018-05-24 2018-05-24 A kind of steel trestle infrastructure structure for resisting the impact of flood discharge torrent speed

Country Status (1)

Country Link
CN (1) CN208280155U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930474A (en) * 2019-04-04 2019-06-25 中交第三航务工程勘察设计院有限公司 A kind of connected structure for pile foundation type trestle and barrel type basis
CN110055895A (en) * 2019-03-20 2019-07-26 广州市第二市政工程有限公司 A kind of economical and practical steel trestle construction method
CN118375046A (en) * 2024-01-15 2024-07-23 保利长大工程有限公司 Construction method of inclined rock foundation trestle and drilling platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055895A (en) * 2019-03-20 2019-07-26 广州市第二市政工程有限公司 A kind of economical and practical steel trestle construction method
CN110055895B (en) * 2019-03-20 2020-08-18 广州市第二市政工程有限公司 Economical and practical steel trestle construction method
CN109930474A (en) * 2019-04-04 2019-06-25 中交第三航务工程勘察设计院有限公司 A kind of connected structure for pile foundation type trestle and barrel type basis
CN118375046A (en) * 2024-01-15 2024-07-23 保利长大工程有限公司 Construction method of inclined rock foundation trestle and drilling platform

Similar Documents

Publication Publication Date Title
CN107700366B (en) Deep water high-block bridge degree the bridge construction naked rock river bed trestle of hard stone and construction method
CN104404861A (en) Steel trestle provided with steel anchor pile and construction method of steel trestle
CN108708284B (en) A kind of steel trestle construction method for resisting flood discharge bed scour
CN208280155U (en) A kind of steel trestle infrastructure structure for resisting the impact of flood discharge torrent speed
CN103306289A (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN105003272A (en) Reversed construction method for expanding and excavating stations on sectional shield tunnel foundations of subways
CN201250407Y (en) Embedded steel wale
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN106759376A (en) Anchored Sheet Pile Wall for Excavation system and its construction method for closing on existing underground structure
CN110499772A (en) A kind of rock matter riverbed double-layer plate pile cofferdam construction method
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable
CN205975658U (en) Steel platform tower crane foundation
CN106498957A (en) Steel sheet pile cofferdam construction platform and integral construction method
CN207878458U (en) Interim steel trestle with resistance to plucking auxiliary pile
CN106088120A (en) Construction method is transferred in a kind of cofferdam
CN207452738U (en) The deep water high-block bridge degree bridge construction naked rock river bed trestle of hard stone
CN107938685A (en) A kind of new diagonal brace composite support device
CN207525758U (en) A kind of reinforced Structure About Soldier Pile
CN100473787C (en) Connecting structure for use in piled anchor supporting system and construction method thereof
CN106758759A (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN206784393U (en) T-piece and underground pipe gallery foundation pit support system
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN108103922A (en) It is a kind of to cross water suspension bridge construction method for the big amount of increase river of high flow rate
CN210104765U (en) High and large retaining structure of soft geological side slope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant