CN102797471A - 一种斜井明挖衬砌段tbm步进方法 - Google Patents

一种斜井明挖衬砌段tbm步进方法 Download PDF

Info

Publication number
CN102797471A
CN102797471A CN2012102071939A CN201210207193A CN102797471A CN 102797471 A CN102797471 A CN 102797471A CN 2012102071939 A CN2012102071939 A CN 2012102071939A CN 201210207193 A CN201210207193 A CN 201210207193A CN 102797471 A CN102797471 A CN 102797471A
Authority
CN
China
Prior art keywords
guide rail
tbm
vertical shift
carriage
shift guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102071939A
Other languages
English (en)
Other versions
CN102797471B (zh
Inventor
韩冰
柴永模
雷升祥
徐亮
李铁成
张洪威
王守国
李建强
李方利
刘宏宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 13th Bureau Group Co Ltd
Original Assignee
China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 13th Bureau Group Co Ltd filed Critical China Railway 13th Bureau Group Co Ltd
Priority to CN201210207193.9A priority Critical patent/CN102797471B/zh
Publication of CN102797471A publication Critical patent/CN102797471A/zh
Application granted granted Critical
Publication of CN102797471B publication Critical patent/CN102797471B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

一种斜井明挖衬砌段TBM步进方法,包括如下步骤:①将TBM主机和始发托架固接,在TBM主机壳体外部两侧各焊接两个反力点,并分别安装竖向液压千斤顶;②将TBM主机顶升后,在始发托架的下部安装纵移导轨后收回竖向液压千斤顶,将TBM主机和始发托架落到纵移导轨的后部;③利用左右对称安装在纵移导轨上的两台水平液压千斤顶将TBM主机和始发托架推到导轨的前端;④再用竖向液压千斤顶将始发托架和TBM主机顶起,并使纵移导轨前行;⑤纵移导轨纵移就位后落下竖向液压千斤顶,将始发托架和主机顶推至纵移导轨的前端,周而复始,直到始发托架到达始发位置。本发明可实现TBM设备与始发托架同时在有限空间的斜坡上成功步进。

Description

一种斜井明挖衬砌段TBM步进方法
技术领域:
本发明属于一种建筑施工方法,特别涉及一种斜井明挖衬砌段TBM步进方法。
背景技术:
TBM掘进机集钻、掘、护于一体,能够有效实现长大隧道施工的工厂化作业,是世界上最先进的大型综合性隧道施工设备,代表着国际隧道施工技术的最高水平,在国际上已广泛应用于交通、水电、矿山、市政、国防等工程领域中。
目前TBM步进多在平坡段进行,在有限空间的斜坡上步进是一个面临的新课题,同时,以往TBM设备步进都是先在始发位,然后步进主机到始发托架位置,进行TBM始发。
发明内容:
本发明的目的就在于提供一种斜井明挖衬砌段TBM步进方法,该方法可实现TBM设备与始发托架同时在有限空间的斜坡上成功步进,并且操作简单、易行。
如上构思,本发明的技术方案是:一种斜井明挖衬砌段TBM步进方法,其特征在于:包括如下步骤:
①将TBM主机和始发托架固接,在TBM主机壳体外部两侧各焊接两个反力点,并分别安装竖向液压千斤顶;
②利用竖向液压千斤顶将TBM主机顶升后,在始发托架的下部安装纵移导轨,纵移导轨就位后收回竖向液压千斤顶,将TBM主机和始发托架落到纵移导轨的后部;
③在纵移导轨后部安装反力点,并且利用左右对称安装在纵移导轨上的两台水平液压千斤顶顶推始发托架,将TBM主机和始发托架推到纵移导轨的前端;
④再次启动竖向液压千斤顶将始发托架和TBM主机顶起,并且使纵移导轨前行;
⑤当纵移导轨纵移就位后再次落下竖向液压千斤顶,并利用步骤③采用的顶推方法将始发托架和TBM主机推至纵移导轨的前端,周而复始,直到始发托架到达始发位置。
上述步骤④利用卷扬机和固定在始发端的定滑轮牵引使纵移导轨前行。
本发明利用TBM主机钢板与始发托架及纵移导轨间的摩擦系数小于纵移导轨与混凝土的摩擦系数,而钢与钢之间的摩擦系数又大于坡度的百分数,即摩擦力大于下摩力的原理,因此,本发明可实现TBM设备与始发托架同时在有限空间的斜坡上成功步进,而且操作起来简单、易行。
附图说明:
图1:斜井TBM步进横剖面图
图2:斜井TBM步进附视图
图中:1、TBM主机;2、始发托架;3、纵移导轨;4、导轨连接件;5、竖向液压千斤顶;6、水平液压千斤顶;7、卷扬机;8、定滑轮。
具体实施方式:
如图所示:一种斜井明挖衬砌段TBM步进方法,明挖衬砌结构内径8.2m,TBM直径7.64m,下坡坡度为6度。其具体实施步骤如图1、图2所示:
1、将TBM主机1和始发托架2进行连接固定,在盾壳外部两侧各焊接两个反力点,并分别安装竖向液压千斤顶5。
2、利用竖向液压千斤顶将TBM主机1顶升后,在始发托架2的下部安装纵移导轨3,纵移导轨3就位后收回竖向液压千斤顶5,将TBM主机1和始发托架2落到纵移导轨3的后部。
3、在纵移导轨后部安装反力点,采用两台水平液压千斤顶6左右对称布置同时顶推始发托架2,将主机1和始发托架2推到纵移导轨3的前端。
4、再次启动竖向液压千斤顶5将始发托架2和主机1顶起,利用卷扬机7和固定在始发端的定滑轮8牵引纵移导轨3前行。
5、纵移导轨3纵移就位后再次落下竖向液压千斤顶6,采用上面的方法顶推始发托架和主机到达纵移导轨的前端,周而复始,直到始发托架到达始发位置。
通过上述方法可实现TBM设备与始发托架同时在有限空间的斜坡上成功步进。

Claims (2)

1.一种斜井明挖衬砌段TBM步进方法,其特征在于:包括如下步骤:
①将TBM主机和始发托架固接,在TBM主机壳体外部两侧各焊接两个反力点,并分别安装竖向液压千斤顶;
②利用竖向液压千斤顶将TBM主机顶升后,在始发托架的下部安装纵移导轨,纵移导轨就位后收回竖向液压千斤顶,将TBM主机和始发托架落到纵移导轨的后部;
③在纵移导轨后部安装反力点,并且利用左右对称安装在纵移导轨上的两台水平液压千斤顶顶推始发托架,将TBM主机和始发托架推到纵移导轨的前端;
④再次启动竖向液压千斤顶将始发托架和TBM主机顶起,并且使纵移导轨前行;
⑤当纵移导轨纵移就位后再次落下竖向液压千斤顶,并利用步骤③采用的顶推方法将始发托架和TBM主机推至纵移导轨的前端,周而复始,直到始发托架到达始发位置。
2.根据权利要求1所述的一种斜井明挖衬砌段TBM步进方法,其特征在于:步骤④利用卷扬机和固定在始发端的定滑轮牵引使纵移导轨前行。
CN201210207193.9A 2012-06-21 2012-06-21 一种斜井明挖衬砌段tbm步进方法 Active CN102797471B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210207193.9A CN102797471B (zh) 2012-06-21 2012-06-21 一种斜井明挖衬砌段tbm步进方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210207193.9A CN102797471B (zh) 2012-06-21 2012-06-21 一种斜井明挖衬砌段tbm步进方法

Publications (2)

Publication Number Publication Date
CN102797471A true CN102797471A (zh) 2012-11-28
CN102797471B CN102797471B (zh) 2016-12-21

Family

ID=47196749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210207193.9A Active CN102797471B (zh) 2012-06-21 2012-06-21 一种斜井明挖衬砌段tbm步进方法

Country Status (1)

Country Link
CN (1) CN102797471B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100273A (zh) * 2014-07-16 2014-10-15 同济大学 一种减少箱涵顶进时土体纵向变形的反拖曳装置
CN104806250A (zh) * 2015-04-16 2015-07-29 中铁二十四局集团上海铁建工程有限公司 一种掘进机始发牵引方法
CN104989413A (zh) * 2015-06-16 2015-10-21 中铁隧道集团有限公司 单护盾tbm平面滑行步进装置及其步进方法
CN105178968A (zh) * 2013-11-13 2015-12-23 葛洲坝集团第一工程有限公司 隧道掘进机顶推支撑装置及施工方法
CN105221156A (zh) * 2015-11-12 2016-01-06 北方重工集团有限公司 一种敞开式煤矿岩巷硬岩掘进机始发步进方法
CN105863657A (zh) * 2016-05-27 2016-08-17 中铁二十局集团轨道交通工程有限公司 土压平衡盾构机始发侧滚修正装置及方法
CN106121671A (zh) * 2016-08-24 2016-11-16 中铁隧道股份有限公司 一种盾构/tbm快速过站的步进平台
CN109026038A (zh) * 2018-09-28 2018-12-18 中国葛洲坝集团第工程有限公司 Tbm盾体防侧滚行走支撑装置及使用方法
CN112412478A (zh) * 2020-12-15 2021-02-26 中铁工程装备集团有限公司 一种隧道斜井施工系统及施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101463725A (zh) * 2009-01-16 2009-06-24 鄂尔多斯市昊华精煤有限责任公司 弱胶结易风化岩体倾斜巷道综掘机掘进施工方法
CN101929351A (zh) * 2010-02-03 2010-12-29 中铁隧道集团二处有限公司 Tbm整体式轨道托架及tbm电机驱动、整体式轨道托架步进方法
CN101929337A (zh) * 2010-02-03 2010-12-29 中铁隧道集团二处有限公司 Tbm油缸推进、弧形滑道步进方法
CN102200019A (zh) * 2011-04-14 2011-09-28 中铁第一勘察设计院集团有限公司 隧道掘进机中板步进加固支撑机构及其施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101463725A (zh) * 2009-01-16 2009-06-24 鄂尔多斯市昊华精煤有限责任公司 弱胶结易风化岩体倾斜巷道综掘机掘进施工方法
CN101929351A (zh) * 2010-02-03 2010-12-29 中铁隧道集团二处有限公司 Tbm整体式轨道托架及tbm电机驱动、整体式轨道托架步进方法
CN101929337A (zh) * 2010-02-03 2010-12-29 中铁隧道集团二处有限公司 Tbm油缸推进、弧形滑道步进方法
CN102200019A (zh) * 2011-04-14 2011-09-28 中铁第一勘察设计院集团有限公司 隧道掘进机中板步进加固支撑机构及其施工方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178968A (zh) * 2013-11-13 2015-12-23 葛洲坝集团第一工程有限公司 隧道掘进机顶推支撑装置及施工方法
CN104100273A (zh) * 2014-07-16 2014-10-15 同济大学 一种减少箱涵顶进时土体纵向变形的反拖曳装置
CN104806250A (zh) * 2015-04-16 2015-07-29 中铁二十四局集团上海铁建工程有限公司 一种掘进机始发牵引方法
CN104989413A (zh) * 2015-06-16 2015-10-21 中铁隧道集团有限公司 单护盾tbm平面滑行步进装置及其步进方法
CN105221156A (zh) * 2015-11-12 2016-01-06 北方重工集团有限公司 一种敞开式煤矿岩巷硬岩掘进机始发步进方法
CN105863657A (zh) * 2016-05-27 2016-08-17 中铁二十局集团轨道交通工程有限公司 土压平衡盾构机始发侧滚修正装置及方法
CN105863657B (zh) * 2016-05-27 2018-02-23 中铁二十一局集团轨道交通工程有限公司 土压平衡盾构机始发侧滚修正装置及方法
CN106121671A (zh) * 2016-08-24 2016-11-16 中铁隧道股份有限公司 一种盾构/tbm快速过站的步进平台
CN109026038A (zh) * 2018-09-28 2018-12-18 中国葛洲坝集团第工程有限公司 Tbm盾体防侧滚行走支撑装置及使用方法
CN112412478A (zh) * 2020-12-15 2021-02-26 中铁工程装备集团有限公司 一种隧道斜井施工系统及施工方法
CN112412478B (zh) * 2020-12-15 2021-11-05 中铁工程装备集团有限公司 一种隧道斜井施工系统及施工方法

Also Published As

Publication number Publication date
CN102797471B (zh) 2016-12-21

Similar Documents

Publication Publication Date Title
CN102797471A (zh) 一种斜井明挖衬砌段tbm步进方法
CN101514633B (zh) 无巷旁支护的沿空留巷工艺
CN103669216A (zh) 一种钢箱梁散拼滑移装置及安装方法
CN105697013A (zh) 掘进巷道可收缩式临时支架
CN109653775A (zh) 一种可实现三维让压的缓冲支架及支护方法
CN202768006U (zh) 一种斜井明挖衬砌段tbm步进装置
CN203547753U (zh) 型钢混凝土井筒壁座
CN103850708A (zh) 一种采用混凝土充填体的沿空留巷方法
CN102418525A (zh) 软煤层长壁大采高综合机械化采煤末采方法
CN202560321U (zh) 盾构分体始发管线同步移动装置
CN102322281B (zh) 井巷快掘超前支护综合装置
CN104389605B (zh) 一种采煤工作面密集钢丝绳掩护回撤方法
CN203223232U (zh) 一种隧道管棚的互锁导向钢管
CN103362527B (zh) 快速掘进用移动装置及其移动方法
CN107227966B (zh) 巷道掘进临时支护装置
CN201786365U (zh) 井内煤矿用液压伸缩支架
CN201857996U (zh) 采煤工作面推进度监测装置
CN211819433U (zh) 一种煤矿巷道肩角使用的支护装置
CN204517304U (zh) 一种用于狭窄道路环境的高压电缆便捷式顶管
CN204199284U (zh) 深层夯扩桩机
CN203846494U (zh) 腰梁土锚杆分段连接结构
CN101793123A (zh) 海洋油田多功能自升式支持平台钻机三滑移系统
CN102587946A (zh) 整体移动超前支护支架
CN202644528U (zh) 一种改进的合页式大吨位锚固装置
CN206407504U (zh) 刮板输送机的推移装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant