CN102786004A - 无缆风绳带载整体移动式液压提升系统及提升方法 - Google Patents

无缆风绳带载整体移动式液压提升系统及提升方法 Download PDF

Info

Publication number
CN102786004A
CN102786004A CN2012103005690A CN201210300569A CN102786004A CN 102786004 A CN102786004 A CN 102786004A CN 2012103005690 A CN2012103005690 A CN 2012103005690A CN 201210300569 A CN201210300569 A CN 201210300569A CN 102786004 A CN102786004 A CN 102786004A
Authority
CN
China
Prior art keywords
pylon
lifting beam
lifting
hydraulic
orbit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103005690A
Other languages
English (en)
Other versions
CN102786004B (zh
Inventor
许宝利
冯庆辉
仝玉坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
THE SEVENTH CONSTRUCTION COMPANY OF CNPC Ltd.
China National Petroleum Corp
China Petroleum Engineering and Construction Corp
Original Assignee
No7 Building Corp Chinese Petroleum Gas
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No7 Building Corp Chinese Petroleum Gas filed Critical No7 Building Corp Chinese Petroleum Gas
Priority to CN201210300569.0A priority Critical patent/CN102786004B/zh
Publication of CN102786004A publication Critical patent/CN102786004A/zh
Application granted granted Critical
Publication of CN102786004B publication Critical patent/CN102786004B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及起重吊装领域,尤其是一种无缆风绳带载整体移动式液压提升系统及液压提升方法。该系统包括塔架,所述的塔架包括塔架立柱和塔架连接横梁,该系统还包括两个相互平行的运行轨道,两个运行轨道固定在地面上,该系统包括四根塔架立柱,塔架立柱的底端设置在运行轨道内,且塔架立柱沿运行轨道滑动,两根塔架立柱设置在一个运行轨道上,另外两根塔架立柱设置在第二个运行轨道上,两运行轨道上的塔架立柱相互对应,且两运行轨道对应的塔架立柱的顶端通过塔架连接横梁连接,塔架立柱和塔架连接横梁组成框架式结构的塔架。该系统和方法不需设置缆风绳,且吊装时能够带载整体长距离移动,吊装过程安全稳定,吊装费用经济。

Description

无缆风绳带载整体移动式液压提升系统及提升方法
技术领域
本发明涉及起重吊装领域,尤其是一种无缆风绳带载整体移动式液压提升系统及液压提升方法。
背景技术
随着石油炼制与化工装置规模的大型化,装置中的重型设备越来越多,而随着运输能力和制造水平的提高,超长超重设备整体进入安装现场已成为必然。与采用吊车吊装相比,采用液压提升或顶升系统进行特大型设备进行吊装,在安全可靠、吊装能力、进出场费用、占地面积及闲置费用等方面具有很大优势,得到了更为广泛的应用。目前,现有的液压提升或顶升系统均采用门式带缆风绳结构,该结构存在的缺陷是:首先,门式结构对于高基础或分段的设备及结构吊装具有较大缺陷和难度;第二,缆风绳的设置对被吊物周围的设备安装、工艺管线、钢结构等施工具有较大制约。因此对液压提升系统提出了新的技术要求。
发明内容
本发明的目的在于提出了一种无缆风绳带载整体移动式液压提升系统及提升方法,该系统和方法可以用于设备基础高、周围障碍物多的工作环境,不需设置缆风绳,且吊装时能够带载整体长距离移动,吊装过程安全稳定,吊装费用经济。
本发明是采用以下的技术方案实现的:一种无缆风绳带载整体移动式液压提升系统,包括塔架,所述的塔架包括塔架立柱和塔架连接横梁,其中,该系统还包括两个相互平行的运行轨道,两个运行轨道均固定在地面上,该系统包括四根塔架立柱,塔架立柱的底端设置在运行轨道内,且塔架立柱沿运行轨道滑动,其中两根塔架立柱设置在一个运行轨道上,另外两根塔架立柱设置在第二个运行轨道上,两运行轨道上的塔架立柱相互对应,且两运行轨道对应的塔架立柱的顶端通过塔架连接横梁连接,设置在同一运行轨道上的塔架立柱的顶端分别通过第一吊装梁和第二吊装梁连接,塔架立柱和塔架连接横梁组成了框架式结构的塔架,第一吊装梁和第二吊装梁之间通过第三吊装梁连接,第三吊装梁设置在第一吊装梁和第二吊装梁的上表面,第三吊装梁上固定有液压提升设备。
本发明中,液压提升设备包括提升油缸、上锚具、下锚具、提升液压泵站和计算机控制柜,提升液压泵站同时与提升油缸和计算机控制柜连接,计算机控制柜控制提升液压泵站工作,提升液压泵站工作时控制提升油缸动作,钢绞线通过上锚具和下锚具与提升油缸固定连接。所述的液压提升设备包括至少一个提升油缸。
第一吊装梁和第二吊装梁上表面可以设有轨道,以便于第三吊装梁能够沿轨道滑动;第一吊装梁和第二吊装梁的上表面也可以不设置轨道。
本发明还包括一种利用上述无缆风绳带载整体移动式液压提升系统所实施的液压提升方法,该方法包括以下步骤:
(1)液压提升设备的选择:根据被吊设备的重量,选择液压提升设备;
(2)设计塔架和吊装梁:根据液压提升设备的吊装能力,初步确定塔架和吊装梁的尺寸,并分别对各尺寸的结构进行应力分析和强度校核,最终确定塔架和吊装梁的尺寸;
(3)设置运行轨道:根据被吊设备的重量,计算塔架基础地基承载力,设置运行轨道;
(4)组装液压提升系统:将运行轨道固定安装在地面上,将四根塔架立柱组装在运行轨道上,然后将塔架连接横梁、第一吊装梁和第二吊装梁安装在塔架立柱的顶端,将第三吊装梁安装在第一吊装梁和第二吊装梁上,并将液压提升设备设置在第三吊装梁上;
(5)将被吊设备头部摆放至第三吊装梁的正下方,在钢绞线上系挂吊装机具,提升油缸将被吊设备缓慢提升至设备直立;
(6)设备就位:塔架立柱沿运行轨道滑动,使设置在塔架上的液压提升设备与被吊设备一起整体移动至设备安装基础正上方,找准设备安装方位后,通过提升油缸将被吊设备缓慢就位。
所述液压提升设备中包括至少一个提升油缸,各提升油缸额定载荷的总和应大于所吊设备的重量。
所述吊装机具可以采用吊耳、平衡梁或能够起到相同作用的设备。
本发明的有益效果是:通过本发明所述的无缆风绳带载整体移动式液压提升系统和液压提升方法,首先,实现了在设备基础高、周围障碍物多的工作环境的吊装工作;第二,不需设置缆风绳,且吊装时能够带载长距离整体移动,能够使设备准确吊装就位,吊装过程安全稳定,节约吊装成本。
附图说明
图1是无缆风绳带载整体移动式液压提升系统的结构示意图;
图2是无缆风绳带载整体移动式液压提升方法的流程图。
图中:1塔架立柱;2塔架连接横梁;3第一吊装梁;3’第二吊装梁;3”第三吊装梁;4液压提升设备;5运行轨道。
具体实施方式
下面结合附图对本发明做进一步说明。
实施例1
本发明提出了一种无缆风绳带载整体移动式液压提升系统,如图1所示,该系统包括两个相互平行的运行轨道5和四根塔架立柱1,两个运行轨道5均固定在地面上,塔架立柱1的底端设置在运行轨道5内,且塔架立柱1可以沿运行轨道5滑动。其中两根塔架立柱1设置在一个运行轨道上,另外两根塔架立柱1对应的设置在第二个运行轨道上。设置在同一运行轨道的塔架立柱的顶端分别通过第一吊装梁3和第二吊装梁3’连接。两运行轨道上设置的塔架立柱相互对应,并且相互对应的塔架立柱1的顶端分别通过塔架连接横梁2连接。塔架立柱1和塔架连接横梁2组成了框架式结构的塔架。第一吊装梁3和第二吊装梁3’之间通过第三吊装梁3”连接,第三吊装梁3”设置在第一吊装梁3和第二吊装梁3’的上表面,第一吊装梁3和第二吊装梁3’的上表面设有轨道,以便于第三吊装梁3”能够沿轨道滑动。第三吊装梁3”上固定有液压提升设备4。液压提升设备4包括两个提升油缸、提升液压泵站、上锚具、下锚具和计算机控制柜,提升液压泵站同时与提升油缸和计算机控制柜连接,计算机控制柜控制提升液压泵站工作,提升液压泵站工作时控制提升油缸动作。钢绞线通过上锚具和下锚具与提升油缸固定连接。
本发明还包括一种无缆风绳带载整体移动式液压提升方法,如图2所示,该方法包括以下步骤:
第一步,液压提升设备的选择:根据被吊设备的重量,选择合适的液压提升设备,本实施例采用的液压提升设备包括两个提升油缸,两个提升油缸额定载荷的总和应大于被吊设备的重量,液压提升设备中可以包括至少一个提升油缸;
第二步,设计塔架和吊装梁:根据液压提升设备的吊装能力,初步确定塔架和吊装梁的尺寸,并分别对各尺寸的结构进行应力分析和强度校核,最终确定塔架和吊装梁的尺寸;
第三步,设置运行轨道:根据被吊设备的重量,计算塔架基础地基承载力,设置运行轨道,运行轨道的长度一般根据设备需要移动的距离确定;
第四步,组装液压提升系统:先将运行轨道固定安装在地面上,将四根塔架立柱组装在运行轨道上,然后将塔架连接横梁、第一吊装梁和第二吊装梁分别安装在塔架立柱的顶端,将第三吊装梁安装在第一吊装梁和第二吊装梁上,并将液压提升设备设置在第三吊装梁上;
第五步,设备吊装:将被吊设备头部摆放至第三吊装梁的正下方,在钢绞线上系挂吊装机具,提升油缸将被吊设备缓慢提升至设备直立,所述的吊装机具可以采用吊耳、平衡梁等;
第六步,设备就位:塔架立柱沿运行轨道滑动,使设置在塔架上的液压提升设备与被吊设备一起整体移动至设备安装基础正上方,找准设备安装方位后,通过提升油缸将被吊设备缓慢就位。
本实施例中的液压提升系统不需设置缆风绳,吊装过程中可以带载整体长距离移动。
实施例2
本实施例中,所述第三吊装梁固定在第一吊装梁和第二吊装梁的上表面,第一吊装梁和第二吊装梁的上表面无需设置轨道。
其他同实施例1。

Claims (7)

1.一种无缆风绳带载整体移动式液压提升系统,包括塔架,所述的塔架包括塔架立柱(1)和塔架连接横梁(2),其特征在于:该系统还包括两个相互平行的运行轨道(5),两个运行轨道(5)均固定在地面上,该系统包括四根塔架立柱(1),塔架立柱(1)的底端设置在运行轨道(5)内,且塔架立柱(1)沿运行轨道(5)滑动,其中两根塔架立柱(1)设置在一个运行轨道上,另外两根塔架立柱(1)设置在第二个运行轨道上,两运行轨道上的塔架立柱相互对应,且两运行轨道对应的塔架立柱(1)的顶端通过塔架连接横梁(2)连接,设置在同一运行轨道上的塔架立柱(1)的顶端分别通过第一吊装梁(3)和第二吊装梁(3’)连接,塔架立柱(1)和塔架连接横梁(2)组成了框架式结构的塔架,第一吊装梁(3)和第二吊装梁(3’)之间通过第三吊装梁(3”)连接,第三吊装梁(3”)设置在第一吊装梁和第二吊装梁的上表面,第三吊装梁(3”)上固定有液压提升设备(4)。
2.根据权利要求1所述的无缆风绳带载整体移动式液压提升系统,其特征在于:所述液压提升设备(4)包括提升油缸、上锚具、下锚具、提升液压泵站和计算机控制柜,提升液压泵站同时与提升油缸和计算机控制柜连接,钢绞线通过上锚具和下锚具与提升油缸固定连接。
3.根据权利要求2所述的无缆风绳带载整体移动式液压提升系统,其特征在于:所述的液压提升设备包括至少一个提升油缸。
4.根据权利要求1所述的无缆风绳带载整体移动式液压提升系统,其特征在于:第一吊装梁(3)和第二吊装梁(3’)的上表面设有轨道,第三吊装梁(3”)沿轨道滑动。
5.一种利用权利要求1所述液压提升系统的液压提升方法,其特征在于该方法包括以下步骤:
(1)液压提升设备的选择:根据被吊设备的重量,选择液压提升设备;
(2)设计塔架和吊装梁:根据液压提升设备的吊装能力,初步确定塔架和吊装梁的尺寸,并对该尺寸的结构进行应力分析和强度校核,最终确定塔架和吊装梁的尺寸;
(3)设置运行轨道:根据被吊设备的重量,计算塔架基础地基承载力,设置运行轨道;
(4)组装液压提升系统:将运行轨道固定安装在地面上,将四根塔架立柱组装在运行轨道上,然后将塔架连接横梁、第一吊装梁和第二吊装梁分别安装在塔架立柱的顶端,将第三吊装梁安装在第一吊装梁和第二吊装梁上,并将液压提升设备设置在第三吊装梁上;
(5)将被吊设备头部摆放至第三吊装梁的正下方,在钢绞线上系挂吊装机具,提升油缸将被吊设备缓慢提升至设备直立;
(6)设备就位:塔架立柱沿运行轨道滑动,使设置在塔架上的液压提升设备与被吊设备一起整体移动至设备安装基础正上方,找准设备安装方位后,通过提升油缸将被吊设备缓慢就位。
6.根据权利要求5所述的无缆风绳带载整体移动式液压提升方法,其特征在于:所述液压提升设备中包括至少一个提升油缸,各提升油缸额定载荷的总和大于被吊设备的重量。
7.根据权利要求5所述的无缆风绳带载整体移动式液压提升方法,其特征在于:所述吊装机具采用吊耳或平衡梁。
CN201210300569.0A 2012-08-22 2012-08-22 无缆风绳带载整体移动式液压提升方法 Active CN102786004B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210300569.0A CN102786004B (zh) 2012-08-22 2012-08-22 无缆风绳带载整体移动式液压提升方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210300569.0A CN102786004B (zh) 2012-08-22 2012-08-22 无缆风绳带载整体移动式液压提升方法

Publications (2)

Publication Number Publication Date
CN102786004A true CN102786004A (zh) 2012-11-21
CN102786004B CN102786004B (zh) 2014-07-16

Family

ID=47151619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210300569.0A Active CN102786004B (zh) 2012-08-22 2012-08-22 无缆风绳带载整体移动式液压提升方法

Country Status (1)

Country Link
CN (1) CN102786004B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104062133A (zh) * 2014-06-09 2014-09-24 珠海格力电器股份有限公司 综合调节测试工装架
CN104386587A (zh) * 2014-09-15 2015-03-04 安徽鸿路钢结构(集团)股份有限公司 一种滑移吊装装置
CN104803318A (zh) * 2015-03-27 2015-07-29 李�杰 一种改进的建筑施工用液压提升装置及其控制方法
CN107309844A (zh) * 2017-06-20 2017-11-03 邯郸市恒工冶金机械有限公司 一种用于单流切割设备上可移动的切割机架
CN111039166A (zh) * 2019-11-29 2020-04-21 上海航天精密机械研究所 一种具有起重功能的分段结构贮箱试验塔架
CN112125238A (zh) * 2020-08-05 2020-12-25 中石化宁波工程有限公司 一种竖井内钢梁的施工安装方法
CN113860181A (zh) * 2021-10-09 2021-12-31 国网河南省电力公司新安县供电公司 一种电力管道铺设装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3361274A (en) * 1966-04-04 1968-01-02 Jerome L. Goldman Lighter lifting and stacking devices
US4106641A (en) * 1976-03-17 1978-08-15 Algoship International Limited Universal gantry crane
CN2839224Y (zh) * 2005-08-03 2006-11-22 上海永致机电设备有限公司 顶升式大型龙门起重机
CN2923644Y (zh) * 2006-04-13 2007-07-18 张勇 超高超大型大吨位行走井架式吊装机具
CN201046889Y (zh) * 2007-06-07 2008-04-16 宏润建设集团股份有限公司 贝雷桁架组拼门架
CN201217616Y (zh) * 2008-05-29 2009-04-08 中国化学工程第十一建设公司 多功能全液压门架提升装置
CN102146660A (zh) * 2011-02-25 2011-08-10 中交四航局第一工程有限公司 一种跨拱肋龙门吊及蝴蝶拱桥空间结构体系的安装方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3361274A (en) * 1966-04-04 1968-01-02 Jerome L. Goldman Lighter lifting and stacking devices
US4106641A (en) * 1976-03-17 1978-08-15 Algoship International Limited Universal gantry crane
CN2839224Y (zh) * 2005-08-03 2006-11-22 上海永致机电设备有限公司 顶升式大型龙门起重机
CN2923644Y (zh) * 2006-04-13 2007-07-18 张勇 超高超大型大吨位行走井架式吊装机具
CN201046889Y (zh) * 2007-06-07 2008-04-16 宏润建设集团股份有限公司 贝雷桁架组拼门架
CN201217616Y (zh) * 2008-05-29 2009-04-08 中国化学工程第十一建设公司 多功能全液压门架提升装置
CN102146660A (zh) * 2011-02-25 2011-08-10 中交四航局第一工程有限公司 一种跨拱肋龙门吊及蝴蝶拱桥空间结构体系的安装方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104062133A (zh) * 2014-06-09 2014-09-24 珠海格力电器股份有限公司 综合调节测试工装架
CN104386587A (zh) * 2014-09-15 2015-03-04 安徽鸿路钢结构(集团)股份有限公司 一种滑移吊装装置
CN104803318A (zh) * 2015-03-27 2015-07-29 李�杰 一种改进的建筑施工用液压提升装置及其控制方法
CN107309844A (zh) * 2017-06-20 2017-11-03 邯郸市恒工冶金机械有限公司 一种用于单流切割设备上可移动的切割机架
CN111039166A (zh) * 2019-11-29 2020-04-21 上海航天精密机械研究所 一种具有起重功能的分段结构贮箱试验塔架
CN112125238A (zh) * 2020-08-05 2020-12-25 中石化宁波工程有限公司 一种竖井内钢梁的施工安装方法
CN112125238B (zh) * 2020-08-05 2021-11-30 中石化宁波工程有限公司 一种竖井内钢梁的施工安装方法
CN113860181A (zh) * 2021-10-09 2021-12-31 国网河南省电力公司新安县供电公司 一种电力管道铺设装置

Also Published As

Publication number Publication date
CN102786004B (zh) 2014-07-16

Similar Documents

Publication Publication Date Title
CN102786004B (zh) 无缆风绳带载整体移动式液压提升方法
CN102080357B (zh) 钢管墩贝雷梁现浇支架整体落梁装置及方法
CN100522793C (zh) 门式起重机的安装方法
US20140260076A1 (en) Jacking tower
CN101537976A (zh) 双塔桅巨型自升降起重设备及其跟携吊装方法
CN201376848Y (zh) 双塔桅巨型自升降起重设备
CN102587281A (zh) 步履式多点顶推施工方法
CN202689495U (zh) 自升式烟囱水塔施工塔架
CN104805907A (zh) 一种钢结构模块的顶升方法和装置
US20230356989A1 (en) Lift system for heavy oversized structural element
CN103967263B (zh) 液压自动爬升卸料平台
CN113348289A (zh) 多柱式风力涡轮机塔及架设方法
CN105293322A (zh) 一种轧机牌坊吊装方法
KR101319019B1 (ko) 풍력발전기 설치방법 및 그 장치
CN203947758U (zh) 新型液压自动爬升卸料平台
CN104249979B (zh) 导轨式自爬升旋臂起重机
CN203715115U (zh) 一种用于门式起重机自提升系统的支撑点结构
CN107217669B (zh) 拔桩设备及其快速移动方法
CN202429882U (zh) 移动式吊装架
CN205100216U (zh) 一种可拆装组合桩架起重式打桩船
CN201943006U (zh) 辅助不变幅架梁吊机架设钢箱梁用主塔区活动支架
CN103726449A (zh) 自动落梁平台装置及其用于更换铁路梁的施工方法
CN205116883U (zh) 超高层钢结构发射塔的桅杆提升装置
CN209873587U (zh) 一种简支钢桁梁四点支撑顶推系统
CN203682928U (zh) 一种电动液压提升装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Miao road Laoshan District 266300 Shandong city of Qingdao province No. 36 in building A

Patentee after: China Petroleum & natural gas seventh Construction Co., Ltd.

Address before: Miao road Laoshan District 266300 Shandong city of Qingdao province No. 36 in building A

Patentee before: No.7 Building Corp., Chinese Petroleum Gas

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210310

Address after: 100032 liupukang, Xicheng District, Beijing

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CHINA PETROLEUM ENGINEERING & CONSTRUCTION Corp.

Patentee after: THE SEVENTH CONSTRUCTION COMPANY OF CNPC Ltd.

Address before: 266300 block a, Guofa building, No.36, Miaoling Road, Laoshan District, Qingdao City, Shandong Province

Patentee before: THE SEVENTH CONSTRUCTION COMPANY OF CNPC Ltd.