CN205116883U - 超高层钢结构发射塔的桅杆提升装置 - Google Patents

超高层钢结构发射塔的桅杆提升装置 Download PDF

Info

Publication number
CN205116883U
CN205116883U CN201520548588.4U CN201520548588U CN205116883U CN 205116883 U CN205116883 U CN 205116883U CN 201520548588 U CN201520548588 U CN 201520548588U CN 205116883 U CN205116883 U CN 205116883U
Authority
CN
China
Prior art keywords
crossbeam
link
mast
launching tower
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520548588.4U
Other languages
English (en)
Inventor
司坤
刘明路
刘建
王金生
王馥琴
韩向科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
Shanghai Mcc No13 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mcc No13 Construction Co Ltd filed Critical Shanghai Mcc No13 Construction Co Ltd
Priority to CN201520548588.4U priority Critical patent/CN205116883U/zh
Application granted granted Critical
Publication of CN205116883U publication Critical patent/CN205116883U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

本实用新型涉及建筑施工领域,具体是一种超高层钢结构发射塔的桅杆提升装置;其特征是:它包括立柱、横梁、提升器、连接钢缆和连接架,立柱有多根,均竖直设置,横梁将各立柱连接并位于各立柱的顶部,如此,立柱与横梁共同形成一个框架式支撑架;在各横梁的顶部中央设置提升器,在各提升器下方的横梁上开有通孔,连接架位于提升器的正下方,连接钢缆穿过横梁上的通孔后将提升器与连接架连接,连接架与被提升的桅杆杆身固定连接。本提升装置结构简单、安全,并且施工方便,适用于安装构件超出传统起重设备吊装高度范围,特别适用于超高层钢结构发射塔的桅杆施工。

Description

超高层钢结构发射塔的桅杆提升装置
技术领域
本实用新型涉及建筑施工领域,具体是一种超高层钢结构发射塔的桅杆提升装置。
背景技术
由于超高层建筑的发射塔桅杆高度远超过主体结构,也超过施工塔吊吊装高度范围,因此其发射塔的桅杆安装一直是个难以解决的问题。
发明内容
本实用新型的目的在于,提供一种承载力大,结构安全,施工方便,适用于安装构件超出传统起重设备吊装高度范围,特别适用于超高层钢结构发射塔的桅杆的提升装置。
为了达到上述目的,本实用新型是这样实现的:
一种超高层钢结构发射塔的桅杆提升装置,它包括立柱、横梁、提升器、连接钢缆和连接架,立柱有多根,均竖直设置,横梁将各立柱连接并位于各立柱的顶部,如此,立柱与横梁共同形成一个框架式支撑架;在各横梁的顶部中央设置提升器,在各提升器下方的横梁上开有通孔,连接架位于提升器的正下方,连接钢缆穿过横梁上的通孔后将提升器与连接架连接,连接架与被提升的桅杆杆身固定连接。
所述的超高层钢结构发射塔的桅杆提升装置,各立柱的中部水平连接有加强横梁。
所述的超高层钢结构发射塔的桅杆提升装置,连接架由钢梁制作并呈三叉形。
所述的超高层钢结构发射塔的桅杆提升装置,立柱有三根,呈三角状竖立在同一水平面上并用三根横梁连接。
本提升装置结构简单、安全,并且施工方便,适用于安装构件超出传统起重设备吊装高度范围,特别适用于超高层钢结构发射塔的桅杆施工。
附图说明
图1是本发明装置俯视图。
图2是本发明装置立面图。
具体实施方式
以下通过具体实施例进一步说明本实用新型。
如图1、图2所示,一种超高层钢结构发射塔的桅杆提升装置,它包括立柱2、横梁3、提升器1、连接钢缆5和连接架4,立柱2有多根,均竖直设置,横梁3将各立柱2连接并位于各立柱2的顶部,如此,立柱2与横梁3共同形成一个框架式支撑架;在各横梁3的顶部中央设置提升器1,在各提升器1下方的横梁3上开有通孔8,连接架4位于提升器1的正下方,连接钢缆5穿过横梁3上的通孔8后将提升器1与连接架4连接,连接架4与被提升的桅杆7杆身固定连接。
上述的提升器1,可以选用液压提升器,如此可大大提升其承载能力,使得本提升装置更安全可靠。
所述的超高层钢结构发射塔的桅杆提升装置,各立柱2的中部水平连接有加强横梁6。
所述的超高层钢结构发射塔的桅杆提升装置,连接架4由钢梁制作并呈三叉形。
所述的超高层钢结构发射塔的桅杆提升装置,立柱2有三根,呈三角状竖立在同一水平面上并用三根横梁3连接。
本提升装置结构简单、安全,并且施工方便,适用于安装构件超出传统起重设备吊装高度范围,特别适用于超高层钢结构发射塔的桅杆施工。

Claims (4)

1.一种超高层钢结构发射塔的桅杆提升装置,其特征是:它包括立柱、横梁、提升器、连接钢缆和连接架,立柱有多根,均竖直设置,横梁将各立柱连接并位于各立柱的顶部,如此,立柱与横梁共同形成一个框架式支撑架;在各横梁的顶部中央设置提升器,在各提升器下方的横梁上开有通孔,连接架位于提升器的正下方,连接钢缆穿过横梁上的通孔后将提升器与连接架连接,连接架与被提升的桅杆杆身固定连接。
2.根据权利要求1所述的超高层钢结构发射塔的桅杆提升装置,其特征是:各立柱的中部水平连接有加强横梁。
3.根据权利要求1所述的超高层钢结构发射塔的桅杆提升装置,其特征是:连接架由钢梁制作并呈三叉形。
4.根据权利要求1或2所述的超高层钢结构发射塔的桅杆提升装置,其特征是:立柱有三根,呈三角状竖立在同一水平面上并用三根横梁连接。
CN201520548588.4U 2015-07-27 2015-07-27 超高层钢结构发射塔的桅杆提升装置 Expired - Fee Related CN205116883U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520548588.4U CN205116883U (zh) 2015-07-27 2015-07-27 超高层钢结构发射塔的桅杆提升装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520548588.4U CN205116883U (zh) 2015-07-27 2015-07-27 超高层钢结构发射塔的桅杆提升装置

Publications (1)

Publication Number Publication Date
CN205116883U true CN205116883U (zh) 2016-03-30

Family

ID=55572502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520548588.4U Expired - Fee Related CN205116883U (zh) 2015-07-27 2015-07-27 超高层钢结构发射塔的桅杆提升装置

Country Status (1)

Country Link
CN (1) CN205116883U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106486733A (zh) * 2016-10-30 2017-03-08 上海二十冶建设有限公司 卫星天线的提升装置及其施工方法
CN109332430A (zh) * 2018-11-15 2019-02-15 上海宝冶集团有限公司 一种桅杆提升调直装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106486733A (zh) * 2016-10-30 2017-03-08 上海二十冶建设有限公司 卫星天线的提升装置及其施工方法
CN109332430A (zh) * 2018-11-15 2019-02-15 上海宝冶集团有限公司 一种桅杆提升调直装置
CN109332430B (zh) * 2018-11-15 2020-04-14 上海宝冶集团有限公司 一种桅杆提升调直装置

Similar Documents

Publication Publication Date Title
CN101537976B (zh) 双塔桅巨型自升降起重设备及其跟携吊装方法
CN102786004B (zh) 无缆风绳带载整体移动式液压提升方法
CN103993728B (zh) 一种装配式型钢悬挑防护棚
CN205296803U (zh) 电梯自动提升操作台
CN205116883U (zh) 超高层钢结构发射塔的桅杆提升装置
CN202544468U (zh) 拉杆型电力钢管杆
CN203173749U (zh) 液压复式起重机塔架组装整体式竖向自顶升装置
CN103669882B (zh) 工业厂房内利用钢丝绳做轨道进行构件安装的方法
CN204629405U (zh) 助航灯光塔易碎杆升降系统
CN204454235U (zh) 一种新型多吊点平衡梁装置
CN107476560B (zh) 风电塔施工平台及方法
CN202785387U (zh) 一种室内悬臂起重机
CN203238967U (zh) 一种大型钢结构框架整体提升装置
CN103556837B (zh) 一种在裙楼处实现钢柱安装的方法
CN206957175U (zh) 一种平面尺寸及高度可调的操作平台
CN202063655U (zh) 塔式起重机防倾安全装置
CN204980945U (zh) 一种辅助塔吊拆装设备
CN205575534U (zh) 格构式井字形架体提升设备
CN205132926U (zh) 水轮发电机组尾水肘管的专用井字吊具
CN205346600U (zh) 一种大板梁吊装专用工具
CN209651673U (zh) 一种顶升平台的施工电梯附着结构
CN203531413U (zh) 钢结构网架整体提升的辅助构造
CN203499575U (zh) 一种石油钻机的液压起升井架
CN201092521Y (zh) 内爬塔吊液压支承装置
CN201339309Y (zh) 附着式升降脚手架

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190801

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160330

CF01 Termination of patent right due to non-payment of annual fee