CN102776813A - Bituminous pavement preventive maintenance method based on swinging lane markings - Google Patents

Bituminous pavement preventive maintenance method based on swinging lane markings Download PDF

Info

Publication number
CN102776813A
CN102776813A CN2012103026540A CN201210302654A CN102776813A CN 102776813 A CN102776813 A CN 102776813A CN 2012103026540 A CN2012103026540 A CN 2012103026540A CN 201210302654 A CN201210302654 A CN 201210302654A CN 102776813 A CN102776813 A CN 102776813A
Authority
CN
China
Prior art keywords
road surface
traffic lane
lane line
swinging
maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103026540A
Other languages
Chinese (zh)
Other versions
CN102776813B (en
Inventor
王志
周伟
陈法安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201210302654.0A priority Critical patent/CN102776813B/en
Publication of CN102776813A publication Critical patent/CN102776813A/en
Application granted granted Critical
Publication of CN102776813B publication Critical patent/CN102776813B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)

Abstract

The invention discloses a bituminous pavement preventive maintenance method based on swinging lane markings, which overcomes the shortcomings including long construction period and high construction cost of the existing roadway maintenance methods. The method is carried out from a traffic engineering perspective, swings construction partition positions of traffic lane markings at adequate time and amount, realizes guiding of re-distribution of driving wheel marks of vehicles, and further achieves the aims of improving road surface effective utilization, delaying development of road surface diseases and prolonging the service life of the road surface. The bituminous pavement preventive maintenance method based on swinging lane markings has the advantages of being low in cost, fast in construction speed, energy-conservation and environment-protection.

Description

A kind of based on the bituminous pavement preventive maintenance method that swings traffic lane line
Technical field
The present invention relates to a kind of bituminous pavement preventive maintenance method, be specifically related to a kind ofly based on the bituminous pavement preventive maintenance method that swings traffic lane line, this method is applicable to the preventive maintenance of asphalt pavement of highway.
Background technology
Flexible pavement has that the driving comfort level is good, and the construction period is short, simple maintenance, advantage such as suitable stage construction and being used widely.At present, the most speedways of China are selected flexible pavement for use, and ratio reaches more than 90%.But, under the vehicular load of flexible pavement and the comprehensive function of environmental factor, be easy to generate following disease: diseases such as rut, crack, hole groove.These diseases all can reduce road surface functional performance and service level, shorten service life of road surface.
In order to guarantee vehicle safety operation efficiently in order, the common employing of speedway is executed a stroke traffic lane line and is carried out the canalized traffic management, and big or small vehicle, speed vehicle use Correct Lane.But the canalization on road surface, it is inhomogeneous to cause axle for vehicle to be loaded in the road surface transverse spatial distribution, causes the cross direction profiles of pavement disease to have than big-difference, and the disease at wherein relatively-stationary wheel path place is particularly serious.Promptly when wheel path rut, crack, hole groove etc. have occurred and destroys, do not occur the disease phenomenon of respective degrees on the non-wheel path, reduced the effective rate of utilization on road surface, thereby caused shorten greatly the application life on road surface.
In order to prolong the application life of road, the experts and scholars of research institution carry out long-life road surface research from optimization pavement design, improvement ground surface material on the one hand both at home and abroad, set about from the maintenance of surface technology on the other hand, constantly explore the maintenance of surface new technology.
Yet; The maintenance of surface technology of applying in China at present mostly absorbs from external introduction, mainly is that road pavement is carried out medium-capital overhauling, excavates or the existing road surface of milling; Again the surfacing material perhaps carries out covers such as little table place, slurry seal, crushed stone sealing and handles.Also have employing to carry out carrying out again after rut is filled the recovery technique of cover for the serious express highway pavement of rut.Though existing maintenance of surface technology also can reach the purpose of improving pavement behavior, improving the road surface functional performance, has shortcomings such as cost is higher, the cycle is long, resource consumption is high, environment pollution is big, the close traffic time is long.
Summary of the invention
Problem to be solved by this invention provide a kind of scientific and reasonable, the maintenance cost is low, speed of application is fast, the bituminous pavement preventive maintenance new technology of energy-conserving and environment-protective.This technology is from the traffic engineering angle; Need not to change original road structure and material type, through the flexible pavement traffic lane line being carried out swinging of appropriate amplitude, thereby correspondingly change the wheelpath of vehicle in good time; Make the vehicle wheel path laterally redistribute on the road surface; Improve the road surface effective rate of utilization, delay the development of pavement disease, and then reach the purpose that prolongs service life of road surface.
For solving the problems of the technologies described above, the present invention takes following technical solution:
Be suitable for provided by the present invention based on the bituminous pavement preventive maintenance method that swings traffic lane line treat the maintenance road surface for being provided with band in the middle of the band that stops in emergency, another other being provided with on one side, and middle band and stopping in emergency is provided with the asphalt pavement of highway in compact car track and heavy goods vehicles track between being with at least; Treating the maintenance road surface in the method does as giving a definition: along the middle direction that brings to the band that stops in emergency is positive direction, and the direction that brings to middle band along stopping in emergency is in the other direction; Treat to be provided with n track through (n+1) bar traffic lane line on the maintenance road surface; And on positive direction, be followed successively by: first lane graticule, first lane, second lane graticule, second lane, third lane graticule to the n track, (n+1) traffic lane line; N is a positive integer; And n >=2, method is undertaken by following step:
Step 1 detects and treats the rut degree of depth RD and the traffic lane line retro-reflecting coefficient RC on maintenance road surface, as RD>=10mm or RC≤80mcdlx -1M -2The Shi Jinhang step 2, otherwise this treats that the maintenance road surface temporarily do not launch technical scheme of the present invention and carry out maintenance;
Step 2; The rut width W in heavy goods vehicles track on the maintenance road surface is treated in measurement; (n+1) bar traffic lane line is swung respectively; The amplitude of swinging of every traffic lane line is
Figure BDA00002049488900031
to swing direction and is positive direction, and then accomplishes traffic lane line and swing for the first time;
Step 3 detects the traffic lane line retro-reflecting coefficient RC ' that treats the maintenance road surface that accomplishes after traffic lane line swings for the first time; As RC '≤80mcdlx -1M -2The time, (n+1) bar traffic lane line after swinging is for the first time swung respectively, wherein, the amplitude of swinging of first lane graticule does
Figure BDA00002049488900032
Swing direction in the other direction; The amplitude of swinging of second lane graticule does
Figure BDA00002049488900033
Swing direction in the other direction; The amplitude of swinging of other traffic lane lines is W, swings direction in the other direction; And then the completion graticule second time swings;
Step 4 detects the traffic lane line retro-reflecting coefficient RC " that treats the maintenance road surface that accomplishes after traffic lane line swings for the second time; As RC "≤80mcdlx -1M -2The time, second traffic lane line to the (n+1) the bar traffic lane line after swinging is for the second time swung respectively, wherein, the amplitude of swinging of second lane graticule does
Figure BDA00002049488900034
Swinging direction is positive direction; The amplitude of swinging of other traffic lane lines does
Figure BDA00002049488900035
Swinging direction is positive direction; Accomplish swinging for the third time of traffic lane line; So far, accomplishing one of traffic lane line swings the cycle;
Step 5 is judged the application life of treating the maintenance road surface; When treating that the maintenance service life of road surface does not terminate, get into the next one and swing the cycle, repeating step one is to step 4; Otherwise, finish technical scheme of the present invention this treated that the maintenance road surface carries out maintenance.
The judgement of service life of road surface is a foundation with the detection evaluation result of treating maintenance road surface functional performance PQI in the above-mentioned steps five, when PQI<80, and the service life of road surface termination.
With existing bituminous pavement preventive maintenance compared with techniques, the present invention has following technical characterstic:
(1) method is easy, and short construction period is little to the traffic interference, is convenient to implement;
(2) the maintenance cost is low, can alleviate the problem that highway in China maintenance financing gap further enlarges;
(3) need not to change original road structure and material type, energy-saving and emission-reduction are preventive maintenance new technologies of a kind of " resource-conserving " and " environmentally friendly ";
(4) method of the present invention is used the unification that can reach social benefit, economic benefit and environmental benefit, has wide promotion prospect.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is done further explain:
Fig. 1 is a schematic flow sheet of the present invention;
Fig. 2 swings sketch map for traffic lane line of the present invention.
The specific embodiment
Traffic lane line has to carry out and uses Correct Lane, and realizing the function of separating between the various vehicle has the effect of canalization constraint and guiding simultaneously to vehicle.Because traffic lane line is to the constraint and the guiding function of traffic flow; It is central that driving vehicle is in single runway basically; Make the go wheelmark position relative fixed of vehicle in single track, thereby cause pavement disease (crack, rut and hole groove etc.) mainly to concentrate on the wheel path place of runway.
Design of the present invention is: in view of pavement disease mainly concentrates on vehicle wheel path place; Therefore can draw the position through the executing of traffic lane line that swings the road surface timely and appropriately; The wheelmark redistribution of going of guiding traffick; Thereby improve the road surface effective rate of utilization, delay the development of pavement disease, and then reach the purpose that prolongs service life of road surface.
Need to prove:
" traffic lane line swings " described in the present invention is meant draws executing again of traffic lane line, makes the traffic lane line certain distance that on the direction of vertical road travel direction, squints.During practical implementation; According to technical scheme of the present invention and combine concrete speedway actual conditions to carry out the general arrangement that traffic lane line swings scheme and draw relevant working drawing, when specifically constructing with reference to " highway traffic safety facility construction technique normalizing " (JTCl71-2006) with " highway maintenance safety work rules " (JTG H30-2004).
Traffic lane line described in the present invention swings amplitude for last time swinging the side-play amount of graticule position, back relatively.
Among the present invention related compact car track and heavy goods vehicles track be meant the freeway traffic Warning Mark the clear and definite track of specializing in corresponding vehicle vehicle ' of indication.
Being suitable for the maintenance road surface of treating based on the bituminous pavement preventive maintenance method that swings traffic lane line provided by the present invention is that one side is provided with the band that stops in emergency, another side is provided with middle band; And the centre is with and is stopped in emergency and is provided with the asphalt pavement of highway in compact car track and heavy goods vehicles track between the band at least; For clearlying show the concrete steps of this method, definition brings to the band that stops in emergency along the centre direction is a positive direction, and the direction that brings to middle band of stopping in emergency is opposite direction; Said treating is provided with n track through (n+1) bar traffic lane line on the maintenance road surface; And on positive direction, be followed successively by: first lane graticule, first lane, second lane graticule, second lane, third lane graticule to the n track, (n+1) traffic lane line, n is a positive integer, and n >=2; With reference to figure 1 and Fig. 2, method is undertaken by following step:
Step 1 detects rut degree of depth RD and traffic lane line retro-reflecting coefficient RC, as RD>=10mm or RC≤80mcdlx -1M -2The Shi Jinhang step 2, otherwise this treats that the maintenance road surface temporarily do not launch technical scheme of the present invention and carry out maintenance;
What need to analyze explanation is: when rut degree of depth RD<10mm, to not obviously influence of normal driving; When rut degree of depth RD>=10mm, the ponding in the rainy day rut causes driving vehicle to produce the neatly effect easily, jeopardizes traffic safety, and in addition, when the vehicle lane change was gone, darker rut can increase driver's controlling difficulty, reduce occupant's comfortableness vehicle; According to " road traffic marking quality requirement and detection method " (GB/T16311-2009), as traffic lane line retro-reflecting coefficient RC≤80mcdlx -1M -2The time, graticule has reached application life, and night, visibility did not satisfy the safe driving requirement; Can not guide driving at night well; Need execute again and draw, it is most economical implementing that graticule swings this moment, therefore; From travel safety, comfortableness, handling and engineering economy angle, step 1 is rut degree of depth 10mm or traffic lane line retro-reflecting coefficient 80mcdlx -1M -2Confirm as the trigger value that traffic lane line swings.
Step 2; The rut width W in the heavy goods vehicles track on maintenance road surface is treated in measurement; (n+1) bar traffic lane line is swung respectively; The amplitude of swinging of every traffic lane line is
Figure BDA00002049488900061
to swing direction and is positive direction; Thereby make wheel roll a crest of rut, and then accomplish traffic lane line and swing for the first time;
Step 3 detects the traffic lane line retro-reflecting coefficient RC ' that treats the maintenance road surface that accomplishes after traffic lane line swings for the first time; As RC '≤80mcdlx -1M -2The time, (n+1) bar traffic lane line after swinging is for the first time swung respectively, wherein, the amplitude of swinging of first lane graticule does
Figure BDA00002049488900062
Swing direction in the other direction, initial relatively graticule position is 0 after swinging; The amplitude of swinging of second lane graticule does
Figure BDA00002049488900063
Swing direction in the other direction, initial relatively graticule position does after swinging The amplitude of swinging of other traffic lane lines is W, swings direction in the other direction, and initial relatively graticule position does after swinging
Figure BDA00002049488900065
And then the completion graticule second time swings;
What need the analysis explanation is:
Be generally heavy goods vehicles with the vehicle that stops in emergency with going in the adjacent track; The destruction of its road pavement is the most serious; Preferentially satisfy it and swing condition, make to swing another crest that rear wheel rolls rut, therefore; The amplitude of the swinging second time of other traffic lane lines except that first lane graticule and second lane graticule is W, swings direction in the other direction;
In addition, have only the left side marginal strip of 0.5~0.75m usually between speedway first lane graticule and the middle branch band, for guaranteeing traffic safety, this marginal strip can not compress, and the first lane graticule does not just possess the condition that swings to opposite direction like this;
And each track of speedway is wide, is 3.75m; Wherein large car car body broad, wheelspan are bigger, and the compact car car body is narrower, wheelspan is less, and correlative study both at home and abroad shows in addition: in order to guarantee normal driving; Outside Large Vehicle Lane does not possess contractive condition; Do not influence its normal driving and compress inboard Light-duty vehicle Lane width in right amount, therefore, determinedly in this step swing the traffic safety that amplitude does not influence road.
Step 4 detects the traffic lane line retro-reflecting coefficient RC " that treats the maintenance road surface that accomplishes after traffic lane line swings for the second time; As RC "≤80mcdlx -1M -2The time, second traffic lane line to the (n+1) the bar traffic lane line after swinging is for the second time swung respectively, wherein, the amplitude of swinging of second lane graticule does
Figure BDA00002049488900071
Swinging direction is positive direction; The amplitude of swinging of other traffic lane lines does Swinging direction is positive direction; Swinging the initial relatively graticule position of all traffic lane lines of back is 0, and all traffic lane lines are kept in the center, and then accomplish swinging for the third time of traffic lane line; So far, accomplishing one of traffic lane line swings the cycle.Test shows: after swinging through twice, former wheel path rut both sides ridge rolls down to sink gradually at wheel; And former wheel path rut sink the position in both sides horizontal push effect recover gradually, at this moment, the pavement track band has been tending towards recovering smooth, therefore, swings once more and makes all traffic lane lines keep in the center;
Step 5 is judged the application life of treating the maintenance road surface; When treating that the maintenance service life of road surface does not terminate, get into the next one and swing the cycle, repeating step one is to step 4; Otherwise, finish technical scheme of the present invention this treated that the maintenance road surface carries out maintenance.
The service life of road surface termination face badly broken that shows the way adopts the routine servicing method can not make the road surface recover good working order, can not guarantee the favorable service function, need overhaul.The judgement in general road application life is a foundation with the detection evaluation result of treating maintenance road surface functional performance PQI; When road surface functional performance PQI<80, road surface breakage is serious, promptly thinks the service life of road surface termination this moment.
On the physics, the definition in " cycle " of " pendulum " is: the time of accomplishing once vibration entirely (3 swings are kept in the center).Imitative this, swing period definition to graticule and be: the number of times of accomplishing and once swing entirely (3 times swing, graticule is kept in the center).
The pavement rutting depth detection method with reference to " asphalt pavement rut method of testing " (T0973-2008) in the method; The reference of traffic lane line retro-reflecting coefficient detection method: " road traffic marking quality requirement and detection method " (GB/T16311-2009); The pavement track method for measuring width with reference to " asphalt pavement rut method of testing " (T0973-2008); The road surface functional performance detects assessment method with reference to " highway technology situation evaluation criteria " (JTG H20-2007).
Embodiment:
Xi'an is speedway around the city, and 80 kilometers of total lengths are totally-enclosed, full-overpass, and by two-way six-lane type design, design speed is 120 kilometers/hour completely, is the main hinge of Shaanxi Province's modern highway network.Speedway is divided into two sections in south, north around the city in Xi'an, wherein around 34 kilometers of north of the city section total lengths, arises from Fan family village grade separation; Terminate in earflaps Liu grade separation, put into operation in October, 1998, was open to the traffic in 2000; Full section width of subgrade is 35 meters; The road surface is an asphalt concrete pavement, carries out canalized traffic, and the vehicle strictness uses Correct Lane.
From build up be open to traffic after; Because the traffic volume increases year by year, solid axle carries vehicle and increases gradually; In addition summer continuous high temperature weather, make this runway wheel path position, part highway section, expressway significantly crack, rut occur comparatively, wherein the crack exists only in asphalt concrete pavement; Comprise load type longitudinal crack and non-load type transverse crack, the rut degree of depth 1~3cm does not wait.
Speedway single width road surface transverse set becomes mainly to comprise around the city in Xi'an: middle band, fast, runway (compact car track+heavy goods vehicles track), urgent driving band; Single width road surface overall width is 15.80m, left side marginal strip width 0.75m wherein, fast width 3.90m; Light-duty vehicle Lane width 3.75m; Heavy lane width 3.90m, the bandwidth of stopping in emergency 3.50m possesses the implementation condition of swinging.
In July, 2007, through Field Research, the straight highway section of selecting Xi'an speedway north section 5Km around the city is as test section (pile No. K18+000~K23+000).For implementation result is verified, with reference to " highway technology situation evaluation criteria " (JTG H20-2007) pavement behavior in this test section and adjacent highway section is detected evaluation, road surface functional performance indices P QI is " excellent ".
" cross section chi method of testing " road pavement rut degree of depth RD in the employing " asphalt pavement rut method of testing " (T0973-2008) detects; Detection method in the employing " road traffic marking quality requirement and detection method " (GB/T16311-2009) detects traffic lane line retro-reflecting coefficient RC.Detect through on-the-spot, the average of the pavement rutting depth of this test section and graticule retro-reflecting coefficient is respectively: RD=11.5mm>10mm, RC=85mcdlx -1M -2>80mcd -1Lxm -2, wherein pavement rutting depth has reached and has swung activation threshold value, can implement traffic lane line and swing;
" cross section, road surface appearance method " in the employing " asphalt pavement rut method of testing " (T0973-2008) externally stresses the pavement track width in type track to be measured, and calculates the average rut width in road surface and is: W ≈ 100cm;
According to technical scheme of the present invention; Traffic lane line to the test section swings first: 4 traffic lane lines are swung respectively, and the amplitude of swinging of every traffic lane line is
Figure BDA00002049488900091
to swing direction and is positive direction;
After this whenever the traffic lane line retro-reflecting coefficient is detected at a distance from 6 months.
In July, 2008, the traffic lane line retro-reflecting coefficient that records after swinging first is: RC '=77mcdlx -1M -2<80mcdlx -1M -2, reach secondary and swing activation threshold value, can implement graticule and swing for the second time;
According to technical scheme of the present invention; The traffic lane line of test section is carried out secondary to swing: 4 traffic lane lines are swung respectively, and the amplitude that swings of first lane graticule is W=100cm for the amplitude that swings of
Figure BDA00002049488900092
second lane graticule for the amplitude of swinging of
Figure BDA00002049488900093
other two traffic lane lines; Swinging direction is in the other direction;
After this whenever the traffic lane line retro-reflecting coefficient is detected at a distance from 6 months.
In July, 2009, traffic lane line retro-reflecting coefficient RC "=68mcdlx -1M -2<80mcdlx -1M -2, reach three times and swing activation threshold value, can implement graticule and swing for the third time.
According to technical scheme of the present invention, the traffic lane line of test section is carried out three times swing: the amplitude that swings of second lane graticule is a positive direction for
Figure BDA00002049488900101
swings direction; The amplitude that swings of third lane graticule, Four-Lane Road graticule is a positive direction for
Figure BDA00002049488900102
swings direction.
So far, all traffic lane lines are kept in the center, and accomplish complete swinging the cycle of traffic lane line.
In August, 2009, the pavement behavior in test section and adjacent highway section has been carried out detecting once more evaluation, and carried out comparative analysis.The result shows: the road surface functional performance indices P QI of this test section is " very ", do not implement this maintenance process adjacent highway section road surface functional performance indices P QI for " in ", pavement behavior is than what a grade of adjacent highway section of not implementing this maintenance process.It is thus clear that use method and technology of the present invention can prolong the application life of flexible pavement.

Claims (2)

1. one kind based on the bituminous pavement preventive maintenance method that swings traffic lane line; What be suitable for this method treats the maintenance road surface for being provided with band in the middle of the band that stops in emergency, another other being provided with on one side, and middle band and stopping in emergency is provided with the asphalt pavement of highway in compact car track and heavy goods vehicles track between being with at least; Treating the maintenance road surface in the method does as giving a definition: along the middle direction that brings to the band that stops in emergency is positive direction, and the direction that brings to middle band along stopping in emergency is in the other direction; Treat to be provided with n track through (n+1) bar traffic lane line on the maintenance road surface; And on positive direction, be followed successively by: first lane graticule, first lane, second lane graticule, second lane, third lane graticule to the n track, (n+1) traffic lane line; N is a positive integer; And n >=2, method is undertaken by following step:
Step 1 detects and treats the rut degree of depth RD and the traffic lane line retro-reflecting coefficient RC on maintenance road surface, as RD>=10mm or RC≤80mcdlx -1M -2The Shi Jinhang step 2, otherwise this treats that the maintenance road surface temporarily do not launch technical scheme of the present invention and carry out maintenance;
Step 2; The rut width W in heavy goods vehicles track on the maintenance road surface is treated in measurement; (n+1) bar traffic lane line is swung respectively; The amplitude of swinging of every traffic lane line is
Figure FDA00002049488800011
to swing direction and is positive direction, and then accomplishes traffic lane line and swing for the first time;
Step 3 detects the traffic lane line retro-reflecting coefficient RC ' that treats the maintenance road surface that accomplishes after traffic lane line swings for the first time; As RC '≤80mcdlx -1M -2The time, (n+1) bar traffic lane line after swinging is for the first time swung respectively, wherein, the amplitude of swinging of first lane graticule does
Figure FDA00002049488800012
Swing direction in the other direction; The amplitude of swinging of second lane graticule does
Figure FDA00002049488800013
Swing direction in the other direction; The amplitude of swinging of other traffic lane lines is W, swings direction in the other direction; And then the completion graticule second time swings;
Step 4 detects the traffic lane line retro-reflecting coefficient RC " that treats the maintenance road surface that accomplishes after traffic lane line swings for the second time; As RC "≤80mcdlx -1M -2The time, second traffic lane line to the (n+1) the bar traffic lane line after swinging is for the second time swung respectively, wherein, the amplitude of swinging of second lane graticule does Swinging direction is positive direction; The amplitude of swinging of other traffic lane lines does
Figure FDA00002049488800022
Swinging direction is positive direction; Accomplish swinging for the third time of traffic lane line; So far, accomplishing one of traffic lane line swings the cycle;
Step 5 is judged the application life of treating the maintenance road surface; When treating that the maintenance service life of road surface does not terminate, get into the next one and swing the cycle, repeating step one is to step 4; Otherwise, finish technical scheme of the present invention this treated that the maintenance road surface carries out maintenance.
2. as claimed in claim 1 based on the bituminous pavement preventive maintenance method that swings traffic lane line; It is characterized in that; The judgement of service life of road surface is a foundation with the detection evaluation result of treating maintenance road surface functional performance PQI in the step 5, when PQI<80, and the service life of road surface termination.
CN201210302654.0A 2012-08-23 2012-08-23 Bituminous pavement preventive maintenance method based on swinging lane markings Expired - Fee Related CN102776813B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210302654.0A CN102776813B (en) 2012-08-23 2012-08-23 Bituminous pavement preventive maintenance method based on swinging lane markings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210302654.0A CN102776813B (en) 2012-08-23 2012-08-23 Bituminous pavement preventive maintenance method based on swinging lane markings

Publications (2)

Publication Number Publication Date
CN102776813A true CN102776813A (en) 2012-11-14
CN102776813B CN102776813B (en) 2014-07-30

Family

ID=47121910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210302654.0A Expired - Fee Related CN102776813B (en) 2012-08-23 2012-08-23 Bituminous pavement preventive maintenance method based on swinging lane markings

Country Status (1)

Country Link
CN (1) CN102776813B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106570208A (en) * 2016-09-28 2017-04-19 深圳大学 Road running system
CN109271663A (en) * 2018-08-01 2019-01-25 北京航空航天大学 A kind of urban road maintenance policy optimization method based on main body emulation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000008335A (en) * 1998-06-25 2000-01-11 Mitsubishi Heavy Ind Ltd Lane changing guide system for road
KR20120010894A (en) * 2010-07-27 2012-02-06 주식회사 바우 컨설탄트 Reversible lane operating system for tunnel

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000008335A (en) * 1998-06-25 2000-01-11 Mitsubishi Heavy Ind Ltd Lane changing guide system for road
KR20120010894A (en) * 2010-07-27 2012-02-06 주식회사 바우 컨설탄트 Reversible lane operating system for tunnel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
ZHI WANG: "New Concept of Prolonging the Service Life-Span for Asphalt Pavement of Expressways", 《SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION》, 31 December 2009 (2009-12-31), pages 223 - 226 *
王志等: "公路路面养护新思路——标线摆移法", 《中外公路》, vol. 30, no. 4, 31 August 2010 (2010-08-31), pages 99 - 102 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106570208A (en) * 2016-09-28 2017-04-19 深圳大学 Road running system
CN109271663A (en) * 2018-08-01 2019-01-25 北京航空航天大学 A kind of urban road maintenance policy optimization method based on main body emulation

Also Published As

Publication number Publication date
CN102776813B (en) 2014-07-30

Similar Documents

Publication Publication Date Title
CN102568218B (en) Method for determining safe running speed on expressway under crosswind
CN103693045A (en) Elevated urban traffic system
CN102730011B (en) Monorail suspension type dual-power electric bus
CN201907505U (en) Double-layered and two-way rail compatible green public transit
CN201980230U (en) Rail type traffic system
CN201914251U (en) Hanging type new energy-resource rail bus
CN106504164A (en) A kind of division methods of combination area of city and country's inferior grade road speeds control zone
CN102776813B (en) Bituminous pavement preventive maintenance method based on swinging lane markings
CN102730004A (en) Overhead type public traffic operation scheme
CN202989803U (en) Road construction apparatus capable of reducing traffic accident
CN207362621U (en) Complex layered anti-skid surface structure
CN202163498U (en) Gate type bus
CN210856823U (en) Road bed subsidence prosthetic devices
CN204551168U (en) Asphalt pavement regeneration half flexibly jointed chain Rotating fields
CN211922113U (en) Laying device for urban rail transit
CN202671991U (en) Small universal unblocked overpass
Li et al. Comparison of skid resistance and noise between transverse and longitudinal grooving pavements in newly constructed concrete pavement
Ma et al. The Speed Limit Determination of Tunnel Entrance And Exit Section On Rainy Days
CN204676459U (en) The environmental protection of urban road maidenliness is parked hurdle
Liu et al. Analysis of impact of tire tread groove depth on hydroplaning risk level
CN204959527U (en) Need not overpass structure of traffic lights
CN204370246U (en) A kind of road section of track of anti-rolling anti-twist distortion and level crossing mouth thereof
CN202610669U (en) Bridge type steel road with multidimensional paving frame and of three-dimensional structure
CN212956074U (en) Compaction leveling device for repairing highway pavement
CN102463994A (en) Double-layer double-way rail compatible green transit system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140730

Termination date: 20180823