CN204959527U - Need not overpass structure of traffic lights - Google Patents

Need not overpass structure of traffic lights Download PDF

Info

Publication number
CN204959527U
CN204959527U CN201520496140.2U CN201520496140U CN204959527U CN 204959527 U CN204959527 U CN 204959527U CN 201520496140 U CN201520496140 U CN 201520496140U CN 204959527 U CN204959527 U CN 204959527U
Authority
CN
China
Prior art keywords
trunk roads
major trunk
overpass
access bridge
traffic lights
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520496140.2U
Other languages
Chinese (zh)
Inventor
吴学志
杨熙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520496140.2U priority Critical patent/CN204959527U/en
Application granted granted Critical
Publication of CN204959527U publication Critical patent/CN204959527U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a need not overpass structure of traffic lights, including criss -cross major trunk roads anyhow, set up the overpass at the cross section of criss -cross major trunk roads anyhow and make that criss -cross major trunk roads are independently current each other anyhow, set up semi -circular overpass no. 1 respectively on major trunk roads cross section major trunk roads all around, be equipped with the access bridge respectively in semi -circular overpass both sides, the intercommunication is said to access bridge and the mobile jib that corresponds, intercommunication and make loop -locked circumferential highway of all semi -circular overpasss no. 1 and access bridge component between adjacent access bridge, the utility model discloses simple structure, upper and lower two -layer design only needs to build with " butyl " word way on current " ten " word way in each city and need not to widen the road surface, but and at one time a direction vehicle mutually noninterfere pass through, the zuohang car directly turns left promptly, the car of walking on the right side directly is turned right, two -way craspedodrome directly is passed through, the route is clear, the traffic lights time improvement velocity of flow such as saves simultaneously, time of reduction vehicle on the way, also can reduce energy waste.

Description

A kind of overpass bridge structure without the need to traffic lights
Technical field
The utility model relates to a kind of overpass bridge structure without the need to traffic lights, belongs to road structure design field.
Background technology
At present, countries in the world are at " ten " word crossing, " fourth " word crossing uses traffic lights to control the current method of all directions vehicle, though this method effectively controls, all directions vehicle is current in order ensure that traffic safety, but also indirectly block up because waiting traffic lights to cause vehicle to flock together and produce, lose time and do not stop working at the time vehicle of waiting traffic lights, waste energy and cause unnecessary air pollution, traffic lights have some deficiency following, first, each urban road is all anyhow to intersect and in same level, and vehicle goes having of which direction, in order to support vehicles are safe and orderly, so adopt traffic lights control methods, time passing through in a direction, another direction can only stop-for-waiting, a large amount of vehicle will be made like this to flock together and to cause traffic congestion, the second, necessarily wait traffic lights the time because the vehicle going to each direction has, we can calculate like this, if the vehicle set out on a journey every day in each city has 1,000,000, so just have 500,000 in slow traveling, and are waiting traffic lights the while of another 500,000, 3rd, because of in city, the whole world all the time all some vehicle waiting traffic lights, and most of vehicle is selected not stop working, add that summer, heat was turned on the aircondition, winter is cold opens warm braw, so every day can waste how much energy because waiting traffic lights in the world, for no reason produces again a large amount of Vehicular exhaust and causes air pollution, 4th, every day, city working clan caused vehicle low running speed because waiting traffic lights generation traffic congestion indirectly, in order to not incur loss through delay the work hours, can only shift to an earlier date and set out on a journey for a long time.Current in a word, vehicle congestion becomes the large problem in each city one, the world, and a large factor of this problem is exactly that traffic lights cause.
And existing overpass bridge has some deficiency following; The first, floor space is excessive, waste land resources.The second, all directions overpass bridge route disorderly.3rd, construction cost is high.
Utility model content
The purpose of this utility model is: for the defect of prior art, provides a kind of overpass bridge structure without the need to traffic lights, and this structure grade separation number of plies is few, and cost is low, effective, to overcome the deficiencies in the prior art.
The technical solution of the utility model
A kind of overpass bridge structure without the need to traffic lights, comprise the major trunk roads anyhow intersected, arrange at the infall of the major trunk roads anyhow intersected the major trunk roads that overpass bridge makes anyhow to intersect to pass through independently of one another, the major trunk roads of major trunk roads infall surrounding arrange semicircle overpass bridge one respectively, access bridge is respectively equipped with in semicircle overpass bridge one both sides, access bridge is communicated with corresponding mobile jib road, is communicated with and makes all semicircle overpass bridges one and access bridge form the circumferential road of a closed loop between adjacent access bridge.
Owing to have employed technique scheme, compared with prior art, the utility model structure is simple, upper and lower two-layer design, only need build without the need to widening pavement in existing " ten " word road and " fourth " word road in each city, and an interior direction vehicle can non-interferencely pass through at one time, namely left lateral car directly turns left, right lateral car is directly turned right, and two-way craspedodrome is directly passed through, clear route, save the time that waits traffic lights simultaneously and improve flow velocity, reduce the vehicle time on the way, also can reduce energy waste, greatly reduce the traffic congestion puzzlement that city vehicle is too much.
Accompanying drawing explanation
Accompanying drawing 1 is the structural representation of the utility model when being used in cross road;
Accompanying drawing 2 is conspectuses when vehicle is turned right and turns left in the utility model;
Accompanying drawing 3 is the utility model structural representations one when being used in T-shaped road;
Accompanying drawing 4 is the utility model structural representations two when being used in T-shaped road.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail, but not as to any restriction of the present utility model.
Embodiment of the present utility model: a kind of overpass bridge structure without the need to traffic lights, as shown in Figure 1, comprise the major trunk roads 1 anyhow intersected, arrange at the infall of the major trunk roads 1 anyhow intersected the major trunk roads 1 that overpass bridge 2 makes anyhow to intersect to pass through independently of one another, the major trunk roads 1 of the infall surrounding of major trunk roads 1 arrange semicircle overpass bridge 1 respectively, access bridge 4 is respectively equipped with in semicircle overpass bridge 1 both sides, access bridge 4 is communicated with corresponding mobile jib road 1, is communicated with and makes all semicircle overpass bridges 1 and access bridge 4 form the circumferential road of a closed loop between adjacent access bridge 4.
In actual motion, the present embodiment needs to adopt certain friendship rule cooperation could better realize this structure function, is specially:
As shown in Figure 2, first arrange and hand over rule, major trunk roads and corresponding access bridge junction specify that vehicle can only " be kept straight on or turn left " or " kept straight on or turn right " in the present embodiment, specifically, at the A of major trunk roads with corresponding access bridge junction, B, D, F place is set to can only keep straight on or turn right to major trunk roads vehicle, and access bridge vehicle can only be kept straight on, at the H of major trunk roads with corresponding access bridge junction, C, E, G place is set to can only keep straight on to major trunk roads vehicle, and access bridge vehicle can only be kept straight on or turn left, the structure of the present embodiment is coordinated again according to above-mentioned friendship rule, then a in accompanying drawing, b, then represent the right-hand bend of vehicle respectively, turn left, in the process, on major trunk roads, on normal straight-ahead operation vehicle and access bridge, warming-up exercise vehicle there will not be meeting phenomenon.
Accompanying drawing 3 is the principle of the present embodiment structural representation when being applied in T-shaped road; wherein accompanying drawing 3 can change crossroad into for this T-shaped road later stage; therefore need to arrange overpass bridge at crossing infall; and accompanying drawing 4 is the design scheme on general T-shaped road; its principle is consistent with cross road, all belongs to protection domain of the present utility model.

Claims (1)

1. the overpass bridge structure without the need to traffic lights, comprise the major trunk roads (1) anyhow intersected, arrange at the infall of the major trunk roads anyhow intersected (1) major trunk roads (1) that overpass bridge (2) makes anyhow to intersect to pass through independently of one another, it is characterized in that: on the major trunk roads (1) of the infall surrounding of major trunk roads (1), semicircle overpass bridge one (3) is set respectively, access bridge (4) is respectively equipped with in semicircle overpass bridge one (3) both sides, access bridge (4) is communicated with corresponding mobile jib road (1), be communicated with between adjacent access bridge (4) and make all semicircle overpass bridges one (3) and access bridge (4) form the circumferential road of a closed loop.
CN201520496140.2U 2015-07-10 2015-07-10 Need not overpass structure of traffic lights Expired - Fee Related CN204959527U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520496140.2U CN204959527U (en) 2015-07-10 2015-07-10 Need not overpass structure of traffic lights

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520496140.2U CN204959527U (en) 2015-07-10 2015-07-10 Need not overpass structure of traffic lights

Publications (1)

Publication Number Publication Date
CN204959527U true CN204959527U (en) 2016-01-13

Family

ID=55054602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520496140.2U Expired - Fee Related CN204959527U (en) 2015-07-10 2015-07-10 Need not overpass structure of traffic lights

Country Status (1)

Country Link
CN (1) CN204959527U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105369704A (en) * 2015-07-10 2016-03-02 吴学志 Overpass bridge without traffic lights and design method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105369704A (en) * 2015-07-10 2016-03-02 吴学志 Overpass bridge without traffic lights and design method thereof

Similar Documents

Publication Publication Date Title
CN102277806B (en) Shift-type interchange for all-time omnidirectional traffic at intersection of roads
CN103498394A (en) Planar road network system for motor vehicles
CN200974957Y (en) Combined type crossing passing bridge
CN204959527U (en) Need not overpass structure of traffic lights
CN206971274U (en) A kind of motor vehicle and non-motor vehicle and the river-crossing tunnel section arrangement deposited
CN103590291A (en) Crossroad and T road all-directional no-parking flyover
CN200992680Y (en) Town crossroad combined bridge
CN204825535U (en) Need not T road bridge structure of traffic lights
CN203782508U (en) Precast type road intersection structure system
CN105369704A (en) Overpass bridge without traffic lights and design method thereof
CN104831595A (en) Intercommunication type grade-separated junction layout structure
CN205501746U (en) Light automobile steel of highway T crossing constructs overpass structures
CN100482889C (en) Urban stereo road
CN203383113U (en) Cross road and T road all-directional no-parking flyover
CN100516364C (en) Urban stereo road
CN202925409U (en) Half-storey-height flyover unit
CN202194042U (en) Traffic junction utilizing lane changing way
CN202688814U (en) Traffic light-free fast transportation system arranged on city crossroad
CN202023130U (en) Elevated overpass shaped like a Chinese character `Ri`
CN202390735U (en) U-shaped turning bridge for realizing continuous passing of vehicles at level crossing
CN200992681Y (en) Combined crossroad pass bridge
CN105178123A (en) Cross overpass
CN201459557U (en) Completely interchanging flyover
CN205501745U (en) Highway intersection's light automobile steel constructs two -wayly and simultaneous friendship bridge construction
CN204626183U (en) A kind of traffic system with traffic light-free intersection

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113

Termination date: 20180710