CN102767218A - Frame for bathroom caisson, bathroom caisson and construction method - Google Patents

Frame for bathroom caisson, bathroom caisson and construction method Download PDF

Info

Publication number
CN102767218A
CN102767218A CN2012102843949A CN201210284394A CN102767218A CN 102767218 A CN102767218 A CN 102767218A CN 2012102843949 A CN2012102843949 A CN 2012102843949A CN 201210284394 A CN201210284394 A CN 201210284394A CN 102767218 A CN102767218 A CN 102767218A
Authority
CN
China
Prior art keywords
caisson
washroom
casing
captation
blow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102843949A
Other languages
Chinese (zh)
Other versions
CN102767218B (en
Inventor
卫青富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210284394.9A priority Critical patent/CN102767218B/en
Publication of CN102767218A publication Critical patent/CN102767218A/en
Application granted granted Critical
Publication of CN102767218B publication Critical patent/CN102767218B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)
  • Sanitary Device For Flush Toilet (AREA)

Abstract

The invention relates to the technical field of building engineering, in particular to a frame for a bathroom caisson, a bathroom caisson and a construction method. The frame for the bathroom caisson comprises a support frame, a water collecting device, a floor drain device and a discharge pipe connection port. The support frame is in an aerial structure, and the water collecting device is arranged inside the aerial structure; the support frame is used for supporting the water collecting device which is used for collecting leaked water; and the discharge pipe connection port and the floor drain device which are arranged on the water collecting device are communicated to discharge the water collected by the water collecting device. The bathroom caisson comprises a caisson body and the frame for the bathroom caisson; a discharge reserve hole is arranged in the inner wall of the caisson body; the bathroom caisson is arranged in the caisson body through the frame; the discharge pipe connection port and the discharge reserve hole are communicated; and the water collecting device is connected with the inner wall of the caisson body. The framework for the bathroom caisson, the bathroom caisson and the construction method can solve the water leakage problem of the bathroom caisson.

Description

The washroom caisson is with framework, washroom caisson and job practices
Technical field
The present invention relates to the building engineering technical field, be specifically related to a kind of washroom caisson with framework, washroom caisson and job practices.
Background technology
Washroom of the prior art caisson, as shown in Figure 1, comprise casing 4, and the base plane of casing 4 is lower than the flooring.Comprise leveling layer 3, waterproofing course 6 and cement mortar protective course 2 on the inwall of casing 4 successively; The set inside of casing 4 has other pipe-line equipments such as drainage pipeline networks, waterline network in addition; Wherein other pipe-line equipments such as drainage pipeline networks, waterline network do not draw in Fig. 1; Be filled with slag backfill layer 5 in the inside of casing 4, on slag backfill layer 5, build concrete cushion 1.
What washroom of the prior art caisson adopted is concrete self-waterproof and the dual waterproof scheme that adds waterproofing course; The water of the flushing valve place seepage of ground water or closet can leak into the casing 4 of washroom caisson; Again because do not design dewatering installation in the casing; Therefore the water that leaks into casing can only accumulate in the inside of casing 4, goes out in order to prevent the seepage that accumulates in box house, and waterproof construction can be set on casing.Main waterproof construction in the prior art in the casing is the waterproofing course 6 on the inwall of casing 4.
Yet waterproofing course of the prior art is the membranaceous structure that the two-layer water-repellent paint of brushing forms on the inwall of casing.Its thickness of waterproofing course of the prior art is thinner; Destroyed easily; And the inside of casing especially the pipelines that are provided with of four jiaos of casing places can form four jiaos of brushings, not only increased the difficulty of waterproofing course brushing but also made that the brushing of waterproofing course is inhomogeneous, draw waterproof construction in the existing caisson thus and be not and very stablely the crack may occur; The water that accumulates in the casing may leak into downstairs along the crack, and the problem that percolating water appears in the washroom caisson takes place.
Summary of the invention
Washroom provided by the invention caisson can solve the problem of washroom caisson percolating water with framework, washroom caisson and job practices.
In order to solve this technical problem, the present invention is achieved in that
The washroom caisson is used framework, comprising: bracing frame, captation, floor drain apparatus and blow-off pipe interface;
Support frame as described above is an aerial construction, and said captation is arranged on the inside of said aerial construction;
Support frame as described above is used to support said captation, and said captation is used to collect the water of seepage;
Said captation is provided with blow-off pipe interface and floor drain apparatus, and said floor drain apparatus is communicated with said blow-off pipe interface, to discharge the water that said captation is collected.
With framework, washroom caisson and job practices, can reach following beneficial effect through washroom provided by the invention caisson:
1. washroom provided by the invention caisson is used framework, comprising: bracing frame, captation, floor drain apparatus and blow-off pipe interface; Support frame as described above is an aerial construction, and said captation is arranged on the inside of said aerial construction; Located seepage to the washroom during caisson when flushing valve of ground and closet etc., the water of seepage is collected by captation; Simultaneously because the floor drain apparatus that is provided with on the captation is communicated with the blow-off pipe interface; The blow-off pipe interface is communicated with the blowdown reserved opening of setting in the casing; And the blowdown reserved opening be with the house in blow-off line be communicated with; Therefore the collected water of captation can be drained into the blow-off pipe in the house through floor drain apparatus and blow-off pipe interface; Thereby the water that will leak into the washroom caisson is discharged the casing of washroom caisson; The water of avoiding leaking into the washroom caisson accumulates in the inside of casing, does not have the phenomenon that washroom caisson percolating water just can not take place yet of accumulating of water in the casing, and therefore washroom of the present invention caisson can solve the problem of washroom caisson percolating water with framework, washroom caisson and job practices.
Blow-off pipe in running into the house stop up situation the time; The water that leaks into the washroom caisson is collected by captation; And captation is connected with the inwall of casing; The water that captation is collected can not drop on the bottom of casing; Still still can not drop on the bottom of casing in the inside of casing though therefore leak into the water of washroom caisson, thereby prevent that the seepage in the casing from arriving downstairs, thereby washroom of the present invention caisson has played waterproof effect with framework, washroom caisson and job practices.
3. the job practices of washroom of the present invention caisson; Be that the washroom caisson is installed in the casing as a finished product with framework; On-site construction processes such as plaster in the scene, joints cement have been avoided in the construction of washroom of the prior art caisson; Therefore the job practices difficulty of construction of washroom of the present invention caisson is low, and the construction period is short.
4. the job practices of washroom provided by the invention caisson; Do not need site operations such as plaster in the scene, joints cement; Just can not produce the useless slurry of cement yet and wait building waste; And need be on the inwall of caisson the brushing waterproofing course, can not produce harmful chemicals such as methyl alcohol, benzene, therefore the environment pollution that brings of the job practices of washroom of the present invention caisson is little.
Description of drawings
In order to be illustrated more clearly in the specific embodiment of the invention or technical scheme of the prior art; To do to introduce simply to the accompanying drawing of required use in the specific embodiment or the description of the Prior Art below; Obviously, the accompanying drawing in describing below is embodiments more of the present invention, for those of ordinary skills; Under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the structure chart of washroom caisson in the prior art;
Fig. 2 is the structure chart that embodiment of the invention washroom caisson cooperates with framework and casing;
Fig. 3 is the vertical view of embodiment of the invention curved slab;
Fig. 4 is the vertical view that embodiment of the invention curved slab cooperates with connector;
Fig. 5 is the embodiment of the invention 4 washroom caisson job practices flow charts.
Description of drawings: 1-concrete cushion, 2-cement mortar protective course, 3-leveling layer, 4-casing, 5-slag backfill layer, 6-waterproofing course; 7-master's blow-off pipe interface, 8-connector, 9-washroom body of wall, 10-floor drain apparatus, 11-curved slab; 12-first girder system, 13-second girder system, 14-column, 15-bracing frame, 16-floor drain installing hole; The 17-leghole, 18-gutter installing hole, 19-master's blow-off pipe installing hole, 20-blow-off pipe installing hole, 21-curved slab edge.
The specific embodiment
Below will combine accompanying drawing that the technical scheme of various embodiments of the present invention is carried out clear, complete description, obviously, described embodiment only is a part of embodiment of the present invention, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills are resulting all other embodiment under the prerequisite of not making creative work, the scope that all belongs to the present invention and protected.
Embodiment 1
The embodiment of the invention 1 provides a kind of washroom caisson to use framework, comprising: bracing frame, captation, floor drain apparatus and blow-off pipe interface;
Support frame as described above is an aerial construction, and said captation is arranged on the inside of said aerial construction;
Support frame as described above is used to support said captation, and said captation is used to collect the water that leaks into the washroom caisson;
Said captation is provided with blow-off pipe interface and floor drain apparatus, and said floor drain apparatus is communicated with said blow-off pipe interface, to discharge the water that said captation is collected.
The washroom caisson that present embodiment provides is arranged on the inside of casing with framework as a finished product device, has located seepage to the washroom during caisson when flushing valve of ground and closet etc., and the water of seepage is collected by captation; Simultaneously because the floor drain apparatus that is provided with on the captation is communicated with the blow-off pipe interface; The blow-off pipe interface is communicated with the blowdown reserved opening of setting in the casing; And the blowdown reserved opening be with the house in blow-off line be communicated with; Therefore the collected water of captation can be drained into the blow-off pipe in the house through floor drain apparatus and blow-off pipe interface; Thereby the water that will leak into the washroom caisson is discharged the casing of washroom caisson; The water of avoiding leaking into the washroom caisson accumulates in the inside of casing, do not have the phenomenon that washroom caisson percolating water just can not take place yet of accumulating of water in the casing, so the washroom caisson of present embodiment can solve the problem of washroom caisson percolating water with framework.
In real life, the special circumstances that the blow-off pipe in the house can occur stopping up, at this moment; In the time of in seepage arrives the casing of washroom caisson; The water of seepage is collected by captation equally, and the water that captation is collected can not drop on the bottom of casing, though therefore leak into the water of washroom caisson still can not drop on casing in the inside of casing bottom; Thereby prevented that the seepage in the casing from arriving downstairs, thereby the washroom caisson of present embodiment has played waterproof effect with framework.
A kind of washroom caisson that the embodiment of the invention 2 provides describes through accompanying drawing 2 to 4 with the washroom caisson that framework and embodiment 3 provide.
Embodiment 2
The embodiment of the invention 2 provides a kind of washroom caisson to use framework, comprising: bracing frame 15, captation, floor drain apparatus 10 and blow-off pipe interface;
Support frame as described above 15 is an aerial construction;
Concrete, support frame as described above 15 comprises two-layer, is designated as first girder system 12 and second girder system 13 respectively;
First girder system 12 and second girder system 13 couple together through column system;
Preferably, first girder system 12 and second girder system 13 include transverse beam group and longitudinal beam group;
Said transverse beam group comprises a plurality of transverse beams, and the spacing between a plurality of said transverse beam equates;
Said longitudinal beam group comprises a plurality of longitudinal beams, and the spacing between a plurality of said longitudinal beam equates;
Said transverse beam group and said longitudinal beam component are two-layer and link together;
Preferably, first girder system 12 is identical with the structure of second girder system 13.
Said column is to comprise a plurality of columns 14, and the spacing between a plurality of columns 14 equates;
The two ends of each column 14 connect transverse beam group and the tie point of longitudinal beam group in first girder system 12 and second girder system 13 respectively, and each column 14 is all vertical with second girder system 13 with first girder system 12.
In the present embodiment, transverse beam and longitudinal beam all can be the square-section square tube, and its inside is hollow-core construction; Column 14 can be hollow pipe;
The material of transverse beam in the present embodiment,, longitudinal beam and column 14 all can be engineering plastic alloy PC+ABS.
Acrylonitrile-butadiene-styrene copolymer (Acrylonitrile-Butadiene-Styrene is called for short ABS) is a kind of universal thermoplastic polymer.Merlon (being called for short PC) is the high molecular polymer that contains carbonate group in the strand.PC+ABS (engineering plastic alloy), plastic alloy, why called after PC+ABS is because this material had both had good heat-resisting weatherability, dimensional stability and the impact resistance of PC resin at the Chinese name of chemical industry.
In the present embodiment, said transverse beam group and said longitudinal beam component are two-layer and link together, and adopt ABS glue to paste between its tie point.
In the present embodiment, the spacing between the column 14 is confirmed according to the size of washroom, is typically 300mm-500mm;
According to the size of washroom, usually, the length of transverse beam and/or longitudinal beam is that the clear span of washroom deducts 50mm, and for example the clear span of washroom is 1800mm, and then the length of transverse beam and/or longitudinal beam is 1750mm.
In the present embodiment, spacing between the transverse beam and the spacing between the longitudinal beam are confirmed according to the spacing between the column 14.
Said captation is arranged on the inside of said aerial construction; Bracing frame 15 is used to support said captation, and said captation is used to collect the water of seepage;
Concrete, said captation is a curved slab 11, curved slab 11 is to the bottom of bracing frame 15 protrusion;
Preferably, the material of curved slab 11 is engineering plastic alloy PC+ABS, and wherein the shape and size of curved slab 11 can be adjusted according to the size and dimension of washroom;
Said captation is that a plurality of legholes 17 are set on the curved slab 11; The column 14 of bracing frame 15 passes leghole 17, and said captation is connected with column 14, so that said captation is arranged on the inside of bracing frame 15.
Concrete, a plurality of legholes 17 are set on the curved slab 11, pass a column 14 in each leghole 17;
The size of each leghole 17 is coincide with the size of the column 14 that in leghole 17, passes, and leghole 17 and 14 seamless connections of the column that in leghole 17, passes.
In the present embodiment, can from leghole 17, pass seamless connection that guarantees 17 of column 14 and legholes simultaneously in order to guarantee column 14, usually the size of leghole 17 is than the big 1-2mm of maximum length of the cross section of column 14; After all columns 14 being inserted the leghole 17 of its design respectively and adjusting to design attitude, it is fixing to adopt ABS glue to paste, and guarantees leghole 17 and 14 seamless connections of the column that in leghole 17, passes.
In the present embodiment, the number of column 14 is consistent with the number of leghole 17.
Said captation is provided with blow-off pipe interface and floor drain apparatus 10, and floor drain apparatus 10 is communicated with said blow-off pipe interface, to discharge the water that said captation is collected.
In the present embodiment, said blow-off pipe interface comprises drain interface, sub-blow-off pipe interface and main blow-off pipe interface 7;
Floor drain apparatus 10, drain interface, sub-blow-off pipe interface all are communicated with main blow-off pipe interface 7.
Preferably, be respectively arranged with floor drain installing hole 16, gutter installing hole 18, sub-blow-off pipe installing hole 20 and main blow-off pipe installing hole 19 on the curved slab 11; In the present embodiment, the position of floor drain apparatus 10, drain interface, sub-blow-off pipe interface and main blow-off pipe interface 7 is corresponding one by one with the position of floor drain installing hole 16, gutter installing hole 18, sub-blow-off pipe installing hole 20 and main blow-off pipe installing hole 19.
Floor drain apparatus 10 is arranged in the floor drain installing hole 16, and floor drain apparatus 10 and 16 seamless connections of floor drain installing hole; Floor drain apparatus 10 is communicated with main blow-off pipe interface 7 through pipeline, and curved slab 11 collected water flow in the main blow-off pipe interface 7 through floor drain apparatus 10 and through main blow-off pipe interface 7 discharge washroom caissons, guaranteeing does not have ponding in the washroom caisson;
One end of one end of said drain interface, an end of sub-blow-off pipe interface and main blow-off pipe interface 7 passes said gutter installing hole 18, sub-blow-off pipe installing hole 20 and main blow-off pipe installing hole 19 respectively, and the sidewall of the sidewall of the sidewall of said drain interface, sub-blow-off pipe interface and main blow-off pipe interface 7 respectively with gutter installing hole 18, sub-blow-off pipe installing hole 20 and main 19 seamless connections of blow-off pipe installing hole;
The other end of the other end of said drain interface, sub-blow-off pipe interface is communicated with main blow-off pipe interface 7.
In the present embodiment, an end of drain interface passes said gutter installing hole 18, and is connected with the pipeline of washstand; Drain interface with pass the relative end of an end that said gutter installing hole is connected with the pipeline of washstand and be communicated with main blow-off pipe interface 7.
In the present embodiment, an end of sub-blow-off pipe interface passes sub-blow-off pipe installing hole 20, and is connected with the pipeline of closet; An end relative with an end that passes sub-blow-off pipe installing hole 20 and be connected with the pipeline of closet of sub-blow-off pipe interface is communicated with main blow-off pipe interface 7;
In the present embodiment, the flushing valve of closet is a main water-leaking structure, and the water that flushing valve leaks out collects through curved slab 11 and discharges through floor drain 10, can in the casing 4 of washroom caisson, not accumulate.
In the present embodiment, main blow-off pipe interface 7 is except that with floor drain apparatus 10, gutter, sub-blow-off pipe are communicated with, its two ports respectively with caisson in the reserved opening that is provided be connected.
In the present embodiment, the washroom caisson is used framework, further comprises: overlay;
Said overlay covers the top of bracing frame 15.
The washroom caisson of present embodiment uses chassis body to be frame construction; At the casing that is installed in the washroom caisson and after setting various structures such as pipeline in the casing, closet; Need lay at the top of bracing frame 15 and form a plane structure; What present embodiment adopted is to be coated with overlay at the top of bracing frame 15, and the material of wherein said overlay is the light concrete precast plate.
Present embodiment has provided a kind of concrete embodiment situation of washroom caisson with framework, can access the finished product of a kind of washroom caisson with framework according to present embodiment.In the washroom caisson, the principle that adopts water-proof drainage to combine uses the washroom caisson of finished product formula to use framework, can avoid the phenomenon of washroom caisson generation percolating water, and the production of finished product formula makes that this effect can lasting stability.
Embodiment 3
The embodiment of the invention 3 provides a kind of washroom caisson, comprises that casing 4 and described washroom caisson use framework;
The inwall of casing 4 is provided with the blowdown reserved opening;
Said washroom caisson is arranged on the inside of casing 4 with framework;
Said blow-off pipe interface is communicated with said blowdown reserved opening;
Said captation is connected with the inwall of casing 4.
In the present embodiment, the outer ledge of captation is connected with the inwall of casing 4 is seamless, and preferably, said captation is connected with the inwall of casing 4 through connector 8;
Concrete, connector 8 is three-back-shaped or annular laminated structure;
Preferably, the material of connector 8 is a flexiplast.
Preferably, in the present embodiment, the inwall of casing 4 is provided with leveling layer.
Be uneven or the gradient because the inner wall surface of casing 4 possibly exist, therefore can on the inner wall surface of casing 4, carry out the laying of leveling layer, make that the inner wall surface of casing 4 is smooth.
Preferably, in the present embodiment, said captation is a curved slab 11, and curved slab edge 21 is 50mm apart from the spacing between the inwall of casing.
In order to realize that curved slab 11 is connected with the seamless of inwall of casing 4, preferably, said captation is that curved slab 11 is connected with the inwall of casing 4 through connector 8.
Concrete, connector 8 can be three-back-shaped or annular laminated structure, connector 8 is that rectangular central portion is the laminated structure of hollow out for outer shape in the present embodiment, and it is that curved slab 11 is provided with around said captation.
In the present embodiment, connector 8 is the laminated structure of middle part hollow out, and the circulus that centers on openwork part has certain width; The side at the hollow out position, contiguous middle part of connector 8 sticks on the curved slab 11, and with 11 seamless connections of curved slab, the shape at hollow out position, middle part is definite according to the shape of curved slab 11.
The side away from the hollow out position, middle part of curved slab 11 of connector 8 sticks on the inwall of casing 4;
Preferably, the material of connector 8 is a flexiplast, is beneficial to the inwall of curved slab 11 with casing 4 to be connected.
Embodiment 4
Washroom of the prior art caisson job practices is:
According to the size of washroom and be lower than the casing that the flooring construction is provided with the washroom caisson;
Retaining is 24 hours in the casing of washroom, and whether inspection the phenomenon of percolating water occurs, if seepage, need to leak source handle and the experiment that needs the repetition retaining until leakproof;
Brushing leveling layer on the inwall of casing;
After treating the leveling layer dry through, the brushing waterproofing course, and generally brush waterproofing course twice;
After treating the waterproofing course film forming, (this process generally needs 24 hours) smeared cement mortar protective course on the waterproofing course surface;
At cement mortar protective course after sclerosis two days later, devices such as the net that fixes a drainpipe, waterline network, closet;
Light material such as backfill slag is as backfill layer in the casing of washroom, and compaction in layers;
At the surperficial concreting bed course of backfill layer, the thickness of general concrete cushion is 60mm.
And the embodiment of the invention 4 provides the job practices of a kind of washroom caisson, and is as shown in Figure 5, comprising:
Step 401: according to the size of washroom and be lower than the casing that the flooring construction is provided with the washroom caisson;
Step 402: the washroom caisson that will be provided with captation is installed in the said casing with framework;
Step 403: said washroom caisson is communicated with the said blowdown reserved opening that is provided with in the said blow-off pipe interface of framework and the casing;
Step 404: said captation is connected with the inwall of said casing;
Preferably, said captation is connected with the inwall of said casing through connector; Connector is arranged on the periphery of captation, and the outer side edges of said captation is connected with the sidewall of said casing is seamless; And at interface brush waterproof agent; , also need the washroom caisson be fixed in said casing with framework connector before being set;
Step 405: on support frame as described above, lay overlay after bedpan is installed;
Preferably, the seam crossing between said overlay is used the asphalt mortar, bituminous mortar joint filling.
Preferably; According to the size of washroom and be lower than after the flooring construction is provided with the casing of washroom caisson; The washroom caisson that will be provided with captation is installed in the said casing with framework before; Further comprise: brushing leveling layer on the inwall of said casing makes that the inner wall surface of casing is smooth.
What washroom of the prior art caisson adopted is to rely mainly on prevention, and is in seepage that seepage is located in ground and flushing valve etc. the seepage through the anti-sealings of each layer structures such as waterproofing course behind the caisson; And washroom of the present invention caisson is main with row; The water that seepage is located in the flushing valve of ground and closet etc. is captured in together by harvester and discharges the washroom caisson through the draining blowdown apparatus; Do not have stockpiling of water in the casing of assurance caisson, bracing frame of the present invention and washroom caisson job practices can solve the problem of washroom caisson percolating water.
Washroom of the prior art caisson job practices, working procedure is many, and for field operation relates to the coordinating operation between the various work posts, has increased the difficulty of organizing of site operation.
And the job practices of washroom of the present invention caisson; After designing the casing of caisson; After having smeared leveling layer on the inwall of casing; The washroom caisson directly is installed with this finished product device of framework, is not needed to carry out again the operation of waterproofing course, cement mortar protective course and slag backfill layer, greatly reduce the difficulty of engineering.
The job practices of washroom of the prior art caisson, the engineering time is long, after the per pass operation is accomplished, all needs certain curing time, and usually, the construction of accomplishing whole washroom caisson needs 15-20 days;
And the job practices of washroom of the present invention caisson, the engineering time is short, and the site operation duration is 3-5 days.
The washroom of the prior art caisson degree of depth is big, and the washroom clear height is lower, and the main body construction difficulty is big.With crouching formula lavatory is example, and the degree of depth of the casing of the caisson in crouching formula lavatory is approximately 500mm, adds the concrete cushion of 50-100mm; Whole height is approximately 600mm; And the house height be generally about 3 meters, so the clear height of washroom has only 2.4m, make the people feel very oppressive.And the deck-molding in house generally is to be lower than indoor plane 450mm; Cause the end of washroom caisson to be lower than the end of the beam in house; For the bottom that makes the washroom caisson is connected with the bottom of the beam in house; Need do hanging beam in the bottom of beam, so not only increase the cost of construction but also increased the difficulty of constructing.
Bracing frame among the present invention, the degree of depth that has reduced the casing of washroom caisson increased the washroom clear height, make things convenient for main structure construction.Bracing frame of the present invention; Still be example with crouching formula lavatory; The height of bracing frame is 200mm, and the height of the casing of washroom caisson is 350mm, adds the thickness of overlay at the top of upper frame; Make the bottom of washroom caisson flush, greatly reduce the difficulty of main body construction with the bottom of the beam in house.
The construction of washroom of the prior art caisson is a site operation, in the work progress, and the concreting etc. of need plastering; Need the situ wet operation; Environment pollution is big, generally adopts polyurethane water-proof paint in addition in the waterproofing course, and the chemical solvent of the inside contains chemical substances such as methyl alcohol, benzene; Volatile, it is bigger that the operator sucks behind the human body hazard ratio to health.In the washroom of the present invention caisson job practices; Need on the sidewall of the caisson of washroom, not smear waterproofing course; Can not produce the chemical substance bigger to the hazard ratio of health; And in the work progress, working procedure is few, and situ wet operations such as the concreting of need not plastering also can reduce the pollution of environment.
To sum up, among the present invention, the washroom caisson is installed in the casing of washroom caisson as a finished product device with framework, has changed the many present situations of washroom caisson on-site construction processes in the prior art, reduced the difficulty of construction; And washroom of the present invention caisson adopts on design principle is the principle that draining combines with waterproof; No matter whether the blow-off pipe in the house stops up and unimpededly can both play the effect that well prevents percolating water, adopts low in the pollution of the environment that washroom of the present invention caisson brings simultaneously.
Various embodiment provided by the invention can make up with any-mode as required each other, the technical scheme that obtains through this combination, also within the scope of the invention.
Obviously, those skilled in the art can carry out various changes and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, belong within the scope of claim of the present invention and equivalent technologies thereof if of the present invention these are revised with modification, then the present invention also comprises these changes and modification interior.

Claims (10)

1. the washroom caisson is used framework, it is characterized in that, comprising: bracing frame, captation, floor drain apparatus and blow-off pipe interface;
Support frame as described above is an aerial construction, and said captation is arranged on the inside of said aerial construction, and support frame as described above is used to support said captation;
Said captation is provided with blow-off pipe interface and floor drain apparatus, and said floor drain apparatus is communicated with said blow-off pipe interface, to discharge the water that said captation is collected.
2. washroom according to claim 1 caisson is used framework, it is characterized in that, a plurality of legholes are set on the said captation; The column of support frame as described above passes said leghole, and said captation is connected with said column, so that said captation is arranged on the inside of support frame as described above.
3. washroom according to claim 1 caisson is used framework, it is characterized in that, said captation is provided with floor drain installing hole and blow-off pipe installing hole;
Said floor drain apparatus is arranged on said floor drain installing hole place, and said floor drain apparatus and said seamless connection of floor drain installing hole;
Said blow-off pipe interface is arranged on said blow-off pipe installing hole place.
4. use framework according to each described washroom caisson of claim 1 to 3, it is characterized in that said captation is a curved slab, said curved slab is to the bottom of support frame as described above protrusion, and preferably, the material of said curved slab is engineering plastic alloy PC+ABS.
5. washroom according to claim 1 caisson is used framework, it is characterized in that, further comprises: overlay;
Said overlay covers the top of support frame as described above.
6. the washroom caisson is characterized in that, comprises casing and uses framework like each described washroom caisson of claim 1 to 5;
The inwall of said casing is provided with the blowdown reserved opening;
Said washroom caisson is arranged on the inside of said casing with framework;
Said blow-off pipe interface is communicated with said blowdown reserved opening;
Said captation is connected with the inwall of said casing.
7. washroom according to claim 6 caisson is characterized in that, said captation is connected with the inwall of said casing through connector;
Said connector is three-back-shaped or annular laminated structure; Preferably, the material of said connector is a flexiplast.
8. washroom according to claim 6 caisson is characterized in that the inwall of said casing is provided with leveling layer.
9. the job practices of washroom caisson is characterized in that, comprising:
According to the size of washroom and be lower than the casing that the flooring construction is provided with the washroom caisson;
The washroom caisson that is provided with captation is installed in the said casing with framework;
Said washroom caisson is communicated with the said blowdown reserved opening that is provided with in the said blow-off pipe interface of framework and the casing;
Said captation is connected with the inwall of said casing;
After being installed, bedpan on support frame as described above, lays overlay.
10. the job practices of washroom according to claim 9 caisson; It is characterized in that; According to the size of washroom and be lower than after the flooring construction is provided with the casing of washroom caisson; The washroom caisson that will be provided with captation is installed in the said casing with framework before, further comprise: brushing leveling layer on the inwall of said casing.
CN201210284394.9A 2012-08-10 2012-08-10 Frame for bathroom caisson, bathroom caisson and construction method Expired - Fee Related CN102767218B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210284394.9A CN102767218B (en) 2012-08-10 2012-08-10 Frame for bathroom caisson, bathroom caisson and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210284394.9A CN102767218B (en) 2012-08-10 2012-08-10 Frame for bathroom caisson, bathroom caisson and construction method

Publications (2)

Publication Number Publication Date
CN102767218A true CN102767218A (en) 2012-11-07
CN102767218B CN102767218B (en) 2014-01-29

Family

ID=47094767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210284394.9A Expired - Fee Related CN102767218B (en) 2012-08-10 2012-08-10 Frame for bathroom caisson, bathroom caisson and construction method

Country Status (1)

Country Link
CN (1) CN102767218B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401660A (en) * 2015-11-20 2016-03-16 许钢良 Waterproof structure of toilet and water collecting tank
CN106639361A (en) * 2016-10-31 2017-05-10 代胜勇 Method for increasing clear height of toilet
CN106759963A (en) * 2016-12-27 2017-05-31 广东星艺装饰集团股份有限公司 Drainpipe grouting bearing, polishing brick template In-situ cast concrete board caisson handling process
CN107060170A (en) * 2017-05-11 2017-08-18 宋正国 The cement foamed backfill structure in caisson type toilet and its earth-filling method
CN107227771A (en) * 2017-07-19 2017-10-03 上海星杰装饰有限公司 A kind of sinking toilet construction skill
CN107762097A (en) * 2017-10-28 2018-03-06 刘孔林 A kind of toilet caisset and construction method
CN108301466A (en) * 2018-03-29 2018-07-20 广东省建工设计院有限公司 Integral prefabricated caisson of toilet and caisson of toilet construction and its construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1987002730A1 (en) * 1985-10-24 1987-05-07 Benny Koudal A floor mounted pipe installation in buildings and a method of providing such an installation
JPH03199536A (en) * 1989-12-27 1991-08-30 Kimura Giken:Kk Floor structure of construction
CN200946301Y (en) * 2006-09-19 2007-09-12 陈永强 Antileak structure for multiple stage secondary drainage of toilet
KR20110075701A (en) * 2009-12-28 2011-07-06 주식회사 청완 A prefabricated bathroom
CN202831102U (en) * 2012-08-10 2013-03-27 卫青富 Frame used for toilet caisson and toilet caisson

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1987002730A1 (en) * 1985-10-24 1987-05-07 Benny Koudal A floor mounted pipe installation in buildings and a method of providing such an installation
JPH03199536A (en) * 1989-12-27 1991-08-30 Kimura Giken:Kk Floor structure of construction
CN200946301Y (en) * 2006-09-19 2007-09-12 陈永强 Antileak structure for multiple stage secondary drainage of toilet
KR20110075701A (en) * 2009-12-28 2011-07-06 주식회사 청완 A prefabricated bathroom
CN202831102U (en) * 2012-08-10 2013-03-27 卫青富 Frame used for toilet caisson and toilet caisson

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
钟尉,陈庆恒等: "架空式下沉卫生间楼地面做法", 《山西建筑》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401660A (en) * 2015-11-20 2016-03-16 许钢良 Waterproof structure of toilet and water collecting tank
CN105401660B (en) * 2015-11-20 2019-07-12 许钢良 A kind of toilet waterproofing structure and catch basin
CN106639361A (en) * 2016-10-31 2017-05-10 代胜勇 Method for increasing clear height of toilet
CN106759963A (en) * 2016-12-27 2017-05-31 广东星艺装饰集团股份有限公司 Drainpipe grouting bearing, polishing brick template In-situ cast concrete board caisson handling process
CN107060170A (en) * 2017-05-11 2017-08-18 宋正国 The cement foamed backfill structure in caisson type toilet and its earth-filling method
CN107060170B (en) * 2017-05-11 2019-03-08 宋正国 The cement foamed backfill structure in caisson type toilet and its earth-filling method
CN107227771A (en) * 2017-07-19 2017-10-03 上海星杰装饰有限公司 A kind of sinking toilet construction skill
CN107227771B (en) * 2017-07-19 2020-06-19 上海星杰装饰有限公司 Sinking type toilet construction process
CN107762097A (en) * 2017-10-28 2018-03-06 刘孔林 A kind of toilet caisset and construction method
CN107762097B (en) * 2017-10-28 2020-04-03 刘孔林 Toilet caisson structure and construction method
CN108301466A (en) * 2018-03-29 2018-07-20 广东省建工设计院有限公司 Integral prefabricated caisson of toilet and caisson of toilet construction and its construction method
CN108301466B (en) * 2018-03-29 2023-09-12 广东省建工设计院有限公司 Integral prefabricated bathroom caisson, bathroom caisson structure and construction method thereof

Also Published As

Publication number Publication date
CN102767218B (en) 2014-01-29

Similar Documents

Publication Publication Date Title
CN102767218B (en) Frame for bathroom caisson, bathroom caisson and construction method
CN110878700B (en) Tunnel waterproof structure and construction method thereof
CN103821181A (en) Basement bottom plate water drainage layer construction method
CN203531009U (en) Macadam layer hydrophobic structure for basement base plate
CA2989257A1 (en) Fluid retaining structure
CN108301466B (en) Integral prefabricated bathroom caisson, bathroom caisson structure and construction method thereof
CN102587416A (en) Basement attached lane structure and construction method thereof
CN104234089B (en) The construction method that a kind of basement guarded drainage combines
CN103410318B (en) Washroom pipe well water-leakage construction method
CN202831102U (en) Frame used for toilet caisson and toilet caisson
CN110541431A (en) waterproof structure of pipe gallery and construction method thereof
CN107386298A (en) A kind of depth hole composite supporting construction and its construction method with water-proof function
CN112942432A (en) Construction method of anti-leakage brick inspection well
CN206408726U (en) A kind of drain structure
CN205804419U (en) The tenon formula joint waterproofing structure of concrete waist rail embedded structure side wall
CN112081254B (en) Toilet waterproof structure and construction method thereof
CN104455757A (en) Downcomer assembly and installation method thereof
CN211599772U (en) Floor waterproof construction is worn to pipeline
CN114045880A (en) Basement post-cast strip treatment process
TW451019B (en) Water-proof and damp-proof method for basement side wall
CN103882918B (en) The water discharge method of floor hydrops and device during construction of super highrise building
CN111075228A (en) Sink built on stilts water absorption formula prefabricated plate lavatory in pond
CN109778912A (en) Underground pipe gallery sole plate expansion joint waterproof joint structure and its construction method
CN220266765U (en) Outer wall drainage system
CN219672265U (en) Novel pond leak protection device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140129

Termination date: 20190810