KR20110075701A - A prefabricated bathroom - Google Patents
A prefabricated bathroom Download PDFInfo
- Publication number
- KR20110075701A KR20110075701A KR1020090132222A KR20090132222A KR20110075701A KR 20110075701 A KR20110075701 A KR 20110075701A KR 1020090132222 A KR1020090132222 A KR 1020090132222A KR 20090132222 A KR20090132222 A KR 20090132222A KR 20110075701 A KR20110075701 A KR 20110075701A
- Authority
- KR
- South Korea
- Prior art keywords
- waterproof plate
- waterproof
- plate
- waterproofing
- drain
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/12—Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/12—Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
- E03C1/122—Pipe-line systems for waste water in building
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03D—WATER-CLOSETS OR URINALS WITH FLUSHING DEVICES; FLUSHING VALVES THEREFOR
- E03D11/00—Other component parts of water-closets, e.g. noise-reducing means in the flushing system, flushing pipes mounted in the bowl, seals for the bowl outlet, devices preventing overflow of the bowl contents; devices forming a water seal in the bowl after flushing, devices eliminating obstructions in the bowl outlet or preventing backflow of water and excrements from the waterpipe
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
Abstract
The present invention relates to a prefabricated washbasin for layered piping, and in particular, a first waterproof plate installed on an upper portion of a slab to be installed down, a second waterproof plate installed on an upper portion of the first waterproof plate, and the first waterproof plate and a second waterproof plate. Regarding the prefabricated washroom for layered piping comprising a wash basin, a bathtub, a toilet and a drain pipe for draining the floor, and a sound insulating material filling the space between the first and second waterproof plates installed between the waterproof plates. will be.
Description
The present invention relates to a prefabricated washbasin for layered piping, and in particular, a first waterproof plate installed on an upper portion of a slab to be installed down, a second waterproof plate installed on an upper portion of the first waterproof plate, and the first waterproof plate and a second waterproof plate. Regarding the prefabricated washroom for layered piping comprising a wash basin, a bathtub, a toilet and a drain pipe for draining the floor, and a sound insulating material filling the space between the first and second waterproof plates installed between the waterproof plates. will be.
In general, the waterproof structure must be installed on the floor of the washroom, and the washroom construction method is divided into a wet method and a dry method.
The wet method is to form a thick waterproof layer on the floor slab by the liquid waterproofing in the state that the slope is formed of retaining wall and masonry wall, and then to perform the floor tile construction on the surface and to form a waterproof layer by liquid waterproofing the wall surface Wall tile construction was performed on the surface.
However, the wet method is very cumbersome to the construction method, such as to form a liquid waterproof layer and then dried, filled with water to confirm the waterproofness, and the construction period is long and the difficulty of construction is high precision construction There was a problem with this difficulty. In particular, when the temperature is low in winter, construction is impossible, it is difficult to secure uniform quality for each construction generation, there is a possibility that water leakage may occur due to the crack of the waterproof layer over time, and maintenance is difficult.
Next, the dry process is called 'Unit Bath Room' (UBR), and the material required for the formation of the bathroom floor and ceiling is pre-produced in the factory, and then simply assembled at the site. How to construct toilet
However, the above wet and dry construction methods are all applied to a conventional drainage system, and are basically connected by a sink, a bathtub, and a sewer pipe, and are provided with a drain pipe device for collecting and discharging sewage and bottom sewage used in the sink and the bathtub. do.
However, in the conventional drainage system as described above, since the drain pipe for discharging sewage is usually formed in the ceiling of the lower floor, the noise of the sewage discharged from the upper floor flows into the lower floor as it is, and the upper and lower floors are thin such as the drain pipe device and the drain pipe. Because it is blocked by PVC membrane, the noise generated inside the upper bath tub (water dropping out of the toilet, the sound of pissing, the sound of showering, etc.) is transferred to the lower floor, and the privacy of the person using the upper bath tub is kept. There is a problem that can be infringed, and people of the lower level may be offended by the sound.
In addition, in the case of applying the UBR to the drainage system, in order to fasten the upper device of the drainage pipe device, the waterproof plate hole constituting the UBR must be drilled, and since the bottom of the drainage pipe device and the drainage pipe are buried in the concrete under the waterproofing water plate, If water leaks from the bottom, there was a problem such as removing the waterproof plate or repair work should be done through the ceiling of the lower floor.
In order to solve the above problems, the applicant has been registered with the 'Layered double piping system of the bath tub'.
The 'bathtub drainage system' is a drainage pipe device for collecting the sewage of the floor on the concrete floor for the down-constructed foundation floor after the construction of the slab of the toilet, and the sewage discharged from the tub, toilet and washbasin After installing the drain pipe to discharge, the finishing material was filled, and the bottom tile was installed on top of the finishing material.
In the case of applying the UBR to the layered double pipe system as described above, after the basic piping is made, the waterproof plate constituting the UBR needs to be installed, so when water leaks from the drain pipe device and the drain pipes installed on the foundation concrete floor, the water leaks to the lower floor. There may be a problem that, in case of leakage occurs because the repair work must be performed after removing the waterproof plate, the repair cost is excessively excessive and the repair process is very difficult.
Accordingly, an object of the present invention is to provide an effective dry toilet construction method that can be applied to a layered double piping system.
More specifically, the first waterproof plate of the tubular shape with the slab bottom of the down-constructed bathroom and the corresponding upper part of the down depth is opened, the first waterproof plate is fastened to the upper part, and the drain pipe device and various drain pipes An object of the present invention is to provide a prefabricated toilet for a layered double piping system configured to include a second waterproof plate to be fastened and a sound insulating material filled between the first waterproof plate and the second waterproof plate.
In addition, by providing an eleventh waterproofing plate installed on the upper slab down slab construction as described above, even if a leak occurs in the drainage pipe device or drainage pipes installed in the lower portion of the second waterproofing plate to prevent leakage to the lower layer by the first waterproofing layer. It aims to do it.
In addition, by installing a molten wall through-sleeve connected to the side of the first waterproofing layer and embedded in the bottom of the wall of the down-constructed toilet, the water leaked to the first waterproofing layer is accumulated so that the water leaked into the first waterproofing layer is accumulated. It is aimed at preventing problems of smells that can be caused by rotting.
In addition, by filling the sound insulation between the first waterproofing layer and the second waterproofing layer is another object to prevent the bottom of the washbasin from ringing or the sound is transmitted to the lower layer.
In order to achieve the above object, the present invention relates to a layered double piping system of a down bathroom having a down construction by a down slab method, wherein an upper portion having a down construction height installed on an upper portion of the down construction slab is opened in a cylindrical shape. 1 waterproof plate; A second waterproof plate installed on an upper portion of the first waterproof plate, the edge of which is sealed to the first waterproof plate, and a drain pipe device main body and various drain pipes are installed on the bottom surface, and the sound insulation is filled between the first waterproof plate and the second waterproof plate; It provides a prefab washbasin comprising a agent.
According to the present invention, the first waterproofing plate, the second waterproofing plate, and the soundproofing agent are configured to be leaked to the lower layer by the first waterproofing layer even if water leaks from the drainage pipe or drainage pipes installed in the lower portion of the second waterproofing plate. It can prevent.
In addition, by installing a molten wall through-sleeve connected to the side of the first waterproofing layer and embedded in the bottom of the wall of the down-constructed toilet, the water leaked to the first waterproofing layer is accumulated so that the water leaked into the first waterproofing layer is accumulated. It is possible to prevent odors caused by rotting.
In addition, the soundproofing agent may be filled between the first and second waterproofing layers to prevent the floor of the washroom from being ringed or transmitted to the lower layer.
Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.
Figure 1 shows the lower waterproof plate constituting the prefabricated washbasin for applying to the layered double piping system according to the present invention, the upper surface is open and the cylindrical first
In more detail, the
Next, the second
In addition, at least two sound
In addition, the drain pipes attached to the lower portion of the second waterproof plate and the retaining wall sleeves embedded in the retaining wall are connected to each other using a flexible eccentric pipe fitting through the through holes formed in the first waterproof plate.
As described above, the prefabricated washroom to be applied to the layered double piping system according to the present invention is extremely easy to be applied to the washbasin that is constructed of two waterproof plates.
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments, but, on the contrary, It will be appreciated that one embodiment is possible. Accordingly, the true scope of the present invention should be determined by the technical idea of the claims.
1 is a view showing the configuration of the first waterproof plate and the second waterproof plate constituting the prefabricated washbasin for the layered pipe according to the present invention.
<Description of the symbols for the main parts of the drawings>
10: first waterproof plate 20: second waterproof plate
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090132222A KR20110075701A (en) | 2009-12-28 | 2009-12-28 | A prefabricated bathroom |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090132222A KR20110075701A (en) | 2009-12-28 | 2009-12-28 | A prefabricated bathroom |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20110075701A true KR20110075701A (en) | 2011-07-06 |
Family
ID=44915667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090132222A KR20110075701A (en) | 2009-12-28 | 2009-12-28 | A prefabricated bathroom |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20110075701A (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102767218A (en) * | 2012-08-10 | 2012-11-07 | 卫青富 | Frame for bathroom caisson, bathroom caisson and construction method |
KR101313848B1 (en) * | 2011-08-17 | 2013-10-01 | 주식회사 청완 | Drainage System on Floor of Flat Slab Type and Toilet Stool Sleeve Using the Same |
KR101488639B1 (en) * | 2014-04-14 | 2015-02-04 | 서종원 | unit bathroom with recessed waterproof board |
CN104847134A (en) * | 2015-05-18 | 2015-08-19 | 广州鸿力复合材料有限公司 | Integrated drainage unit bathroom waterproof base plate |
WO2015183057A1 (en) * | 2014-05-30 | 2015-12-03 | 주식회사 청완 | Drainage integrated bathroom floor slab |
KR20160043423A (en) | 2014-10-13 | 2016-04-21 | 정일테크 (주) | Structure of drid adn raised floor for prefabricated bathroom |
KR20160068312A (en) | 2014-12-05 | 2016-06-15 | 정일테크 (주) | Structure of drid adn raised floor for prefabricated bathroom |
CN106088672A (en) * | 2016-06-27 | 2016-11-09 | 张七龙 | Inflatable bathing room |
CN106088671A (en) * | 2016-06-27 | 2016-11-09 | 张七龙 | The method of manufacture and use thereof in Inflatable bathing room |
CN106759963A (en) * | 2016-12-27 | 2017-05-31 | 广东星艺装饰集团股份有限公司 | Drainpipe grouting bearing, polishing brick template In-situ cast concrete board caisson handling process |
CN106759688A (en) * | 2016-12-13 | 2017-05-31 | 上海市建工设计研究院有限公司 | Prefabricated two-layer equation co-layer draining structural slab, drainage system and its construction method |
CN106759687A (en) * | 2016-12-13 | 2017-05-31 | 上海市建工设计研究院有限公司 | Prefabricated two-layer equation Homofloor drainage system and its construction method |
-
2009
- 2009-12-28 KR KR1020090132222A patent/KR20110075701A/en not_active Application Discontinuation
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101313848B1 (en) * | 2011-08-17 | 2013-10-01 | 주식회사 청완 | Drainage System on Floor of Flat Slab Type and Toilet Stool Sleeve Using the Same |
CN102767218A (en) * | 2012-08-10 | 2012-11-07 | 卫青富 | Frame for bathroom caisson, bathroom caisson and construction method |
KR101488639B1 (en) * | 2014-04-14 | 2015-02-04 | 서종원 | unit bathroom with recessed waterproof board |
CN106414867A (en) * | 2014-05-30 | 2017-02-15 | 清完株式会社 | Drainage integrated bathroom floor slab |
WO2015183057A1 (en) * | 2014-05-30 | 2015-12-03 | 주식회사 청완 | Drainage integrated bathroom floor slab |
KR20160043423A (en) | 2014-10-13 | 2016-04-21 | 정일테크 (주) | Structure of drid adn raised floor for prefabricated bathroom |
KR20160068312A (en) | 2014-12-05 | 2016-06-15 | 정일테크 (주) | Structure of drid adn raised floor for prefabricated bathroom |
CN104847134A (en) * | 2015-05-18 | 2015-08-19 | 广州鸿力复合材料有限公司 | Integrated drainage unit bathroom waterproof base plate |
CN106088672A (en) * | 2016-06-27 | 2016-11-09 | 张七龙 | Inflatable bathing room |
CN106088671A (en) * | 2016-06-27 | 2016-11-09 | 张七龙 | The method of manufacture and use thereof in Inflatable bathing room |
CN106759688A (en) * | 2016-12-13 | 2017-05-31 | 上海市建工设计研究院有限公司 | Prefabricated two-layer equation co-layer draining structural slab, drainage system and its construction method |
CN106759687A (en) * | 2016-12-13 | 2017-05-31 | 上海市建工设计研究院有限公司 | Prefabricated two-layer equation Homofloor drainage system and its construction method |
CN106759963A (en) * | 2016-12-27 | 2017-05-31 | 广东星艺装饰集团股份有限公司 | Drainpipe grouting bearing, polishing brick template In-situ cast concrete board caisson handling process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20110075701A (en) | A prefabricated bathroom | |
KR101218810B1 (en) | Structure of prefabricated bathroom | |
KR101564993B1 (en) | Drain Assembled Bathroom Floor Board | |
KR102028838B1 (en) | Drainage system in the apartment house | |
KR100913781B1 (en) | Drain Equipment For Bathroom Floor Coupled With Drain Pipe System Laid On Floor | |
KR101716876B1 (en) | prefabricated Bathroom Floor Board | |
KR20140049220A (en) | Waterproof plate connection socket of drainage pipe unit bath room | |
KR101081970B1 (en) | Construction method for On-floor drainage piping system of bathroom in multistory building | |
KR101219145B1 (en) | Piping System For Bathroom Having Double Pipe Structure | |
KR101313848B1 (en) | Drainage System on Floor of Flat Slab Type and Toilet Stool Sleeve Using the Same | |
KR101135564B1 (en) | Structure of prefabricated bathroom | |
KR20110101529A (en) | Drainage device for pipe laying on floor whit stopwater of unit bath room | |
KR20090108348A (en) | Bathroom construction | |
KR101290817B1 (en) | Structure of prefabricated bathroom of discharge apparatus for leachate water | |
KR101236143B1 (en) | Layered drainage and construction methods | |
KR100981324B1 (en) | Bathroom And Construction Method Thereof For Laying Drain Pipe System Over Floor | |
KR100918851B1 (en) | Frame for Installing Drain Pipe on Floor | |
KR20170002282U (en) | Floor drain apparatus | |
KR101058940B1 (en) | Drainpipe for layered piping | |
KR102104940B1 (en) | Execution Method Bathroom Above Floor Pipe of Remodel a House | |
KR101677028B1 (en) | Drainage System on Floor of Flat Slab Type and Toilet Stool Institution Cast Using the Same | |
KR101089087B1 (en) | Drainage For Drain Pipe System Laid On Floor | |
KR20160035876A (en) | Drain Assembled Bathroom Floor Board | |
KR20170099095A (en) | The bottom portion of the double layered pipe system and method for the construction of apartment houses Bathroom | |
KR20170099097A (en) | The bottom portion of the double layered pipe system and method for the construction of apartment houses Bathroom |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
N231 | Notification of change of applicant | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |