CN102758638A CN201210249973XA CN201210249973A CN102758638A CN 102758638 A CN102758638 A CN 102758638A CN 201210249973X A CN201210249973X A CN 201210249973XA CN 201210249973 A CN201210249973 A CN 201210249973A CN 102758638 A CN102758638 A CN 102758638A
Authority
CN
China
Prior art keywords
inverted arch
steel support
crd
steel
temporary steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210249973XA
Other languages
English (en)
Other versions
CN102758638B (zh
Inventor
戴兴民
马栋
董贤顺
陈建
汪春生
郭建国
许省会
郭保飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Metro Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201210249973.XA priority Critical patent/CN102758638B/zh
Publication of CN102758638A publication Critical patent/CN102758638A/zh
Application granted granted Critical
Publication of CN102758638B publication Critical patent/CN102758638B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种CRD仰拱施工方法,包括以下步骤:1)设置临时钢支撑;2)破除临时钢支撑附近中隔壁;3)施作临时钢支撑底面找平层、防水层和保护层;4)施加预应力;以及5)仰拱结构施工:破除其余中隔壁,施作找平层、防水层和保护层,施作钢筋、模板、混凝土,混凝土仰拱中间部分用同级混凝土回填,两侧边墙同时浇筑30cm高混凝土。本发明的有益效果为:减少了结构施工缝,避免了工序之间的频繁转换,结构整体性强,实现了防水层全封闭,有效地控制了地面沉降量;该方法操作简单,初期支护结构稳定性强,安全度高;提高了工程质量,加快了施工进度,降低了施工费用。

Description

一种CRD仰拱施工方法
技术领域
本发明属于土木工程领域,尤其涉及一种CRD(交叉中隔壁)仰拱施工方法。
背景技术
北京地铁八号线八标安华桥车站下穿北三环主路地段长64m,右线隧道采用现有CRD(交叉中隔壁)法施工,开挖断面宽9.7m,高9.9m,覆土厚11m,土质松软,地面交通繁忙,地下管线密布,地形险要;原设计方案将底板、边墙、拱圈分成四块衬砌,边破除边衬砌,每次循环为4m,这种方法造成了防水板、钢筋、混凝土接缝多,影响工程质量;工序转换频繁,费工、费材、工期长;如果破除中隔壁过长,则无法满足控制沉降量。
发明内容
本发明的目的是提供一种CRD仰拱施工方法,满足了施工过程设计要求,解决了现有CRD工法中的上述不足。
本发明通过以下技术方案实现其目的:
一种CRD(交叉中隔壁)仰拱施工方法,包括以下步骤:
1)设置临时钢支撑:临时钢支撑采用中隔壁工字钢22a代替,临时钢支撑间距为2.0m;
2)破除临时钢支撑附近的中隔壁:破除临时钢支撑附近的宽1.0m、仰拱轮廓线以下的中隔壁,割除工字钢底部80~100mm范围内钢体;
3)临时钢支撑底面施作找平层、防水层和保护层:在临时钢支撑80cm×80cm范围施作找平层、防水层和保护层;
4)施加预应力:在钢支撑底面垫设规格尺寸为300mm×300mm×10mm的钢板,钢板与钢支撑之间增设两台千斤顶,通过挑杆穿过工字钢,施加给钢支撑13.5t的预应力;以及
5)仰拱结构施工:破除其余中隔壁,施作找平层、防水层和保护层,施作钢筋、模板、混凝土,仰拱中间部分采用同级混凝土回填,两侧边墙同时浇筑30cm高混凝土。
优选的,在步骤3)中,所述保护层为60mm厚的细石混凝土保护层。
优选的,在步骤4)中,所述钢支撑与钢板之间设有钢楔。
优选的,在步骤4)中,所述挑杆通过4根Φ28的钢筋焊接而成。
本发明的有益效果为:减少了结构施工缝,避免了工序之间的频繁转换,结构整体性强,实现了防水层全封闭,有效地控制了地面沉降量;该方法操作简单,初期支护结构稳定性强,安全度高;提高了工程质量,加快了施工进度,降低了施工费用。
具体实施方式
本发明实施例所述的一种CRD仰拱施工方法,包括以下步骤:
1)设置临时钢支撑:临时钢支撑采用中隔壁工字钢22a代替,临时钢支撑间距为2.0m;
2)破除临时钢支撑附近的中隔壁:破除临时钢支撑附近的宽1.0m、仰拱轮廓线以下的中隔壁,割除工字钢底部80~100mm范围内钢体;
3)临时钢支撑底面施作找平层、防水层和保护层:在临时钢支撑80cm×80cm范围施作找平层、防水层和60mm厚的细石混凝土保护层;
4)施加预应力:在钢支撑底面垫设规格尺寸为300mm×300mm×10mm的钢板,钢板与钢支撑之间增设两台千斤顶,钢支撑与钢板之间设有钢楔,通过挑杆穿过工字钢,施加给钢支撑13.5t的预应力;以及
5)仰拱结构施工:破除其余中隔壁,施作找平层、防水层和保护层,施作钢筋、模板、混凝土,仰拱中间部分采用同级混凝土回填,两侧边墙同时浇筑30cm高混凝土。
通过设置临时支撑,按照钢材实际长度,每循环施作仰拱12~18m,连续进行上述CRD仰拱施工,实现了防水层全封闭,有效地控制了地面沉降量,为拱墙结构快速施工创造了有利条件。
虽然以上仅描述了本发明的具体实施方式范例,但是本领域的技术人员应当理解,这些仅是举例说明,本发明的保护范围是由所附权利要求书限定的。本领域的技术人员在不背离本发明的原理和实质的前提下,可以对这些实施方式做出多种变更或修改,但这些变更或修改均落入本发明的保护范围。

Claims (4)

1.一种CRD仰拱施工方法,其特征在于,包括以下步骤:
1)设置临时钢支撑:临时钢支撑采用中隔壁工字钢22a代替,临时钢支撑间距为2.0m;
2)破除临时钢支撑附近的中隔壁:破除临时钢支撑附近的宽1.0m、仰拱轮廓线以下的中隔壁,割除工字钢底部80~100mm范围内钢体;
3)临时钢支撑底面施作找平层、防水层和保护层:在临时钢支撑80cm×80cm范围施作找平层、防水层和保护层;
4)施加预应力:在钢支撑底面垫设规格尺寸为300mm×300mm×10mm的钢板,钢板与钢支撑之间增设两台千斤顶,通过挑杆穿过工字钢,施加给钢支撑13.5t的预应力;以及
5)仰拱结构施工:破除其余中隔壁,施作找平层、防水层和保护层,施作钢筋、模板、混凝土,仰拱中间部分采用同级混凝土回填,两侧边墙同时浇筑30cm高混凝土。
2.根据权利要求1所述的一种CRD仰拱施工方法,其特征在于:在步骤3)中,所述保护层为60mm厚的细石混凝土保护层。
3.根据权利要求2所述的一种CRD仰拱施工方法,其特征在于:在步骤4)中,在临时钢支撑施加预应力时,预铺防水板上部设有钢板保护。
4.根据权利要求3所述的一种CRD仰拱施工方法,其特征在于:在步骤4)中,所述钢支撑与钢板之间设有钢楔;所述挑杆通过4根外径尺寸为Φ28的钢筋焊接而成。
CN201210249973.XA 2012-07-19 2012-07-19 一种crd仰拱施工方法 Expired - Fee Related CN102758638B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210249973.XA CN102758638B (zh) 2012-07-19 2012-07-19 一种crd仰拱施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210249973.XA CN102758638B (zh) 2012-07-19 2012-07-19 一种crd仰拱施工方法

Publications (2)

Publication Number Publication Date
CN102758638A true CN102758638A (zh) 2012-10-31
CN102758638B CN102758638B (zh) 2014-12-10

Family

ID=47053259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210249973.XA Expired - Fee Related CN102758638B (zh) 2012-07-19 2012-07-19 一种crd仰拱施工方法

Country Status (1)

Country Link
CN (1) CN102758638B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103075163A (zh) * 2012-12-28 2013-05-01 成都中铁隆工程集团有限公司 一种大断面隧道二衬施工换撑工艺
CN103075164A (zh) * 2012-12-28 2013-05-01 成都中铁隆工程集团有限公司 一种双洞二衬依次同步推进施工工艺
CN103628899A (zh) * 2013-11-25 2014-03-12 中铁十八局集团有限公司 保留crd中隔壁加焊止水法兰施工工艺
CN103643973A (zh) * 2013-12-03 2014-03-19 中铁十三局集团有限公司 一种crd工法隧道防水施工方法
CN112523784A (zh) * 2020-11-30 2021-03-19 杭州市市政工程集团有限公司 一种软土质暗挖隧道临时支护的防水节点结构及其施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2558442A1 (de) * 1975-12-23 1977-07-07 Bergwerksverband Gmbh Verfahren und mittel zur herstellung einer gasdichten streckenwandung zur grubenbrandverhuetung und -bekaempfung
JPH10176488A (ja) * 1996-12-18 1998-06-30 Nippon Steel Corp 既設トンネルの内張構造
JP2002097898A (ja) * 2000-09-26 2002-04-05 Ishikawajima Constr Materials Co Ltd アーチトンネルおよびアーチトンネルの施工方法および底版ブロック
CN101539021A (zh) * 2009-04-17 2009-09-23 江苏省交通科学研究院股份有限公司 公路隧道开挖方法
CN101775987A (zh) * 2010-02-02 2010-07-14 北京交通大学 地下立交上下主隧道交叠处零间距施工方法
CN101906974A (zh) * 2010-08-09 2010-12-08 中铁第一勘察设计院集团有限公司 一种特大断面黄土隧道的支护结构及其施工方法
CN102268993A (zh) * 2011-06-30 2011-12-07 广东省长大公路工程有限公司 一种高液限土中隧道开挖方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2558442A1 (de) * 1975-12-23 1977-07-07 Bergwerksverband Gmbh Verfahren und mittel zur herstellung einer gasdichten streckenwandung zur grubenbrandverhuetung und -bekaempfung
JPH10176488A (ja) * 1996-12-18 1998-06-30 Nippon Steel Corp 既設トンネルの内張構造
JP2002097898A (ja) * 2000-09-26 2002-04-05 Ishikawajima Constr Materials Co Ltd アーチトンネルおよびアーチトンネルの施工方法および底版ブロック
CN101539021A (zh) * 2009-04-17 2009-09-23 江苏省交通科学研究院股份有限公司 公路隧道开挖方法
CN101775987A (zh) * 2010-02-02 2010-07-14 北京交通大学 地下立交上下主隧道交叠处零间距施工方法
CN101906974A (zh) * 2010-08-09 2010-12-08 中铁第一勘察设计院集团有限公司 一种特大断面黄土隧道的支护结构及其施工方法
CN102268993A (zh) * 2011-06-30 2011-12-07 广东省长大公路工程有限公司 一种高液限土中隧道开挖方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103075163A (zh) * 2012-12-28 2013-05-01 成都中铁隆工程集团有限公司 一种大断面隧道二衬施工换撑工艺
CN103075164A (zh) * 2012-12-28 2013-05-01 成都中铁隆工程集团有限公司 一种双洞二衬依次同步推进施工工艺
CN103075164B (zh) * 2012-12-28 2015-02-18 成都中铁隆工程集团有限公司 一种双洞二衬依次同步推进施工工艺
CN103075163B (zh) * 2012-12-28 2015-02-18 成都中铁隆工程集团有限公司 一种大断面隧道二衬施工换撑工艺
CN103628899A (zh) * 2013-11-25 2014-03-12 中铁十八局集团有限公司 保留crd中隔壁加焊止水法兰施工工艺
CN103628899B (zh) * 2013-11-25 2016-11-02 中铁十八局集团有限公司 保留crd中隔壁加焊止水法兰施工工艺
CN103643973A (zh) * 2013-12-03 2014-03-19 中铁十三局集团有限公司 一种crd工法隧道防水施工方法
CN112523784A (zh) * 2020-11-30 2021-03-19 杭州市市政工程集团有限公司 一种软土质暗挖隧道临时支护的防水节点结构及其施工方法

Also Published As

Publication number Publication date
CN102758638B (zh) 2014-12-10

Similar Documents

Publication Publication Date Title
CN106907159B (zh) 一种浅埋暗挖地铁车站分离开敞式结构及其施工方法
CN102758638B (zh) 一种crd仰拱施工方法
CN103643973A (zh) 一种crd工法隧道防水施工方法
CN102071941B (zh) 一种基于综采沿空留巷的砼块错缝纵码成墙方法
CN105804760B (zh) 特大断面隧道钻爆法原位扩建施工结构及施工方法
CN107489433B (zh) 一种隧道crd工法防渗漏结构及防渗漏方法
CN103835217A (zh) 检查井周边路面破损下陷的防治方法
CN110107303A (zh) 浅覆土盾构下穿高速铁路的变形控制方法
CN204662455U (zh) 一种可调节斜撑加固基坑支护装置
CN104894941A (zh) 城市道路检查井井周路面病害处治结构及施工方法
CN105256854A (zh) 适用于梯形渠道施工的挖斗及施工方法
CN104652495B (zh) 基坑内支撑立柱与底板节点防水施工工艺
CN105672450A (zh) 平行于既有地铁隧道结构上方大口径排水管道的敷设方法
CN110004991A (zh) 基于外凸式翼脚板的地下结构抗浮体系及构建方法
CN103711056A (zh) 钢质工具式临时施工道路及其施工方法
CN202659247U (zh) 隧道仰拱施工背模及其组合钢模
CN103233753A (zh) 用于浅埋大型地下结构建造的全断面开挖的管幕棚架法
CN103132465B (zh) 一种紧贴桩基承台的地下箱涵建造方法
CN108999218B (zh) 盾构区间施工穿越防渗板墙施工方法
CN203890843U (zh) 土木工程用公路夯土机
CN104213567B (zh) 地下管廊控制斜坡段滑移的施工方法
CN204690528U (zh) 城市道路检查井井周路面病害处治结构
CN102926403B (zh) 盖挖法顶板施工方法
CN203247838U (zh) 全埋式地下室侧墙后浇带超前止水模板
CN203403434U (zh) 地下室

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY CONSTRUCTION ENGINEERING BUREAU NO.1

Effective date: 20130711

Owner name: THE SUBWAY ENGINEERING CO., LTD. OF CR16 G

Free format text: FORMER OWNER: CHINA RAILWAY CONSTRUCTION ENGINEERING BUREAU NO.16 GROUP CORP., LTD.

Effective date: 20130711

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130711

Address after: 100018, No. 2, building 19, North Court, North Korean pine garden, Beijing, Chaoyang District 9

Applicant after: SUBWAY ENGINEERING CO., LTD. OF CHINA RAILWAY 16TH BUREAU GROUP Co.,Ltd.

Applicant after: CHINA RAILWAY 16TH BUREAU GROUP Co.,Ltd.

Address before: 100018 Beijing city Chaoyang District No. 2 North Pine dam Park

Applicant before: CHINA RAILWAY 16TH BUREAU GROUP Co.,Ltd.

ASS Succession or assignment of patent right

Free format text: FORMER OWNER: CHINA RAILWAY CONSTRUCTION ENGINEERING BUREAU NO.16 GROUP CORP., LTD.

Effective date: 20141103

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20141103

Address after: 100018, No. 2, building 19, North Court, North Korean pine garden, Beijing, Chaoyang District 9

Applicant after: SUBWAY ENGINEERING CO., LTD. OF CHINA RAILWAY 16TH BUREAU GROUP Co.,Ltd.

Address before: 100018, No. 2, building 19, North Court, North Korean pine garden, Beijing, Chaoyang District 9

Applicant before: SUBWAY ENGINEERING CO., LTD. OF CHINA RAILWAY 16TH BUREAU GROUP Co.,Ltd.

Applicant before: CHINA RAILWAY 16TH BUREAU GROUP Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20210719

CF01 Termination of patent right due to non-payment of annual fee