沿海软土深基坑筋膨凝边坡支护方法 Download PDFInfo
- Publication number
- CN102733396A CN102733396A CN201210234707XA CN201210234707A CN102733396A CN 102733396 A CN102733396 A CN 102733396A CN 201210234707X A CN201210234707X A CN 201210234707XA CN 201210234707 A CN201210234707 A CN 201210234707A CN 102733396 A CN102733396 A CN 102733396A
- Authority
- CN
- China
- Prior art keywords
- muscle
- spray
- soil
- slopes
- curing compound
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本发明公开了一种沿海软土深基坑筋膨凝边坡支护方法,包括喷射固化剂、喷射聚氨酯泡沫剂、横向串筋。本发明施工方便,在使用固化剂作用下,使土质团体凝固,然后插入拉结筋,产生拉伸力,阻止坡塌陷;通过在边坡土层中喷射聚氨酯膨胀剂,使土颗粒膨大,挤出土中水份,使土体密实力增强,压缩系数变小,维护边墙稳定;通过在土壤中掺入土壤固化剂,使土壤颗粒及颗粒块增强了粘着力,形成整体合力,使边坡稳定。
Description
技术领域
本发明涉及一种沿海软土深基坑筋膨凝边坡支护方法。
背景技术
目前,我国沿海软土区域深基坑边坡一般采用钢筋混凝土支护,土钉墙支护等技术方法,均能起到很好效果,但成本很高,所用资源量很大,耗费人工很多。
发明内容
本发明的目的在于提供一种施工方便,支护效果好的沿海软土深基坑筋膨凝边坡支护方法。
本发明的技术解决方案是:
一种沿海软土深基坑筋膨凝边坡支护方法,其特征是:包括:
(1)喷射固化剂:从护坡边起距20cm处,按横纵间隔距离300cm为一个喷射点,喷射固化剂,喷射深度比基桩深度大50~80cm,总喷射量为土层体积的3%;所述固化剂采用水泥、砂、石灰、石膏、胶配置成胶糊状,配置重量比例:水泥:砂:石灰:石膏;胶:水=20:20:12:18:6:15,且配置后搅拌均匀;
(2)喷射聚氨酯泡沫剂:从护坡边起距30cm处,按横纵间隔距离300cm为一个喷射点,喷射固化剂,喷射深度比基桩深度大50~80cm,总喷射量为土层体积的2%;
(3)横向串筋:当基坑开挖到50cm时,进行第一次横向串筋,横向串筋采用竹片进行串筋,竹片厚度为0.2cm,宽度为1cm,长度为150cm,一头削成尖头状,按横向间距10cm串一根,然后随着开挖深度每20cm串筋一层,形成延伸拉力,保护边坡。
本发明施工方便,在使用固化剂作用下,使土质团体凝固,然后插入拉结筋,产生拉伸力,阻止坡塌陷;通过在边坡土层中喷射聚氨酯膨胀剂,使土颗粒膨大,挤出土中水份,使土体密实力增强,压缩系数变小,维护边墙稳定;通过在土壤中掺入土壤固化剂,使土壤颗粒及颗粒块增强了粘着力,形成整体合力,使边坡稳定。
下面结合实施例对本发明作进一步说明。
具体实施方式
一种沿海软土深基坑筋膨凝边坡支护方法,包括:
(1)喷射固化剂:从护坡边起距20cm处,按横纵间隔距离300cm为一个喷射点,喷射固化剂,喷射深度比基桩深度大50~80cm,总喷射量为土层体积的3%;所述固化剂采用水泥、砂、石灰、石膏、胶配置成胶糊状,配置重量比例:水泥:砂:石灰:石膏;胶:水=20:20:12:18:6:15,且配置后搅拌均匀;
(2)喷射聚氨酯泡沫剂:从护坡边起距30cm处,按横纵间隔距离300cm为一个喷射点,喷射固化剂,喷射深度比基桩深度大50~80cm,总喷射量为土层体积的2%;
(3)横向串筋:当基坑开挖到50cm时,进行第一次横向串筋,横向串筋采用竹片进行串筋,竹片厚度为0.2cm,宽度为1cm,长度为150cm,一头削成尖头状,按横向间距10cm串一根,然后随着开挖深度每20cm串筋一层,形成延伸拉力,保护边坡。
Claims (1)
1.一种沿海软土深基坑筋膨凝边坡支护方法,其特征是:包括:
(1)喷射固化剂:从护坡边起距20cm处,按横纵间隔距离300cm为一个喷射点,喷射固化剂,喷射深度比基桩深度大50~80cm,总喷射量为土层体积的3%;所述固化剂采用水泥、砂、石灰、石膏、胶配置成胶糊状,配置重量比例:水泥:砂:石灰:石膏;胶:水=20:20:12:18:6:15,且配置后搅拌均匀;
(2)喷射聚氨酯泡沫剂:从护坡边起距30cm处,按横纵间隔距离300cm为一个喷射点,喷射固化剂,喷射深度比基桩深度大50~80cm,总喷射量为土层体积的2%;
(3)横向串筋:当基坑开挖到50cm时,进行第一次横向串筋,横向串筋采用竹片进行串筋,竹片厚度为0.2cm,宽度为1cm,长度为150cm,一头削成尖头状,按横向间距10cm串一根,然后随着开挖深度每20cm串筋一层,形成延伸拉力,保护边坡。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210234707.XA CN102733396B (zh) | 2012-07-09 | 2012-07-09 | 沿海软土深基坑筋膨凝边坡支护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210234707.XA CN102733396B (zh) | 2012-07-09 | 2012-07-09 | 沿海软土深基坑筋膨凝边坡支护方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102733396A true CN102733396A (zh) | 2012-10-17 |
CN102733396B CN102733396B (zh) | 2014-03-26 |
Family
ID=46989653
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210234707.XA Active CN102733396B (zh) | 2012-07-09 | 2012-07-09 | 沿海软土深基坑筋膨凝边坡支护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102733396B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107386453A (zh) * | 2017-08-14 | 2017-11-24 | 上海二十冶建设有限公司 | 高层吊脚楼施工方法 |
CN108221529A (zh) * | 2018-01-15 | 2018-06-29 | 赤峰诚联市政工程有限责任公司 | 城市道路淤泥基挤压固化施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3609666A1 (de) * | 1986-03-21 | 1987-10-08 | Gudehus Gerd Prof Dr | Verfahren zur herstellung von baugruben oder hohlraeumen |
WO2010068014A2 (ko) * | 2008-12-08 | 2010-06-17 | 코오롱건설주식회사 | 상하수도 공사에 적합한 고심도용 간이 흙막이 구조물 |
CN102011404A (zh) * | 2010-11-24 | 2011-04-13 | 温州中城建设集团有限公司 | 基坑支护结构及其施工方法 |
-
2012
- 2012-07-09 CN CN201210234707.XA patent/CN102733396B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3609666A1 (de) * | 1986-03-21 | 1987-10-08 | Gudehus Gerd Prof Dr | Verfahren zur herstellung von baugruben oder hohlraeumen |
WO2010068014A2 (ko) * | 2008-12-08 | 2010-06-17 | 코오롱건설주식회사 | 상하수도 공사에 적합한 고심도용 간이 흙막이 구조물 |
CN102011404A (zh) * | 2010-11-24 | 2011-04-13 | 温州中城建设集团有限公司 | 基坑支护结构及其施工方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107386453A (zh) * | 2017-08-14 | 2017-11-24 | 上海二十冶建设有限公司 | 高层吊脚楼施工方法 |
CN107386453B (zh) * | 2017-08-14 | 2019-05-24 | 上海二十冶建设有限公司 | 高层吊脚楼施工方法 |
CN108221529A (zh) * | 2018-01-15 | 2018-06-29 | 赤峰诚联市政工程有限责任公司 | 城市道路淤泥基挤压固化施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102733396B (zh) | 2014-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103469939B (zh) | 一种砌体填充墙与主体柔性连接抗震结构及其施工方法 | |
CN202899165U (zh) | 一种公路路基t形壁板式挡墙结构 | |
JP6279945B2 (ja) | 土構造物ののり面表層すべり対策工法 | |
CN206941608U (zh) | 一种地下连续墙基坑支护结构 | |
CN104005786B (zh) | 用于尾砂充填采矿的现浇泡沫隔离墙施工方法 | |
CN104343111A (zh) | 一种利用节点桩加固厚沙土层的复合地基 | |
CN105780787A (zh) | 底柱表孔型现浇绿化混凝土及制备方法和设备 | |
CN103410158B (zh) | 一种可回收直立式门架自稳围护结构及其应用方法 | |
CN207211165U (zh) | 一种适用于库岸边坡的复合抗滑桩墙支挡结构 | |
CN104532855B (zh) | 一种深厚泥炭质土层中的组合桩支护结构 | |
CN102733396B (zh) | 沿海软土深基坑筋膨凝边坡支护方法 | |
CN103334450A (zh) | 一种带排水沟的桩柱预制板挡土墙的施工方法 | |
CN101608454B (zh) | 一种空腔浅基础及施工方法 | |
CN203768914U (zh) | 一种用于基坑围护的斜向支撑桩结构 | |
CN102605779B (zh) | 软土基坑的高抗拔锚杆支护结构及其施工方法 | |
CN103046670B (zh) | 预制再生混凝土带消能连接键剪力墙及作法 | |
CN108517882A (zh) | 一种土工格室加筋高陡边坡及其施工方法 | |
CN201605588U (zh) | 预应力锚固框架梁坡面加固及固定结构 | |
CN104746791B (zh) | 半刚性框架—内填再生混凝土墙板及制作方法 | |
CN204174627U (zh) | 一种边坡支护结构 | |
CN207485469U (zh) | 一种轻型灵活的挡墙支护结构 | |
CN207062958U (zh) | 一种深基坑复杂多种支护组合结构 | |
CN216007015U (zh) | 一种软土地基砖胎模施工结构 | |
CN204386611U (zh) | 一种隧洞喷射混凝土免拆模板 | |
CN113756352A (zh) | 一种软土地基砖胎模施工结构及其工法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Support method of reinforced expansive concrete slope of deep foundation pit in coastal soft soil Effective date of registration: 20220427 Granted publication date: 20140326 Pledgee: China Construction Bank Corporation Rudong sub branch Pledgor: JIANGSU SHUNTONG CONSTRUCTION GROUP Co.,Ltd. Registration number: Y2022980004919 |