CN102733362A - 海洋风电安装船超大吨位塔头平台吊装方法 - Google Patents

海洋风电安装船超大吨位塔头平台吊装方法 Download PDF

Info

Publication number
CN102733362A
CN102733362A CN2012102304708A CN201210230470A CN102733362A CN 102733362 A CN102733362 A CN 102733362A CN 2012102304708 A CN2012102304708 A CN 2012102304708A CN 201210230470 A CN201210230470 A CN 201210230470A CN 102733362 A CN102733362 A CN 102733362A
Authority
CN
China
Prior art keywords
tower head
suspension centre
lifting
head platform
wheel machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102304708A
Other languages
English (en)
Other versions
CN102733362B (zh
Inventor
许桢英
朱之红
徐秀龙
闻武
倪涛
张永康
蒋家坤
李杨
庄建军
王匀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong COSCO Shipping Engineering Co., Ltd.
Qidong Zhongyuan Marine Engineering Co., Ltd.
Southeast University
Jiangsu University
Original Assignee
Southeast University
Jiangsu University
Cosco Shipyard Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University, Jiangsu University, Cosco Shipyard Group Co Ltd filed Critical Southeast University
Priority to CN201210230470.8A priority Critical patent/CN102733362B/zh
Publication of CN102733362A publication Critical patent/CN102733362A/zh
Application granted granted Critical
Publication of CN102733362B publication Critical patent/CN102733362B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及海工平台和大型船舶的建造领域,特指一种海洋风电安装船超大吨位塔头平台吊装方法,适用于大型海工平台和大型船舶的模块吊装。该方法提供了一种超大吨位塔头平台吊装方法,在塔头平台的吊装过程中,由于其特殊锥型结构,在下部吊点的位置追加三角支架,然后将平台吊起并安装插入吊机筒体。本发明可操作性强,解决了塔头平台锥型结构吊装的难题,为海洋工程装备和船舶建造等吊装积累了宝贵的经验。

Description

海洋风电安装船超大吨位塔头平台吊装方法
技术领域
本发明涉及海工平台和大型船舶的建造领域,特指一种洋风电安装船超大吨位塔头平台吊装方法,适用于多数大型海工平台和船舶的建造,可操作性和适应性强。
背景技术
近年来,发展可再生能源已经是大势所趋。海上风电由于其资源丰富、风速稳定、开发利益相关方较少、不与其他发展项目争地、可以大规模开发等优势,一直受到风电开发商关注。我国东南沿海及其附近岛屿是风能资源丰富地区,有效风能密度大于或等于200瓦/平方米的等值线平行于海岸线,风电安装船作为高附加值的海洋工程装备,是各国争夺的战略核心领域,也是江苏新一轮沿海开发国家战略的重点产业,具有战略性、成长性、带动性、先导性和支柱性等鲜明特征,对机电、钢铁、化工、航运、海洋资源开发等上、下游产业发展具有较强的带动作用,对促进劳动力就业、发展出口贸易、保障国家能源安全和维护国家海洋权益意义重大。
风电安装船需要安装塔头平台,传统的吊装方法是将索具连接塔头平台,然后起吊安装,这对于上头大下部小的锥型特殊结构不适用,吊起过程平台会接触索具,并存在安全隐患,如何解决这一问题成为塔头平台吊装的关键因素之一。
发明内容
本发明的目的是为了克服以上的不足,提供一种可操作性强、应用范围广的海洋风电安装船超大吨位塔头平台吊装方法。
本发明的目的通过以下技术方案来实现:海洋风电安装船超大吨位塔头平台吊装方法,包括下列步骤:
A、准备工作:
a、在吊装之前对吊梁、防撞工装、索具进行检查,进行日常检查,发现钢丝绳或金属附近的损坏超过报废标准时不得投入使用,确认上述设备安全后方可使用;
b、吊装前准备好索具和索具配件,索具包括钢丝绳、吊带、吊链,索具配件包括吊环、吊钩、卸扣;
c、吊装前,检查浮吊上的卷扬机、锚机有无异常声响,定期更换齿轮减速箱内机油和缓冲垫,带缆锚机附近严禁堆放影响作业的物件;
d、吊装前,在吊装区域应用彩带围起来,与操作无关人员不能进入吊装区域,并确保起重人员与吊机操作以及驳船控制者之间保持通话畅通;
B、吊装过程:
a、将运输船和浮吊系泊到风电安装船位置;
b、塔头平台为锥型结构,塔头平台上吊点的安装位置分别为:第一吊点、第二吊点、第五吊点和第六吊点分别位于塔头平台上表面,第三吊点和第四吊点在结构轴承旁,第三吊点和第四吊点旁安装有三角架,慢慢调节浮吊臂杆的角度和钩头的高度,浮吊臂杆的角度为65°,钩头的高度为45m,将索具与塔头平台连接好;
c、首先进行试吊,拉动第一吊点、第二吊点、第三吊点和第四吊点,用浮吊将塔头平台吊高190-210m,跟踪吊机读数,当读数为1072T时,停止4-6分钟,检查结构,吊机读数由跳动变化到逐渐稳定,确认读数稳定后,拉上索具吊的第一吊点和第二吊点上,吊16m高度,下降第三吊点和第四吊点,将塔头平台旋转至36°;
d、塔头平台旋转至36°后,检查结构及吊机读数的变化,停止4-6分钟,确认读数稳定后,确认安全后,将塔头平台旋转至66°;
e、塔头平台旋转至66°后,检查结构及吊机读数的变化,停止4-6分钟,确认读数稳定后,确认安全后,将塔头平台旋转至76°;
f、塔头平台旋转至76°后,检查结构及吊机读数的变化,停止4-6分钟,确认读数稳定后,确认安全后,最后将塔头平台立直;
g、根据吊机桶内导向板的位置将转塔旋转到0°或180°,使得塔头平台中心线对准塔内中心线,然后将浮吊移到安装位置;
h、将辅钩拆除,然后准备将塔头平台插入吊机筒体;
i、安装塔头平台。
本发明与现有技术相比具有以下优点:
1、本吊装方法针对塔头平台特殊结构,优化吊点的设计。针对塔头平台上头大下部小的结构,独创的添加了三角架,即优化应力分布又解决了索具接触上部平台的危险问题;
2、在吊机筒体安装导向板,校准中心线,将塔头平台插入吊机筒体;
3、本吊装方法简单实用,工艺简单,应用范围广,可操作性和可重复性强,为其他海洋工程装备建造提供了指导。
附图说明
图1是索具连接塔头平台的结构示意图;
图2是图1中A向的结构示意图;
图3是图1中B向的结构示意图;
图4是塔头平台不吊装旋转示意图;
图5为塔头平台吊装旋转36°示意图;
图6为塔头平台吊装旋转66°示意图;
图7为塔头平台吊装旋转76°示意图;
图8为塔头平台吊装旋转90°示意图;
图中标号:1-第一吊点、2-第二吊点、3-第三吊点、4-第四吊点、5-第五吊点、6-第六吊点、7-钢丝绳、8-吊钩、9-卸扣、10-塔头平台、11-三角架。
具体实施方式
为了加深对本发明的理解,下面将结合实施例和附图对本发明作进一步详述,该实施例仅用于解释本发明,并不构成对本发明保护范围的限定。
塔头平台由锥形框架钢结构,外形尺寸为:长为12.5m、宽为16.5m、高为26.8m,总重量约536.3吨。海洋风电安装船超大吨位塔头平台吊装方法,包括下列步骤:
A、准备工作:
a、在吊装之前对吊梁、防撞工装、索具进行检查,进行日常检查,发现钢丝绳或金属附近的损坏超过报废标准时不得投入使用,确认上述设备安全后方可使用;
b、吊装前准备好索具和索具配件,所述索具包括钢丝绳7、吊带、吊链,所述索具配件包括吊环、吊钩8、卸扣9;
c、吊装前,检查浮吊上的卷扬机、锚机有无异常声响,定期更换齿轮减速箱内机油和缓冲垫,带缆锚机附近严禁堆放影响作业的物件;
d、吊装前,在吊装区域应用彩带围起来,与操作无关人员不能进入吊装区域,并确保起重人员与吊机操作以及驳船控制者之间保持通话畅通;
B、吊装过程:
a、将运输船和浮吊系泊到风电安装船位置;
b、塔头平台10为锥型结构,塔头平台10上吊点的安装位置分别为:第一吊点1、第二吊点2、第五吊点5和第六吊点6分别位于塔头平台10上表面,第三吊点3和第四吊点4在结构轴承旁,第三吊点3和第四吊点旁安装有三角架11,慢慢调节浮吊臂杆的角度和钩头的高度,浮吊臂杆的角度为65°,钩头的高度为45m,将索具与塔头平台10连接好,如图1至图4所示;
c、首先进行试吊,拉动第一吊点1、第二吊点2、第三吊点3和第四吊点4,用浮吊将塔头平台10吊高190-210m,跟踪吊机读数,当读数为1072T时,停止4-6分钟,检查结构,吊机读数由跳动变化到逐渐稳定,确认读数稳定后,拉上索具吊的第一吊点1和第二吊点2上,吊16m高度,下降第三吊点3和第四吊点4,将塔头平台10旋转至36°,如图5所示;
d、塔头平台旋转至36°后,检查结构及吊机读数的变化,停止4-6分钟,确认读数稳定后,确认安全后,将塔头平台10旋转至66°,如图6所示;
e、塔头平台旋转至66°后,检查结构及吊机读数的变化,停止4-6分钟,确认读数稳定后,确认安全后,将塔头平台10旋转至76°,如图7所示;
f、塔头平台旋转至76°后,检查结构及吊机读数的变化,停止4-6分钟,确认读数稳定后,确认安全后,最后将塔头平台10立直,如图8所示;
g、根据吊机桶内导向板的位置将转塔旋转到0°或180°,使得塔头平台10中心线对准塔内中心线,然后将浮吊移到安装位置;
h、将辅钩拆除,然后准备将塔头平台10插入吊机筒体;
i、安装塔头平台10。
本发明并不限于塔头平台的吊装,也适用于船舶和平台的各个模块的吊装。综上所述,本发明涉及了一种海洋风电安装船超大吨位塔头平台吊装方法,通过在下部吊点位置按装三角架结构,解决了塔头平台锥型结构吊装的难题,本发明已成功应用于1000T塔头平台的吊装上,安全可靠,工艺简单,装配精度高,可操作性和适应性强。
本吊装方法针对塔头平台特殊结构,优化吊点的设计。针对塔头平台上头大下部小的结构,独创的添加了三角架,即优化应力分布又解决了索具接触上部平台的危险问题;在吊机筒体安装导向板,校准中心线,将塔头平台插入吊机筒体;本吊装方法简单实用,工艺简单,应用范围广,可操作性和可重复性强,为其他海洋工程装备建造提供了指导。

Claims (1)

1.一种海洋风电安装船超大吨位塔头平台吊装方法,其特征在于:其吊装方法包括下列步骤:
A、准备工作:
a、在吊装之前对吊梁、防撞工装、索具进行检查,进行日常检查,发现钢丝绳或金属附近的损坏超过报废标准时不得投入使用,确认上述设备安全后方可使用;
b、吊装前准备好索具和索具配件,所述索具包括钢丝绳(7)、吊带、吊链,所述索具配件包括吊环、吊钩(8)、卸扣(9);
c、吊装前,检查浮吊上的卷扬机、锚机有无异常声响,定期更换齿轮减速箱内机油和缓冲垫,带缆锚机附近严禁堆放影响作业的物件;
d、吊装前,在吊装区域应用彩带围起来,与操作无关人员不能进入吊装区域,并确保起重人员与吊机操作以及驳船控制者之间保持通话畅通;
B、吊装过程:
a、将运输船和浮吊系泊到风电安装船位置;
b、塔头平台(10)为锥型结构,所述塔头平台(10)上吊点的安装位置分别为:第一吊点(1)、第二吊点(2)、第五吊点(5)和第六吊点(6)分别位于所述塔头平台(10)上表面,第三吊点(3)和第四吊点(4)在结构轴承旁,所述第三吊点(3)和所述第四吊点旁安装有三角架(11),慢慢调节浮吊臂杆的角度和钩头的高度,浮吊臂杆的角度为65°,钩头的高度为45m,将索具与所述塔头平台(10)连接好;
c、首先进行试吊,拉动第一吊点(1)、第二吊点(2)、第三吊点(3)和第四吊点(4),用浮吊将所述塔头平台(10)吊高190-210m,跟踪吊机读数,当读数为1072T时,停止4-6分钟,检查结构,吊机读数由跳动变化到逐渐稳定,确认读数稳定后,拉上索具吊的第一吊点(1)和第二吊点(2)上,吊16m高度,下降第三吊点(3)和第四吊点(4),将所述塔头平台(10)旋转至36°;
d、塔头平台旋转至36°后,检查结构及吊机读数的变化,停止4-6分钟,确认读数稳定后,确认安全后,将所述塔头平台(10)旋转至66°;
e、塔头平台旋转至66°后,检查结构及吊机读数的变化,停止4-6分钟,确认读数稳定后,确认安全后,将所述塔头平台(10)旋转至76°;
f、塔头平台旋转至76°后,检查结构及吊机读数的变化,停止4-6分钟,确认读数稳定后,确认安全后,最后将所述塔头平台(10)立直;
g、根据吊机桶内导向板的位置将转塔旋转到0°或180°,使得所述塔头平台(10)中心线对准塔内中心线,然后将浮吊移到安装位置;
h、将辅钩拆除,然后准备将所述塔头平台(10)插入吊机筒体;
i、安装所述塔头平台(10)。
CN201210230470.8A 2012-07-05 2012-07-05 海洋风电安装船超大吨位塔头平台吊装方法 Active CN102733362B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210230470.8A CN102733362B (zh) 2012-07-05 2012-07-05 海洋风电安装船超大吨位塔头平台吊装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210230470.8A CN102733362B (zh) 2012-07-05 2012-07-05 海洋风电安装船超大吨位塔头平台吊装方法

Publications (2)

Publication Number Publication Date
CN102733362A true CN102733362A (zh) 2012-10-17
CN102733362B CN102733362B (zh) 2014-09-17

Family

ID=46989619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210230470.8A Active CN102733362B (zh) 2012-07-05 2012-07-05 海洋风电安装船超大吨位塔头平台吊装方法

Country Status (1)

Country Link
CN (1) CN102733362B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104805816A (zh) * 2014-08-01 2015-07-29 烟台中集来福士海洋工程有限公司 桩腿分段的合拢工装及桩腿分段的待安装支撑管安装方法
CN109137711A (zh) * 2017-06-28 2019-01-04 中国二十冶集团有限公司 一种桥梁超宽钢箱梁构件及其水上拼接方法
CN112623147A (zh) * 2020-12-23 2021-04-09 大连中远海运重工有限公司 折臂海工吊运输及翻身吊装工艺方法
CN116812762A (zh) * 2023-07-28 2023-09-29 招商局重工(江苏)有限公司 一种fpso内转塔吊运工装及风险控制方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009005359A1 (en) * 2007-07-05 2009-01-08 National Oilwell Norway As A method and a device for hoisting an item
TW200905043A (en) * 2007-07-27 2009-02-01 Shen Ye Construction Co Ltd Hoisting method for top/down column of pile foundation
CN101850831A (zh) * 2010-05-31 2010-10-06 南通中远船务工程有限公司 一种大型远洋海工平台生活区总段吊装方法
CN101870435A (zh) * 2010-05-31 2010-10-27 南通中远船务工程有限公司 直升机平台的翻转式吊装方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009005359A1 (en) * 2007-07-05 2009-01-08 National Oilwell Norway As A method and a device for hoisting an item
TW200905043A (en) * 2007-07-27 2009-02-01 Shen Ye Construction Co Ltd Hoisting method for top/down column of pile foundation
CN101850831A (zh) * 2010-05-31 2010-10-06 南通中远船务工程有限公司 一种大型远洋海工平台生活区总段吊装方法
CN101870435A (zh) * 2010-05-31 2010-10-27 南通中远船务工程有限公司 直升机平台的翻转式吊装方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104805816A (zh) * 2014-08-01 2015-07-29 烟台中集来福士海洋工程有限公司 桩腿分段的合拢工装及桩腿分段的待安装支撑管安装方法
CN109137711A (zh) * 2017-06-28 2019-01-04 中国二十冶集团有限公司 一种桥梁超宽钢箱梁构件及其水上拼接方法
CN112623147A (zh) * 2020-12-23 2021-04-09 大连中远海运重工有限公司 折臂海工吊运输及翻身吊装工艺方法
CN112623147B (zh) * 2020-12-23 2022-10-04 大连中远海运重工有限公司 折臂海工吊运输及翻身吊装工艺方法
CN116812762A (zh) * 2023-07-28 2023-09-29 招商局重工(江苏)有限公司 一种fpso内转塔吊运工装及风险控制方法

Also Published As

Publication number Publication date
CN102733362B (zh) 2014-09-17

Similar Documents

Publication Publication Date Title
CN101429928B (zh) 风力发电机组海上整体吊装的方法
CN102733362B (zh) 海洋风电安装船超大吨位塔头平台吊装方法
CN101565091B (zh) 水上风力发电机的安装设备及其施工方法
CN108996405B (zh) 海上风电机组关键零部件吊装方法
CN102491162B (zh) 吊装设备和吊装方法
CN103939299B (zh) 一种海上风机分体式安装工艺
CN202415021U (zh) 一种非旋转、折臂式、可变幅大型起重船
CN107165774A (zh) 一种海洋潮流能发电系统
CN102720197A (zh) 自升式风电安装船桩腿翻身吊装方法
CN101428712B (zh) 风力发电机组整体牵引装船的方法
CN105417403A (zh) 一种在船坞内安装超高超大型浮式起重机的方法
CN201614242U (zh) 具有应急变幅功能的甲板起重机起升机构
CN210973614U (zh) 一种海上风电大直径单桩翻转工装
CN201427842Y (zh) 船用全回转起重机
CN206108749U (zh) 一种海上风电吊装维护专用设备
CN104234636B (zh) 自升式平台井架安装方法
CN206142022U (zh) 一种海底电缆运输用钢制托盘
KR102237573B1 (ko) 일정한 방향성을 가지고 해저케이블이 각 풍력터빈의 스위치 기어에 연결되는 구조를 갖는 해상풍력발전단지
Tveiten et al. HSE challenges related to offshore renewable energy
KR101297669B1 (ko) 해상풍력발전기 설치 전용선을 이용한 해상풍력발전기 설치방법
CN107719583B (zh) 一种方便拆检的设备基座和人孔盖组合装置
CN201901538U (zh) 自升式风机安装起重机及海上风机运输安装设备
CN215862212U (zh) 一种单点管道外输连接装置
CN202832993U (zh) 一种潮间带大容量风力发电机组吊装系统
CN106564819B (zh) 一种船用重型吊机及水下安装工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: COSCO SHIPYARD (QIDONG) MARINE ENGINEERING CO., LT

Free format text: FORMER OWNER: JIANGSU UNIVERSITY SOWTHEAST UNIV.

Effective date: 20150225

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Gu Xiang

Inventor after: Zhuang Jianjun

Inventor after: Wang Yun

Inventor after: Xu Zhenying

Inventor after: Zhu Zhihong

Inventor after: Xu Xiulong

Inventor after: Wen Wu

Inventor after: Ni Tao

Inventor after: Zhang Yongkang

Inventor after: Jiang Jiakun

Inventor after: Li Yang

Inventor before: Xu Zhenying

Inventor before: Wang Yun

Inventor before: Zhu Zhihong

Inventor before: Xu Xiulong

Inventor before: Wen Wu

Inventor before: Ni Tao

Inventor before: Zhang Yongkang

Inventor before: Jiang Jiakun

Inventor before: Li Yang

Inventor before: Zhuang Jianjun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: XU ZHENYING ZHU ZHIHONG XU XIULONG WEN WU NI TAO ZHANG YONGKANG JIANG JIAKUN LI YANG ZHUANG JIANJUN WANG YUN TO: GU XIANG XU ZHENYING ZHU ZHIHONG XU XIULONG WEN WU NI TAO ZHANG YONGKANG JIANG JIAKUN LI YANG ZHUANG JIANJUN WANG YUN

TR01 Transfer of patent right

Effective date of registration: 20150225

Address after: 226000 Jiangsu Province, Nantong City Chongchuan District COSCO Road No. 1

Patentee after: COSCO Shipyard Group Co., Ltd.

Patentee after: COSCO (Qidong) Marine Engineering Co. Ltd.

Patentee after: Jiangsu University

Patentee after: Southeast University

Address before: 226000 Jiangsu Province, Nantong City Chongchuan District COSCO Road No. 1

Patentee before: COSCO Shipyard Group Co., Ltd.

Patentee before: Jiangsu University

Patentee before: Southeast University

CP03 Change of name, title or address

Address after: 226000 No. 1, COSCO Road, Jiangsu, Nantong

Co-patentee after: Qidong Zhongyuan Marine Engineering Co., Ltd.

Patentee after: Nantong COSCO Shipping Engineering Co., Ltd.

Co-patentee after: jiangsu university

Co-patentee after: Southeast University

Address before: 226000 Jiangsu Province, Nantong City Chongchuan District COSCO Road No. 1

Co-patentee before: COSCO Shipping (Qidong) Ocean Engineering Co., Ltd.

Patentee before: COSCO Shipyard Group Co., Ltd.

Co-patentee before: jiangsu university

Co-patentee before: Southeast University

CP03 Change of name, title or address