CN102720353A - 用于塔楼沉降缝处后施工一侧剪力墙模板及实施方法 - Google Patents
用于塔楼沉降缝处后施工一侧剪力墙模板及实施方法 Download PDFInfo
- Publication number
- CN102720353A CN102720353A CN2012101531992A CN201210153199A CN102720353A CN 102720353 A CN102720353 A CN 102720353A CN 2012101531992 A CN2012101531992 A CN 2012101531992A CN 201210153199 A CN201210153199 A CN 201210153199A CN 102720353 A CN102720353 A CN 102720353A
- Authority
- CN
- China
- Prior art keywords
- shear wall
- construction
- settlement joint
- wall formwork
- high building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明涉及一种用于塔楼沉降缝处后施工一侧剪力墙模板及施工方法,后施工一侧剪力墙模板结构为数根木枋与数块胶合板用铁钉钉在一起形成模板,在模板上按设计计算书间距钻孔,在模板的每个钻孔的水平位置安装两根钢管,每两根钢管上焊接一燕尾卡,且燕尾卡的两个圆弧处分别焊接在两根钢管上,燕尾卡上的中心处设有通孔,螺帽焊接在燕尾卡的外侧通孔处。本发明用于塔楼沉降缝处后施工一侧剪力墙模板稳定可靠,整体刚度、强度好,保证剪力墙垂直度质量,并可重复使用,成功解决塔楼施工过程中,沉降缝两侧剪力墙施工进度不一致,后施工一侧剪力墙沉降缝侧模板因距离狭窄,无法正常安装的施工难题,同时降低成本,有好的应用前景。
Description
技术领域
本发明涉及一种建筑施工中使用的整体拼接吊装模板体系及施工方法,具体涉及用于塔楼沉降缝处后施工一侧剪力墙模板及实施方法。
背景技术
塔楼施工过程中,沉降缝两侧剪力墙施工进度不一致,后施工一侧剪力墙沉降缝侧模板因距离狭窄,仅约200mm,无法正常安装。这就需要改进模板体系予以解决。
发明内容
本发明的目的在于克服上述现有技术存在的问题及缺点,提供一种用于塔楼沉降缝处后施工一侧剪力墙模板及施工方法。本发明用于塔楼沉降缝处后施工一侧剪力墙模板稳定可靠,整体刚度、强度好,保证剪力墙垂直度质量,模板体系可重复使用。
本发明通过下述技术方案实现:
用于塔楼沉降缝处后施工一侧剪力墙模板,包括数块胶合板、数根木枋、钢管、燕尾卡、螺帽,其特征在于:数根木枋与数块胶合板用铁钉钉在一起形成模板,在模板上按设计计算书间距钻孔,在模板的每个钻孔的水平位置安装两根钢管,每两根钢管上焊接一燕尾卡,且燕尾卡的两个圆弧处分别焊接在两根钢管上,燕尾卡上的中心处设有通孔,螺帽焊接在燕尾卡的外侧通孔处。
本发明的用于塔楼沉降缝处后施工一侧剪力墙模板还包括吊环,吊环焊接在端部的钢管上,方便塔吊吊装。
所述吊环用直径为25mm的钢筋制作而成。
所述木枋的横截面为50m×100mm,所述胶合板厚为18 mm。
所述钢管直径为48 mm,壁厚为3.5mm。
用于塔楼沉降缝处后施工一侧剪力墙模板的实施方法,其特征在于按以下步骤进行:
(1)、剪力墙钢筋已绑扎完成,剪力墙内侧模板已就位,用塔吊将用于塔楼沉降缝处后施工一侧剪力墙模板吊装就位,在剪力墙内侧模板与用于塔楼沉降缝处后施工一侧剪力墙模板之间放置有套管,所述套管为PVC套管;
(2)、将对拉螺杆从剪力墙室内一侧模板穿过套管和用于塔楼沉降缝 处后施工一侧剪力墙模板的预留孔并与螺帽相连,并顺时针拧紧,所述对拉螺杆直径为14mm;
(3)、清理,封模,浇筑剪力墙混凝土;
(4)、拆模:先拆剪力墙内侧模板,将对拉螺杆从室内反时针拧松,取出,再拆用于塔楼沉降缝处后施工一侧剪力墙模板;
(5)、用塔吊将用于塔楼沉降缝处后施工一侧剪力墙模板调走,清理模板。
本发明相对现有技术,具有如下优点与有益效果:
(1)传力明确,本发明利用对拉螺杆连接,受力合理,整体刚度、强度好。
(2)安装、拆卸操作方便,工效高,施工快,并可做成标准化。
(3)该用于塔楼沉降缝处后施工一侧剪力墙模板可以重复使用,大大降低成本。
(4)拆卸对拉螺杆后,在套管内注入发泡剂,杜绝了外墙渗漏的维修难题。
附图说明
图1是本发明的用于塔楼沉降缝处后施工一侧剪力墙模板拼接吊装安装剖面图。
图2是本发明的用于塔楼沉降缝处后施工一侧剪力墙模板拼接吊装安装立面图。
具体实施方式
下面结合附图和实施例对本发明作进一步详细的说明,但本发明的实施方式不限于此。
如图1、图2所示,本发明的用于塔楼沉降缝处后施工一侧剪力墙模板,包括数块胶合板、数根木枋、钢管、燕尾卡、螺帽,其特征在于:数根木枋与数块胶合板用铁钉钉在一起形成模板,在模板上按设计计算书间距钻孔,在模板的每个钻孔的水平位置安装两根钢管,每两根钢管上焊接一燕尾卡,且燕尾卡的两个圆弧处分别焊接在两根钢管上,燕尾卡上的中心处设有通孔,螺帽焊接在燕尾卡的外侧通孔处。吊环焊接在上部的钢管上,方便塔吊吊装;所述吊环用直径为25mm的钢筋制作而成。所述木枋的横截面为50m×100mm,所述胶合板厚为18 mm。所述钢管直径为48 mm,壁厚为3.5mm。
用于塔楼沉降缝处后施工一侧剪力墙模板的实施方法,其特征在于按以下步骤进行:
(1)、剪力墙钢筋已绑扎完成,剪力墙内侧模板已就位,用塔吊将用于塔楼沉降缝处后施工一侧剪力墙模板吊装就位,在剪力墙内侧模板与用于塔楼沉降缝处后施工一侧剪力墙模板之间放置有套管4,所述套管4为PVC套管;
(2)、将对拉螺杆3从剪力墙室内一侧模板穿过套管4和用于塔楼沉降缝处后施工一侧剪力墙模板的预留孔并与螺帽7相连,并顺时针拧紧,所述对拉螺杆直径为14mm;
(3)、清理,封模,浇筑剪力墙混凝土;
(4)、拆模:先拆剪力墙内侧模板,将对拉螺杆3从室内反时针拧松,取出,再拆用于塔楼沉降缝处后施工一侧剪力墙模板;
(5)、用塔吊将用于塔楼沉降缝处后施工一侧剪力墙模板调走,清理模板。
Claims (8)
1.用于塔楼沉降缝处后施工一侧剪力墙模板,包括数块胶合板、数根木枋、钢管、燕尾卡、螺帽,其特征在于:数根木枋与数块胶合板用铁钉钉在一起形成模板,在模板上按设计计算书间距钻孔,在模板的每个钻孔的水平位置安装两根钢管,每两根钢管上焊接一燕尾卡,且燕尾卡的两个圆弧处分别焊接在两根钢管上,燕尾卡上的中心处设有通孔,螺帽焊接在燕尾卡的外侧通孔处。
2.根据权利要求1所述的用于塔楼沉降缝处后施工一侧剪力墙模板,其特征在于:还包括吊环,吊环焊接在端部的钢管上。
3.根据权利要求2所述的用于塔楼沉降缝处后施工一侧剪力墙模板,其特征在于:所述吊环用直径为25mm的钢筋制作而成。
4.根据权利要求1所述的用于塔楼沉降缝处后施工一侧剪力墙模板,其特征在于:所述木枋的横截面为50m×100mm,所述胶合板厚为18 mm。
5.根据权利要求1所述的用于塔楼沉降缝处后施工一侧剪力墙模板,其特征在于:所述钢管直径为48 mm,壁厚为3.5mm。
6.根据权利要求2所述的用于塔楼沉降缝处后施工一侧剪力墙模板的实施方法,其特征在于按以下步骤进行:
(1)、剪力墙钢筋已绑扎完成,剪力墙内侧模板已就位,用塔吊将用于塔楼沉降缝处后施工一侧剪力墙模板吊装就位,在剪力墙内侧模板与用于塔楼沉降缝处后施工一侧剪力墙模板之间放置有套管;
(2)、将对拉螺杆从剪力墙室内一侧模板穿过套管和用于塔楼沉降缝处后施工一侧剪力墙模板的预留孔并与螺帽相连,并顺时针拧紧;
(3)、清理,封模,浇筑剪力墙混凝土;
(4)、拆模:先拆剪力墙内侧模板,将对拉螺杆从室内反时针拧松,取出,再拆用于塔楼沉降缝处后施工一侧剪力墙模板;
(5)、用塔吊将用于塔楼沉降缝处后施工一侧剪力墙模板调走,清理模板。
7.根据权利要求6所述的用于塔楼沉降缝处后施工一侧剪力墙模板的实施方法,其特征在于:所述对拉螺杆直径为14mm。
8.根据权利要求6所述的用于塔楼沉降缝处后施工一侧剪力墙模板的实施方法,所述套管为PVC套管。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101531992A CN102720353A (zh) | 2012-05-17 | 2012-05-17 | 用于塔楼沉降缝处后施工一侧剪力墙模板及实施方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101531992A CN102720353A (zh) | 2012-05-17 | 2012-05-17 | 用于塔楼沉降缝处后施工一侧剪力墙模板及实施方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102720353A true CN102720353A (zh) | 2012-10-10 |
Family
ID=46946205
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012101531992A Pending CN102720353A (zh) | 2012-05-17 | 2012-05-17 | 用于塔楼沉降缝处后施工一侧剪力墙模板及实施方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102720353A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102995566A (zh) * | 2012-12-20 | 2013-03-27 | 北京城建道桥建设集团有限公司 | 连续板拱桥小半径拱圈施工工法 |
CN104818843A (zh) * | 2015-04-20 | 2015-08-05 | 常州展华机器人有限公司 | 一种大型剪力墙免钻孔安装模板及使用方法 |
CN110630010A (zh) * | 2019-09-24 | 2019-12-31 | 中冶天工集团有限公司 | 一种剪力墙沉降缝钢木结合模板支设装置及使用方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000087555A (ja) * | 1998-09-08 | 2000-03-28 | Taisei Corp | セパレ−タ− |
CN201486133U (zh) * | 2009-07-17 | 2010-05-26 | 中达建设集团股份有限公司 | 钢筋混凝土双剪力墙模板 |
CN101892742A (zh) * | 2010-06-21 | 2010-11-24 | 陕西省第三建筑工程公司 | 一种高低跨楼变形缝处低段剪力墙的施工方法 |
CN202787958U (zh) * | 2012-05-17 | 2013-03-13 | 中建三局第二建设工程有限责任公司 | 用于塔楼沉降缝处后施工一侧剪力墙模板 |
-
2012
- 2012-05-17 CN CN2012101531992A patent/CN102720353A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000087555A (ja) * | 1998-09-08 | 2000-03-28 | Taisei Corp | セパレ−タ− |
CN201486133U (zh) * | 2009-07-17 | 2010-05-26 | 中达建设集团股份有限公司 | 钢筋混凝土双剪力墙模板 |
CN101892742A (zh) * | 2010-06-21 | 2010-11-24 | 陕西省第三建筑工程公司 | 一种高低跨楼变形缝处低段剪力墙的施工方法 |
CN202787958U (zh) * | 2012-05-17 | 2013-03-13 | 中建三局第二建设工程有限责任公司 | 用于塔楼沉降缝处后施工一侧剪力墙模板 |
Non-Patent Citations (1)
Title |
---|
陆汉时等: "变形缝处双剪力墙模板施工", 《工程质量》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102995566A (zh) * | 2012-12-20 | 2013-03-27 | 北京城建道桥建设集团有限公司 | 连续板拱桥小半径拱圈施工工法 |
CN102995566B (zh) * | 2012-12-20 | 2014-08-06 | 北京城建道桥建设集团有限公司 | 连续板拱桥小半径拱圈施工工法 |
CN104818843A (zh) * | 2015-04-20 | 2015-08-05 | 常州展华机器人有限公司 | 一种大型剪力墙免钻孔安装模板及使用方法 |
CN110630010A (zh) * | 2019-09-24 | 2019-12-31 | 中冶天工集团有限公司 | 一种剪力墙沉降缝钢木结合模板支设装置及使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202139833U (zh) | 一种用于在用房屋建筑施工的悬挑脚手架 | |
CN106337555A (zh) | 建筑外墙悬挑结构三角钢支撑施工方法 | |
CN102926504B (zh) | 一种钢混叠合梁结合部施工方法 | |
CN203429641U (zh) | 建筑施工用单侧支模加固结构体系 | |
CN202248831U (zh) | 一种斜拉钢丝绳与建筑结构拉结使用的吊环 | |
CN102518300A (zh) | 预埋锥形承载接头式钢结构支座及其施工方法 | |
CN102720353A (zh) | 用于塔楼沉降缝处后施工一侧剪力墙模板及实施方法 | |
CN113774822B (zh) | 钢筋混凝土旧桥的拆除方法 | |
CN111851987B (zh) | 一种附着式短肢工字钢花篮拉杆拉结式悬挑架施工方法 | |
CN202611223U (zh) | 可循环使用的螺栓式脚手架连墙件 | |
CN202787958U (zh) | 用于塔楼沉降缝处后施工一侧剪力墙模板 | |
CN204212406U (zh) | 一种单侧加固施工大钢模 | |
CN201704954U (zh) | 用于浇筑防水墙体的模板对拉装置 | |
CN105275198B (zh) | 一种剪力墙加固模板结构及其施工方法 | |
CN204024088U (zh) | 厂房钢柱分段吊装对接的快速定位装置 | |
CN101089329B (zh) | 组合式聚氯乙烯建筑工程模板 | |
CN102650158A (zh) | 一种上下层剪力墙浇筑时的接茬装置 | |
CN102605945B (zh) | 木大模板的制作方法 | |
CN211007079U (zh) | 一种用于二次结构墙拉筋的预埋构件结构 | |
CN204081468U (zh) | 一种剪力墙加固模板结构 | |
CN204571265U (zh) | 一种可重复使用的预埋锚环 | |
CN211143731U (zh) | 一种后浇带支撑结构 | |
CN104727569B (zh) | 大型塔设备的增高方法 | |
CN209509453U (zh) | 一种高层建筑现浇混凝土结构工具式悬挑脚手架 | |
CN110700574A (zh) | 一种后浇带支撑结构及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20121010 |