CN102706152B - 烧结机台车带料状态下台车更换装置 - Google Patents

烧结机台车带料状态下台车更换装置 Download PDF

Info

Publication number
CN102706152B
CN102706152B CN201210218485.2A CN201210218485A CN102706152B CN 102706152 B CN102706152 B CN 102706152B CN 201210218485 A CN201210218485 A CN 201210218485A CN 102706152 B CN102706152 B CN 102706152B
Authority
CN
China
Prior art keywords
trolley
chassis
sintering machine
car
suspension bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210218485.2A
Other languages
English (en)
Other versions
CN102706152A (zh
Inventor
叶学农
黄河
姜涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huatian Engineering and Technology Corp MCC
Original Assignee
Huatian Engineering and Technology Corp MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huatian Engineering and Technology Corp MCC filed Critical Huatian Engineering and Technology Corp MCC
Priority to CN201210218485.2A priority Critical patent/CN102706152B/zh
Publication of CN102706152A publication Critical patent/CN102706152A/zh
Application granted granted Critical
Publication of CN102706152B publication Critical patent/CN102706152B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

本发明公开一种烧结机台车带料状态下台车更换装置,为了解决在台车工作段进行故障台车更换所带来的生产影响及更换时间过长。该装置至少包括烧结机本体、以及置于所述烧结机本体上的布料装置和台车装置,所述台车装置由工作段台车车组和回程段台车车组构成,所述台车更换装置置于所述台车装置的回程段上。所述台车更换机构由台车吊架、电动葫芦、转运渡车、电液动推杆以及渡车轨道构成。首先是对生产的影响降至最低。由于本方案更换台车是在回程段进行,因此,在更换过程中,烧结机工作段台车始终处于正常装料状态,烧结生产的风平衡和物料平衡都没有被打破,一旦台车更换完毕烧结机恢复正常运行,烧结机终点位置就会在短时间内恢复正常。

Description

烧结机台车带料状态下台车更换装置
技术领域
本发明涉及烧结机台车更换装置,尤其涉及一种烧结机台车带料状态下台车更换装置。
背景技术
烧结机台车上的蓖条和车轮轴承是易损件,一旦损坏至一定程度,必须将故障台车整体吊出以便对蓖条和车轮轴承进行更换或检修,同时将备用台车装入。
传统更换台车的方法是,当需要更换的故障台车通过布料装置时停止给料,使故障台车及其前后的台车空料,在空料的故障台车运行至靠近尾部合适位置时,烧结机停止运行,启动液压推杆使尾部移动架后移以使紧靠在一起的台车间松动,再通过安装在烧结机上方的吊车将故障台车吊出至平台检修位,然后将备用台车吊起装入,液压推杆泄压,烧结机起动运行。
传统方式存在的缺点:被更换的故障台车及其前后的台车在烧结工作段全程都处于空车状态,因此烧结生产平衡被打破,烧结温度曲线产生紊乱,烧结终点产生漂移,通常要经过十多个小时的调整期才会达到正常,因此会对烧结生产带来较大的影响。
发明内容
针对上述问题,本发明的目的在于提供一种烧结机台车带料状态下台车更换装置,缩短了故障台车的更换时间,降低了对烧结生产带来的影响。
为达到上述目的,本发明所述一种烧结机台车带料状态下台车更换装置,至少包括烧结机本体、以及置于所述烧结机本体上的布料装置和台车装置,所述台车装置由工作段台车车组和回程段台车车组构成,所述工作段台车车组上方设有能将故障台车吊出运至存放处的吊车,还包括台车更换机构,所述台车更换机构置于所述台车装置的回程段上。
优选地,所述台车更换机构由台车吊架、电动葫芦、转运渡车、电液动推杆以及渡车轨道构成,其中;
台车吊架,置于所述回程段台车车组的上方,且吊架一端延伸至外部;
电动葫芦,置于所述台车吊架上,可沿台车吊架从内部吊架移动至外部吊架;
转运渡车,置于外部吊架的下方;
电液动推杆,置于所述转运渡车的下部,可推动转运渡车于渡车轨道上移动。
本发明的有益效果为:
1、首先是对生产的影响降至最低。由于本方案更换台车是在回程段进行,因此,在更换过程中,烧结机工作段台车始终处于正常装料状态,烧结生产的风平衡和物料平衡都没有被打破,一旦台车更换完毕烧结机恢复正常运行,烧结机终点位置就会在短时间内恢复正常。从此意义上可以说该装置能够有效提高烧结机的生产效率;
2、节省更换检修时间。采用传统方法更换台车,从台车布料点开始计算,至机尾下料点为止,抵消吊装台车耗费的时间后,比采用本技术装置要多耗费30分钟以上的时间。因此本技术装置能够有效提高烧结机台车更换效率,从而提高烧结机作业率。
附图说明
图1是烧结机的整体结构示意图;
图2是本发明实施例所述台车更换机构的正视图;
图3是本发明实施例所述台车更换机构的侧视图;
图4是本发明实施例所述台车更换机构的部分俯视图。
具体实施方式
下面结合说明书附图对本发明做进一步的描述。
如图1-图4所示,本发明实施例所述一种烧结机台车带料状态下台车更换装置,至少包括烧结机本体、以及置于所述烧结机本体上的布料装置2和台车装置,所述台车装置由工作段台车车组和回程段台车车组构成,所述工作段台车车组上方设有能将故障台车1吊出运至存放处的吊车4,还包括台车更换机构11,所述台车更换机构11置于所述台车装置的回程段上。
传统更换台车的方法是在烧结机台车工作段上进行更换,其具体更换过程为:当需要更换的故障台车通过布料装置时停止给料,使故障台车及其前后的台车空料,在空料的故障台车运行至靠近尾部合适位置时,烧结机停止运行,启动液压推杆3使尾部移动架5后移以使紧靠在一起的台车间松动,再通过安装在烧结机上方的吊车将故障台车吊出至平台检修位,然后将备用台车吊起装入,液压推杆泄压,烧结机起动运行。
传统方式存在的缺点:被更换的故障台车及其前后的台车在烧结工作段全程都处于空车状态,因此烧结生产平衡被打破,烧结温度曲线产生紊乱,烧结终点产生漂移,通常要经过十多个小时的调整期才会达到正常,因此会对烧结生产带来较大的影响。
本方案更换台车是在烧结机台车回程段上进行更换,其需要在回程段上置有台车更换机构。
如图2-图4所示,所述台车更换机构由台车吊架6、电动葫芦7、转运渡车8、电液动推杆9以及渡车轨道10构成,其中;
台车吊架,置于所述回程段台车车组的上方,且吊架一端延伸至外部;
电动葫芦,置于所述台车吊架上,可沿台车吊架从内部吊架移动至外部吊架;
转运渡车,置于外部吊架的下方;
电液动推杆,置于所述转运渡车的下部,可推动转运渡车于渡车轨道上移动。
其具体更换过程为:当需要更换的故障台车运行至台车更换机构安装的位置时,烧结机停机,两台电葫芦通过钢丝绳将台车吊起,运行至转运渡车位置并将台车置于转运渡车上,起动电液动推杆,将转运渡车推移至与工作段平台吊装孔对应位置,利用烧结机上方的吊车将被更换的故障台车吊出运至存放位置。然后再按上述步骤逆向操作,将备用台车从存放处装入烧结机上被更换台车的位置,起动烧结机运行,工作过程完成。
与传统的在烧结机台车工作段更换台车的方法相比,采用本发明技术更换台车装置具有以下明显的优点:
(1)首先是将对生产的影响降至最低。在整个台车更换过程中,烧结机工作段台车始终处于正常装料状态,烧结生产的风平衡和物料平衡都没有被打破,一旦烧结机恢复正常运行,烧结机终点位置就会在短时间内恢复正常。从此意义上可以说该装置能够有效提高烧结机的生产效率。
(2)节省更换检修时间。采用传统方法更换台车,从台车布料点开始计算,至机尾下料点为止,抵消吊装台车耗费的时间后,比采用本发明技术装置要多耗费30分钟以上的时间。因此本发明技术装置能够有效提高烧结机台车更换效率,从而提高烧结机作业率。
以上,仅为本发明的较佳实施例,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求所界定的保护范围为准。

Claims (1)

1.一种烧结机台车带料状态下台车更换装置,至少包括烧结机本体、以及置于所述烧结机本体上的布料装置和台车装置,所述台车装置由工作段台车车组和回程段台车车组构成,所述工作段台车车组上方设有能将故障台车吊出运至存放处的吊车,其特征在于,还包括台车更换机构,所述台车更换机构置于所述台车装置的回程段上;
所述台车更换机构由台车吊架、电动葫芦、转运渡车、电液动推杆以及渡车轨道构成,其中,
台车吊架,置于所述回程段台车车组的上方,且吊架一端延伸至外部;
电动葫芦,置于所述台车吊架上,可沿台车吊架从内部吊架移动至外部吊架;
转运渡车,置于外部吊架的下方;
电液动推杆,置于所述转运渡车的下部,可推动转运渡车于渡车轨道上移动。
CN201210218485.2A 2012-06-28 2012-06-28 烧结机台车带料状态下台车更换装置 Active CN102706152B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210218485.2A CN102706152B (zh) 2012-06-28 2012-06-28 烧结机台车带料状态下台车更换装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210218485.2A CN102706152B (zh) 2012-06-28 2012-06-28 烧结机台车带料状态下台车更换装置

Publications (2)

Publication Number Publication Date
CN102706152A CN102706152A (zh) 2012-10-03
CN102706152B true CN102706152B (zh) 2014-06-04

Family

ID=46899105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210218485.2A Active CN102706152B (zh) 2012-06-28 2012-06-28 烧结机台车带料状态下台车更换装置

Country Status (1)

Country Link
CN (1) CN102706152B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103575108B (zh) * 2013-11-01 2015-05-27 南京钢铁股份有限公司 一种烧结机在线快速更换台车的方法
CN106352700B (zh) * 2015-07-14 2019-02-15 中冶宝钢技术服务有限公司 烧结九辊布料机在线更换施工方法
CN105344420B (zh) * 2015-11-20 2017-11-14 莱芜钢铁集团有限公司 烧结机及烧结机的单辊篦板更换辅助装置
CN105758183B (zh) * 2016-02-29 2018-01-26 攀钢集团攀枝花钢钒有限公司 烧结机在线快速更换台车的方法
CN108870977A (zh) * 2018-06-15 2018-11-23 首钢水城钢铁(集团)有限责任公司 一种用于冶金烧结工艺中的台车限位装置
CN112266992A (zh) * 2020-10-12 2021-01-26 张家港宏昌钢板有限公司 一种脱硫渣处理装置及其应用

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2325358Y (zh) * 1998-04-09 1999-06-23 唐小丽 烧结机台车更换装置
CN2755539Y (zh) * 2004-11-15 2006-02-01 安钢集团信阳钢铁有限责任公司 烧结机机头更换台车机构
CN101806542A (zh) * 2010-04-28 2010-08-18 张健 节能型连续运转式斜面烧结机

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2325358Y (zh) * 1998-04-09 1999-06-23 唐小丽 烧结机台车更换装置
CN2755539Y (zh) * 2004-11-15 2006-02-01 安钢集团信阳钢铁有限责任公司 烧结机机头更换台车机构
CN101806542A (zh) * 2010-04-28 2010-08-18 张健 节能型连续运转式斜面烧结机

Also Published As

Publication number Publication date
CN102706152A (zh) 2012-10-03

Similar Documents

Publication Publication Date Title
CN102706152B (zh) 烧结机台车带料状态下台车更换装置
CN203826828U (zh) 开关柜断路器维修运载平台
CN104444937B (zh) 一种组合升降机构
CN201809076U (zh) 用于更换变电设备的装置
CN104047630A (zh) 一种综采工作面机械化安装工艺方法
CN204098952U (zh) 一种煤矿巷道中悬挂式集装箱输送装置
CN203359556U (zh) 用电动堆高车改装而成的倒桶车
CN102371931B (zh) 热态渣渣罐搬运车
CN103449313A (zh) 轨道式集装箱门式起重机小车运行机构专用维修吊
CN204823466U (zh) 一种冶金起重机设备钢丝绳更换卷绳装置
CN103434992B (zh) 桥吊用液压推进式台车搬运系统
CN202878162U (zh) 后氮缸检修装置
CN202785542U (zh) 反应堆穹顶吊篮
CN202272089U (zh) 热态渣渣罐搬运车
CN204871022U (zh) 一种使用安全的矿车防侧翻装置
CN202449713U (zh) 一种更换挤干辊吊具
CN201834709U (zh) 一种电动自行小车的在线顶升装置
CN203578746U (zh) 一种钢包的加盖装置
CN205762960U (zh) 后置小车的小车轮快捷拆装装置
CN203713935U (zh) 大盘重钢丝卷搬运装置
CN205762959U (zh) 无缝钢管生产用穿孔机的后置小车
CN214355350U (zh) 液压扒装轮装置
CN205413918U (zh) 一种冶金机械设备中局限空间胶辊更换的装置
CN204832481U (zh) 特高压互感器串级式校验平台
CN204022185U (zh) 一种能够紧急驻车的斜井箕斗

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HUATIAN NANJING ENGINEERING + TECHNOLOGY CORPORATI

Free format text: FORMER OWNER: ZHONGYE HUATIAN ENGINEERING TECHNOLOGY CO., LTD.

Effective date: 20150319

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 243005 MAANSHAN, ANHUI PROVINCE TO: 210019 NANJING, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150319

Address after: Jianye District of Nanjing City, Jiangsu province the Fuchun River 210019 street 18#

Patentee after: Huatian Nanjing Engineering & Technology Corporation, MCC

Address before: 243005 No. 25, Hunan Road, Anhui, Ma'anshan

Patentee before: Zhongye Huatian Engineering Technology Co., Ltd.