CN102704697B - Assembled bolt group mold - Google Patents

Assembled bolt group mold Download PDF

Info

Publication number
CN102704697B
CN102704697B CN201210232652.9A CN201210232652A CN102704697B CN 102704697 B CN102704697 B CN 102704697B CN 201210232652 A CN201210232652 A CN 201210232652A CN 102704697 B CN102704697 B CN 102704697B
Authority
CN
China
Prior art keywords
support
bolt group
mantle fiber
screw rod
fiber screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210232652.9A
Other languages
Chinese (zh)
Other versions
CN102704697A (en
Inventor
高山林
吴闽
李卫锋
常欢欢
彭怀江
朱惠伟
侯智勇
杨良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Original Assignee
PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION filed Critical PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Priority to CN201210232652.9A priority Critical patent/CN102704697B/en
Publication of CN102704697A publication Critical patent/CN102704697A/en
Application granted granted Critical
Publication of CN102704697B publication Critical patent/CN102704697B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to an assembled bolt group mold which can effectively solve problems that labor intensity is increased, procedures cannot be connected reasonably and manpower and materials are wasted by adopting the traditional manufacturing cleading to pre-bury bolts. The technical scheme for solving the problems is that the assembled bolt group mold comprises supports and threading screws, wherein the supports are of cuboid structures formed by four transversely parallel U-bars, the support in the front row is connected with the support in the back row through four horizontal first threading screws arranged at one end, the support in the upper row is connected with the support in the lower row through four vertical second threading screws at one end, three groups of clamping hoops are respectively and uniformly distributed on each support, and baffles are arranged on the clamping hoops. The assembled bolt group mold is novel and unique in structure, simple and reasonable, is directly arranged in a foundation by being welded to form a bolt group, solves construction problems that bolt pre-burying is low in accuracy and slow, saves a large number of materials, and has remarkable economic benefit and social benefit.

Description

Packaging bolt group mould
Technical field
The present invention relates to a kind of packaging bolt group mould.
Background technology
Along with the fast development of Chinese national economy, the adjustment of the industrial structure, there are more and more large area industrial premises, these factory buildings generally all adopt steel work, therefore structural steelwork is also more and more subject to the favor of Construction unit, from steel work practice of construction process, investigate and be not difficult to find out, the accuracy of steel structure base embedding anchor bolts is to affect the very important factor of Steel Structure Installation quality; Once having produced larger deviation, bolt embedment will directly affect the debugging of the normal installation of all kinds of steel work and equipment.Adopt the construction technology of traditional fabrication cage plate not only to make labour intensity strengthen, operation can not reasonable link, cause waste artificial, material, and technique backwardness causes difficult quality control, cause a lot of difficulties to the installation in later stage, how to capture pre-embedded anchoring bolts be to need the problem that solves for selected technology advanced person, economical rationality, safe and reliable technology.
Summary of the invention
For above-mentioned situation, for overcoming the defect of prior art, the present invention's object is just to provide a kind of packaging bolt group mould, can effectively solve and adopt traditional fabrication cage plate to carry out the increasing of bolt embedment labour intensity, operation can not reasonable link, causes the problem of the waste of artificial, material.
The technical scheme that the present invention solves is, comprise support and mantle fiber screw rod, support is by horizontal 4 parallel rectangle structures that channel-section steel forms, front and back two rows' supports are connected through the first mantle fiber screw rod of 4 levels of one end, the support of two rows is connected through 4 of one end the second vertical mantle fiber screw rods, on every support, be evenly equipped with respectively 3 groups of clips, on clip, have baffle plate.
Novel structure uniqueness of the present invention, advantages of simple, directly be installed in basis by welding fabrication bolt group on packaging bolt group mould dexterously, solve low, the slow-footed construction difficult problem of pre-embedded bolt precision, not only solve the control of quality difficulty or ease, and accelerating construction progress, save lot of materials, wherein every engineering can shift to an earlier date about 7 days, save various direct costs more than 50,000 yuan, indirect benefit is that create beneficial result is gone into operation early 200,000 yuan of left and right by Construction unit, and economic and social benefit is remarkable.
Accompanying drawing explanation
Fig. 1 is structural front view of the present invention.
Fig. 2 is structure top view of the present invention.
Fig. 3 is structure left view of the present invention.
Fig. 4 is the structural front view of clip of the present invention.
Fig. 5 is the structure top view of clip of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in further detail.
Provided by Fig. 1 to Fig. 5, comprise support and mantle fiber screw rod, support 1 is by horizontal 4 parallel rectangle structures that channel-section steel forms, front and back two rows' supports are connected through the first mantle fiber screw rod 3 of 4 levels of one end, the support of two rows is connected through 4 of one end the second vertical mantle fiber screw rods 4, on every support 1, be evenly equipped with respectively 3 groups of clips 2, on clip 2, have baffle plate 8.
In order to guarantee result of use, the diameter of the first described mantle fiber screw rod 3 is 12mm, and two ends first nut 6 of the first mantle fiber screw rod is connected with two of the front and back support in same level respectively with pad 7.
The diameter of the second described mantle fiber screw rod 4 is 20mm, and two ends first nut 6 of the second mantle fiber screw rod is connected with two supports up and down on same perpendicular respectively with pad 7.
Described support 1 is by horizontal 4 parallel rectangle structures that No. 8 channel-section steels form.
Described every group of clip 2 is inverted on support 1 and formed by No. 10 long channel-section steels of 2 30mm side by side, and each clip is contained on support through flat head screw 5 and the second nut 9.
When the present invention uses, first ready finished product bolt is put into clip 2, adjust the center of bolt to the rectangular indentation of every group of clip two channel-section steels formation side by side; All bolt end faces are adjusted in same horizontal plane; After bolt is all in place, adjust the planeness of bolt and the overall verticality of bolt; Prepare some reinforcing bars (the monolateral length that length is bolt), with electric welding machine, steel bar welding is received in the bolt group of adjusting, be used for fixing bolt group; The adjustment of the front and back size of support 1 can be by regulating the first nut 6 on the first mantle fiber screw rod 3 and the position of pad 7 to realize, and the adjustment of the vertical size of support 1 can be by regulating the first nut 6 on the second mantle fiber screw rod 4 and the position of pad 7 to realize; Welding fabrication bolt group is directly installed in basis, efficiently solve low, the slow-footed construction difficult problem of pre-embedded bolt precision, and solved the problem of difficult quality control, accelerating construction progress greatly, save lot of materials, after tested, every engineering can shift to an earlier date about 7 days, saved various direct costs more than 50,000 yuan, indirect benefit is that create beneficial result is gone into operation early 200,000 yuan of left and right by Construction unit, remarkable in economical benefits, simultaneously construction quality arrived assurance, be that one in building implements innovated greatly.

Claims (4)

1. a packaging bolt group mould, comprise support and mantle fiber screw rod, it is characterized in that, support (1) is by 4 rectangle structures that channel-section steel forms of transverse horizontal, front and back two rows' supports are connected through the first mantle fiber screw rod (3) of 4 levels of one end, the support of two rows is connected through 4 of one end the second vertical mantle fiber screw rods (4), on every support (1), be evenly equipped with respectively 3 groups of clips (2), on clip (2), there is baffle plate (8), described clip (2) is inverted in the upper formation of support (1) by No. 10 long channel-section steels of 2 30mm side by side, each clip is contained on support through flat head screw (5) and the second nut (9).
2. packaging bolt group mould according to claim 1, it is characterized in that, the diameter of the first described mantle fiber screw rod (3) is 12mm, and two ends first nuts (6) of the first mantle fiber screw rod are connected with two of the front and back support in same level respectively with pad (7).
3. packaging bolt group mould according to claim 1, it is characterized in that, the diameter of the second described mantle fiber screw rod (4) is 20mm, and two ends first nuts (6) of the second mantle fiber screw rod are connected with two supports up and down on same perpendicular respectively with pad (7).
4. packaging bolt group mould according to claim 1, is characterized in that, described support (1) is by horizontal 4 parallel rectangle structures that No. 8 channel-section steels form.
CN201210232652.9A 2012-07-06 2012-07-06 Assembled bolt group mold Expired - Fee Related CN102704697B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210232652.9A CN102704697B (en) 2012-07-06 2012-07-06 Assembled bolt group mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210232652.9A CN102704697B (en) 2012-07-06 2012-07-06 Assembled bolt group mold

Publications (2)

Publication Number Publication Date
CN102704697A CN102704697A (en) 2012-10-03
CN102704697B true CN102704697B (en) 2014-06-18

Family

ID=46897726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210232652.9A Expired - Fee Related CN102704697B (en) 2012-07-06 2012-07-06 Assembled bolt group mold

Country Status (1)

Country Link
CN (1) CN102704697B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700605A (en) * 2019-09-03 2020-01-17 中冶(上海)钢结构科技有限公司 Adjustable embedded bolt assembling die and construction method thereof

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000096575A (en) * 1998-09-18 2000-04-04 Asahi Boruto Shokai:Kk Anchor bolt bearing frame
KR20020086430A (en) * 2002-10-23 2002-11-18 이창남 The apparatus of attaching between concrete and steel structural members and attaching method
CN2571914Y (en) * 2002-09-13 2003-09-10 北京城建二建设工程有限公司 Integral contracted door-opening form
CN2596170Y (en) * 2002-10-30 2003-12-31 莱芜钢铁集团有限公司 Positioning rack of pre-buried ground bolt
CN101666100A (en) * 2009-09-15 2010-03-10 中冶实久建设有限公司 Method for accurately installing large foundation bolt of industrial equipment foundation
CN201635183U (en) * 2010-04-27 2010-11-17 中建七局第二建筑有限公司 Fixed structure of pre-embedded bolt in cast-in-place concrete structure
CN201865121U (en) * 2010-10-30 2011-06-15 甘肃海外工程总公司 Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts
CN201891172U (en) * 2010-11-03 2011-07-06 中建三局第二建设工程有限责任公司 Fixing bracket with fine-adjusting function for embedding anchor bolts
CN201991241U (en) * 2011-03-30 2011-09-28 宿迁市科路养护技术有限公司 Steel structural upright column foundation bolt positioning device
CN202031179U (en) * 2011-04-20 2011-11-09 中国十七冶集团有限公司 Centre line aligning and elevation adjusting device of basic embedded bolts
CN202645028U (en) * 2012-07-06 2013-01-02 平煤神马建工集团有限公司土建处 Assembly type bolt group die

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000096575A (en) * 1998-09-18 2000-04-04 Asahi Boruto Shokai:Kk Anchor bolt bearing frame
CN2571914Y (en) * 2002-09-13 2003-09-10 北京城建二建设工程有限公司 Integral contracted door-opening form
KR20020086430A (en) * 2002-10-23 2002-11-18 이창남 The apparatus of attaching between concrete and steel structural members and attaching method
CN2596170Y (en) * 2002-10-30 2003-12-31 莱芜钢铁集团有限公司 Positioning rack of pre-buried ground bolt
CN101666100A (en) * 2009-09-15 2010-03-10 中冶实久建设有限公司 Method for accurately installing large foundation bolt of industrial equipment foundation
CN201635183U (en) * 2010-04-27 2010-11-17 中建七局第二建筑有限公司 Fixed structure of pre-embedded bolt in cast-in-place concrete structure
CN201865121U (en) * 2010-10-30 2011-06-15 甘肃海外工程总公司 Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts
CN201891172U (en) * 2010-11-03 2011-07-06 中建三局第二建设工程有限责任公司 Fixing bracket with fine-adjusting function for embedding anchor bolts
CN201991241U (en) * 2011-03-30 2011-09-28 宿迁市科路养护技术有限公司 Steel structural upright column foundation bolt positioning device
CN202031179U (en) * 2011-04-20 2011-11-09 中国十七冶集团有限公司 Centre line aligning and elevation adjusting device of basic embedded bolts
CN202645028U (en) * 2012-07-06 2013-01-02 平煤神马建工集团有限公司土建处 Assembly type bolt group die

Also Published As

Publication number Publication date
CN102704697A (en) 2012-10-03

Similar Documents

Publication Publication Date Title
CN203160267U (en) Split adjustable positioning device of embedded bolts of tower crane foundation
CN110158394B (en) Joint-cutting-free construction structure of concrete super-flat terrace
CN102704697B (en) Assembled bolt group mold
CN203834361U (en) Integral prefabricated molding bed of cross-sea bridge wide pier body steel reinforcement cage
CN103924526B (en) A kind of bridge spanning the sea roomy pier shaft integral prefabricated moulding bed of steel reinforcement cage
CN202645028U (en) Assembly type bolt group die
CN109457872A (en) A kind of prefabricated assembled constructing device of cast in place frame column steel reinforcement cage and construction method
CN203188130U (en) Prestress counter-tension pre-pressing bracket type scaffold supporting device
CN104908159A (en) Operation equipment for industrial large-scale solid square pile production line
CN209384526U (en) A kind of prefabricated assembled constructing device of cast in place frame column steel reinforcement cage
CN203514323U (en) Connection component
CN203531381U (en) Temporary hanging and supporting device used for steel bar truss formworks
CN206495329U (en) Adjustable accurately foot bolt reinforces mould and hardened system
CN210421190U (en) Batter pile model test device
CN211897899U (en) Main pier tie beam suspension type formwork support system
CN203855982U (en) Gas engine foundation embedded bolt suspending and reinforcing device
CN210880147U (en) Prefabricated template of concrete arch-shaped T beam
CN203569693U (en) Pre-buried iron part with steel ties arranged on concrete structure
CN202042851U (en) Mobile power distribution box frame
CN201288329Y (en) Precision built-in steel mold of ultralong cluster anchor bolt
CN208604976U (en) A kind of mould plate supporting device of hanging concrete straining beam
CN209923774U (en) Precise alignment finish rolling threaded die for steel box girder installation consolidation pier construction
CN209755640U (en) Precast beam pinion rack and flange plate reinforcing bar positioner
CN215889394U (en) Device for controlling elevation of cast large-area floor slab
CN203514312U (en) Prestress combined workpiece of supporting system in foundation pit support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Gao Shanlin

Inventor after: Wu Min

Inventor after: Li Weifeng

Inventor after: Chang Huanhuan

Inventor after: Peng Huaijiang

Inventor after: Zhu Huiwei

Inventor after: Hou Zhiyong

Inventor after: Yang Liang

Inventor before: Gao Shanlin

Inventor before: Wu Min

Inventor before: Li Weifeng

Inventor before: Chang Huanhuan

Inventor before: Peng Huaijiang

Inventor before: Zhu Huiwei

Inventor before: Hou Zhiyong

Inventor before: Yang Liang

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140618

Termination date: 20150706

EXPY Termination of patent right or utility model