CN203160267U - Split adjustable positioning device of embedded bolts of tower crane foundation - Google Patents

Split adjustable positioning device of embedded bolts of tower crane foundation Download PDF

Info

Publication number
CN203160267U
CN203160267U CN 201320163618 CN201320163618U CN203160267U CN 203160267 U CN203160267 U CN 203160267U CN 201320163618 CN201320163618 CN 201320163618 CN 201320163618 U CN201320163618 U CN 201320163618U CN 203160267 U CN203160267 U CN 203160267U
Authority
CN
China
Prior art keywords
plate
location
embedded bolt
junction plate
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320163618
Other languages
Chinese (zh)
Inventor
仝茂祥
吴跃明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN 201320163618 priority Critical patent/CN203160267U/en
Application granted granted Critical
Publication of CN203160267U publication Critical patent/CN203160267U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a split adjustable positioning device of embedded bolts of a tower crane foundation and belongs to a tower crane mounting device. The split adjustable positioning device is characterized by mainly comprising four positioning plates, transverse connecting rods, longitudinal connecting rods, inclined connecting rods, embedded bolts, and protecting sleeves, wherein the four positioning plates are arranged corresponding to rectangular four corners of a tower crane base left and right as well as front and rear; the left and right positioning plates are arranged symmetrically; the front and rear positioning plates are arranged symmetrically; each positioning plate mainly comprises a plate body, a connecting plate I, a connecting plate II and a connecting plate III; the longitudinal connecting rods are fixedly mounted between the symmetrical connecting plates II by bolts respectively; the transverse connecting rods are fixedly mounted between the symmetrical connecting plates I by bolts; each inclined connecting rod is fixedly mounted between every two connecting plates III corresponding to the same diagonal line by bolts; and the embedded bolts sleeved with the protecting sleeves are correspondingly mounted in embedded bolt holes in the positioning plates in a penetrating manner respectively. The split adjustable positioning device is safe and reliable to use and high in positioning accuracy.

Description

The adjustable positioner of the split of foundation for tower crane pre-embedded bolt
Technical field
The utility model belongs to tower machine erecting device, especially relates to a kind of positioner of foundation for tower crane pre-embedded bolt.
Background technology
Tower machine concrete foundation is that the tower machine is installed one of stable essential condition, the location of pre-embedded bolt in traditional foundation for tower crane, the one, take the supporting positioning mode, the 2nd, take to cut apart positioning mode, but these two kinds of modes never well solve accuracy and the uniformity of height and the no stained property of pre-embedded bolt screw thread of each pre-embedded bolt location, therefore, often occur each pre-embedded bolt deviations big and each pre-embedded bolt thread segment length is overproof and the pre-embedded bolt thread segment by problems such as concrete are stained.
The utility model content
The purpose of this utility model is the adjustable positioner of split that proposes a kind of foundation for tower crane pre-embedded bolt, and is not only rational in infrastructure, safe and reliable, and installation, convenient disassembly, the positioning accuracy height, and applied widely, construction cost is low.
The purpose of this utility model is achieved like this: the adjustable positioner of a kind of split of foundation for tower crane pre-embedded bolt (abbreviation positioner), comprise the tower machine base, it is characterized in that: the adjustable positioner of the split of this foundation for tower crane pre-embedded bolt is mainly by location-plate, horizontal connecting rod, vertical connecting rod, oblique connecting rod and pre-embedded bolt, protective jacket is formed, totally four of this location-plates, be left-right and front-back ground corresponding to the rectangle four corners position setting of tower machine base, and anterior left and right sides location-plate and the left and right sides location-plate at rear portion are symmetrical arranged respectively, and the front and back location-plate of the front and back location-plate of left part and right part also is symmetrical arranged respectively, now the location-plate with the upper left corner is that example is described further: this location-plate is mainly by plate body, the junction plate I, junction plate II and junction plate III are formed, this plate body is rectangular, offer the pre-embedded bolt hole respectively at this plate body four jiaos, and position and the aperture of each the pre-embedded bolt installing hole on the position in this each pre-embedded bolt hole and aperture and the tower machine base corresponding angles are corresponding to the same, simultaneously, the rectangular junction plate I of the level that vertically is welded at the middle part of this (location-plate in the upper left corner) plate body right flank, the rectangular junction plate II of the level that vertically is welded at the middle part of this plate body leading flank, and at the right front angle of this plate body corresponding to the be welded rectangular junction plate III of level of diagonal position, in addition, in the junction plate I, junction plate II and junction plate III are offered two connecting holes respectively;
Like this, the junction plate II on the location-plate in the upper right corner also forward, and the junction plate II on the location-plate in the location-plate in the lower right corner and the lower left corner is all backward, fixedly mounts vertical connecting rod respectively with bolt between each symmetrical junction plate II;
Junction plate I on the location-plate in the upper right corner and the location-plate in the lower right corner all left, and the junction plate I on the location-plate in the lower left corner is also to the right, with bolt horizontal connecting rod is installed between each symmetrical junction plate I;
On the left-front corner of the location-plate in the upper right corner and on the left rear corner at the location-plate in the lower right corner and on the right back angle at the location-plate in the lower left corner corresponding to the diagonal position rectangular junction plate III of level that is welded respectively, and between each is corresponding to the junction plate III on the same diagonal, with bolt oblique connecting rod is installed respectively;
This vertical connecting rod, horizontal connecting rod all can adopt 4 bugle steel to make, and tiltedly connecting rod can adopt band steel to make, in the pre-embedded bolt hole on each location-plate respectively correspondence install pre-embedded bolt and equal spinning nuts and be the suspension shape, in addition, thread segment at each pre-embedded bolt is set with protective jacket, and this protective jacket can adopt discarded beverage bottle to make.
During installation, at first with the horizontal connecting rod between corresponding junction plate I, junction plate II and the junction plate III on four location-plates, vertical connecting rod, tiltedly connecting rod is fixedly connected respectively, and must guarantee that the pre-embedded bolt hole on each location-plate is accurately corresponding with the installing hole of tower machine base, be installed on each pre-embedded bolt in the pre-embedded bolt hole respectively then and implant in the reinforcing bar network in the concrete basis (be about to each pre-embedded bolt respectively with the concrete basis in the corresponding welding of reinforcing bar), and the uniformity that keeps the thread segment of each pre-embedded bolt to stretch out height; Pouring concrete basis is measured before concrete initial set and each pre-embedded bolt is rectified a deviation, to keep the accuracy of each pre-embedded bolt location; After waiting for that concrete initial set is qualified, dismantle this positioner, take out each location-plate, in order to reuse.
The adjustable positioner of split of the foundation for tower crane pre-embedded bolt that the utility model proposes, not only rational in infrastructure, safe and reliable, and also installation, convenient disassembly, the positioning accuracy height, applied widely, construction cost is low.
Now the adjustable positioner of split of the foundation for tower crane pre-embedded bolt that in conjunction with the accompanying drawings and embodiments the utility model is proposed is described further.
Description of drawings
Fig. 1 is the schematic top plan view of the adjustable positioner of split of the foundation for tower crane pre-embedded bolt that proposes of the utility model.
Fig. 2 is the schematic perspective view of the adjustable positioner of the split of the foundation for tower crane pre-embedded bolt that proposes of the utility model when installing.
Fig. 3 is the partial cutaway schematic of the adjustable positioner of split of the foundation for tower crane pre-embedded bolt that proposes of the utility model.
Among Fig. 1, Fig. 2, Fig. 3: 1, location-plate 1-1, junction plate I 1-2, junction plate II 1-3, junction plate III 1-4, pre-embedded bolt hole 1-5, plate body 2-1, horizontal connecting rod 2-2, vertical connecting rod 3, oblique connecting rod 4, pre-embedded bolt 5, nut 6, protective jacket 7, concrete basis.
The specific embodiment
From Fig. 1, Fig. 2, among Fig. 3 as can be seen: the adjustable positioner of a kind of split of foundation for tower crane pre-embedded bolt (abbreviation positioner), comprise the tower machine base, it is characterized in that: the adjustable positioner of the split of this foundation for tower crane pre-embedded bolt is mainly by location-plate 1, horizontal connecting rod 2-1, vertical connecting rod 2-2, oblique connecting rod 3 and pre-embedded bolt 4, protective jacket 6 is formed, totally four of this location-plates 1, being left-right and front-back ground arranges corresponding to the rectangle four corners position of tower machine base, and anterior left and right sides location-plate and the left and right sides location-plate at rear portion are symmetrical arranged respectively, and the front and back location-plate of the front and back location-plate of left part and right part also is symmetrical arranged respectively, now the location-plate 1 with the upper left corner is that example is described further: this location-plate 1 is mainly by plate body 1-5, junction plate I 1-1, junction plate II 1-2 and junction plate III 1-3 form, 1-5 is rectangular for this plate body, offer pre-embedded bolt hole 1-4 respectively at this plate body 1-5 four jiaos, and position and the aperture of the installing hole of each pre-embedded bolt 4 on the position of this each pre-embedded bolt hole 1-4 and aperture and the tower machine base corresponding angles are corresponding to the same, simultaneously, the rectangular junction plate I 1-1 of the level that vertically is welded at the middle part of this (location-plate 1 in the upper left corner) plate body 1-5 right flank, the rectangular junction plate II 1-2 of the level that vertically is welded at the middle part of this plate body 1-5 leading flank, and at the right front angle of this plate body 1-5 corresponding to the be welded rectangular junction plate III 1-3 of level of diagonal position, in addition, at this junction plate I 1-1, junction plate II 1-2 and junction plate III 1-3 offer two connecting holes respectively;
Like this, the junction plate II 1-2 on the location-plate 1 in the upper right corner also forward, and the junction plate II 1-2 on the location-plate 1 in the location-plate 1 in the lower right corner and the lower left corner is all backward, fixedly mounts vertical connecting rod 2-2 respectively with bolt between each symmetrical junction plate II 1-2;
Junction plate I 1-1 on the location-plate 1 in the upper right corner and the location-plate 1 in the lower right corner all left, and the junction plate I 1-1 on the location-plate 1 in the lower left corner is also to the right, with bolt horizontal connecting rod 2-1 is installed between each symmetrical junction plate I 1-1;
On the left-front corner of the location-plate 1 in the upper right corner and on the left rear corner at the location-plate 1 in the lower right corner and on the right back angle at the location-plate 1 in the lower left corner corresponding to the diagonal position rectangular junction plate III 1-3 of level that is welded respectively, and between each is corresponding to the junction plate III 1-3 on the same diagonal, with bolt oblique connecting rod 3 is installed respectively;
This horizontal connecting rod 2-1, vertical connecting rod 2-2 all can adopt 4 bugle steel to make, and tiltedly connecting rod 3 can adopt band steel to make, among the pre-embedded bolt hole 1-4 on each location-plate 1 respectively correspondence install pre-embedded bolt 4 and equal spinning nuts 5 and be the suspension shape, and being set with protective jacket 6 at the thread segment of each pre-embedded bolt 4, this protective jacket 6 can adopt discarded beverage bottle to make.
During installation, at first with the corresponding junction plate I 1-1 on four location-plates 1, horizontal connecting rod 2-1 between junction plate II 1-2 and the junction plate III 1-3, vertical connecting rod 2-2, tiltedly connecting rod 3 is fixedly connected respectively, and must guarantee that the pre-embedded bolt hole 1-4 on each location-plate 1 is accurately corresponding with the installing hole of tower machine base, then each pre-embedded bolt 4 is installed on respectively among the 1-4 of pre-embedded bolt hole and the corresponding reinforcing bar network of implanting in the concrete basis 7 in (be about to each pre-embedded bolt 4 respectively with concrete basis 7 in the corresponding welding of reinforcing bar), and keep the uniformity of stretching out height of the thread segment of each pre-embedded bolt 4; Pouring concrete basis 7 is measured before concrete initial set and each pre-embedded bolt 4 is rectified a deviation, to keep the accuracy of each pre-embedded bolt 4 location; After waiting for that concrete initial set is qualified, dismantle this positioner, take out each location-plate 1, safe and reliable in order to reuse, and also installation, convenient disassembly, the positioning accuracy height.

Claims (4)

1. the adjustable positioner of the split of a foundation for tower crane pre-embedded bolt, comprise the tower machine base, it is characterized in that: the adjustable positioner of the split of this foundation for tower crane pre-embedded bolt is mainly by location-plate (1), horizontal connecting rod (2-1), vertical connecting rod (2-2), oblique connecting rod (3) and pre-embedded bolt (4), protective jacket (6) is formed, totally four of this location-plates (1), being left-right and front-back ground arranges corresponding to the rectangle four corners position of tower machine base, and anterior left and right sides location-plate and the left and right sides location-plate at rear portion are symmetrical arranged respectively, and the front and back location-plate of the front and back location-plate of left part and right part also is symmetrical arranged respectively, this location-plate (1) is mainly by plate body (1-5), junction plate I (1-1), junction plate II (1-2) and junction plate III (1-3) are formed, (1-5) is rectangular for this plate body, offer pre-embedded bolt hole (1-4) respectively at this plate body (1-5) four jiaos, and position and the aperture of the installing hole of each pre-embedded bolt (4) on the position in this each pre-embedded bolt hole (1-4) and aperture and the tower machine base corresponding angles are corresponding to the same, simultaneously, the rectangular junction plate I (1-1) of the level that vertically is welded at the middle part of plate body (1-5) right flank of the location-plate (1) in this upper left corner, the rectangular junction plate II (1-2) of the level that vertically is welded at the middle part of this plate body (1-5) leading flank, and at the right front angle of this plate body (1-5) corresponding to the be welded rectangular junction plate III (1-3) of level of diagonal position, in addition, in this junction plate I (1-1), junction plate II (1-2) and junction plate III (1-3) are offered two connecting holes respectively;
Like this, junction plate II (1-2) on the location-plate in the upper right corner (1) also forward, and the junction plate II (1-2) on the location-plate (1) in the location-plate in the lower right corner (1) and the lower left corner all backward, fixedly mounts vertical connecting rod (2-2) respectively with bolt between each symmetrical junction plate II (1-2);
Junction plate I (1-1) on the location-plate (1) in the location-plate in the upper right corner (1) and the lower right corner all left, and the junction plate I (1-1) on the location-plate in the lower left corner (1) also to the right, with bolt horizontal connecting rod (2-1) is installed between each symmetrical junction plate I (1-1);
On the left-front corner of the location-plate (1) in the upper right corner and on the left rear corner at the location-plate (1) in the lower right corner and on the right back angle at the location-plate (1) in the lower left corner corresponding to the diagonal position rectangular junction plate III (1-3) of level that is welded respectively, and between each is corresponding to the junction plate III (1-3) on the same diagonal, with bolt oblique connecting rod (3) is installed respectively;
In the pre-embedded bolt hole (1-4) on each location-plate (1) respectively correspondence install pre-embedded bolt (4) and equal spinning nuts (5) and be the suspension shape, and be set with protective jacket (6) at the thread segment of each pre-embedded bolt (4).
2. the adjustable positioner of the split of foundation for tower crane pre-embedded bolt according to claim 1 is characterized in that this horizontal connecting rod (2-1), vertical connecting rod (2-2) all adopt 4 bugle steel to make.
3. the adjustable positioner of the split of foundation for tower crane pre-embedded bolt according to claim 1 is characterized in that this oblique connecting rod (3) adopts band steel to make.
4. the adjustable positioner of the split of foundation for tower crane pre-embedded bolt according to claim 1 is characterized in that this protective jacket (6) adopts discarded beverage bottle to make.
CN 201320163618 2013-04-03 2013-04-03 Split adjustable positioning device of embedded bolts of tower crane foundation Expired - Lifetime CN203160267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320163618 CN203160267U (en) 2013-04-03 2013-04-03 Split adjustable positioning device of embedded bolts of tower crane foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320163618 CN203160267U (en) 2013-04-03 2013-04-03 Split adjustable positioning device of embedded bolts of tower crane foundation

Publications (1)

Publication Number Publication Date
CN203160267U true CN203160267U (en) 2013-08-28

Family

ID=49021463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320163618 Expired - Lifetime CN203160267U (en) 2013-04-03 2013-04-03 Split adjustable positioning device of embedded bolts of tower crane foundation

Country Status (1)

Country Link
CN (1) CN203160267U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741709A (en) * 2014-01-09 2014-04-23 武汉竹安工程设备管理有限公司 Embedded bolt mold for tower crane
CN104328795A (en) * 2014-11-25 2015-02-04 黑龙江大学 Locator for tower frame connection stand bar and mounting foundation bolt and using method of locator for tower frame connection stand bars and mounting foundation bolts
CN106049884A (en) * 2016-06-28 2016-10-26 上海二十冶建设有限公司 Cross-shaped flange positioner for elevator car and construction method of cross-shaped flange positioner
CN107100190A (en) * 2017-05-17 2017-08-29 新奥泛能网络科技股份有限公司 The built-in fitting device poured applied to Equipment Foundations
CN108118694A (en) * 2018-01-31 2018-06-05 深圳市奇见科技有限公司 The positioning fixture and its localization method of a kind of basic buried plate of vertical circulating garage
CN109024911A (en) * 2018-07-02 2018-12-18 中国十七冶集团有限公司 A kind of assembled stair cast-in-place node pre-cast bolt positioning device and its construction method
CN109396715A (en) * 2018-10-30 2019-03-01 江南造船(集团)有限责任公司 A kind of soldering positioning device and welding and assembling technics of ship deck bolt mounting post
CN111155550A (en) * 2020-01-21 2020-05-15 中国华冶科工集团有限公司 Rapid construction method for inclined frame of vertical shaft

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741709A (en) * 2014-01-09 2014-04-23 武汉竹安工程设备管理有限公司 Embedded bolt mold for tower crane
CN104328795A (en) * 2014-11-25 2015-02-04 黑龙江大学 Locator for tower frame connection stand bar and mounting foundation bolt and using method of locator for tower frame connection stand bars and mounting foundation bolts
CN106049884A (en) * 2016-06-28 2016-10-26 上海二十冶建设有限公司 Cross-shaped flange positioner for elevator car and construction method of cross-shaped flange positioner
CN107100190A (en) * 2017-05-17 2017-08-29 新奥泛能网络科技股份有限公司 The built-in fitting device poured applied to Equipment Foundations
CN108118694A (en) * 2018-01-31 2018-06-05 深圳市奇见科技有限公司 The positioning fixture and its localization method of a kind of basic buried plate of vertical circulating garage
CN109024911A (en) * 2018-07-02 2018-12-18 中国十七冶集团有限公司 A kind of assembled stair cast-in-place node pre-cast bolt positioning device and its construction method
CN109396715A (en) * 2018-10-30 2019-03-01 江南造船(集团)有限责任公司 A kind of soldering positioning device and welding and assembling technics of ship deck bolt mounting post
CN109396715B (en) * 2018-10-30 2020-07-28 江南造船(集团)有限责任公司 Welding positioning device and welding process for ship deck bolt mounting column
CN111155550A (en) * 2020-01-21 2020-05-15 中国华冶科工集团有限公司 Rapid construction method for inclined frame of vertical shaft

Similar Documents

Publication Publication Date Title
CN203160267U (en) Split adjustable positioning device of embedded bolts of tower crane foundation
CN203631067U (en) Road traffic sign board
CN202937005U (en) Cast-in-situ concrete beam lateral template reinforcement device
CN203783165U (en) Multi-directional accurate adjusting device for embedded part
CN201817814U (en) Adjustable fixed support of vertical surface sheet steel form
CN203334680U (en) Upper reversed beam lifting mold for concrete pouring
CN110670873B (en) Support system of steel formwork of ultrahigh large-section concrete column and construction method
CN201933794U (en) Steel beam correcting clamp
CN210562223U (en) Slope protection template with arch framework
CN209384117U (en) A kind of vertical bracing means of Bailey beam bracket nonsupport point
CN203569871U (en) Installation structure for scaffold
CN202055258U (en) Accurate sample frame for positioning pre-embedded bolts of contact network stand column foundation
CN206360113U (en) Embedded column base crab-bolt support positioning bracket
CN214005723U (en) Steel pipe support concrete foundation structure
CN204148776U (en) The assembled moulding bed of bent cap framework of steel reinforcement
CN205134291U (en) Large -scale steel form with adjustable
CN105401775B (en) Variable cross-section auxiliary positioning angle steel
CN210122761U (en) Super high-rise steel pipe concrete column base
CN204456166U (en) A kind of high-speed railway subgrade location contact net basic pre-embedded bolt fixes mould bases
CN208455656U (en) A kind of anchor ear support device
CN203594264U (en) Clamp special for angle steel iron tower rectification and tool for angle steel iron tower rectification
CN103866865B (en) The pre-buried fixing means of a diameter of 48mm foundation bolt
CN204059763U (en) A kind of negative reinforcement is constructed adjustable auxiliary frame
CN204290167U (en) Put stringing crossing frame
CN202431000U (en) Horizontal supporting structure of building formwork

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130828