CN204456166U - A kind of high-speed railway subgrade location contact net basic pre-embedded bolt fixes mould bases - Google Patents
A kind of high-speed railway subgrade location contact net basic pre-embedded bolt fixes mould bases Download PDFInfo
- Publication number
- CN204456166U CN204456166U CN201520095980.8U CN201520095980U CN204456166U CN 204456166 U CN204456166 U CN 204456166U CN 201520095980 U CN201520095980 U CN 201520095980U CN 204456166 U CN204456166 U CN 204456166U
- Authority
- CN
- China
- Prior art keywords
- embedded bolt
- embedded
- formwork
- welded
- upper frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009415 formwork Methods 0.000 claims abstract description 26
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 8
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 238000000034 method Methods 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Landscapes
- Moulds, Cores, Or Mandrels (AREA)
Abstract
本实用新型提出了一种高速铁路路基地段接触网基础预埋螺栓固定模架,包括:下框架、螺母、上框架、调节螺杆、加强杆、横搭、预埋螺栓;所述的下框架由螺纹钢焊接而成,下框架通过加强杆与上框架相连;所述的调节螺杆焊接在下框架上;所述的上框架上设置有预埋螺栓孔;所述的预埋螺栓孔由螺纹钢焊接而成;所述的预埋螺栓安装在预埋螺栓孔中,用螺母固定;所述的横搭焊接在上框架上,用于将模架放置在模板上。本实用新型能够快速、准确的定位和加固预埋螺栓,防止螺栓组间距超标,防止螺栓在浇注过程中下沉而影响螺栓外漏长度,能在混凝土浇注前快速精确的调整螺栓的位置,大幅度提高工作的准确性和工作效率。
The utility model proposes a high-speed railway embankment section catenary foundation pre-embedded bolt fixing formwork, including: a lower frame, a nut, an upper frame, an adjusting screw, a reinforcing rod, a horizontal bridge, and a pre-embedded bolt; the lower frame is composed of The lower frame is connected with the upper frame through reinforcing rods; the adjusting screw is welded on the lower frame; the upper frame is provided with pre-embedded bolt holes; the pre-embedded bolt holes are welded by rebar The embedded bolts are installed in the embedded bolt holes and fixed with nuts; the horizontal laps are welded on the upper frame for placing the formwork on the formwork. The utility model can quickly and accurately locate and reinforce the pre-embedded bolts, prevent the distance between the bolt groups from exceeding the standard, prevent the bolts from sinking during the pouring process and affect the bolt leakage length, and can quickly and accurately adjust the positions of the bolts before concrete pouring. Significantly improve the accuracy and efficiency of work.
Description
技术领域 technical field
本实用新型涉及一种模架,具体涉及一种高速铁路路基地段接触网基础预埋螺栓固定模架。 The utility model relates to a formwork, in particular to a formwork fixed by pre-embedded bolts of a catenary foundation in a high-speed railway embankment section.
技术背景 technical background
目前、铁路路基地段接触网基础施工基本均由土建施工单位施工,接触网基础施工后交予四电施工单位安装接触网立柱,但在交付过程中,往往存在大量接触网预埋螺栓组间距不符合要求,接触网预埋螺栓外漏长度不足、接触网预埋螺栓不竖直偏位,造成接触网立柱无法安装,接收单位不接收而出现返工的现象。 At present, the catenary foundation construction of the railway subgrade section is basically carried out by the civil engineering construction unit. After the catenary foundation is constructed, it is handed over to the Sidian construction unit to install the catenary column. However, during the delivery process, there are often a large number of catenary embedded bolts. If the requirements are met, the leakage length of the catenary pre-embedded bolts is insufficient, and the catenary pre-embedded bolts are not vertically offset, resulting in the failure of the catenary column to be installed, and the receiving unit does not accept it and rework occurs.
发明内容 Contents of the invention
为了解决上述问题,本实用新型提出了一种高速铁路路基地段接触网基础预埋螺栓固定模架。 In order to solve the above problems, the utility model proposes a high-speed railway embankment section catenary foundation pre-embedded bolt fixed formwork.
本实用新型的技术方案是:一种高速铁路路基地段接触网基础预埋螺栓固定模架,包括:下框架、螺母、上框架、调节螺杆、加强杆、横搭、预埋螺栓;所述的下框架由螺纹钢焊接而成,下框架通过加强杆与上框架相连;所述的调节螺杆焊接在下框架上;所述的上框架上设置有预埋螺栓孔;所述的预埋螺栓孔由螺纹钢焊接而成;所述的预埋螺栓安装在预埋螺栓孔中,用螺母固定;所述的横搭焊接在上框架上,用于将模架放置在模板上。 The technical solution of the utility model is: a high-speed railway embankment section catenary foundation pre-embedded bolt fixing formwork, including: lower frame, nut, upper frame, adjusting screw, reinforcing rod, horizontal bridge, and pre-embedded bolts; The lower frame is welded by threaded steel, and the lower frame is connected with the upper frame through reinforcing rods; the adjusting screw is welded on the lower frame; the upper frame is provided with embedded bolt holes; the embedded bolt holes are formed by The threaded steel is welded; the embedded bolts are installed in the embedded bolt holes and fixed with nuts; the horizontal laps are welded on the upper frame for placing the formwork on the formwork.
进一步地,所述的调节螺杆的数量为八个,分别焊接在下框架的四个边上。 Further, there are eight adjusting screws, which are respectively welded to the four sides of the lower frame.
进一步地,所述的横搭的数量为两个,平行地焊接在上框架上。 Further, the number of said cross-legs is two, which are welded on the upper frame in parallel.
进一步地,所述的预埋螺栓能够从模架上取下。 Further, the embedded bolts can be removed from the formwork.
进一步地,所述的螺纹钢的直径为16毫米以上。 Further, the diameter of the rebar is more than 16 mm.
有益效果Beneficial effect
本实用新型的一种高速铁路路基地段接触网基础预埋螺栓固定模架,能够快速、准确的定位和加固预埋螺栓,防止螺栓组间距超标,能防止螺栓在浇注过程中下沉而影响螺栓外漏长度,能在混凝土浇注前快速精确的调整螺栓的位置,能大幅度提高工作的准确性和工作效率。 A high-speed railway subgrade section catenary foundation pre-embedded bolt fixing formwork of the utility model can quickly and accurately locate and reinforce the pre-embedded bolts, prevent the distance between the bolt groups from exceeding the standard, and prevent the bolts from sinking during the pouring process and affect the bolts The leakage length can quickly and accurately adjust the position of the bolt before concrete pouring, which can greatly improve the accuracy and efficiency of the work.
附图说明 Description of drawings
图1为本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.
图中,1-下框架、2-螺母、3-上框架、4-调节螺杆、5-加强杆、6-横搭、7-预埋螺栓孔、8-预埋螺栓。 In the figure, 1-lower frame, 2-nut, 3-upper frame, 4-adjusting screw, 5-strengthening rod, 6-horizontal lap, 7-embedded bolt hole, 8-embedded bolt.
具体实施方式 Detailed ways
下面结合附图对本实用新型的一种高速铁路路基地段接触网基础预埋螺栓固定模架作详细说明。 A kind of high-speed railway embankment section catenary foundation pre-embedded bolt fixing formwork of the present utility model will be described in detail below in conjunction with the accompanying drawings.
如图1所示,一种高速铁路路基地段接触网基础预埋螺栓固定模架,包括:下框架1、螺母2、上框架3、调节螺杆4、加强杆5、横搭6、预埋螺栓8;所述的下框架1由螺纹钢焊接而成,下框架1通过加强杆5与上框架3相连;所述的调节螺杆4的数量为八个,分别焊接在下框架1的四个边上;所述的上框架3上设置有预埋螺栓孔7;所述的预埋螺栓孔7由螺纹钢焊接而成;所述的预埋螺栓8安装在预埋螺栓孔7中,用螺母2固定;所述的横搭6的数量为两个,平行地焊接在上框架3上,用于将模架放置在模板上。 As shown in Figure 1, a high-speed railway embankment section catenary foundation pre-embedded bolt fixed formwork, including: lower frame 1, nut 2, upper frame 3, adjusting screw 4, reinforcing rod 5, horizontal bridge 6, pre-embedded bolts 8; the lower frame 1 is welded by rebar, and the lower frame 1 is connected with the upper frame 3 through the reinforcing rod 5; the number of the adjusting screws 4 is eight, which are respectively welded on the four sides of the lower frame 1 The described upper frame 3 is provided with embedded bolt holes 7; the described embedded bolt holes 7 are welded by threaded steel; the described embedded bolts 8 are installed in the embedded bolt holes 7, and the nuts 2 Fixing; the number of said cross-laps 6 is two, which are welded on the upper frame 3 in parallel, and are used to place the formwork on the formwork.
将横搭6放置在模板上,调节调节螺杆4使其紧贴模板侧面;调节预埋螺栓8上的螺母2,使预埋螺栓8露出的长度符合设计要求,此时,可以往模板里加入混凝土。 Place the crossbar 6 on the formwork, adjust the adjusting screw 4 to make it close to the side of the formwork; adjust the nut 2 on the embedded bolt 8, so that the exposed length of the embedded bolt 8 meets the design requirements, at this time, you can add it to the formwork concrete.
以上所述,仅是本实用新型的较佳实施例而已,并非对本实用新型作任何形式上的限制,虽然本实用新型已以较佳实施例揭露如上,然而并非用以限定本实用新型,任何熟悉本专业的技术人员,在不脱离本实用新型技术方案范围内,当可利用上述揭示的技术内容作出些许更动或修饰为等同变化的等效实施例,但凡是未脱离本实用新型技术方案的内容,依据本实用新型的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本实用新型技术方案的范围内。 The above are only preferred embodiments of the utility model, and are not intended to limit the utility model in any form. Although the utility model has been disclosed as above with preferred embodiments, it is not intended to limit the utility model. Any Those who are familiar with this profession, without departing from the scope of the technical solution of the present utility model, can use the technical content disclosed above to make some changes or modify the equivalent embodiments of equivalent changes, but all those that do not depart from the technical solution of the present utility model Any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the utility model still belong to the scope of the technical solution of the utility model.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520095980.8U CN204456166U (en) | 2015-02-11 | 2015-02-11 | A kind of high-speed railway subgrade location contact net basic pre-embedded bolt fixes mould bases |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520095980.8U CN204456166U (en) | 2015-02-11 | 2015-02-11 | A kind of high-speed railway subgrade location contact net basic pre-embedded bolt fixes mould bases |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204456166U true CN204456166U (en) | 2015-07-08 |
Family
ID=53663075
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520095980.8U Expired - Lifetime CN204456166U (en) | 2015-02-11 | 2015-02-11 | A kind of high-speed railway subgrade location contact net basic pre-embedded bolt fixes mould bases |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204456166U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106006361A (en) * | 2016-06-30 | 2016-10-12 | 中国五冶集团有限公司 | Pre-buried bolt assembly |
| CN108457295A (en) * | 2018-05-04 | 2018-08-28 | 中铁三局集团有限公司 | High-speed railway subgrade contact net basic foundation bolt accurate positioning device |
-
2015
- 2015-02-11 CN CN201520095980.8U patent/CN204456166U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106006361A (en) * | 2016-06-30 | 2016-10-12 | 中国五冶集团有限公司 | Pre-buried bolt assembly |
| CN108457295A (en) * | 2018-05-04 | 2018-08-28 | 中铁三局集团有限公司 | High-speed railway subgrade contact net basic foundation bolt accurate positioning device |
| CN108457295B (en) * | 2018-05-04 | 2023-07-18 | 中铁三局集团有限公司 | Precise positioning device for foundation anchor bolts of high-speed railway subgrade contact net |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN208055849U (en) | A kind of pier shaft embedded bar positioning device based on cushion cap template | |
| CN103306208A (en) | Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier | |
| CN108035375A (en) | A kind of concrete assembled rim of a cup basis | |
| CN205839599U (en) | Pier stud reinforcing bar location auxiliary moulding bed | |
| CN204920210U (en) | Dysmorphism spar template reinforced structure | |
| CN107571392A (en) | A kind of beam making bench for the construction of transverse tensioning method prestressing force prefabricated small box girder | |
| CN204456166U (en) | A kind of high-speed railway subgrade location contact net basic pre-embedded bolt fixes mould bases | |
| CN204997807U (en) | Prefabricated little case roof beam centre form device | |
| CN204455823U (en) | A kind of suspension bridge push-and-pull rod anchor system | |
| CN204112712U (en) | A kind of side root haunch cast-in-place wall model sheetinstallat device | |
| CN106522282A (en) | Liftable post-cast strip template structure and system and construction method thereof | |
| CN203334190U (en) | Thin-wall hollow pillar integral elevation model turning device | |
| CN205224266U (en) | Overlength super large area bottom plate post -cast strip structure | |
| CN204199318U (en) | Multi-purpose Iron Tower Foundation Anchor Bolt Positioning Formwork Device | |
| CN103850266A (en) | Multipurpose positioning template device for foundation bolt of iron tower and positioning method | |
| CN206589121U (en) | It is a kind of to be used for precast beam, the diaphragm plate horizontal reinforcement mounting and positioning device of plate | |
| CN104405417A (en) | Inverted arch construction trolley for self-propelled tunnel | |
| CN205295916U (en) | RPC leveling board | |
| CN208072956U (en) | Concrete shear force wall root bracing means | |
| CN106400687A (en) | Positioning assisting assembly jig for pier column reinforcing rib | |
| CN206503076U (en) | The stiff skeleton operating platform of hollow thin-walled high pier cage bar positioning | |
| CN205046843U (en) | Reinforcing apparatus's stair template of marking time in middle of installation | |
| CN204224997U (en) | Little curve circuit bracing means | |
| CN202500335U (en) | Horizontal internal formwork supporting device | |
| CN205874988U (en) | Case back board prestressing tendons positioner |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150708 |