CN209923774U - Precise alignment finish rolling threaded die for steel box girder installation consolidation pier construction - Google Patents

Precise alignment finish rolling threaded die for steel box girder installation consolidation pier construction Download PDF

Info

Publication number
CN209923774U
CN209923774U CN201920321531.9U CN201920321531U CN209923774U CN 209923774 U CN209923774 U CN 209923774U CN 201920321531 U CN201920321531 U CN 201920321531U CN 209923774 U CN209923774 U CN 209923774U
Authority
CN
China
Prior art keywords
finish rolling
steel
construction
sleeve
embedding sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920321531.9U
Other languages
Chinese (zh)
Inventor
杨希富
韩维东
田德君
于磊
夏传江
马琳琳
王云
李凯
胡成明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
China Railway 22nd Bureau Group Co Ltd
Original Assignee
Harbin Railway Construction Group Co Ltd of China Railway 22nd Bureau Group Co Ltd
China Railway Group Ltd CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Railway Construction Group Co Ltd of China Railway 22nd Bureau Group Co Ltd, China Railway Group Ltd CREC filed Critical Harbin Railway Construction Group Co Ltd of China Railway 22nd Bureau Group Co Ltd
Priority to CN201920321531.9U priority Critical patent/CN209923774U/en
Application granted granted Critical
Publication of CN209923774U publication Critical patent/CN209923774U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

Accurate counterpoint finish rolling screw thread mould of steel case roof beam installation consolidation pier construction relates to the construction facility, concretely relates to accurate counterpoint mould that uses in the construction of steel case roof beam installation consolidation pier. The fine rolling device is composed of an embedding sleeve and an embedding sleeve, wherein the embedding sleeve is fixed below a steel beam bottom plate, the upper part of the embedding sleeve is embedded in the lower part of the embedding sleeve, square tubes are longitudinally and transversely arranged in the embedding sleeve, and the upper end of a fine rolling threaded steel bar is arranged in a staggered area of each pair of longitudinally and transversely arranged square tubes. The problems that potential safety hazards exist to construction operators and the operation difficulty of manual operation is high in the process of constructing the preformed hole of the box girder bottom plate in the high-altitude process of finish rolling threaded steel bars are solved.

Description

Precise alignment finish rolling threaded die for steel box girder installation consolidation pier construction
Technical Field
The utility model relates to a construction facility, the accurate counterpoint mould that uses in concretely relates to steel case roof beam installation consolidation pier construction.
Background
In the building construction, the positioning and installation of the steel bars are always the key problems in the engineering construction, in the traditional steel bar construction, most of the steel bars are bound or welded after being positioned, the pier column and the steel beam are welded, namely, a support and a leveling steel plate are arranged on the pier column cushion stone, and the leveling steel plate and the steel beam are welded into a whole.
In the construction engineering, the connection form of the pier column and the steel box girder is that the pier beam is fixedly connected, 5 meters above the pier column, and the outer wrapping steel plate (namely the steel ferrule) is provided with the shear nails and the stiffening plates. The pier column is internally provided with 24 phi 32 finish rolling screw threads and vertical tensioning ribs, the tensioning ribs penetrate through a reserved hole at the bottom of the beam when the steel box girder is installed, after the steel beam is installed, concrete is poured in the box and 5 meters above the pier column at one time to form pier girder consolidation, and after the concrete strength meets the requirement of vertical tensioning.
In the construction of the finish rolling threaded steel bar high altitude pair for box girder bottom plate preformed hole, the prior art is that after the girder steel high altitude is tentatively counterpointed, 10cm space is reserved with the reinforcing bar at the bottom of the beam, then the steel pipe is used to stretch out in the beam bottom plate preformed hole by the manual work, embolias the reinforcing bar one by one, and after 24 finish rolling threads are all emboliaed the steel pipe, the accurate position that falls is accomplished in the girder steel whereabouts. The construction personnel using the method have potential safety hazards, and in addition, the high-altitude phi 32 finish rolling twisted steel has the problems of elastic deformation and the like, so the manual operation difficulty is high.
SUMMERY OF THE UTILITY MODEL
The utility model provides a steel case roof beam installation consolidation mound construction accurate alignment finish rolling screw thread mould, it has solved finish rolling twisted steel high altitude to in being the construction of case roof beam bottom plate preformed hole, and there is the potential safety hazard in the construction operation personnel, the big scheduling problem of the manual work operation degree of difficulty.
In order to solve the above problem, the utility model adopts the following technical scheme: the precise alignment finish rolling threaded die for the construction of the steel box girder installation consolidation piers is composed of an embedding sleeve and an embedding sleeve, wherein the embedding sleeve is fixed below a steel girder bottom plate, the upper part of the embedding sleeve is embedded in the lower part of the embedding sleeve, square pipes are longitudinally and transversely arranged in the embedding sleeve, and the upper end of a finish rolling threaded steel bar is arranged in the staggered area of each pair of the longitudinally and transversely arranged square pipes.
The utility model can quickly complete the high-altitude alignment of the reinforcing steel bar, reduce the time of manual operation and ensure the safety of high-altitude operation; the method also has the advantages of simple raw material processing and manufacturing, simple operation, easy control and convenient use. The utility model discloses a characteristics are embedded cover of inlaying for the main part, adopt the square pipe of setting with great ease fixed with the finish rolling twisted steel, once can accomplish whole reinforcing bars to the hole problem to the counterpoint.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is a schematic view of the structure of the lower nest;
FIG. 4 is a lower nested use state diagram;
fig. 5 is a diagram of the overall usage state of the present invention.
The symbols in the drawings illustrate that: an embedding sleeve 1; nesting 2; 2-1 of square tubes; finish rolling the twisted steel 3; a steel beam bottom plate 4.
Detailed Description
The present invention will be described in detail with reference to the preferred embodiments.
As shown in fig. 1-5, the precise alignment finish rolling threaded die for the construction of the steel box girder installation and consolidation piers is composed of an embedding sleeve 1 and an embedding sleeve 2, wherein the embedding sleeve 1 and the embedding sleeve 2 are both in square frame structures, and the embedding sleeve 1 and the embedding sleeve 2 are welded by 10mm steel plates. The embedding sleeve 1 is fixed below the steel beam bottom plate 4, the upper portion of the embedding sleeve 2 is embedded in the lower portion of the embedding sleeve 1, square pipes 2-1 are longitudinally and transversely arranged in the embedding sleeve 2, every two square pipes 2-1 are a pair, the front ends and the rear ends of a plurality of pairs of vertically arranged square pipes 2-1 are fixed on the front frame and the rear frame of the embedding sleeve 2, the left ends and the right ends of a plurality of pairs of horizontally arranged square pipes 2-1 are fixed on the left frame and the right frame of the embedding sleeve 2, holes are formed in the frames of the embedding sleeve 2. The upper end of the finish rolling twisted steel 3 is arranged in a square area at the staggered position of each pair of the square pipes 2-1 which are arranged longitudinally and transversely.
The mold designed this time is composed of an embedded nest plate and a lower nest:
(1) embedding a sleeve: the embedded sleeve and the lower embedded sleeve are welded by a 10mm steel plate.
(2) And a 10-by-10 square tube is added into the lower nest for fixing the finish-rolled twisted steel.
The current manual work is to the hole, and the girder steel high altitude hover time is long, has great potential safety hazard, the utility model discloses reasonable effectual this problem of having solved. And the embedded embedding sleeve can be repeatedly used, so that the precision and the efficiency are improved, and the equipment cost of occupying a large crane for a long time is reduced.
The upper part is embedded with a sleeve and welded on the outer side of the steel beam bottom plate; the lower nest is placed over the rebar during use. And phi 32 finish rolling the twisted steel, and when the lower part of the twisted steel is placed in the lower part nest, the height of the steel does not exceed the upper edge of the lower part nest. The steel beam bottom plate, this picture is that the reinforcing bar accomplishes the counterpoint through the embedding steel sheet.
The utility model discloses obtain using in the experimental items, this utility model has replaced original artifical reinforcing bar counterpoint mode in the construction, very big quickening construction speed, the material resources of using manpower sparingly use moreover the utility model discloses the potential safety hazard of artifical high altitude construction of avoiding, the satisfactory completion construction task in this engineering.

Claims (4)

1. The precise alignment finish rolling threaded die for the construction of the steel box girder installation consolidation piers is characterized by comprising an embedding sleeve and a nesting sleeve, wherein the embedding sleeve is fixed below a steel girder bottom plate, the upper part of the nesting sleeve is embedded in the lower part of the embedding sleeve, square tubes are vertically and horizontally arranged in the nesting sleeve, and the upper end of a finish rolling threaded steel bar is arranged in the staggered area of each pair of the vertically and horizontally arranged square tubes.
2. The precision alignment finish rolling threaded die for the construction of the steel box girder installation and consolidation piers as claimed in claim 1, wherein the embedding sleeve and the nesting sleeve are both of square frame structures.
3. The steel box girder installation and consolidation pier construction precision alignment finish rolling threaded mold according to claim 1, wherein every two square pipes are paired, the front and rear ends of a plurality of pairs of longitudinally arranged pipes are fixed on the front and rear nested frames, and the left and right ends of a plurality of pairs of transversely arranged pipes are fixed on the left and right nested frames.
4. The precision alignment finish rolling threaded die for the construction of the steel box girder installation and consolidation piers as claimed in claim 1, wherein holes are formed on the nesting frames, and the end parts of the square pipes are fixed in the holes.
CN201920321531.9U 2019-03-14 2019-03-14 Precise alignment finish rolling threaded die for steel box girder installation consolidation pier construction Active CN209923774U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920321531.9U CN209923774U (en) 2019-03-14 2019-03-14 Precise alignment finish rolling threaded die for steel box girder installation consolidation pier construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920321531.9U CN209923774U (en) 2019-03-14 2019-03-14 Precise alignment finish rolling threaded die for steel box girder installation consolidation pier construction

Publications (1)

Publication Number Publication Date
CN209923774U true CN209923774U (en) 2020-01-10

Family

ID=69070547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920321531.9U Active CN209923774U (en) 2019-03-14 2019-03-14 Precise alignment finish rolling threaded die for steel box girder installation consolidation pier construction

Country Status (1)

Country Link
CN (1) CN209923774U (en)

Similar Documents

Publication Publication Date Title
CN105888108B (en) Built-in positioning prefabricated component reinforced concrete shear wall and construction method
CN103669655B (en) Deformation joint both walls body concrete pouring construction process
CN210658968U (en) Auxiliary fixing framework of frame column node core stirrup cage
CN104018581A (en) Prestress concrete F slab and framework structure system
CN205975382U (en) Adjustable device of cast -in -situ box girder prestressing force bellows coordinate
CN110130534A (en) A kind of novel energy-consumption precast shear wall and its processing installation method
CN209923774U (en) Precise alignment finish rolling threaded die for steel box girder installation consolidation pier construction
CN211850371U (en) Stirrup cage structure in beam column core area
CN112982485A (en) Construction method for cast-in-situ pipe gallery bottom plate and top plate synchronous formwork pouring concrete
CN210918296U (en) Square steel pipe sleeve fixing device
CN112854577A (en) Self-formwork-supporting cast-in-place floor and construction method thereof
CN209874261U (en) Underground shear wall reinforcing steel bar buckle
CN102465605A (en) Method for building bottom plate steel bar support
CN207686147U (en) Floor and double steel bar protective layer thickness control device
CN107724384B (en) Pile-to-pile connection construction method
CN211846865U (en) Device for hoisting corrugated pipe
CN212897009U (en) Take assembled shear wall structure of corner
CN214302829U (en) Scaffold wall connecting piece structure of high-impermeability shear wall
CN211171938U (en) Quick distance instrument of stake owner muscle
CN109826102B (en) Accurate alignment construction process for steel box girder installation and consolidation pier construction
CN108590042B (en) Multifunctional stirrup for controlling thickness of steel bar protection layer and floor slab
CN208168349U (en) A kind of profile steel concrete column template reinforcing device
CN109162371B (en) Fixing structure of externally-adhered rubber water stop and construction method thereof
CN206319595U (en) Oblique circular cylinder template
CN205614240U (en) Bored concrete pile steel reinforcement cage owner muscle interval fixing tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 150006 No. 113 West straight street, Nangang District, Heilongjiang, Harbin

Patentee after: CHINA RAILWAY 22ND CONSTRUCTION BUREAU 1ST ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY 22ND BUREAU GROUP Co.,Ltd.

Address before: 150006 No. 113 West straight street, Nangang District, Heilongjiang, Harbin

Patentee before: HARBIN RAILWAY CONSTRUCTION GROUP CO., LTD. OF CHINA RAILWAY 22ND CONSTRUCTION BUREAU Co.,Ltd.

Patentee before: CHINA RAILWAY 22ND BUREAU GROUP Co.,Ltd.