CN201635183U - Fixed structure of pre-embedded bolt in cast-in-place concrete structure - Google Patents
Fixed structure of pre-embedded bolt in cast-in-place concrete structure Download PDFInfo
- Publication number
- CN201635183U CN201635183U CN 201020172129 CN201020172129U CN201635183U CN 201635183 U CN201635183 U CN 201635183U CN 201020172129 CN201020172129 CN 201020172129 CN 201020172129 U CN201020172129 U CN 201020172129U CN 201635183 U CN201635183 U CN 201635183U
- Authority
- CN
- China
- Prior art keywords
- embedded bolt
- cast
- embedded
- hole
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000011065 in-situ storage Methods 0.000 claims description 9
- 230000003014 reinforcing Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 5
- 230000002708 enhancing Effects 0.000 abstract 1
- 238000005266 casting Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000001737 promoting Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Abstract
The utility model discloses a fixed structure of a pre-embedded bolt in a cast-in-place concrete structure, comprising a fixed support frame and the pre-embedded bolt, wherein the fixed support frame comprises a bottom pre-embedded part and an auxiliary support frame, wherein the auxiliary support frame is welded on the bottom pre-embedded part; a top horizontal frame of the auxiliary support frame is provided with a through hole; the pre-embedded bolt penetrates through the through hole so as to be screwed and fixed with a screw cap arranged on the top horizontal frame; and the outer ring of the screw cap arranged on the top horizontal frame is welded with a horizontal fine-adjustment bolt. The utility model has fast construction speed and high pre-embedded precision, not only enhances the work efficiency, but also ensures the construction quality, and creates good conditions for sequential work.
Description
Technical field
The utility model design building construction field specifically is the fixed structure of pre-embedded bolt in a kind of cast-in-situ concrete structure.
Background technology
In the construction of structure concrete, equipment is fixed and the requirement of subsequent technique in order to satisfy, and often has a large amount of pre-embedded bolts to need carry out in the concrete casting process accurately pre-buried and fixing.Particularly in the industrial building structure concrete, the pre-buried quantity of bolt is big, precision prescribed is high, time-consuming, precision control difficulty is bigger.If no reliable fixation though precision meets the requirements before the concrete cast, because of causes such as lateral pressure is bigger in the concrete casting process, tends to cause pre-embedded bolt skew or bending, cause and to use.Both incur loss through delay the duration, caused unnecessary loss again.Particularly the pre-embedded bolt in prevention of mass concrete or the unsettled concrete member very easily can cause a hidden trouble to subsequent handling, not only can't ensure the quality of products, and can cause bigger economic loss to engineering.
For many years, the method for pre-embedded bolt all adopts traditional pre-buried method in the cast-in-situ concrete structure, mainly contains direct pre-buried method, steel pipe truss fixation, cage of reinforcement fixation, wooden frame fixation etc.But after the concrete cast, its pre-embedded bolt precision often can not satisfy design or code requirement, causes unnecessary doing over again and economic loss.
The utility model content
The technical problems to be solved in the utility model provides the fixed structure of pre-embedded bolt in a kind of cast-in-situ concrete structure, solved and adopted the randomness of traditional handicraft pre-embedded bolt big for a long time, cause the pre-embedded bolt low precision, can not satisfy the needs of subsequent handling, stop that secondary is done over again and unnecessary economic loss.
The technical solution of the utility model is:
The fixed structure of pre-embedded bolt in the cast-in-situ concrete structure, comprise fixed support and pre-embedded bolt, described fixed support comprises bottom built-in fitting and auxiliary stand, described auxiliary stand is welded on the built-in fitting of bottom, have through hole on the top level frame of auxiliary stand, described pre-embedded bolt passes the nut that is provided with on through hole and the top level frame and screws togather fixingly, and the outer ring that is positioned at nut on the level frame of described top is welded with the WidFin bolt.
The aperture of described through hole is greater than the screw diameter of pre-embedded bolt; Described nut race diameter is greater than the aperture of through hole.
Be fixedly welded with reinforcing crossmember support and cross fixation support on the described auxiliary stand.
The utility model employing auxiliary stand and nut are tentatively fixing with pre-embedded bolt, in the concrete work progress, regulate nut at any time according to the absolute altitude that level gauge is measured, and be accurate with the absolute altitude position of guaranteeing bolt.
The utility model adopts the outer ring spot welding WidFin bolt that is positioned at nut on auxiliary stand, in the concrete work progress, as required the horizontal level of pre-embedded bolt is adjusted at any time, and is accurate with the horizontal level of guaranteeing pre-embedded bolt.
Speed of application of the present utility model is fast, and pre-buried precision height has not only improved operating efficiency, and has guaranteed construction quality, for good condition has been created in follow-up work; Pre-embedded bolt off-centring value compliant is less than the requirement of 2.0mm; Satisfying pre-embedded bolt exposed length deviation simultaneously is 0<L≤30mmm, and the reach deviation is the code requirement of 0<S≤30mm.Owing to the utlity model has characteristics such as practical, in similar engineering construction, have promotional value and application prospect widely.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment.
Fig. 2 is the vertical view of the auxiliary stand among the utility model embodiment.
The specific embodiment
The utility model embodiment: the fixed structure of pre-embedded bolt in the cast-in-situ concrete structure, comprise fixed support and pre-embedded bolt 5, fixed support comprises bottom built-in fitting 1 and auxiliary stand 2, auxiliary stand 2 is welded on the built-in fitting 1 of bottom, have through hole 3 on the top level frame of auxiliary stand 2, pre-embedded bolt 5 passes the nut 4 that is provided with on through hole 3 and the top level frame and screws togather fixingly, and the outer ring point that is positioned at nut 4 on the level frame of top is welded with WidFin bolt 6.
The aperture of through hole 3 is greater than the screw diameter of pre-embedded bolt 5, promptly satisfy pre-embedded bolt 5 and can carry out horizontal movement in the horizontal direction, and the WidFin bolt by nut 4 outer rings cooperatively interacts and props up engaging pre-embedded bolt 5, guarantees in the horizontal direction fixing of pre-embedded bolt; Nut 4 race diameters promptly satisfy nut and are positioned on the auxiliary stand 2 greater than the aperture of through hole 3, can not pass through hole, and pre-embedded bolt and nut screw togather fixing, have guaranteed the fixing of pre-embedded bolt in the vertical direction.
When the height of auxiliary stand 2 is higher than five meters, fixedly be welded with reinforcing crossmember support 7 and cross fixation support 8 on the auxiliary stand, strengthened the stability of auxiliary stand.
Claims (3)
1. the fixed structure of pre-embedded bolt in the cast-in-situ concrete structure, comprise fixed support and pre-embedded bolt, it is characterized in that: described fixed support comprises bottom built-in fitting and auxiliary stand, described auxiliary stand is welded on the built-in fitting of bottom, have through hole on the top level frame of auxiliary stand, described pre-embedded bolt passes the nut that is provided with on through hole and the top level frame and screws togather fixingly, and the outer ring that is positioned at nut on the level frame of described top is welded with the WidFin bolt.
2. the fixed structure of pre-embedded bolt in the cast-in-situ concrete structure according to claim 1, it is characterized in that: the aperture of described through hole is greater than the screw diameter of pre-embedded bolt; Described nut race diameter is greater than the aperture of through hole.
3. the fixed structure of pre-embedded bolt in the cast-in-situ concrete structure according to claim 1 is characterized in that: be fixedly welded with reinforcing crossmember support and cross fixation support on the described auxiliary stand.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201020172129 CN201635183U (en) | 2010-04-27 | 2010-04-27 | Fixed structure of pre-embedded bolt in cast-in-place concrete structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201020172129 CN201635183U (en) | 2010-04-27 | 2010-04-27 | Fixed structure of pre-embedded bolt in cast-in-place concrete structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201635183U true CN201635183U (en) | 2010-11-17 |
Family
ID=43079669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201020172129 Expired - Fee Related CN201635183U (en) | 2010-04-27 | 2010-04-27 | Fixed structure of pre-embedded bolt in cast-in-place concrete structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201635183U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704697A (en) * | 2012-07-06 | 2012-10-03 | 平煤神马建工集团有限公司土建处 | Assembled bolt group mold |
CN103526954A (en) * | 2013-10-24 | 2014-01-22 | 中国建筑第二工程局有限公司 | Support for overweight precision embedded part and construction method thereof |
CN104100104A (en) * | 2014-07-10 | 2014-10-15 | 青岛第一市政工程有限公司 | Fabricated lattice type H-shaped bearing steel support |
CN107267165A (en) * | 2017-07-28 | 2017-10-20 | 马鞍山钢铁建设集团有限公司 | A kind of dry coke quenching body of heater is circular layout pre-embedded bolt fixed structure and installation method |
CN108360691A (en) * | 2018-03-29 | 2018-08-03 | 中国十七冶集团有限公司 | A kind of device and method of adjustable concrete column cap embedded iron parts position and absolute altitude |
-
2010
- 2010-04-27 CN CN 201020172129 patent/CN201635183U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704697A (en) * | 2012-07-06 | 2012-10-03 | 平煤神马建工集团有限公司土建处 | Assembled bolt group mold |
CN102704697B (en) * | 2012-07-06 | 2014-06-18 | 平煤神马建工集团有限公司土建处 | Assembled bolt group mold |
CN103526954A (en) * | 2013-10-24 | 2014-01-22 | 中国建筑第二工程局有限公司 | Support for overweight precision embedded part and construction method thereof |
CN103526954B (en) * | 2013-10-24 | 2015-06-24 | 中国建筑第二工程局有限公司 | Support for overweight precision embedded part and construction method thereof |
CN104100104A (en) * | 2014-07-10 | 2014-10-15 | 青岛第一市政工程有限公司 | Fabricated lattice type H-shaped bearing steel support |
CN107267165A (en) * | 2017-07-28 | 2017-10-20 | 马鞍山钢铁建设集团有限公司 | A kind of dry coke quenching body of heater is circular layout pre-embedded bolt fixed structure and installation method |
CN107267165B (en) * | 2017-07-28 | 2019-10-11 | 马鞍山钢铁建设集团有限公司 | A kind of dry coke quenching furnace body is circular layout pre-embedded bolt fixed structure and installation method |
CN108360691A (en) * | 2018-03-29 | 2018-08-03 | 中国十七冶集团有限公司 | A kind of device and method of adjustable concrete column cap embedded iron parts position and absolute altitude |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201635183U (en) | Fixed structure of pre-embedded bolt in cast-in-place concrete structure | |
CN204152217U (en) | The assembled moulding bed of the assembling that a kind of Construction of Steel Structure is general | |
CN101538939A (en) | Preset nut type steel-reinforced concrete compound pier template fixing device and construction method thereof | |
CN103061249A (en) | Quick positioning construction device and construction method for steel-pipe column of bridge | |
CN202000651U (en) | Adjustable wall-mounted supporting device for reinforcing upright columns | |
CN204343319U (en) | Cableway pipe patten pre-embedded anchoring bolts jig | |
CN103343639B (en) | A kind of sliding mode system of efficient adjustment | |
CN202430980U (en) | Detachably movable type steel pipe fixing insertion column for cantilever scaffold | |
CN203383331U (en) | Steel mold used for simply and conveniently positioning section steel column embedded bolt | |
CN205476528U (en) | Precast pile device of taking one's place fast | |
CN203361642U (en) | Assembled-structure cast-in-place stair steel molding plate | |
CN205259618U (en) | Cast -in -place floor gauge control device of concrete | |
CN202787668U (en) | Rear bolt anchoring system for cantilever steel I-beam | |
CN201635404U (en) | Precise positioning structure of preserved pipeline | |
CN202090291U (en) | Tensioning support | |
CN203361735U (en) | Sliding mode system with function of efficient adjustment | |
CN204212319U (en) | A kind of screw-in greenhouse pillar | |
CN201401010Y (en) | Fixing device for preset nut type steel reinforced concrete combined column template | |
CN204002876U (en) | A kind of steel chassis for tunnel construction | |
CN103334584B (en) | Template regulating system for sliding form system | |
CN202047528U (en) | Concrete protection layer thickness controller | |
CN202202314U (en) | Die plate corner locating device | |
CN102653943B (en) | Underground embedded steel column straightening limiting device | |
CN203361734U (en) | Slip form system capable of accurately adjusting template taper | |
CN201747071U (en) | Precast reinforced concrete column positioning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |