Precision built-in steel mold of ultralong cluster anchor bolt Download PDFInfo
- Publication number
- CN201288329Y CN201288329Y CNU200820161378XU CN200820161378U CN201288329Y CN 201288329 Y CN201288329 Y CN 201288329Y CN U200820161378X U CNU200820161378X U CN U200820161378XU CN 200820161378 U CN200820161378 U CN 200820161378U CN 201288329 Y CN201288329 Y CN 201288329Y
- Authority
- CN
- China
- Prior art keywords
- mould
- cluster
- utility
- stone bolt
- margin bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility provides a steel mould for precisely preembedding superlong cluster lower margin bolt comprising two upper and lower mould and several steel pipes; the several steel pipes are evenly distributed between upper and lower mould for connecting upper and lower mould which are provided with several through-hole corresponding to lower margin bolt; the upper and lower mould are circular, rectangular or polygon in shape according to distribution of lower margin bolt; the upper and lower mould are provided with reinforced rib for promoting intensity and preventing deformation. The utility has a reasonable structure thereby guaranteeing accuracy of pre-embedding parameter of superlong cluster lower margin bolt, Intensifying engineering quality reliability and stability, reducing labor intensity, saving manpower, shortening construction period; The steel mould, being an ideal mould for precise precast for large scale equipment super long cluster lower margin bolt, is mass produced and can be repeatedly used and widely generalized. The utility has obvious economic and social benefit.
Description
Technical field
The utility model relates to a kind of construction equipment, particularly a kind of accurate pre-buried steel mould of large equipment base overlength cluster stone bolt that is used for.
Background technology
In the production equipment of industries such as modern oil, chemical industry, space flight, machine, superelevation, super large, overweight tower, horizontal main equipment have a lot, and its basis mostly is the reaction force basis, stone bolt overlength, cluster, layout complexity.For guaranteeing the installation quality of these main equipments, guarantee once to lift, accurately in place, the uniformity that the verticality of overlength cluster stone bolt and top mark are high just seems very important, usually adopt first pre-embedded bolt fixed block at present, again stone bolt be installed, with the construction precision of control overlength cluster pre-embedded anchoring bolts.Form of construction work that can be existing, not only constructor's labour intensity is big, long in time limit, and be difficult to the uniformity that guarantees that each pre-buried parameters precision interrelates between overlength cluster stone bolt, particularly top mark height and verticality, after equipment is installed, also need to add cushion block often and regulate or adopt the concrete secondary levelling, thereby make the installation quality of main equipment can not get guaranteeing.
The utility model content
For overcoming the deficiencies in the prior art, the utility model provides a kind of accurate pre-buried steel mould of overlength cluster stone bolt rational in infrastructure, easy to use, guarantees each the pre-buried parameters precision between overlength cluster stone bolt, improves the installation quality of main equipment.
The technical scheme that its technical problem that solves the utility model adopts is: it comprises two upper and lower templates of annular set up and down and several steel pipe, several steel pipes are distributed in equably and connect upper and lower template between upper and lower template, offer several through holes corresponding to stone bolt on upper and lower template.
The shape of above-mentioned upper and lower template is four limits or polygon shaped as frame according to the distribution of stone bolt.
Be equipped with reinforcing rib in the above-mentioned upper and lower template,, prevent distortion to improve the intensity of upper and lower template.
The beneficial effects of the utility model are: it is rational in infrastructure, guaranteed each the pre-buried parameters precision between overlength cluster stone bolt, strengthen the reliability and stability of workmanship, reduced labour intensity, saved manpower, shortened the duration, batch production is made, and is reusable, and good popularizing value is arranged, be high, heavy, the accurate pre-buried desirable mould of the basic overlength cluster of large equipment stone bolt, have remarkable economic efficiency and social benefit.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the schematic diagram of the utility model construction state.
Among the figure: 1 is that cope match-plate pattern, 2 is that steel pipe, 3 is that lower bolster, 4 is that reinforcing rib, 5 is that through hole, 6 is that lower margin bolt, 7 is a nut.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is further specified.
As depicted in figs. 1 and 2, real upper and lower template 1,3 and the steel pipe 2 of comprising of the utility model, annular (the distribution situation of base area foot bolt 6 and deciding, also can be rectangular shaped as frame or other polygon shaped as frame), upper and lower template 1,3 that shape is identical goes to upper and lower corresponding the setting, is provided with ten from shape reinforcing rib 4 in the annular cavity of upper and lower template 1,3.Several steel pipes 2 are distributed in 1,3 of upper and lower templates equably, and its two ends are connected with upper and lower template 1,3 respectively by welding and are connected; On upper and lower template 1, offer several through holes 5 corresponding to stone bolt 6.
As shown in Figure 3, at first the utility model is lifted on the spacer bars, carry out precisely contraposition and the check mutually of axis, control point, fixed behind the horizontal repetition measurement; Then, some stone bolt 6 penetrate respectively in the through hole 5 corresponding on the upper and lower template 1,3, after the top of stone bolt 6 adopts nut 7 to be adjusted to same top mark height, recheck the verticality of every stone bolt 6 once more, the bottom of every stone bolt 6 welds with # font reinforcing bar and reinforcement foundation, if stone bolt 6 length are greater than 1200mm, middle part also must weld with reinforcement foundation on it.Behind stone bolt 6 location, thread is coated with the butter corrosion protection, and puts plastic pipe protection thread and prevent that concrete from polluting.Foot bolt 6 vibrations closely of fluid concrete, plug-in type vibrating head, the bottom surface of lower bolster 3 is exactly the top mark height of base concrete.After treating concrete setting, back out nut 7, the utility model is hung to another place, repeat above-mentioned operation.
Claims (3)
1, the accurate pre-buried steel mould of a kind of overlength cluster stone bolt, it is characterized in that: comprise two upper and lower templates of annular set up and down and several steel pipe, several steel pipes are distributed in equably and connect upper and lower template between upper and lower template, offer several through holes corresponding to stone bolt on upper and lower template.
2, the accurate pre-buried steel mould of a kind of overlength cluster stone bolt according to claim 1, it is characterized in that: the shape of above-mentioned upper and lower template is four limits or polygon shaped as frame according to the distribution of stone bolt.
3, the accurate pre-buried steel mould of a kind of overlength cluster stone bolt according to claim 1 and 2 is characterized in that: be equipped with reinforcing rib in the above-mentioned upper and lower template.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200820161378XU CN201288329Y (en) | 2008-10-31 | 2008-10-31 | Precision built-in steel mold of ultralong cluster anchor bolt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200820161378XU CN201288329Y (en) | 2008-10-31 | 2008-10-31 | Precision built-in steel mold of ultralong cluster anchor bolt |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201288329Y true CN201288329Y (en) | 2009-08-12 |
Family
ID=40980006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU200820161378XU Expired - Fee Related CN201288329Y (en) | 2008-10-31 | 2008-10-31 | Precision built-in steel mold of ultralong cluster anchor bolt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201288329Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493668A (en) * | 2011-12-15 | 2012-06-13 | 中国建筑第八工程局有限公司 | Locating mould and method for pre-embedding position embedding parts in ultrahigh precision |
CN103174166A (en) * | 2013-03-27 | 2013-06-26 | 中国京冶工程技术有限公司 | Recreation facility embedded part integrally arranged in complete-set mode and installation method thereof |
-
2008
- 2008-10-31 CN CNU200820161378XU patent/CN201288329Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493668A (en) * | 2011-12-15 | 2012-06-13 | 中国建筑第八工程局有限公司 | Locating mould and method for pre-embedding position embedding parts in ultrahigh precision |
CN103174166A (en) * | 2013-03-27 | 2013-06-26 | 中国京冶工程技术有限公司 | Recreation facility embedded part integrally arranged in complete-set mode and installation method thereof |
CN103174166B (en) * | 2013-03-27 | 2015-09-16 | 中国京冶工程技术有限公司 | A kind of recreation facility built-in fitting of complete integral installation and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106988483A (en) | A kind of assembled steel reinforced Concrete U Vierendeel girder and its construction method | |
CN201756803U (en) | Sill anchor pre-embedded positioning cover die | |
CN111456256A (en) | Reinforced concrete prefabricated column type steel connecting joint and connecting method | |
CN201288329Y (en) | Precision built-in steel mold of ultralong cluster anchor bolt | |
CN206800800U (en) | Horizontal reinforcement distance piece | |
CN103147454A (en) | Pre-fabricated foundation structure of steel structure factory building | |
CN103758342B (en) | Tool-type top for building mould | |
CN203462754U (en) | Free-disassembly suspension template | |
CN203475310U (en) | Formwork for concrete slabs of composite steel-concrete box girders | |
CN201730330U (en) | Beam formwork for building | |
CN218116533U (en) | Pre-buried bolt crowd high accuracy fixing device of large-scale equipment basis | |
CN103921347B (en) | Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases | |
CN201605595U (en) | Equipment anchor bolt installation device | |
CN203361642U (en) | Assembled-structure cast-in-place stair steel molding plate | |
CN205476528U (en) | Precast pile device of taking one's place fast | |
CN215055273U (en) | A assembled template for installing support bracket embedded box | |
CN204199323U (en) | For the positioning screw hole mould of pre-embedded bolt quick position | |
CN203113362U (en) | Steel structure factory building prefabricated foundation structure | |
CN207888896U (en) | Pretensioning prestressed concrete track board assembly line tensioning system | |
CN210768051U (en) | Be applied to prefabricated assembled isolation bearing of shear wall structure | |
CN203856199U (en) | Prefabricated square steel stepping die | |
CN202337949U (en) | Bridge jacking device | |
CN202644563U (en) | Installation device for embedded foundation bolt of small facility | |
CN203383563U (en) | Fast assembled communication iron tower | |
CN202000266U (en) | Supporting structure of bridge coping template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090812 Termination date: 20171031 |
|