CN102704697A - Assembled bolt group mold - Google Patents

Assembled bolt group mold Download PDF

Info

Publication number
CN102704697A
CN102704697A CN2012102326529A CN201210232652A CN102704697A CN 102704697 A CN102704697 A CN 102704697A CN 2012102326529 A CN2012102326529 A CN 2012102326529A CN 201210232652 A CN201210232652 A CN 201210232652A CN 102704697 A CN102704697 A CN 102704697A
Authority
CN
China
Prior art keywords
support
bolt group
mantle fiber
screw rod
fiber screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102326529A
Other languages
Chinese (zh)
Other versions
CN102704697B (en
Inventor
高山林
吴闵
李卫峰
常欢欢
彭怀江
朱惠伟
侯志勇
杨良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Original Assignee
PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION filed Critical PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Priority to CN201210232652.9A priority Critical patent/CN102704697B/en
Publication of CN102704697A publication Critical patent/CN102704697A/en
Application granted granted Critical
Publication of CN102704697B publication Critical patent/CN102704697B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to an assembled bolt group mold which can effectively solve problems that labor intensity is increased, procedures cannot be connected reasonably and manpower and materials are wasted by adopting the traditional manufacturing cleading to pre-bury bolts. The technical scheme for solving the problems is that the assembled bolt group mold comprises supports and threading screws, wherein the supports are of cuboid structures formed by four transversely parallel U-bars, the support in the front row is connected with the support in the back row through four horizontal first threading screws arranged at one end, the support in the upper row is connected with the support in the lower row through four vertical second threading screws at one end, three groups of clamping hoops are respectively and uniformly distributed on each support, and baffles are arranged on the clamping hoops. The assembled bolt group mold is novel and unique in structure, simple and reasonable, is directly arranged in a foundation by being welded to form a bolt group, solves construction problems that bolt pre-burying is low in accuracy and slow, saves a large number of materials, and has remarkable economic benefit and social benefit.

Description

Packaging bolt group mould
Technical field
The present invention relates to a kind of packaging bolt group mould.
Background technology
Fast development along with Chinese national economy; The adjustment of the industrial structure; More and more large tracts of land industrial premises occur, these factory buildings generally all adopt steel work, so structural steelwork also more and more receives the favor of Construction unit; From steel work practice of construction process, investigate and be not difficult to find out, the steel work pre-buried accuracy of foot bolt fundamentally is to influence the crucial factor of Steel Structure Installation quality; To influence directly that all kinds of steel work are normal to be installed and the debugging of equipment in case bolt is pre-buried to have produced bigger deviation.Adopt the construction technology of traditional fabrication cage plate that labour intensity is strengthened; Operation can not reasonable link; Cause the waste of manual work, material; And the technology backwardness causes difficult quality control, causes a lot of difficulties for the installation in later stage, and how to capture pre-embedded anchoring bolts be the problem that needs solution for selected technology advanced person, economical rationality, safe and reliable technology.
Summary of the invention
To above-mentioned situation; For overcoming the defective of prior art, the present invention's purpose just provides a kind of packaging bolt group mould, can effectively solve to adopt the traditional fabrication cage plate to carry out the pre-buried labour intensity increasing of bolt; Operation can not reasonable link, causes the problem of the waste of manual work, material.
The technical scheme that the present invention solves is; Comprise support and mantle fiber screw rod; Support is by horizontal 4 parallel rectangle structures that channel-section steel is formed, and front and back two rows' support links to each other through the first mantle fiber screw rod of 4 levels of an end, and the support of two rows is continuous through 4 second vertical mantle fiber screw rods of an end; Be evenly equipped with 3 groups of clips on the every support respectively, baffle plate is arranged on the clip.
Novel structure of the present invention is unique, and advantages of simple directly is installed in the basis through welding fabrication bolt group on packaging bolt group mould dexterously; Solved low, the slow-footed construction difficult problem of pre-embedded bolt precision; Not only solved the control of quality difficulty or ease, and accelerating construction progress, lot of materials saved; Wherein every engineering can shift to an earlier date about 7 days; Save various direct costs more than 50,000 yuan, indirect benefit is that create beneficial result is gone into operation early about 200,000 yuan by Construction unit, and economic and social benefit is remarkable.
Description of drawings
Fig. 1 is a structural front view of the present invention.
Fig. 2 is a structure vertical view of the present invention.
Fig. 3 is a structure left view of the present invention.
Fig. 4 is the structural front view of clip of the present invention.
Fig. 5 is the structure vertical view of clip of the present invention.
The specific embodiment
Do further explain below in conjunction with the accompanying drawing specific embodiments of the invention.
Provide by Fig. 1 to Fig. 5; Comprise support and mantle fiber screw rod; Support 1 is by horizontal 4 parallel rectangle structures that channel-section steel is formed, and front and back two rows' support links to each other through the first mantle fiber screw rod 3 of 4 levels of an end, and the support of two rows is continuous through 4 of an end second vertical mantle fiber screw rods 4; Be evenly equipped with 3 groups of clips 2 on the every support 1 respectively, baffle plate 8 is arranged on the clip 2.
In order to guarantee result of use, the diameter of the described first mantle fiber screw rod 3 is 12mm, two ends first nut 6 of the first mantle fiber screw rod and pad 7 respectively with same horizontal plane on two supports in front and back link to each other.
The diameter of the described second mantle fiber screw rod 4 is 20mm, two ends first nut 6 of the second mantle fiber screw rod and pad 7 respectively with same perpendicular on two supports up and down link to each other.
Described support 1 is by horizontal 4 parallel rectangle structures that No. 8 channel-section steels are formed.
Described every group of clip 2 is inverted on the support 1 by side by side No. 10 long channel-section steels of 2 30mm and constitutes, and each clip is contained on the support through the flat head screw 5 and second nut 9.
When the present invention uses, at first ready finished product bolt is put into clip 2, the center of the rectangular indentation that adjustment bolt to every group of clip two channel-section steels side by side form; All bolt end faces are adjusted to are in same horizontal plane; After bolt is all in place, the planeness of adjustment bolt and the whole verticality of bolt; Prepare some reinforcing bars (length is the monolateral length of bolt), reinforcing bar is welded on the bolt group of adjusting, be used for fixing the bolt group with electric welding machine; The adjustment of the front and back size of support 1 can realize through first nut 6 and the position of pad 7 regulated on the first mantle fiber screw rod 3, and the adjustment of the vertical size of support 1 can realize through first nut 6 and the position of pad 7 regulated on the second mantle fiber screw rod 4; Welding fabrication bolt group directly is installed in the basis, efficiently solves low, the slow-footed construction difficult problem of pre-embedded bolt precision, and has solved the problem of difficult quality control; Accelerating construction progress has been saved lot of materials greatly, through test; Every engineering can shift to an earlier date about 7 days, saved various direct costs more than 50,000 yuan, and indirect benefit is that create beneficial result is gone into operation early about 200,000 yuan by Construction unit; Remarkable in economical benefits, simultaneously construction quality arrived assurance, be that one on the building implements innovated greatly.

Claims (5)

1. packaging bolt group mould; Comprise support and mantle fiber screw rod, it is characterized in that support (1) is by 4 rectangle structures that channel-section steel is formed of transverse horizontal; Front and back two rows' support links to each other through the first mantle fiber screw rod (3) of 4 levels of an end; The support of two rows links to each other through 4 second vertical mantle fiber screw rods (4) of an end, is evenly equipped with 3 groups of clips (2) on the every support (1) respectively, and baffle plate (8) is arranged on the clip (2).
2. packaging bolt group mould according to claim 1; It is characterized in that; The diameter of the described first mantle fiber screw rod (3) is 12mm, two ends first nuts (6) of the first mantle fiber screw rod and pad (7) respectively with same horizontal plane on two supports in front and back link to each other.
3. packaging bolt group mould according to claim 1; It is characterized in that; The diameter of the described second mantle fiber screw rod (4) is 20mm, two ends first nuts (6) of the second mantle fiber screw rod and pad (7) respectively with same perpendicular on two supports up and down link to each other.
4. packaging bolt group mould according to claim 1 is characterized in that, described support (1) is by horizontal 4 parallel rectangle structures that No. 8 channel-section steels are formed.
5. packaging bolt group mould according to claim 1; It is characterized in that; Described every group of clip (2) is inverted in upward formation of support (1) by No. 10 long channel-section steels of 2 30mm side by side, and each clip is contained on the support through flat head screw (5) and second nut (9).
CN201210232652.9A 2012-07-06 2012-07-06 Assembled bolt group mold Expired - Fee Related CN102704697B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210232652.9A CN102704697B (en) 2012-07-06 2012-07-06 Assembled bolt group mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210232652.9A CN102704697B (en) 2012-07-06 2012-07-06 Assembled bolt group mold

Publications (2)

Publication Number Publication Date
CN102704697A true CN102704697A (en) 2012-10-03
CN102704697B CN102704697B (en) 2014-06-18

Family

ID=46897726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210232652.9A Expired - Fee Related CN102704697B (en) 2012-07-06 2012-07-06 Assembled bolt group mold

Country Status (1)

Country Link
CN (1) CN102704697B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700605A (en) * 2019-09-03 2020-01-17 中冶(上海)钢结构科技有限公司 Adjustable embedded bolt assembling die and construction method thereof

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000096575A (en) * 1998-09-18 2000-04-04 Asahi Boruto Shokai:Kk Anchor bolt bearing frame
KR20020086430A (en) * 2002-10-23 2002-11-18 이창남 The apparatus of attaching between concrete and steel structural members and attaching method
CN2571914Y (en) * 2002-09-13 2003-09-10 北京城建二建设工程有限公司 Integral contracted door-opening form
CN2596170Y (en) * 2002-10-30 2003-12-31 莱芜钢铁集团有限公司 Positioning rack of pre-buried ground bolt
CN101666100A (en) * 2009-09-15 2010-03-10 中冶实久建设有限公司 Method for accurately installing large foundation bolt of industrial equipment foundation
CN201635183U (en) * 2010-04-27 2010-11-17 中建七局第二建筑有限公司 Fixed structure of pre-embedded bolt in cast-in-place concrete structure
CN201865121U (en) * 2010-10-30 2011-06-15 甘肃海外工程总公司 Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts
CN201891172U (en) * 2010-11-03 2011-07-06 中建三局第二建设工程有限责任公司 Fixing bracket with fine-adjusting function for embedding anchor bolts
CN201991241U (en) * 2011-03-30 2011-09-28 宿迁市科路养护技术有限公司 Steel structural upright column foundation bolt positioning device
CN202031179U (en) * 2011-04-20 2011-11-09 中国十七冶集团有限公司 Centre line aligning and elevation adjusting device of basic embedded bolts
CN202645028U (en) * 2012-07-06 2013-01-02 平煤神马建工集团有限公司土建处 Assembly type bolt group die

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000096575A (en) * 1998-09-18 2000-04-04 Asahi Boruto Shokai:Kk Anchor bolt bearing frame
CN2571914Y (en) * 2002-09-13 2003-09-10 北京城建二建设工程有限公司 Integral contracted door-opening form
KR20020086430A (en) * 2002-10-23 2002-11-18 이창남 The apparatus of attaching between concrete and steel structural members and attaching method
CN2596170Y (en) * 2002-10-30 2003-12-31 莱芜钢铁集团有限公司 Positioning rack of pre-buried ground bolt
CN101666100A (en) * 2009-09-15 2010-03-10 中冶实久建设有限公司 Method for accurately installing large foundation bolt of industrial equipment foundation
CN201635183U (en) * 2010-04-27 2010-11-17 中建七局第二建筑有限公司 Fixed structure of pre-embedded bolt in cast-in-place concrete structure
CN201865121U (en) * 2010-10-30 2011-06-15 甘肃海外工程总公司 Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts
CN201891172U (en) * 2010-11-03 2011-07-06 中建三局第二建设工程有限责任公司 Fixing bracket with fine-adjusting function for embedding anchor bolts
CN201991241U (en) * 2011-03-30 2011-09-28 宿迁市科路养护技术有限公司 Steel structural upright column foundation bolt positioning device
CN202031179U (en) * 2011-04-20 2011-11-09 中国十七冶集团有限公司 Centre line aligning and elevation adjusting device of basic embedded bolts
CN202645028U (en) * 2012-07-06 2013-01-02 平煤神马建工集团有限公司土建处 Assembly type bolt group die

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700605A (en) * 2019-09-03 2020-01-17 中冶(上海)钢结构科技有限公司 Adjustable embedded bolt assembling die and construction method thereof

Also Published As

Publication number Publication date
CN102704697B (en) 2014-06-18

Similar Documents

Publication Publication Date Title
CN110158394B (en) Joint-cutting-free construction structure of concrete super-flat terrace
CN205218385U (en) Reinforcing bar welds net and uses stop device
CN202645028U (en) Assembly type bolt group die
CN102704697B (en) Assembled bolt group mold
CN109457872A (en) A kind of prefabricated assembled constructing device of cast in place frame column steel reinforcement cage and construction method
CN203188130U (en) Prestress counter-tension pre-pressing bracket type scaffold supporting device
CN206397137U (en) A kind of framed column template bracing means
CN206554500U (en) Steel structure concrete, which is poured, uses adjustable transverse support bar
CN210475352U (en) Be applied to standard bed-jig of empty core plate reinforcement
CN202831617U (en) Large-scale integrated steel template
CN209384526U (en) A kind of prefabricated assembled constructing device of cast in place frame column steel reinforcement cage
CN203391095U (en) Strapping mold for rebar framework of box girder
CN203701596U (en) Scissor-type connecting-rod keel-supporting system
CN215889394U (en) Device for controlling elevation of cast large-area floor slab
CN210421190U (en) Batter pile model test device
CN103510514A (en) Steel strand anchorage device base
CN211897899U (en) Main pier tie beam suspension type formwork support system
CN203569693U (en) Pre-buried iron part with steel ties arranged on concrete structure
CN210880147U (en) Prefabricated template of concrete arch-shaped T beam
CN113183313A (en) Prefabricated square pile reinforcing bar tensioning equipment
CN208428458U (en) A kind of reinforcing bar tire fixture of precast segment box beam
CN208604976U (en) A kind of mould plate supporting device of hanging concrete straining beam
CN202042851U (en) Mobile power distribution box frame
CN218881583U (en) Constructional column construction supporting template
CN209755640U (en) Precast beam pinion rack and flange plate reinforcing bar positioner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Gao Shanlin

Inventor after: Wu Min

Inventor after: Li Weifeng

Inventor after: Chang Huanhuan

Inventor after: Peng Huaijiang

Inventor after: Zhu Huiwei

Inventor after: Hou Zhiyong

Inventor after: Yang Liang

Inventor before: Gao Shanlin

Inventor before: Wu Min

Inventor before: Li Weifeng

Inventor before: Chang Huanhuan

Inventor before: Peng Huaijiang

Inventor before: Zhu Huiwei

Inventor before: Hou Zhiyong

Inventor before: Yang Liang

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140618

Termination date: 20150706

EXPY Termination of patent right or utility model