CN102704635B - 一种涂料粉刷施工的方法 - Google Patents

一种涂料粉刷施工的方法 Download PDF

Info

Publication number
CN102704635B
CN102704635B CN201210202781.3A CN201210202781A CN102704635B CN 102704635 B CN102704635 B CN 102704635B CN 201210202781 A CN201210202781 A CN 201210202781A CN 102704635 B CN102704635 B CN 102704635B
Authority
CN
China
Prior art keywords
putty
bottoming
layer
coating
thickness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210202781.3A
Other languages
English (en)
Other versions
CN102704635A (zh
Inventor
陶祖岐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI KANGSHUN ENERGY-SAVING MATERIAL TECHNOLOGY CO LTD
Original Assignee
WUXI KANGSHUN ENERGY-SAVING MATERIAL TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI KANGSHUN ENERGY-SAVING MATERIAL TECHNOLOGY CO LTD filed Critical WUXI KANGSHUN ENERGY-SAVING MATERIAL TECHNOLOGY CO LTD
Priority to CN201210202781.3A priority Critical patent/CN102704635B/zh
Publication of CN102704635A publication Critical patent/CN102704635A/zh
Application granted granted Critical
Publication of CN102704635B publication Critical patent/CN102704635B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

一种涂料粉刷施工的方法,其步骤依次包括砖墙基面清理、基层粉刷、腻子打底以及面层滚涂,基层粉刷步骤的方法为:先洒水湿润砖墙基面,刷水泥浆一道,再用水泥砂浆进行粉刷,第一层粉刷厚度为0.08~0.1cm,第二层粉刷厚度为0.05~0.08cm,然后用刮尺刮平,最后用木抹子搓平;腻子打底步骤的方法为:分两层进行打底,第一层腻子打底厚度为0.3~0.5cm,间隔22~26小时后进行第二层腻子打底,打底厚度为0.2~0.3cm,自然养护后用磨平机、砂皮纸两道工序进行磨平;面层滚涂步骤的方法为:先在上一步骤打底的腻子面上刷一遍涂料,时隔3~5小时后再滚动一遍涂料,然后进行保养。按照本施工方法粉刷的面层光滑,平整,均匀,没有裂缝,并且在墙柱的阴阳角做成微弧形,美观简洁、不易积灰。

Description

一种涂料粉刷施工的方法
技术领域
本发明涉及建筑施工技术领域,尤其是涉及一种对建筑内墙面和外墙面进行涂料粉刷的方法。
背景技术
建筑内外墙面的涂料粉刷工艺决定了墙面是否平整美观,不合理的施工方法会导致众多质量问题,如腻子干燥后出现裂纹,导致乳胶漆龟裂,其原因有一次涂刮腻子太厚或不均匀、基层处理不干净,坑凹处灰尘、杂物未清理干净,腻子不能生根等;又如面层空鼓、裂缝,其主要原因是结构基底不平,底层抹灰厚薄不匀,没按规程分层打底和分格施工,由于大面积水泥砂浆抹后不分格、不分层,干燥收缩不一,会形成空鼓裂缝;此外,在做面层时,由于基层清理不净,基层比较干燥,亦同样会将面层拉裂。
发明内容
针对现有技术存在的上述问题,本申请人提供了一种涂料粉刷施工的方法。按照本施工方法粉刷的面层光滑,平整,均匀,没有裂缝,并且在墙柱的阴阳角做成微弧形,美观简洁、不易积灰。
本发明的技术方案如下:
一种涂料粉刷施工的方法,其步骤依次包括砖墙基面清理、基层粉刷、腻子打底以及面层滚涂,所述基层粉刷步骤的工艺方法为:先洒水湿润砖墙基面,刷水泥浆一道,再用水泥和黄砂的比例为1:2~3的水泥砂浆进行粉刷,分两层进行粉刷,第一层粉刷厚度为0.08~0.1cm,第二层粉刷厚度为0.05~0.08cm,然后用刮尺刮平,最后用木抹子搓平;
所述腻子打底步骤的工艺方法为:当上一步骤所涂砂浆强度达到70~85%时用腻子进行打底,分两层进行打底,第一层腻子打底厚度为0.3~0.5cm,间隔22~26小时后进行第二层腻子打底,打底厚度为0.2~0.3cm,自然养护后用磨平机、砂皮纸两道工序进行磨平;
所述面层滚涂步骤的工艺方法为:先在上一步骤打底的腻子面上刷一遍涂料,时隔3~5小时后再滚动一遍涂料,然后进行保养。
所述基层粉刷步骤中,先洒水湿润砖墙基面,当气温在5~15℃时,提前三天洒水。所述腻子打底步骤中,当气温在5~25℃时,在基层粉刷步骤完成后3~7天进行腻子打底;当气温在25~38℃时,在基层粉刷步骤完成后2~3天进行腻子打底。所述面层滚涂步骤中,滚涂后当气温在5~15℃时保养5~7天,当气温在15~25℃时保养3~5天,当气温在25~38℃时保养2~3天。腻子打底步骤中所述砂皮纸为600目砂皮纸。
当粉刷外墙时,外门窗套顶部阴角、墙阳角、阳台角、柱子阳角做成弧形;当粉刷内墙时,内门窗套顶部阴角、墙阴角、阳台角、内墙柱子阴阳角做成弧形。
本发明有益的技术效果在于:
按照本施工方法粉刷的面层光滑,平整,均匀,没有裂缝。
外墙阳角、阳台角、柱子阳角等做成微弧形,可以加快打落在外墙上雨雪的流速,不易积水,防止渗水,还能使整栋建筑立体感强,美观大方。内墙阴角、阳台角、柱子阳角等做成微弧形,不易积灰,方便清洁,使室内整体感强,简洁大方。
本涂料粉刷施工的方法适合的建筑类型广泛,适用于工业建筑、民用建筑、公共建筑、构筑物、古建筑、危房改造、水利建筑、地下建筑物等;适用的砌筑砖包括粘土红砖、粘土青砖、水泥砖、轻集料小型空心砌块、加气砼砌块。
具体实施方式
在用本涂料粉刷施工的方法粉刷非承重墙、承重墙之前,非承重墙、承重墙的砌筑施工操作方法按照下述方法进行:
非承重墙在砌筑前,砖砌块必须提前洒水湿润,当气温在25~38℃时,提前一天浇水,砖砌块湿度在40~50%;当气温在10~25℃时,提前两天浇水,砖砌块湿度在30~40%。砌筑时墙体拉结筋长度≥1m,沿墙高度间距≤0.5m,砌筑砂浆等级为M5.0混合砂浆,灰缝饱满,横平竖直。砌体与梁柱等砼构件连接处用钢丝网满铺,每边40cm宽。轻集料空心砌块、水泥砖等需整墙满铺钢丝网;
承重墙在砌筑前,砖砌块必须提前洒水湿润,当气温在25~38℃时,提前一天浇水,砖砌块湿度在40~50%;当气温在10~25℃时,提前两天浇水,砖砌块湿度在30~40%。在砌筑时,构造柱必须留马牙搓,砌筑时墙体拉结筋≥1m,包括内外墙连接处也须设置拉结筋,砌筑砂浆等级为M7.5混合砂浆,灰缝饱满,横平竖直。砌体与梁柱等砼构件连接处用钢丝网满铺,每边40cm宽。
实施例:
按照上述方法砌筑完毕承重墙或非承重墙后,按照下面的步骤进行涂料粉刷:
(1)砖墙基面清理:砌筑砖墙面在粉刷前必须清理干净;
(2)基层粉刷:粉刷前砖墙面必须洒水湿润,气温在5~15℃时,提前三天洒水。粉刷基层时,先刷水泥浆一道,然后用黄砂和水泥比例为1:2.5的水泥砂浆进行粉刷,分两次进行,第一层厚度为0.1cm,第二层厚度为0.08cm,然后用2米长的刮尺刮平,再用木抹子磨平砂浆表面;
(3)腻子打底:腻子打底必须等砂浆强度达到80%左右,当气温在5~25℃时,粉刷后5天进行腻子打底;当气温在25~38℃时,粉刷后3天进行腻子打底。 腻子打底分两遍进行,第一层厚度为0.4cm,间隔24小时进行第二层腻子打底,厚度为0.25cm。腻子打底施工完成后需进行保养,当气温在5~15℃时保养5天,当气温在15~25℃时保养4天,当气温在25~38℃时保养2天,之后用磨平机、砂皮纸(600目)两道工序磨平;
(4)面层滚涂:首先在腻子面上刷一遍涂料,时隔3小时后再滚动一层涂料,完成面层。
外墙特定的施工方案为:外门窗套顶部阴角、墙阳角、阳台角、柱子阳角等必须做成弧形,以加快打落在外墙上雨雪的流速,不易积水,防止渗水,还能使整栋建筑立体感强,美观大方。
内墙特定的施工方案:内门窗套顶部阴角、墙阴角、阳台角、内墙柱子阴阳角等必须做成弧形,不易积灰,方便清洁,使室内整体感强,简洁大方。
当用户使用色彩面层的时候,浓度要严格控制,如浓度不稳定,对内外墙的牢固性和美观度都会有影响。
本涂料施工后的验收规范按照GB50210-2001(《建筑装饰装修工程施工质量验收规范》)执行。

Claims (6)

1.一种涂料粉刷施工的方法,其步骤依次包括砖墙基面清理、基层粉刷、腻子打底以及面层滚涂,其特征在于:
所述基层粉刷步骤的工艺方法为:先洒水湿润砖墙基面,刷水泥浆一道,再用水泥和黄砂的重量比例为1:2~3的水泥砂浆进行粉刷,分两层进行粉刷,第一层粉刷厚度为0.08~0.1cm,第二层粉刷厚度为0.05~0.08cm,然后用刮尺刮平,最后用木抹子搓平;
所述腻子打底步骤的工艺方法为:当上一步骤所涂砂浆强度达到70~85%时用腻子进行打底,分两层进行打底,第一层腻子打底厚度为0.3~0.5cm,间隔22~26小时后进行第二层腻子打底,打底厚度为0.2~0.3cm,自然养护后用磨平机、砂皮纸两道工序进行磨平;
所述面层滚涂步骤的工艺方法为:先在上一步骤打底的腻子面上刷一遍涂料,时隔3~5小时后再滚动一遍涂料,然后进行保养。
2.根据权利要求1所述的涂料粉刷施工的方法,其特征在于所述基层粉刷步骤中,先洒水湿润砖墙基面,当气温在5~15℃时,提前三天洒水。
3.根据权利要求1所述的涂料粉刷施工的方法,其特征在于所述腻子打底步骤中,当气温在5~25℃时,在基层粉刷步骤完成后3~7天进行腻子打底;当气温在25~38℃时,在基层粉刷步骤完成后2~3天进行腻子打底。
4.根据权利要求1所述的涂料粉刷施工的方法,其特征在于所述腻子打底步骤中,腻子打底后当气温在5~15℃时保养5~7天,当气温在15~25℃时保养3~5天,当气温在25~38℃时保养2~3天。
5.根据权利要求1所述的涂料粉刷施工的方法,其特征在于所述腻子打底步骤中所述砂皮纸为600目砂皮纸。
6.根据权利要求1所述的涂料粉刷施工的方法,其特征在于当粉刷外墙时,外门窗套顶部阴角、墙阳角、阳台角、柱子阳角做成弧形;当粉刷内墙时,内门窗套顶部阴角、墙阴角、阳台角、内墙柱子阴阳角做成弧形。
CN201210202781.3A 2012-06-19 2012-06-19 一种涂料粉刷施工的方法 Expired - Fee Related CN102704635B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210202781.3A CN102704635B (zh) 2012-06-19 2012-06-19 一种涂料粉刷施工的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210202781.3A CN102704635B (zh) 2012-06-19 2012-06-19 一种涂料粉刷施工的方法

Publications (2)

Publication Number Publication Date
CN102704635A CN102704635A (zh) 2012-10-03
CN102704635B true CN102704635B (zh) 2014-08-27

Family

ID=46897664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210202781.3A Expired - Fee Related CN102704635B (zh) 2012-06-19 2012-06-19 一种涂料粉刷施工的方法

Country Status (1)

Country Link
CN (1) CN102704635B (zh)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147543A (zh) * 2012-12-02 2013-06-12 上海馨来建筑装饰设计有限公司 混凝土墙的负离子油漆方法
CN103821295B (zh) * 2014-01-13 2016-01-06 福建皓尔宝新材料科技有限公司 一种功能性涂料的渐变涂布方法
CN103821294B (zh) * 2014-01-13 2016-01-06 福建皓尔宝新材料科技有限公司 一种功能性涂料的喷涂方法
CN104234339B (zh) * 2014-09-09 2016-04-13 王慧同 一种直接在墙面上形成无缝墙砖的方法
CN104712113A (zh) * 2015-02-10 2015-06-17 宁波高新区巴艺新材料科技有限公司 墙面的负离子油漆方法
CN105040929B (zh) * 2015-09-11 2017-05-03 苏州水木清华设计营造有限公司 建筑涂料墙面的批底腻子渗胶强化施工方法
CN107419858A (zh) * 2017-07-04 2017-12-01 合肥安力电力工程有限公司 一种内墙粉刷涂抹施工方法
CN108424046A (zh) * 2018-02-06 2018-08-21 南方雄狮创建集团股份有限公司 一种新型环保墙面材料
CN109235909A (zh) * 2018-09-21 2019-01-18 中冶成都勘察研究总院有限公司 一种冷库防潮隔汽层基层处理工艺
CN113944305B (zh) * 2021-11-14 2022-12-20 安徽沃恒建设工程项目管理有限公司 一种环保型建筑施工用墙面抹平装置及其操作方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0325147A (ja) * 1989-06-20 1991-02-01 Yamamoto Yogyo Kako Kk 建造物の表面処理方法及び建造物貼付用化粧材の製造方法
JPH0427063A (ja) * 1990-05-22 1992-01-30 Sekisui Chem Co Ltd 内壁の仕上げ方法
CN1342827A (zh) * 2000-09-08 2002-04-03 郑月山 一种防止墙面裂缝的施工方法
CN101363269A (zh) * 2008-08-13 2009-02-11 中建五局第三建设有限公司 免抹灰混凝土结构墙体腻子施工方法
CN201411799Y (zh) * 2009-04-02 2010-02-24 四川航天建筑工程公司 避免空鼓引起砼面抹灰层脱落的墙体结构
CN102146728A (zh) * 2011-02-14 2011-08-10 宿迁华夏建设(集团)工程有限公司 一种内墙抗裂薄层粉刷的施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0325147A (ja) * 1989-06-20 1991-02-01 Yamamoto Yogyo Kako Kk 建造物の表面処理方法及び建造物貼付用化粧材の製造方法
JPH0427063A (ja) * 1990-05-22 1992-01-30 Sekisui Chem Co Ltd 内壁の仕上げ方法
CN1342827A (zh) * 2000-09-08 2002-04-03 郑月山 一种防止墙面裂缝的施工方法
CN101363269A (zh) * 2008-08-13 2009-02-11 中建五局第三建设有限公司 免抹灰混凝土结构墙体腻子施工方法
CN201411799Y (zh) * 2009-04-02 2010-02-24 四川航天建筑工程公司 避免空鼓引起砼面抹灰层脱落的墙体结构
CN102146728A (zh) * 2011-02-14 2011-08-10 宿迁华夏建设(集团)工程有限公司 一种内墙抗裂薄层粉刷的施工方法

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
《外墙涂料开裂的防治措施》;陈振宇;《山西建筑》;20050831;第31卷(第16期);全文 *
《外墙涂料饰面开裂原因及其预防》;杨荣光;《大众科技》;20051231(第10期);全文 *
《浅析墙体粉刷工程开裂原因及预防措施》;韦国颂;《企业科技与发展》;20081231(第20期);全文 *
杨荣光.《外墙涂料饰面开裂原因及其预防》.《大众科技》.2005,(第10期),34-35.
陈振宇.《外墙涂料开裂的防治措施》.《山西建筑》.2005,第31卷(第16期),146-147.
韦国颂.《浅析墙体粉刷工程开裂原因及预防措施》.《企业科技与发展》.2008,(第20期),187-188.

Also Published As

Publication number Publication date
CN102704635A (zh) 2012-10-03

Similar Documents

Publication Publication Date Title
CN102704635B (zh) 一种涂料粉刷施工的方法
CN104775575B (zh) 真石漆施工工艺方法
CN102477797B (zh) 一种防止填充墙裂缝的施工方法
CN103046709B (zh) 一种内墙面的建筑施工方法
CN104120845A (zh) 一种外墙无机保温砂浆涂料饰面施工方法
CN102400525B (zh) 蒸压加气砼砌块墙体薄层抹灰方法
CN103437521B (zh) 建筑内墙用塑料阳角护角及建筑内墙阴阳角施工方法
CN103821296A (zh) 加气混凝土砌块填充墙墙面抹灰工艺
CN109797920B (zh) 一种室内涂饰施工方法
CN104088416A (zh) 石膏保温粉刷砂浆施工工艺
CN103375000A (zh) 一种水性氟碳金属漆在弹性中涂拉毛表面的施工工艺
CN105525726A (zh) 一种加气砖墙面抹灰施工方法
CN102094496A (zh) 仿砖墙面的制作方法
CN103195218B (zh) 一种墙体陶砂砂浆外抹灰施工工法
CN105298045B (zh) 一种内墙硅藻泥涂层及其涂覆方法
CN103147562A (zh) 地面水泥沙浆找平的施工方法
CN113006397A (zh) 一种厨卫空间规方找平的施工方法
CN113152814A (zh) 一种外墙真石漆喷涂施工方法
CN110306819B (zh) 一种古建筑红砖外墙修补方法
CN106869428A (zh) 一种隔热反射彩色砂浆施工工艺
CN205777261U (zh) 一种柔性基层半胶壁纸粘贴工艺结构
CN104612343A (zh) 建筑外墙挤塑聚苯板装饰线条施工方法
CN209958651U (zh) 瓷砖外墙防水结构
CN203834826U (zh) 一种新型楼梯间滴水槽
CN212405863U (zh) 一种建筑外立面装饰构造

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140827

Termination date: 20190619