CN102650875B - 检查系统、管理服务器、检查装置及检查数据管理方法 - Google Patents

检查系统、管理服务器、检查装置及检查数据管理方法 Download PDF

Info

Publication number
CN102650875B
CN102650875B CN201110342983.3A CN201110342983A CN102650875B CN 102650875 B CN102650875 B CN 102650875B CN 201110342983 A CN201110342983 A CN 201110342983A CN 102650875 B CN102650875 B CN 102650875B
Authority
CN
China
Prior art keywords
inspection
data
result data
inspection result
management server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110342983.3A
Other languages
English (en)
Chinese (zh)
Other versions
CN102650875A (zh
Inventor
川田哲博
佐藤毅士
久泉卓也
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Omron Corp
Original Assignee
Omron Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Omron Corp filed Critical Omron Corp
Publication of CN102650875A publication Critical patent/CN102650875A/zh
Application granted granted Critical
Publication of CN102650875B publication Critical patent/CN102650875B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41875Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by quality surveillance of production
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0218Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
    • G05B23/0221Preprocessing measurements, e.g. data collection rate adjustment; Standardization of measurements; Time series or signal analysis, e.g. frequency analysis or wavelets; Trustworthiness of measurements; Indexes therefor; Measurements using easily measured parameters to estimate parameters difficult to measure; Virtual sensor creation; De-noising; Sensor fusion; Unconventional preprocessing inherently present in specific fault detection methods like PCA-based methods
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/31From computer integrated manufacturing till monitoring
    • G05B2219/31323Database for CIM
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/31From computer integrated manufacturing till monitoring
    • G05B2219/31485Verify and update all related data in relational database
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32197Inspection at different locations, stages of manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Manufacturing & Machinery (AREA)
  • General Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Business, Economics & Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Factory Administration (AREA)
  • Supply And Installment Of Electrical Components (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Investigating Materials By The Use Of Optical Means Adapted For Particular Applications (AREA)
CN201110342983.3A 2011-02-25 2011-10-25 检查系统、管理服务器、检查装置及检查数据管理方法 Active CN102650875B (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011-040510 2011-02-25
JP2011040510A JP5779906B2 (ja) 2011-02-25 2011-02-25 検査システム、管理サーバ、検査装置および検査データ管理方法

Publications (2)

Publication Number Publication Date
CN102650875A CN102650875A (zh) 2012-08-29
CN102650875B true CN102650875B (zh) 2016-07-06

Family

ID=45562080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110342983.3A Active CN102650875B (zh) 2011-02-25 2011-10-25 检查系统、管理服务器、检查装置及检查数据管理方法

Country Status (5)

Country Link
US (1) US20120221586A1 (enExample)
EP (1) EP2492767B1 (enExample)
JP (1) JP5779906B2 (enExample)
KR (1) KR20120098390A (enExample)
CN (1) CN102650875B (enExample)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9915940B2 (en) * 2011-10-31 2018-03-13 Applied Materials, Llc Bi-directional association and graphical acquisition of time-based equipment sensor data and material-based metrology statistical process control data
US10127523B2 (en) * 2013-03-20 2018-11-13 Lifetime Brands, Inc. Method and apparatus for mobile quality management inspections
JP6264072B2 (ja) * 2014-02-10 2018-01-24 オムロン株式会社 品質管理装置及びその制御方法
JP6361199B2 (ja) * 2014-03-20 2018-07-25 日本電気株式会社 情報記憶システム
JP6263437B2 (ja) * 2014-05-07 2018-01-17 日立オートモティブシステムズ株式会社 検査装置、検査システム及び検査方法
JP6790154B2 (ja) * 2019-03-07 2020-11-25 東芝デジタルソリューションズ株式会社 協調型学習システム及び監視システム
WO2021014590A1 (ja) * 2019-07-23 2021-01-28 株式会社Fuji データ管理装置
CN110609839B (zh) 2019-09-17 2021-05-25 北京海益同展信息科技有限公司 区块链数据处理的方法、装置、设备及可读存储介质
JP2021135622A (ja) * 2020-02-25 2021-09-13 日本サポートシステム株式会社 情報処理装置、検査システム及びプログラム
JP2022160221A (ja) * 2021-04-06 2022-10-19 Juki株式会社 検査システム
WO2022224657A1 (ja) * 2021-04-19 2022-10-27 富士フイルム株式会社 製造ラインの異常予兆検知装置、方法及びプログラム並びに製造装置及び検品装置
DE112021008199T5 (de) * 2021-09-07 2024-07-11 Yamaha Hatsudoki Kabushiki Kaisha Bauelementmontagesystem
JP2023125673A (ja) * 2022-02-28 2023-09-07 オムロン株式会社 画像処理システム
WO2025057376A1 (ja) * 2023-09-14 2025-03-20 ファナック株式会社 データ記憶装置、及びコンピュータが読み取り可能な記憶媒体

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07160780A (ja) * 1993-12-10 1995-06-23 Canon Inc 生産データ管理システム
JP3699776B2 (ja) * 1996-04-02 2005-09-28 株式会社日立製作所 電子部品の製造方法
CN1862259A (zh) * 2005-05-12 2006-11-15 欧姆龙株式会社 检查基准设定装置及方法、以及工序检查装置
CN1863440A (zh) * 2004-03-15 2006-11-15 欧姆龙株式会社 零部件安装基板制造方法、该基板用检查方法和检查系统
CN1873677A (zh) * 2005-05-30 2006-12-06 欧姆龙株式会社 工序管理装置及工序管理方法

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005008737A2 (en) * 2003-07-14 2005-01-27 August Technology Corporation Inspection and metrology module cluster tool with multi-tool manager
WO2006040829A1 (ja) * 2004-10-15 2006-04-20 Fujitsu Limited Rfidタグ、及び、そのrfidタグを利用する物品に関する情報取得方法
JP2006277475A (ja) * 2005-03-30 2006-10-12 Toppan Printing Co Ltd 検査結果情報の提供方法及びその提供システム
JP2006323505A (ja) * 2005-05-17 2006-11-30 Sony Corp 製造履歴監視システム及び製造履歴監視方法
JP2007157061A (ja) 2005-12-08 2007-06-21 Ricoh Co Ltd 製品の生産システム及び製品の生産方法
JP5312117B2 (ja) * 2009-03-17 2013-10-09 株式会社神戸製鋼所 金属帯板の製造条件決定システム
JP5168665B2 (ja) * 2009-06-11 2013-03-21 新日鐵住金株式会社 品質管理システム
JP5428685B2 (ja) * 2009-09-11 2014-02-26 株式会社リコー ライセンス導入支援装置、ライセンス導入支援方法、及びライセンス導入支援プログラム
JP2011170540A (ja) * 2010-02-17 2011-09-01 Fujifilm Corp 検査システム及び方法、管理サーバ、携帯端末、プログラム、並びに記憶媒体
JP5211180B2 (ja) * 2011-01-11 2013-06-12 ヤフー株式会社 データベース管理装置、データベース管理プログラム、データベース管理方法、データベース管理システム

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07160780A (ja) * 1993-12-10 1995-06-23 Canon Inc 生産データ管理システム
JP3699776B2 (ja) * 1996-04-02 2005-09-28 株式会社日立製作所 電子部品の製造方法
CN1863440A (zh) * 2004-03-15 2006-11-15 欧姆龙株式会社 零部件安装基板制造方法、该基板用检查方法和检查系统
CN1862259A (zh) * 2005-05-12 2006-11-15 欧姆龙株式会社 检查基准设定装置及方法、以及工序检查装置
CN1873677A (zh) * 2005-05-30 2006-12-06 欧姆龙株式会社 工序管理装置及工序管理方法

Also Published As

Publication number Publication date
EP2492767A3 (en) 2013-12-04
JP2012178455A (ja) 2012-09-13
EP2492767A2 (en) 2012-08-29
EP2492767B1 (en) 2021-09-08
CN102650875A (zh) 2012-08-29
KR20120098390A (ko) 2012-09-05
US20120221586A1 (en) 2012-08-30
JP5779906B2 (ja) 2015-09-16

Similar Documents

Publication Publication Date Title
CN102650875B (zh) 检查系统、管理服务器、检查装置及检查数据管理方法
CN1530863B (zh) 设计检查系统以及设计检查方法
CN107453889A (zh) 一种日志文件的上传方法及装置
US20090077106A1 (en) Component data distribution method, component data distribution apparatus, and program thereof
US11106643B1 (en) System and method for integrating systems to implement data quality processing
CN106250410B (zh) 一种基于flume系统的数据处理方法及其装置
CN113298486A (zh) 一种基于大数据的政务监察督查方法及系统
CN117498916A (zh) 卫星远程测运控系统
CN105468502A (zh) 一种日志收集的方法、装置和系统
CN105373900A (zh) 一种企业管理人员信息采集发布系统
CN114239296A (zh) 一种数据处理方法、装置及电子设备
CN105137776B (zh) 计量自动化终端控制辅助系统
CN112235358A (zh) 数据的采集方法、装置、电子设备及计算机可读存储介质
CN120572300A (zh) 一种机械扭力智能管控方法及管控系统
CN106095891A (zh) 一种适用于前台工作人员的业务工作量识别统计方法
US12010077B1 (en) Status determination of electronic transactions using reduced memory resources
CN111078443B (zh) 缺陷自动采集上报方法及装置、服务器
US12117811B1 (en) Route based manufacturing system analysis, apparatuses, systems, and methods
CN106354540A (zh) 一种跨终端应用程序加载方法及系统
CN110347741A (zh) 大数据处理过程中有效提升输出成果数据质量的系统及其控制方法
CN114115003B (zh) 远程启停控制平台
CN120125091A (zh) 铝单板mes质量管理系统
CN119295213A (zh) 基于rpa和ai的etf补券方法、装置、设备、介质
CN119476768A (zh) 基于分时迭代的空间载荷在轨应用任务调度系统及方法
CN119299476A (zh) 物联网信号调整系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant