CN102605965B - 砖混结构隔震支座的安装托换方法 - Google Patents
砖混结构隔震支座的安装托换方法 Download PDFInfo
- Publication number
- CN102605965B CN102605965B CN201110457669.XA CN201110457669A CN102605965B CN 102605965 B CN102605965 B CN 102605965B CN 201110457669 A CN201110457669 A CN 201110457669A CN 102605965 B CN102605965 B CN 102605965B
- Authority
- CN
- China
- Prior art keywords
- brick
- shock isolating
- isolating pedestal
- reinforced concrete
- prefabricated reinforced
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 38
- 238000000034 method Methods 0.000 title claims abstract description 28
- 239000004567 concrete Substances 0.000 title claims abstract description 27
- 238000002955 isolation Methods 0.000 title abstract description 13
- 238000009424 underpinning Methods 0.000 title abstract description 7
- 239000011449 brick Substances 0.000 claims abstract description 76
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 46
- 238000010276 construction Methods 0.000 claims abstract description 34
- 238000005728 strengthening Methods 0.000 claims abstract description 10
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 54
- 230000035939 shock Effects 0.000 claims description 54
- 239000000203 mixture Substances 0.000 claims description 42
- 229910000831 Steel Inorganic materials 0.000 claims description 18
- 239000010959 steel Substances 0.000 claims description 18
- 238000007789 sealing Methods 0.000 claims description 16
- 230000005540 biological transmission Effects 0.000 claims description 4
- 238000009412 basement excavation Methods 0.000 claims description 3
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 238000009417 prefabrication Methods 0.000 claims description 3
- 238000005553 drilling Methods 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 6
- 238000004080 punching Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000002513 implantation Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110457669.XA CN102605965B (zh) | 2011-12-31 | 2011-12-31 | 砖混结构隔震支座的安装托换方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110457669.XA CN102605965B (zh) | 2011-12-31 | 2011-12-31 | 砖混结构隔震支座的安装托换方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102605965A CN102605965A (zh) | 2012-07-25 |
CN102605965B true CN102605965B (zh) | 2014-07-30 |
Family
ID=46523694
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110457669.XA Active CN102605965B (zh) | 2011-12-31 | 2011-12-31 | 砖混结构隔震支座的安装托换方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102605965B (zh) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102852333B (zh) * | 2012-08-17 | 2015-05-20 | 中国十七冶集团有限公司 | 一种混凝土高柱连续浇注施工方法 |
CN102864943B (zh) * | 2012-10-11 | 2016-08-03 | 北京筑福国际工程技术有限责任公司 | 隔震支座砖混加固结构及其安装托换方法 |
CN102926408B (zh) * | 2012-10-11 | 2016-06-08 | 北京筑福建筑事务有限责任公司 | 一种基础隔震结构及其托换处理方法 |
CN105715068B (zh) * | 2016-03-11 | 2018-08-28 | 江苏鼎达建筑新技术有限公司 | 既有砖混结构隔震支座托换加固结构及其施工方法 |
CN106639345A (zh) * | 2016-08-23 | 2017-05-10 | 宇杰集团股份有限公司 | 钢筋混凝土框支大梁钢支座托换方法 |
CN106368480A (zh) * | 2016-10-11 | 2017-02-01 | 云南震安减震科技股份有限公司 | 装配式建筑用预制减震构件 |
CN106337503A (zh) * | 2016-10-11 | 2017-01-18 | 云南震安减震科技股份有限公司 | 装配式建筑用预制复合隔震构件 |
RU179879U1 (ru) * | 2018-02-09 | 2018-05-28 | федеральное государственное бюджетное образовательное учреждение высшего образования "Донской государственный технический университет" (ДГТУ) | Конструкция усиления железобетонной многопустотной плиты перекрытия |
CN108678416B (zh) * | 2018-07-04 | 2023-09-15 | 浙江理工大学 | 一种装配式地下增层隔震结构及增层隔震施工工艺 |
CN109914847A (zh) * | 2019-03-26 | 2019-06-21 | 西安理工大学 | 一种砖石古塔地基托换减震装置及其实施方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09221918A (ja) * | 1996-02-19 | 1997-08-26 | Taisei Corp | 既存鉄筋コンクリート構造物の補強構造 |
CN1827936A (zh) * | 2005-03-04 | 2006-09-06 | 张准胜 | 一种既有建筑物隔震改造的方法与装置 |
CN101736909A (zh) * | 2009-12-07 | 2010-06-16 | 广州大学 | 一种底部框架柱震损房屋建筑的修复方法 |
CN101906883A (zh) * | 2010-07-20 | 2010-12-08 | 中国建筑第八工程局有限公司 | 隔震支座更换方法 |
CN102296833A (zh) * | 2011-05-25 | 2011-12-28 | 陆建衡 | 既有建筑抗震增高结构 |
-
2011
- 2011-12-31 CN CN201110457669.XA patent/CN102605965B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09221918A (ja) * | 1996-02-19 | 1997-08-26 | Taisei Corp | 既存鉄筋コンクリート構造物の補強構造 |
CN1827936A (zh) * | 2005-03-04 | 2006-09-06 | 张准胜 | 一种既有建筑物隔震改造的方法与装置 |
CN101736909A (zh) * | 2009-12-07 | 2010-06-16 | 广州大学 | 一种底部框架柱震损房屋建筑的修复方法 |
CN101906883A (zh) * | 2010-07-20 | 2010-12-08 | 中国建筑第八工程局有限公司 | 隔震支座更换方法 |
CN102296833A (zh) * | 2011-05-25 | 2011-12-28 | 陆建衡 | 既有建筑抗震增高结构 |
Also Published As
Publication number | Publication date |
---|---|
CN102605965A (zh) | 2012-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102605965B (zh) | 砖混结构隔震支座的安装托换方法 | |
CN104294753B (zh) | 一种桥梁预制空心墩柱连接结构及施工工法 | |
CN103669866B (zh) | 地下室钢筋混凝土柱节点连接结构的施工方法 | |
CN102182325A (zh) | 一种框架结构独立基础既有建筑物地下室增层方法 | |
CN105937274B (zh) | 装配式预制剪力墙水平拼缝槽钢焊接连接装置和连接方法 | |
CN104563130B (zh) | 一种十字型围护桩以及围护结构兼做主体结构的施工方法 | |
CN102864943B (zh) | 隔震支座砖混加固结构及其安装托换方法 | |
CN103498570A (zh) | 旧厂房内部加层改造结构及其施工方法 | |
CN201288328Y (zh) | 梁板一体预制拼装式塔机固定基础 | |
CN102926408B (zh) | 一种基础隔震结构及其托换处理方法 | |
CN205024712U (zh) | 一种组合式塔吊基础 | |
CN113235741A (zh) | 一种钢管混凝土装配式隔震节点及施工方法 | |
CN106958259B (zh) | 一种混凝土塔柱基础及其施工方法 | |
CN204112525U (zh) | 高强度混凝土预制框架内嵌带竖缝预制剪力墙结构 | |
CN103643681B (zh) | 一种地铁车站基坑逆作支护结构及其施工方法 | |
CN103603435A (zh) | 一种装配式混凝土抗震梁柱框架及其施工方法 | |
CN203640061U (zh) | 地下室钢筋混凝土柱节点连接结构 | |
CN103015432A (zh) | 一种坡道基坑钢管撑换撑施工方法 | |
CN210564549U (zh) | 一种既有铁路的支撑系统 | |
CN109267578B (zh) | 一种斜面素混凝土结构及其施工方法 | |
CN203603523U (zh) | 旧厂房内部加层改造结构 | |
CN115828381A (zh) | 一种便于纠倾的配电房基础设计方法 | |
CN205475849U (zh) | 一种钢结构建筑装配式预制混凝土剪力墙 | |
CN202850061U (zh) | 一种基础隔震结构 | |
AU2016102393A4 (en) | A Method of constructing a column, a tunnel, and a tunnel made from the method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB02 | Change of applicant information |
Address after: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, two floor, Chak Yang Building Applicant after: Beijing Aeido International Engineering Technology Co., Ltd. Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, two floor, Chak Yang Building Applicant before: Beijing Zhufu Construction Engineering Co., Ltd. |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: BEIJING AEIDO CONSTRUCTION ENGINEERING CO., LTD. TO: BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20171201 Address after: 225300 Jiangsu province Taizhou Gaogang Xu Zhuang Jie Dao Cao Guan Ying Village No. 58 Patentee after: Beijing Yong Bo Science and Technology Ltd. Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, two floor, Chak Yang Building Patentee before: Beijing Aeido International Engineering Technology Co., Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190327 Address after: No. 16 Xixiu Street, Anshun City, Guizhou Province, 561000 Patentee after: Guizhou construction engineering Anshun Construction Engineering Co., Ltd. Address before: 225300 No. 58 Cao Guanying Village, Xuzhuang Street, Gaogang District, Taizhou City, Jiangsu Province Patentee before: Beijing Yong Bo Science and Technology Ltd. |