CN102926408B - 一种基础隔震结构及其托换处理方法 - Google Patents

一种基础隔震结构及其托换处理方法 Download PDF

Info

Publication number
CN102926408B
CN102926408B CN201210385500.2A CN201210385500A CN102926408B CN 102926408 B CN102926408 B CN 102926408B CN 201210385500 A CN201210385500 A CN 201210385500A CN 102926408 B CN102926408 B CN 102926408B
Authority
CN
China
Prior art keywords
joist
isolation
laminated rubber
shoulder
cushion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210385500.2A
Other languages
English (en)
Other versions
CN102926408A (zh
Inventor
董有
赵恩平
万兆
鞠树森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yifeng Machinery Co., Ltd.
Original Assignee
BEIJING BLESS BUILDING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING BLESS BUILDING Co Ltd filed Critical BEIJING BLESS BUILDING Co Ltd
Priority to CN201210385500.2A priority Critical patent/CN102926408B/zh
Publication of CN102926408A publication Critical patent/CN102926408A/zh
Application granted granted Critical
Publication of CN102926408B publication Critical patent/CN102926408B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

本发明涉及一种基础隔震结构及其托换处理方法,属于抗震加固领域,该技术中的预制构件及隔震层包括:预制钢筋混凝土托梁柱、预制钢筋混凝土托梁、预制钢筋混凝土肩梁、预制钢筋混凝土枕梁及叠层橡胶隔震支座组成的隔震层。本发明技术采用预制钢筋混凝土构件代替常用方法里的现浇梁,能很好地解决隔震支座安装的托换问题,简化及加快了工程进度,降低了工程造价,是一项非常实用的砌体结构隔震施工技术,为隔震加固在砌体结构工程上的应用提供了新的方向。

Description

一种基础隔震结构及其托换处理方法
技术领域
本发明涉及一种基础隔震结构及其托换处理方法,属于抗震加固领域。
背景技术
采用隔震技术对建筑进行抗震加固是一种全新的抗震加固思路,该技术通过在建筑物下部设置一道隔震层来吸收和阻断地震能量对上部结构的输入,减少上部结构得地震反应,以提高建筑抗震能力。传统的多层砌体房屋的抗震加固方法会对原结构在外观和结构上造成较大影响,采用设置基础隔震层的方法能解决这一问题。
但是,用隔震方法加固既有多层砌体结构的托换技术复杂,工程量大,施工工期长,是目前采用隔震方法在工程实践中遇到的现实问题。
发明内容
本发明针对上述问题,提出了一种基础隔震结构及其托换处理方法,包括:预制钢筋混凝土托梁柱、预制钢筋混凝土托梁、预制钢筋混凝土肩梁、预制钢筋混凝土枕梁及叠层橡胶隔震支座组成的隔震层。其利用预制钢筋混凝土构件代替现浇梁,能很好地解决隔震支座安装的托换问题,达到安全、可靠、方便、快捷的目的。
为了实现上述目的,本发明采取了如下技术方案:
一种基础隔震结构,包括基础、地圈梁、叠层橡胶隔震垫,所述基础包括条形基础以及独立基础,独立基础之间设置有条形基础以及条形基础之上的墙体;所述独立基础上设置有两根托梁柱,两根托梁柱之间架设有枕梁,枕梁上通过调整螺栓设置有叠层橡胶隔震垫,叠层橡胶隔震垫上部通过调整螺栓连接设置有肩梁,肩梁设置于地圈梁底部,肩梁呈倒T型,相邻肩梁之间并在地圈梁底部设置有托梁,托梁与下部墙体之间断开。
进一步地,所述的枕梁下部与独立基础之间灌注有C30微膨胀混凝土。
进一步地,所述的叠层橡胶隔震垫下部与枕梁之间灌注有无收缩灌浆料。
进一步地,所述的独立基础为钢筋混凝土独立基础。
进一步地,所述的托梁柱为预制钢筋混凝土托梁柱,所述的托梁为预制钢筋混凝土托梁,所述的肩梁为预制钢筋混凝土肩梁,所述的枕梁为预制钢筋混凝土枕梁。
进一步地,所述独立基础的尺寸为:长×宽=3.0m×2.0m。
进一步地,所述的托梁柱截面为“牛腿”形。
上述基础隔震结构的托换处理方法,包括如下步骤:
步骤一:开挖基槽,将原条形基础间隔加宽加厚变成独立基础,并在独立基础上安装托梁柱;
步骤二:在叠层橡胶隔震垫位置,地圈梁下开650mm×650mm的肩梁洞口,安装肩梁,用伸入托梁柱内的调整螺栓加之上的临时垫块将肩梁与地圈梁顶紧,地圈梁与肩梁的缝隙用无收缩灌浆料灌实;
步骤三:在肩梁下到独立基础间清出1000mm×1200mm的洞口,安装枕梁,枕梁至独立基础间用C30微膨胀混凝土填实;
步骤四:安装叠层橡胶隔震垫,用伸入枕梁的调整螺栓把叠层橡胶隔震垫与上部肩梁顶紧,上好叠层橡胶隔震垫上下部所有调整螺栓,用无收缩灌浆料填实叠层橡胶隔震垫与枕梁的空隙;
步骤五:卸除肩梁与托梁柱间的临时垫块,叠层橡胶隔震垫安装完成,断开地圈梁下的墙体,形成隔震层,用水准仪核查隔震层的垂直变形情况,并在相邻肩梁之间通过连接螺栓连接设置托梁;
步骤六:清除隔震层下的回填土,做架空地面的托梁和现浇板,现浇板底至地基表面空隙不小于250mm;
步骤七:对穿过隔震层的各种管线设置柔性连接,防止地震时水平位移过大将其切断;
步骤八:修建叠层橡胶隔震垫维护及更换的通道和检查孔,做叠层橡胶隔震垫的维护井。
有益效果:采用本发明的上述方法能够使隔震托换的施工更快捷,质量提高,造价降低。
附图说明
图1为砌体结构基础隔震加固布置大样图。
图2为隔震垫及隔震托换预制构件剖面图。
图3为托梁柱连接剖面图。
图4为托梁平面图。
图5为图4中端头A-A剖面图。
图6为枕梁连接布置大样图。
图中,1独立基础;2托梁柱;3地圈梁;4托梁;5临时垫块;6连接螺栓;7肩梁;8叠层橡胶隔震垫;9调整螺栓;10维护井墙;11枕梁;12C30微膨胀混凝土。
具体实施方式
如图1~图6所示,本发明的具体实施方式如下:
一种基础隔震结构,包括基础、地圈梁3、叠层橡胶隔震垫8,基础包括条形基础以及独立基础1,独立基础1之间设置有条形基础以及条形基础之上的墙体;独立基础1上设置有两根托梁柱2,两根托梁柱2之间架设有枕梁11,枕梁11上通过调整螺栓9设置有叠层橡胶隔震垫8,叠层橡胶隔震垫8上部通过调整螺栓9连接设置有肩梁7,肩梁7设置于地圈梁3底部,肩梁7呈倒T型,相邻肩梁7之间并在地圈梁3底部设置有托梁4,托梁4与下部墙体之间断开。枕梁11下部与独立基础1之间灌注有C30微膨胀混凝土,叠层橡胶隔震垫8下部与枕梁11之间灌注有无收缩灌浆料。
其中,独立基础1为钢筋混凝土独立基础1,托梁柱2为预制钢筋混凝土托梁柱2,托梁4为预制钢筋混凝土托梁4,肩梁7为预制钢筋混凝土肩梁7,枕梁11为预制钢筋混凝土枕梁11,独立基础1的尺寸为:长×宽=3.0m×2.0m,托梁柱2截面为“牛腿”形。
上述基础隔震结构的托换处理方法,具体包括如下步骤:
步骤一:开挖基槽,将原条形基础间隔加宽加厚变成独立基础1,并在独立基础1上安装托梁柱2;
步骤二:在叠层橡胶隔震垫8位置,地圈梁3下开650mm×650mm的肩梁洞口,安装肩梁7,用伸入托梁柱2内的调整螺栓9加之上的临时垫块5将肩梁7与地圈梁3顶紧,地圈梁3与肩梁7的缝隙用无收缩灌浆料灌实;
步骤三:在肩梁7下到独立基础1间清出1000mm×1200mm的洞口,安装枕梁11,枕梁11至独立基础1间用C30微膨胀混凝土填实;
步骤四:安装叠层橡胶隔震垫8,用伸入枕梁11的调整螺栓9把叠层橡胶隔震垫8与上部肩梁7顶紧,上好叠层橡胶隔震垫8上下部所有调整螺栓9,用无收缩灌浆料填实叠层橡胶隔震垫8与枕梁11的空隙;
步骤五:卸除肩梁7与托梁柱2间的临时垫块5,叠层橡胶隔震垫8安装完成,断开地圈梁3下的墙体,形成隔震层,用水准仪核查隔震层的垂直变形情况,并在相邻肩梁7之间通过连接螺栓6连接设置托梁4;
步骤六:清除隔震层下的回填土,做架空地面的托梁和现浇板,现浇板底至地基表面空隙不小于250mm;
步骤七:对穿过隔震层的各种管线设置柔性连接,防止地震时水平位移过大将其切断;
步骤八:修建叠层橡胶隔震垫8维护及更换的通道和检查孔,做叠层橡胶隔震垫8的维护井。
以上是本发明的一典型实施例,本发明的实施不限于此。

Claims (6)

1.一种基础隔震结构,包括基础、地圈梁(3)、叠层橡胶隔震垫(8),其特征在于:所述基础包括条形基础以及独立基础(1),独立基础(1)之间设置有条形基础以及条形基础之上的墙体;所述独立基础(1)上设置有两根托梁柱(2),两根托梁柱(2)之间架设有枕梁(11),枕梁(11)上通过调整螺栓(9)设置有叠层橡胶隔震垫(8),叠层橡胶隔震垫(8)上部通过调整螺栓(9)连接设置有肩梁(7),肩梁(7)设置于地圈梁(3)底部,肩梁(7)呈倒T型,相邻肩梁(7)之间并在地圈梁(3)底部设置有托梁(4),托梁(4)与下部墙体之间断开;所述的独立基础(1)为钢筋混凝土独立基础(1);所述的托梁柱(2)截面为“牛腿”形。
2.根据权利要求1所述的基础隔震结构,其特征在于:所述的枕梁(11)下部与独立基础(1)之间灌注有C30微膨胀混凝土。
3.根据权利要求1所述的基础隔震结构,其特征在于:所述的叠层橡胶隔震垫(8)下部与枕梁(11)之间灌注有无收缩灌浆料。
4.根据权利要求1所述的基础隔震结构,其特征在于:所述的托梁柱(2)为预制钢筋混凝土托梁柱(2),所述的托梁(4)为预制钢筋混凝土托梁(4),所述的肩梁(7)为预制钢筋混凝土肩梁(7),所述的枕梁(11)为预制钢筋混凝土枕梁(11)。
5.根据权利要求1所述的基础隔震结构,其特征在于:所述独立基础(1)的尺寸为:长×宽=3.0m×2.0m。
6.根据权利要求1-5中任一项所述基础隔震结构的托换处理方法,其特征在于:包括如下步骤:
步骤一:开挖基槽,将原条形基础间隔加宽加厚变成独立基础(1),并在独立基础(1)上安装托梁柱(2);
步骤二:在叠层橡胶隔震垫(8)位置,地圈梁(3)下开650mm×650mm的肩梁洞口,安装肩梁(7),用伸入托梁柱(2)内的调整螺栓(9)加之上的临时垫块(5)将肩梁(7)与地圈梁(3)顶紧,地圈梁(3)与肩梁(7)的缝隙用无收缩灌浆料灌实;
步骤三:在肩梁(7)下到独立基础(1)间清出1000mm×1200mm的洞口,安装枕梁(11),枕梁(11)至独立基础(1)间用C30微膨胀混凝土填实;
步骤四:安装叠层橡胶隔震垫(8),用伸入枕梁(11)的调整螺栓(9)把叠层橡胶隔震垫(8)与上部肩梁(7)顶紧,上好叠层橡胶隔震垫(8)上下部所有调整螺栓(9),用无收缩灌浆料填实叠层橡胶隔震垫(8)与枕梁(11)的空隙;
步骤五:卸除肩梁(7)与托梁柱(2)间的临时垫块(5),叠层橡胶隔震垫(8)安装完成,断开地圈梁(3)下的墙体,形成隔震层,用水准仪核查隔震层的垂直变形情况,并在相邻肩梁(7)之间通过连接螺栓(6)连接设置托梁(4);
步骤六:清除隔震层下的回填土,做架空地面的托梁和现浇板,现浇板底至地基表面空隙不小于250mm;
步骤七:对穿过隔震层的各种管线设置柔性连接,防止地震时水平位移过大将其切断;
步骤八:修建叠层橡胶隔震垫(8)维护及更换的通道和检查孔,做叠层橡胶隔震垫(8)的维护井。
CN201210385500.2A 2012-10-11 2012-10-11 一种基础隔震结构及其托换处理方法 Active CN102926408B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210385500.2A CN102926408B (zh) 2012-10-11 2012-10-11 一种基础隔震结构及其托换处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210385500.2A CN102926408B (zh) 2012-10-11 2012-10-11 一种基础隔震结构及其托换处理方法

Publications (2)

Publication Number Publication Date
CN102926408A CN102926408A (zh) 2013-02-13
CN102926408B true CN102926408B (zh) 2016-06-08

Family

ID=47641325

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210385500.2A Active CN102926408B (zh) 2012-10-11 2012-10-11 一种基础隔震结构及其托换处理方法

Country Status (1)

Country Link
CN (1) CN102926408B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104099951A (zh) * 2014-07-23 2014-10-15 上海康业建筑装饰工程有限公司 保护性建筑的基础减震隔音加固系统
CN104358421B (zh) * 2014-11-12 2016-05-25 云南震安减震技术有限公司 一种隔震橡胶支座的更换方法
CN109339273B (zh) * 2018-11-20 2020-05-12 三峡大学 一种基于非牛顿流体的建筑物防震方法
CN109738478A (zh) * 2019-01-18 2019-05-10 绍兴文理学院元培学院 一种高精度土体冻胀过程自动化监测系统
CN114991521B (zh) * 2022-06-28 2023-09-26 四川省建筑设计研究院有限公司 一种既有砌体结构托换梁隔震加固构造的设计方法
CN115341673A (zh) * 2022-07-01 2022-11-15 湖南工业大学 一种水泥再生胶隔震支座

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177368A (ja) * 1995-12-27 1997-07-08 Bridgestone Corp 免震装置
CN101736909A (zh) * 2009-12-07 2010-06-16 广州大学 一种底部框架柱震损房屋建筑的修复方法
CN102206930A (zh) * 2007-02-15 2011-10-05 尹学军 一种分体式隔振装置及其应用
JP2011256568A (ja) * 2010-06-08 2011-12-22 Irt Corp 柱頭免震構造
CN102605965A (zh) * 2011-12-31 2012-07-25 北京筑福建设工程有限责任公司 砖混结构隔震支座的安装托换方法
CN202850061U (zh) * 2012-10-11 2013-04-03 北京筑福建设工程有限责任公司 一种基础隔震结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177368A (ja) * 1995-12-27 1997-07-08 Bridgestone Corp 免震装置
CN102206930A (zh) * 2007-02-15 2011-10-05 尹学军 一种分体式隔振装置及其应用
CN101736909A (zh) * 2009-12-07 2010-06-16 广州大学 一种底部框架柱震损房屋建筑的修复方法
JP2011256568A (ja) * 2010-06-08 2011-12-22 Irt Corp 柱頭免震構造
CN102605965A (zh) * 2011-12-31 2012-07-25 北京筑福建设工程有限责任公司 砖混结构隔震支座的安装托换方法
CN202850061U (zh) * 2012-10-11 2013-04-03 北京筑福建设工程有限责任公司 一种基础隔震结构

Also Published As

Publication number Publication date
CN102926408A (zh) 2013-02-13

Similar Documents

Publication Publication Date Title
CN102926408B (zh) 一种基础隔震结构及其托换处理方法
CN110512647B (zh) 一种局部装配式地铁车站结构设计及施工方法
CN102182325B (zh) 一种框架结构独立基础既有建筑物地下室增层方法
CN104631512B (zh) 吊模法后浇带梁板施工方法
CN102605965B (zh) 砖混结构隔震支座的安装托换方法
CN105040816A (zh) 预制装配式带暗支撑叠合板式钢筋混凝土核心筒
CN108005399A (zh) 一种既有建筑群下加建多层地下空间的施工方法
CN102031785A (zh) 永久结构板带代替临时围檩的基坑支护技术
CN103526781B (zh) 一种古建筑基础整体托盘隔震加固结构及其施工方法
CN105715068A (zh) 既有砖混结构隔震支座托换加固结构及其施工方法
CN103498570A (zh) 旧厂房内部加层改造结构及其施工方法
CN205806684U (zh) 一种横跨基坑工程管线悬吊结构
CN105064711A (zh) 一种在居民楼间施工地下车库的方法
CN114592688A (zh) 基于等效杆件模型的斜向配筋钢筋混凝土剪力墙施工方法
CN103015432A (zh) 一种坡道基坑钢管撑换撑施工方法
CN210288419U (zh) 一种用于大跨距逆作基坑的反立柱斜撑加固系统
CN202850061U (zh) 一种基础隔震结构
CN109267578B (zh) 一种斜面素混凝土结构及其施工方法
CN107313551A (zh) 一种钢筋桁架混凝土预制墙板及结构体系及其施工方法
CN108412036B (zh) 装配式h型钢柱-独立基础-混凝土圈梁十字形连接节点
CN108625491B (zh) 装配式h型钢柱-独立基础-混凝土圈梁l形连接节点
CN207597914U (zh) 一种既有建筑群下加建多层地下空间的施工受力结构
CN103147591B (zh) 一种砖混建筑增加隔震层的施工方法
CN207017766U (zh) 一种蒸压轻质混凝土板装配式围墙
CN201649355U (zh) 约束煤矸石多孔砖砌体

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, 2 floor, Chak Yang Building

Applicant after: Beijing Aeido International Engineering Technology Co., Ltd.

Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, 2 floor, Chak Yang Building

Applicant before: Beijing Zhufu Construction Engineering Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: BEIJING AEIDO CONSTRUCTION ENGINEERING CO., LTD. TO: BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY CO., LTD.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: BEIJING BLESS BUILDING CO., LTD.

Free format text: FORMER OWNER: BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY CO., LTD.

Effective date: 20150729

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150729

Address after: 100043 Shijingshan District, Yang Yang Street, No. 69, No. 1, building an international Park, Fu International

Applicant after: Beijing Bless Building Co., Ltd.

Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, 2 floor, Chak Yang Building

Applicant before: Beijing Aeido International Engineering Technology Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171206

Address after: 225300 Taizhou City, Jiangsu Province, high Port District Xu Zhuang Street Guan Gou community

Patentee after: Beijing Yong Bo Science and Technology Ltd.

Address before: 100043 Shijingshan District, Yang Yang Street, No. 69, No. 1, building an international Park, Fu International

Patentee before: Beijing Bless Building Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181211

Address after: 221000 Daxu Village, Daxu Town, Tongshan District, Xuzhou City, Jiangsu Province

Patentee after: Li Wenkang

Address before: 225300 Guangou Community of Xuzhuang Street, Gaogang District, Taizhou City, Jiangsu Province

Patentee before: Beijing Yong Bo Science and Technology Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191023

Address after: No. 888, Zikai West Road, Shimen Town, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee after: Zhejiang Yifeng Machinery Co., Ltd.

Address before: Copper Mt. District 221000 of Jiangsu province Xuzhou city Xu Zhen Da Xu Cun

Patentee before: Li Wenkang