CN103015432A - 一种坡道基坑钢管撑换撑施工方法 - Google Patents

一种坡道基坑钢管撑换撑施工方法 Download PDF

Info

Publication number
CN103015432A
CN103015432A CN201210528868XA CN201210528868A CN103015432A CN 103015432 A CN103015432 A CN 103015432A CN 201210528868X A CN201210528868X A CN 201210528868XA CN 201210528868 A CN201210528868 A CN 201210528868A CN 103015432 A CN103015432 A CN 103015432A
Authority
CN
China
Prior art keywords
ramp
wall
support
concrete
top board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210528868XA
Other languages
English (en)
Other versions
CN103015432B (zh
Inventor
刁晓翔
王辉
郭君
刁宁
王端阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Original Assignee
TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd filed Critical TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Priority to CN201210528868.XA priority Critical patent/CN103015432B/zh
Publication of CN103015432A publication Critical patent/CN103015432A/zh
Application granted granted Critical
Publication of CN103015432B publication Critical patent/CN103015432B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Foundations (AREA)

Abstract

本发明公开了一种坡道基坑钢管撑换撑施工方法,它包括以下步骤:(1)在坡道外周长度方向打设支护桩,在支护桩内侧连接内撑系统,然后挖基坑;(2)在基坑内铺设坡道处底板并建造位于坡道处底板两侧的坡道内墙和坡道外墙;(3)在坡道外墙内侧施工一道边梁,在边梁上依次间隔预埋多块预埋钢板;(4)在坡道内墙内侧连接与多块预埋钢板一一对应设置的后增埋件钢板;(5)在每一块预埋钢板和后增埋件钢板之间连接钢管撑;(6)在支护桩与所述的坡道外墙之间回填回填土、铺设素混凝土转换板带;(7)拆除内撑系统;(8)浇筑坡道内、外墙混凝土、坡道顶板梁混凝土以及坡道顶板的混凝土。采用本方法使换撑体系受力平衡稳定、具有足够的强度。

Description

一种坡道基坑钢管撑换撑施工方法
技术领域
本发明涉及一种基坑换撑施工方法,尤其涉及一种坡道基坑钢管撑换撑施工方法。
背景技术
在高层建筑的深基础施工中,基坑支护工程施工工期长,造价高,是整个工程的重点阶段。基坑支护的设计形式较多,但受工程所处位置和地质条件的限制,既经济又适用的支护形式往往不多。目前混凝土内支撑体系因其对周边环境要求低、施工方便已越来越多地应用在深基坑支护的工程中,但受基坑支撑体系的限制,工程施工到一定部位时内支撑的拆除是一个必然过程。在地下室汽车坡道施工中,需要对坡道进行特殊换撑技术施工,才能进行基坑内撑拆除,继而进行后续坡道施工时才能保证坡道施工安全。
通过检索得知已授权的专利:
1申请号为CN201220017701.2的中国专利公开了“基坑围护撑板结构”,本实用新型公开了基坑围护撑板结构,包括混凝土板本体,和分别预埋在混凝土板本体的上部和下部平行的横向两组钢筋,且所述的横向两组钢筋一端直锚入地下室结构,所述预埋在混凝土板本体的上部和下部的横向两组钢筋在锚入地下室结构之前进行交叉,然后再直锚入地下室结构。
2申请号为CN201020676839.4的中国专利公开了“一种坑中坑钢板桩基坑支护结构,一种坑中坑钢板桩基坑支护结构,涉及一种坑中坑钢板桩支护结构,属于岩土工程技术领域。本实用新型包括分别与地表平行的大坑底标高、坑中坑底标高,沿大坑底标高向坑中坑底标高纵向设置钢板桩,钢板桩的上端连接槽钢形成槽钢围檩,槽钢围檩上连接钢管或型钢形成内支撑。
第1~2项专利虽然有一系列的优点,但是不能解决在地下室汽车坡道施工中,坡道换撑技术施工等一系列问题,从而进行基坑内撑拆除,继而进行后续坡道施工保证坡道施工安全。
发明内容
本发明的目的在于克服已有技术的不足,提供一种具有足够的强度、刚度,结构牢固、均衡稳定传力的一种坡道基坑钢管撑换撑施工方法。
本发明的一种坡道基坑钢管撑换撑施工方法,它包括以下步骤:
(1)在坡道外周长度方向打设支护桩,在支护桩内侧连接内撑系统,然后挖基坑;
(2)在所述的基坑内铺设坡道处底板并建造位于坡道处底板两侧的坡道内墙和坡道外墙至高于边梁的梁底的标高位置,同时在坡道内墙和坡道外墙的顶端预留出甩筋;
(3)在坡道外墙内侧沿坡道长度方向施工一道边梁,在所述的边梁上依次间隔预埋多块预埋钢板;
(4)在坡道内墙内侧连接与多块预埋钢板一一对应设置的后增埋件钢板;
(5)在每一块预埋钢板和与其对应设置的后增埋件钢板之间连接钢管撑;
(6)在支护桩与所述的坡道外墙之间回填第一层回填土,然后在第一层回填土的顶部铺设素混凝土转换板带,在所述的素混凝土转换板带上回填第二层回填土;
(7)拆除所述的内撑系统;
(8)继续完成坡道内、外墙高度方向的钢筋绑扎,然后绑扎坡道顶板梁和坡道顶板的钢筋,使坡道顶板梁的钢筋和坡道顶板的钢筋与坡道内、外墙钢筋相连;最后浇筑坡道内、外墙混凝土、坡道顶板梁混凝土以及坡道顶板的混凝土。
采用本发明方法的有益效果是:在地下室汽车坡道施工中,坡道处受力复杂,需要对坡道处进行换撑技术施工,才能将基坑内撑拆除,继而进行后续坡道施工时才能保证坡道施工安全。在坡道内墙与坡道外墙内侧上的边梁之间安装钢管撑,在支护桩与坡道外墙之间回填第一层回填土,然后在第一层回填土的顶部铺设第一层素混凝土转换板带,在第一层素混凝土转换板带上回填第二层回填土。这样整个构成了以钢管撑、边梁、回填土、素混凝土转换板带为主的稳定换撑体系。另外钢管撑所受的力会均衡稳定的传给坡道内墙,继而会均衡稳定的传给主体结构的梁板柱。所以采用本方法使换撑体系受力平衡稳定、具有足够的强度、刚度,确保地下室汽车坡道的换撑施工的均衡传力和刚度稳定安全性。
附图说明
图1为采用本发明的一种坡道基坑钢管撑换撑施工方法安装平面示意图;
图2为采用本发明的一种坡道基坑钢管撑换撑施工方法安装示意图。
具体实施方式
下面结合附图和具体实施例对本发明作以详细描述。
如附图所示的本发明的一种坡道基坑钢管撑换撑施工方法,它包括以下步骤:(1)在坡道外周长度方向打设支护桩6,在支护桩内侧连接内撑系统7,然后挖基坑;(2)在所述的基坑内铺设坡道处底板5并建造位于坡道处底板5两侧的坡道内墙4和坡道外墙3至高于边梁1的梁底的标高位置,同时在坡道内墙4和坡道外墙3的顶端预留出甩筋;(3)在坡道外墙3内侧沿坡道长度方向施工一道边梁1,在所述的边梁1上依次间隔预埋多块预埋钢板;(4)在坡道内墙4内侧连接与多块预埋钢板一一对应设置的后增埋件钢板;(5)在每一块预埋钢板和与其对应设置的后增埋件钢板之间连接钢管撑2;(6)在支护桩与所述的坡道外墙之间回填第一层回填土,然后在第一层回填土的顶部铺设素混凝土转换板带,在所述的素混凝土转换板带上回填第二层回填土;(7)拆除所述的内撑系统7;(8)继续完成坡道内、外墙高度方向的钢筋绑扎,然后绑扎坡道顶板梁和坡道顶板的钢筋,使坡道顶板梁的钢筋和坡道顶板的钢筋与坡道内、外墙钢筋相连;最后浇筑坡道内、外墙混凝土、坡道顶板梁混凝土以及坡道顶板的混凝土。
实施例1
(1)在坡道外周长度方向打设支护桩6,在支护桩内侧连接内撑系统7,然后挖基坑;(2)在所述的基坑内铺设坡道处底板5并建造位于坡道处底板5两侧的坡道内墙4和坡道外墙3至高于边梁1的梁底的标高位置,同时在坡道内墙4和坡道外墙3的顶端预留出甩筋;(3)在坡道外墙3内侧沿坡道长度方向施工一道边梁1,在所述的边梁1上依次间隔预埋多块预埋钢板;(4)在坡道内墙4内侧连接与多块预埋钢板一一对应设置的后增埋件钢板;(5)在每一块预埋钢板和与其对应设置的后增埋件钢板之间连接钢管撑2;(6)在支护桩与所述的外墙之间回填第一层回填土,然后在第一层回填土的顶部铺设素混凝土转换板带,在所述的素混凝土转换板带上回填第二层回填土;(7)拆除所述的内撑系统7;(8)继续完成坡道内、外墙高度方向的钢筋绑扎,然后绑扎坡道顶板梁和坡道顶板的钢筋,使坡道顶板梁的钢筋和坡道顶板的钢筋与坡道内、外墙钢筋相连;最后浇筑坡道内、外墙混凝土、坡道顶板梁混凝土以及坡道顶板的混凝土。
经现场使用:换撑体系受力平衡稳定、具有足够的强度、刚度,确保地下室汽车坡道的换撑施工的均衡传力和刚度稳定安全性。

Claims (1)

1.一种坡道基坑钢管撑换撑施工方法,其特征在于它包括以下步骤:
(1)在坡道外周长度方向打设支护桩,在支护桩内侧连接内撑系统,然后挖基坑;
(2)在所述的基坑内铺设坡道处底板并建造位于坡道处底板两侧的坡道内墙和坡道外墙至高于边梁的梁底的标高位置,同时在坡道内墙和坡道外墙的顶端预留出甩筋;
(3)在坡道外墙内侧沿坡道长度方向施工一道边梁,在所述的边梁上依次间隔预埋多块预埋钢板;
(4)在坡道内墙内侧连接与多块预埋钢板一一对应设置的后增埋件钢板;
(5)在每一块预埋钢板和与其对应设置的后增埋件钢板之间连接钢管撑;
(6)在支护桩与所述的坡道外墙之间回填第一层回填土,然后在第一层回填土的顶部铺设素混凝土转换板带,在所述的素混凝土转换板带上回填第二层回填土;
(7)拆除所述的内撑系统;
(8)继续完成坡道内、外墙高度方向的钢筋绑扎,然后绑扎坡道顶板梁和坡道顶板的钢筋,使坡道顶板梁的钢筋和坡道顶板的钢筋与坡道内、外墙钢筋相连;最后浇筑坡道内、外墙混凝土、坡道顶板梁混凝土以及坡道顶板的混凝土。
CN201210528868.XA 2012-12-07 2012-12-07 一种坡道基坑钢管撑换撑施工方法 Expired - Fee Related CN103015432B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210528868.XA CN103015432B (zh) 2012-12-07 2012-12-07 一种坡道基坑钢管撑换撑施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210528868.XA CN103015432B (zh) 2012-12-07 2012-12-07 一种坡道基坑钢管撑换撑施工方法

Publications (2)

Publication Number Publication Date
CN103015432A true CN103015432A (zh) 2013-04-03
CN103015432B CN103015432B (zh) 2014-12-17

Family

ID=47964494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210528868.XA Expired - Fee Related CN103015432B (zh) 2012-12-07 2012-12-07 一种坡道基坑钢管撑换撑施工方法

Country Status (1)

Country Link
CN (1) CN103015432B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332380A (zh) * 2015-11-16 2016-02-17 上海建工五建集团有限公司 一种地下建筑的换撑结构及方法
CN105863330A (zh) * 2016-05-25 2016-08-17 上海建工建集团有限公司 一种逆作法中汽车坡道顺作施工的方法
CN106836325A (zh) * 2017-04-13 2017-06-13 青岛建集团有限公司 一种室外施工电梯基础加固装置
CN108316313A (zh) * 2018-03-13 2018-07-24 中国二十冶集团有限公司 基坑支护拆撑过程中汽车坡道换撑方法
CN115434330A (zh) * 2022-04-26 2022-12-06 上海宝冶集团有限公司 一种分段式换撑施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050035713A (ko) * 2003-10-14 2005-04-19 고형배 띠장을 제거한 흙막이 공법
US20090047074A1 (en) * 2007-08-13 2009-02-19 Meyer John W Center beam connection assembly for temporary shoring
KR20090120100A (ko) * 2008-05-19 2009-11-24 (주) 아이제이컨티넨탈엔지니어링 흙막이 벽의 띠장 지지용 브라켓 및 그를 이용한 터파기방법
CN102071692A (zh) * 2010-12-02 2011-05-25 上海市第四建筑有限公司 采用环板进行基坑底板换撑的施工方法
KR20110006962U (ko) * 2011-05-30 2011-07-12 (주)핸스 강관 병행 h―시트 파일을 이용한 시공구조
CN102444130A (zh) * 2011-10-20 2012-05-09 中建六局第三建筑工程有限公司 深基坑工程中的快速换撑施工方法
CN102720201A (zh) * 2012-07-02 2012-10-10 中建三局第二建设工程有限责任公司 一种利用建筑物主体结构换撑施工的建造方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050035713A (ko) * 2003-10-14 2005-04-19 고형배 띠장을 제거한 흙막이 공법
US20090047074A1 (en) * 2007-08-13 2009-02-19 Meyer John W Center beam connection assembly for temporary shoring
KR20090120100A (ko) * 2008-05-19 2009-11-24 (주) 아이제이컨티넨탈엔지니어링 흙막이 벽의 띠장 지지용 브라켓 및 그를 이용한 터파기방법
CN102071692A (zh) * 2010-12-02 2011-05-25 上海市第四建筑有限公司 采用环板进行基坑底板换撑的施工方法
KR20110006962U (ko) * 2011-05-30 2011-07-12 (주)핸스 강관 병행 h―시트 파일을 이용한 시공구조
CN102444130A (zh) * 2011-10-20 2012-05-09 中建六局第三建筑工程有限公司 深基坑工程中的快速换撑施工方法
CN102720201A (zh) * 2012-07-02 2012-10-10 中建三局第二建设工程有限责任公司 一种利用建筑物主体结构换撑施工的建造方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332380A (zh) * 2015-11-16 2016-02-17 上海建工五建集团有限公司 一种地下建筑的换撑结构及方法
CN105332380B (zh) * 2015-11-16 2017-04-12 上海建工五建集团有限公司 一种地下建筑的换撑结构及方法
CN105863330A (zh) * 2016-05-25 2016-08-17 上海建工建集团有限公司 一种逆作法中汽车坡道顺作施工的方法
CN106836325A (zh) * 2017-04-13 2017-06-13 青岛建集团有限公司 一种室外施工电梯基础加固装置
CN108316313A (zh) * 2018-03-13 2018-07-24 中国二十冶集团有限公司 基坑支护拆撑过程中汽车坡道换撑方法
CN115434330A (zh) * 2022-04-26 2022-12-06 上海宝冶集团有限公司 一种分段式换撑施工方法

Also Published As

Publication number Publication date
CN103015432B (zh) 2014-12-17

Similar Documents

Publication Publication Date Title
CN104652671B (zh) 预制装配式混凝土外挂墙板固定装置及安装方法
CN104631512B (zh) 吊模法后浇带梁板施工方法
CN103015432B (zh) 一种坡道基坑钢管撑换撑施工方法
CN205776347U (zh) 用于地铁车站的新型盖挖逆作结构体系
CN102031785A (zh) 永久结构板带代替临时围檩的基坑支护技术
CN104878835A (zh) 条形基础房屋后增地下室结构
CN102953385B (zh) 一种坡道异形处基坑换撑施工方法
CN104405062A (zh) 整体带柱保温墙板和生产建筑工艺及相配套的设备
CN210031842U (zh) 基于排桩、连系梁和对拉锚索的相临深基坑联合支护体系
CN210086295U (zh) 一种复合装配式地下结构
CN102926408B (zh) 一种基础隔震结构及其托换处理方法
CN103469732B (zh) 一种桥梁支座地脚螺栓预留孔的施工方法
CN102535495A (zh) 一种装配式建筑u型槽基础及其施工方法
CN111254977A (zh) 一种预制钢扶壁柱的轨排井支撑结构及施工方法
CN209855277U (zh) 一种用于既有建筑地下增层的转换层结构
CN202925552U (zh) 一种坡道基坑钢管撑换撑施工结构
CN203583493U (zh) 组合式格构钢架喷锚基坑支护结构
CN114703861A (zh) 具有共用支护桩的双基坑施工方法
CN110439291A (zh) 一种适用于低层建筑的装配式生产施工方法
CN202925551U (zh) 一种坡道异形处基坑换撑施工结构
CN205475849U (zh) 一种钢结构建筑装配式预制混凝土剪力墙
CN210459229U (zh) 一种深基坑内支撑装配式换撑施工工装
CN211816415U (zh) 一种地铁车站边墙施工防裂预应力结构
CN211057843U (zh) 半预制扶壁式挡土墙
CN210342219U (zh) 一种具有预制卫生间的建筑

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141217

Termination date: 20161207