CN102587299A - 变换吊点拆除横跨既有桥梁或铁路支架横梁的施工方法 - Google Patents
变换吊点拆除横跨既有桥梁或铁路支架横梁的施工方法 Download PDFInfo
- Publication number
- CN102587299A CN102587299A CN2012100591799A CN201210059179A CN102587299A CN 102587299 A CN102587299 A CN 102587299A CN 2012100591799 A CN2012100591799 A CN 2012100591799A CN 201210059179 A CN201210059179 A CN 201210059179A CN 102587299 A CN102587299 A CN 102587299A
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- crane
- wire rope
- hung
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
本发明公开了一种变换吊点拆除横跨既有桥梁或铁路支架横梁的施工方法,其工作流程是:两台吊车在横梁两端分别悬挂吊装钢丝绳;提起横梁向一侧横移;横梁重心点移出上跨桥梁轮廓线以外落到立柱上;横梁左端继续提吊,变换横梁吊点,拆除右吊钢丝绳,安装横梁中吊钢丝绳,使吊点落在横梁重心上,让中吊钢丝绳受力而不提起横梁,然后拆除左吊钢丝绳;中吊钢丝绳吊装横梁落到地面上。本发明操作简单,施工快捷,需要配合的人员少,需要的时间短,可以整体将横梁吊装下来,安全性强,适合于跨既有桥梁支架横梁拆除,以及既有铁路防护棚架的横梁拆除,适合拆除大吨位的横梁。
Description
技术领域
本发明是一种拆除横跨在既有桥梁或者铁路上方横梁的一种施工方法,具体的说是变换吊点拆除横跨在既有桥梁或铁路上方横梁的吊装施工方法,属于铁路、公路建设领域。
背景技术
随着我国公路、铁路交通的发展,铁路或公路跨越既有铁路桥梁或既有公路桥梁的现象越来越多。大多数上跨桥梁采用悬臂浇筑混凝土成桥或者采用先预制梁,然后再架设预制梁成桥的方式跨越既有桥梁。但是有些上跨桥梁由于受到桥梁结构形式或者施工工期等因素的限制,无法采用悬臂浇筑或者预制架设的方式成桥,因此就需要采用支架现浇法施工。现浇支架在跨越既有桥梁上空的部分一般采用军用梁或者贝雷梁或者万能杆件拼装成的重型横梁。另外当桥梁跨越既有铁路时,在施工过程中需要在铁路上方搭设防护棚架对铁路进行保护,防护棚架的横梁一般采用贝雷梁或者大规格尺寸的工字钢。由于横跨在既有桥梁或铁路上方的横梁的重心点在上跨桥梁的下方,在上跨桥梁浇筑完成以后,横梁与上跨桥梁底面距离很近,吊车无法将吊钩深入上跨桥梁底面以下,无法将吊点悬挂在横梁的重心点上,采用一次吊装拆除横梁根本无法实现,更不可能在既有桥梁或铁路上空将横梁分节段吊装,因此拆除横跨在既有桥梁或铁路上空的横梁就很困难,目前还没有公开一种较理想的拆除横跨既有桥梁或铁路支架横梁的施工方法。
发明内容
本发明的目的是提供一种能有效快捷地拆除横跨在既有桥梁或铁路上方横梁的吊装施工方法,可以通过变换吊点,整体将横梁拆除,从而克服了拆除横梁受空间条件限制的困难,也保证了既有桥梁或铁路的安全。
本发明的工作流程是:
a.A吊车、B吊车就位;
b.在横梁两端分别悬挂吊装左吊钢丝绳和右吊钢丝绳;
c.启动A吊车配合B吊车提起横梁,向B吊车一侧横移;
d.横梁重心点移出上跨桥梁轮廓线以外即停止横移,横梁落到立柱上;
e.横梁左端继续用A吊车提吊,将B吊车吊钩上的右吊钢丝绳拆除;
f.变换横梁吊点,安装横梁中吊钢丝绳,使B吊车吊点落在横梁重心上,将中吊钢丝绳挂在B吊车吊钩上;
g.启动B吊车让中吊钢丝绳受力而不提起横梁,然后拆除A吊车吊钩上的左吊钢丝绳;
h.启动B吊车吊装横梁落到地面上,横梁拆除完成。
本发明操作简单,施工快捷,需要配合的人员少,吊装横梁需要的时间很短,可以整体将横梁吊装下来,安全性高,适合于跨既有桥梁支架横梁拆除,以及既有铁路防护棚架的横梁拆除,适合拆除大吨位的横梁。
附图说明
附图1是本发明吊车提吊横梁的示意图。
附图2是本发明吊车提吊横梁横移的示意图。
附图3是本发明吊车吊落横梁到立柱上的示意图。
附图4是本发明吊车将横梁落在立柱上并拆除右吊钢丝绳的示意图。
附图5是本发明变换横梁右吊点并安装中吊钢丝绳的示意图。
附图6是本发明吊车提吊中吊装钢丝绳并拆除左吊钢丝绳的示意图。
附图7是本发明吊车提吊横梁落地的示意图。
附图标记说明如下:
A吊车1、B吊车2、横梁3、左吊钢丝绳4、右吊钢丝绳5、上跨桥梁6、立柱7、既有桥梁8、中吊钢丝绳9。
具体实施方式
本发明的具体实施方式如下:
a.A吊车(1)、B吊车(2)就位,根据吊车的臂长和支架与桥梁之间的相对位置关系,在地面用白灰撒出吊车的停放位置,A吊车(1)停放在既有桥梁(8)的左侧,B吊车(2)停放在既有桥梁(8)的右侧,吊车吨位可根据支架横梁(3)位置的高度和横梁(3)的重量来选择;
b.在横梁(3)两端分别安装左吊钢丝绳(4)和右吊钢丝绳(5);
c.启动A吊车(1)配合B吊车(2)提起横梁(3)向B吊车(2)一侧横移;
d.当横梁(3)的重心点横移出上跨桥梁(6)的轮廓线以外,停止横移,将横梁(3)右端落在立柱(7)上;
e.横梁(3)左端继续用A吊车(1)提吊,将B吊车(2)吊钩上的右吊钢丝绳(5)拆除;
f.变换横梁(3)吊点,安装中吊钢丝绳(9),使得B吊车(2)的吊点落在横梁(3)的重心点上;
g.将中吊钢丝绳(9)挂在B吊车(2)的吊钩上,启动B吊车(2),让中吊钢丝绳(9)受力而不提起横梁(3),然后拆除A吊车(1)吊钩上的左吊钢丝绳(4);
h.启动B吊车(2),将横梁(3)吊装至立柱(7)以外,放在地面上,每拆除一片横梁(3),根据A吊车(1)、B吊车(2)与拟拆除横梁(3)的距离,调整A吊车(1)、B吊车(2)的站位,以满足吊装距离的要求,然后重复以上程序拆除剩余的横梁(3),直至拆除完成。
Claims (2)
1.变换吊点拆除横跨既有桥梁或铁路支架横梁的施工方法,其特征是按以下工作流程进行:
a.A吊车(1)、B吊车(2)就位;
b.在横梁两端分别悬挂吊装左吊钢丝绳(4)和右吊钢丝绳(5);
c.启动A吊车(1)配合B吊车(2)提起横梁(3),向B吊车(2)一侧横移;
d.横梁(3)重心点移出上跨桥梁(6)轮廓线以外即停止横移,横梁(3)落到立柱(7)上;
e.横梁(3)左端继续用A吊车(1)提吊,将B吊车(2)吊钩上的右吊钢丝绳(5)拆除;
f.变换横梁(3)吊点,安装横梁(3)中吊钢丝绳(9),使B吊车(2)吊点落在横梁(3)重心上,将中吊钢丝绳(9)挂在B吊车(2)吊钩上;
g.启动B吊车(2)让中吊钢丝绳(3)受力而不提起横梁(3),然后拆除A吊车(1)吊钩上的左吊钢丝绳(4);
h.启动B吊车(2)吊装横梁(3)落到地面上,横梁(3)拆除完成。
2.根据权利要求1所述的变换吊点拆除横跨既有桥梁或铁路支架横梁的施工方法,其特征是按以下工作流程进行:
a.A吊车(1)、B吊车(2)就位,根据吊车的臂长和支架与桥梁之间的相对位置关系,在地面用白灰撒出吊车的停放位置,A吊车(1)停放在既有桥梁(8)的左侧,B吊车(2)停放在既有桥梁(8)的右侧,吊车吨位可根据支架横梁(3)位置的高度和横梁(3)的重量来选择;
b.在横梁(3)两端分别安装左吊钢丝绳(4)和右吊钢丝绳(5);
c.启动A吊车(1)配合B吊车(2)提起横梁(3)向B吊车(2)一侧横移;
d.当横梁(3)的重心点横移出上跨桥梁(6)的轮廓线以外,停止横移,将横梁(3)右端落在立柱(7)上;
e.横梁(3)左端继续用A吊车(1)提吊,将B吊车(2)吊钩上的右吊钢丝绳(5)拆除;
f.变换横梁(3)吊点,安装中吊钢丝绳(9),使得B吊车(2)的吊点落在横梁(3)的重心点上;
g.将中吊钢丝绳(9)挂在B吊车(2)的吊钩上,启动B吊车(2),让中吊钢丝绳(9)受力而不提起横梁(3),然后拆除A吊车(1)吊钩上的左吊钢丝绳(4);
h.启动B吊车(2),将横梁(3)吊装至立柱(7)以外,放在地面上,每拆除一片横梁(3),根据A吊车(1)、B吊车(2)与拟拆除横梁(3)的距离,调整A吊车(1)、B吊车(2)的站位,以满足吊装距离的要求,然后重复以上程序拆除剩余的横梁(3),直至拆除完成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100591799A CN102587299A (zh) | 2012-03-08 | 2012-03-08 | 变换吊点拆除横跨既有桥梁或铁路支架横梁的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100591799A CN102587299A (zh) | 2012-03-08 | 2012-03-08 | 变换吊点拆除横跨既有桥梁或铁路支架横梁的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102587299A true CN102587299A (zh) | 2012-07-18 |
Family
ID=46476493
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100591799A Pending CN102587299A (zh) | 2012-03-08 | 2012-03-08 | 变换吊点拆除横跨既有桥梁或铁路支架横梁的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102587299A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103938557A (zh) * | 2014-03-11 | 2014-07-23 | 卢耒运 | 一种跨线桥拆除方法 |
CN106276602A (zh) * | 2016-08-29 | 2017-01-04 | 中铁十局集团建筑安装工程有限公司 | 一种跨高铁营业线梁体吊离方法 |
CN109537477A (zh) * | 2018-12-11 | 2019-03-29 | 北京市政路桥股份有限公司 | 一种龙门架拆除旧梁的施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050013704A (ko) * | 2003-07-29 | 2005-02-05 | 임준석 | 콘크리트 구조물을 철거하기 위한 절단방법 및 그 절단장치 |
CN1609363A (zh) * | 2004-08-11 | 2005-04-27 | 中国机械工业建设总公司 | 建筑物桁架整体提升方法及其设备 |
JP2007321476A (ja) * | 2006-06-01 | 2007-12-13 | Mitsubishi Heavy Industries Bridge & Steel Structures Engineering Co Ltd | 橋梁の施工方法及び橋梁 |
CN101324146A (zh) * | 2008-08-11 | 2008-12-17 | 河北建工集团有限责任公司 | 大跨度弧形空腹梁吊装施工方法 |
CN101838955A (zh) * | 2010-05-31 | 2010-09-22 | 中铁二十一局集团有限公司 | 一种既有线路横抬加固方法及结构 |
-
2012
- 2012-03-08 CN CN2012100591799A patent/CN102587299A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050013704A (ko) * | 2003-07-29 | 2005-02-05 | 임준석 | 콘크리트 구조물을 철거하기 위한 절단방법 및 그 절단장치 |
CN1609363A (zh) * | 2004-08-11 | 2005-04-27 | 中国机械工业建设总公司 | 建筑物桁架整体提升方法及其设备 |
JP2007321476A (ja) * | 2006-06-01 | 2007-12-13 | Mitsubishi Heavy Industries Bridge & Steel Structures Engineering Co Ltd | 橋梁の施工方法及び橋梁 |
CN101324146A (zh) * | 2008-08-11 | 2008-12-17 | 河北建工集团有限责任公司 | 大跨度弧形空腹梁吊装施工方法 |
CN101838955A (zh) * | 2010-05-31 | 2010-09-22 | 中铁二十一局集团有限公司 | 一种既有线路横抬加固方法及结构 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103938557A (zh) * | 2014-03-11 | 2014-07-23 | 卢耒运 | 一种跨线桥拆除方法 |
CN103938557B (zh) * | 2014-03-11 | 2016-01-20 | 卢来运 | 一种跨线桥拆除方法 |
CN106276602A (zh) * | 2016-08-29 | 2017-01-04 | 中铁十局集团建筑安装工程有限公司 | 一种跨高铁营业线梁体吊离方法 |
CN109537477A (zh) * | 2018-12-11 | 2019-03-29 | 北京市政路桥股份有限公司 | 一种龙门架拆除旧梁的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201635020U (zh) | 用于大中型混凝土桥梁的拆除桥面吊机 | |
CN107201719B (zh) | 高架桥防撞墙模板吊装转运机及防撞墙施工方法 | |
CN104480863B (zh) | 斜拉桥主塔施工的钢锚梁安装定位方法 | |
CN109797649B (zh) | 一种不影响桥面交通的检修车吊装方案 | |
CN202848940U (zh) | 一种大型煤气柜柜顶桁架整体下降拆除装置 | |
CN103669217B (zh) | 一种后支点挂篮及其整体换幅横移方法 | |
CN104989111B (zh) | 钢结构高层吊装施工方法 | |
CN102587299A (zh) | 变换吊点拆除横跨既有桥梁或铁路支架横梁的施工方法 | |
CN203159089U (zh) | 塔式起重机筒壁施工伸缩提升平台 | |
CN208167536U (zh) | 一种用于桥梁临时支座拆除的施工平台 | |
CN205387439U (zh) | 一种桅杆起吊装置 | |
CN204455842U (zh) | 桥梁预制梁板起梁架 | |
CN109989350A (zh) | 一种大桥索塔施工方法 | |
CN201634333U (zh) | 超高空门架吊机 | |
CN106144929A (zh) | 一种群吊葫芦装置及施工方法 | |
CN206680994U (zh) | 装配式钢筋笼下放架 | |
CN205857026U (zh) | 一种移动式桥梁防撞护栏施工作业台车 | |
CN201176365Y (zh) | 轻型可调式吊架 | |
CN203129025U (zh) | 一种挂篮的悬吊固定装置 | |
CN204529248U (zh) | 隔音屏吊装安装车载移动平台 | |
CN201943006U (zh) | 辅助不变幅架梁吊机架设钢箱梁用主塔区活动支架 | |
CN101768925B (zh) | 防落梁挡块的安装设备及其施工方法 | |
CN211665594U (zh) | 桥梁底模整体拆除装置 | |
CN211547405U (zh) | 桥梁防撞墙护栏模板台车 | |
CN211646007U (zh) | 桥墩吊围篮施工平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120718 |