CN102521509A - 采用改进迭代算法实现配电变压器优化选址的方法 - Google Patents

采用改进迭代算法实现配电变压器优化选址的方法 Download PDF

Info

Publication number
CN102521509A
CN102521509A CN201110413637XA CN201110413637A CN102521509A CN 102521509 A CN102521509 A CN 102521509A CN 201110413637X A CN201110413637X A CN 201110413637XA CN 201110413637 A CN201110413637 A CN 201110413637A CN 102521509 A CN102521509 A CN 102521509A
Authority
CN
China
Prior art keywords
substation transformer
load point
distribution transformer
transformer
steps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110413637XA
Other languages
English (en)
Other versions
CN102521509B (zh
Inventor
全成文
唐超
李俊轩
熊闽
周玲
刘震
郑常清
王静娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Wanzhou Power Supply Co of State Grid Chongqing Electric Power Co Ltd
Original Assignee
CHONGQING ELECTRIC POWER CORP WANZHOU POWER SUPPLY BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING ELECTRIC POWER CORP WANZHOU POWER SUPPLY BUREAU filed Critical CHONGQING ELECTRIC POWER CORP WANZHOU POWER SUPPLY BUREAU
Priority to CN201110413637.XA priority Critical patent/CN102521509B/zh
Publication of CN102521509A publication Critical patent/CN102521509A/zh
Application granted granted Critical
Publication of CN102521509B publication Critical patent/CN102521509B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种基于实际地形地貌的线路修正参数的,采用改进迭代算法实现配电变压器优化选址的方法,包括以下步骤:步骤1:首先结合配电变压器及其供电网的数学模型,求解规划区的最优配电变压器个数、配电变压器供电半径以及配电变压器的经济容量;步骤2:以得到的配电变压器最优供电半径以及个数为依据对配电变压器进行优化选址,优化选址包括配电变压器安装位置的初始多源连续选址优化和对已确定初始位置的配电变压器进行单源连续选址优化,本方法在设计过程中利用了改进的迭代优化算法,同时考虑了基于各个负荷点的实际地形地貌的线路修正系数,在求解过程将各个负荷点的地理信息以及负荷量信息同时考虑在内,其优化结果更具有实用性;方法比较简单,使用过程较为方便。

Description

采用改进迭代算法实现配电变压器优化选址的方法
技术领域
本发明涉及电力建设领域,特别涉及一种采基于实际地形地貌的线路修正参数的,采用改进迭代算法实现配电变压器优化选址的方法。
背景技术
有关配电变压器优化规划方法主要有自适应粒子群法、神经网络法、遗传算法、层次分析法、模糊识别算法、微分进化法、模拟退火法、禁忌搜索算法、Voronoi图法等。但是这些方法求解过程比较复杂,如“离散粒子群优化算法在变电站选址中的应用”(作者:徐珍霞,顾洁.电力电气,2005,25(4):35-115)、“基于粒子群文化算法的变电站规划研究”( 曾涛. 天津:天津大学,2006)这两篇文章中利用自适应粒子群算法对变电站的进行优化选址,该方法虽然效率高、收敛快,但是精确度比较低,而且易于发散,针对这个问题虽然有人将自适应粒子群与其他算法相结合,提高优化算法的精确度,但是结合后的算法比较繁琐,速度比较慢;
在“改进的混合模拟退火-遗传算法应用于电网规划”(作者:陈章潮,顾洁,孙纯军.电力系统自动化,1999,25(10):28-40)这篇文献中在求解过程中利用了模拟退火算法,该算法在初期时候搜索全局最优解能力比较强,但是其速度比较慢,所需时间比较长,在求解过程中也有可能将最优解丢失;
在“基于禁忌搜索算法的变电站电压无功优化控制[J]”(作者:任晓莉,程红丽等.继电器,2008,36(8):31-39)这篇文献中,作者利用了禁忌搜索算法,该算法的局部搜索能力比较强,但是全局搜索能力就大大降低;
在“变电站选址定容新模型及其遗传算法优化”(作者:李鑫滨,朱庆军.电力系统及其自动化学报,2008,21(3):32-35.)和“基于混合遗传算法的变电站选址定容”(作者:王成山,刘涛等.电力系统自动化,2006,30(6):30-34)这两篇文献中提到的遗传算法,是适用于解决具有多目的性、非线性和整数性的配电规划问题,并不能满足其他很多问题的需要;
另外,由于Voronoi图的建立并不依赖于空间的几何坐标,对解决空间剖分问题有一定的优势,已经被广泛应用于与几何信息相关的许多领域。在文献“变电站定位及供电区域划分的计算几何方法”(作者:杨丽徒,王金凤,段嘉平. [J].郑州大学学报,2003,24(4):16-45.)中,杨丽徒等首先提出应用计算几何算法中的Voronoi图和Delaunay三角网解决新增变压器的定位和各变压器最佳供电区域划分的问题,但是,由于这种方法是在新增变压器数量和容量一定,并且假定负荷分布均匀的情况下解决问题的,因此只是解决了变压器优化规划的一个子问题。
发明内容
有鉴于此,本发明的目的是提供采用改进迭代算法实现配电变压器优化选址的方法。其方法求解过程简单,应用方便。
本发明的目的是通过以下技术方案实现的:
该种采用迭代算法实现配电变压器优化选址的方法,包括以下步骤:
步骤1:首先结合配电变压器及其供电网的数学模型,求解规划区的最优配电变压器个数、配电变压器供电半径以及配电变压器的经济容量;配电变压器个数的确定是配网规划设计中的一个具有普遍意义的技术经济问题,是后期配变优化规划的前提,在本领域中,这一步骤是属于公知的一种计算方法;
步骤2:以得到的配电变压器最优供电半径以及个数为依据对配电变压器进行优化选址,优化算法的目标函数为:                                                
Figure 444905DEST_PATH_IMAGE001
,根据各负荷点相对位置建立几何坐标系,获得各负荷点的坐标位置;
其中:
Figure 865522DEST_PATH_IMAGE002
为馈线网损因数,
Figure 400409DEST_PATH_IMAGE003
为个负荷点的功率;
Figure 248279DEST_PATH_IMAGE004
为标志量;为基于实际地形地貌的第j个负荷点的线路修正系数,
Figure 460135DEST_PATH_IMAGE006
为第j个负荷点到第i个配电变压器的直线距离;
优化计算包括:
步骤A:配电变压器安装位置的初始多源连续选址优化,包括以下步骤:
步骤A1)首先结合配电变压器及其供电网的数学模型计算配电变压器最优经济个数m及经济容量,根据配电变压器的个数以及经济容量将规划区负荷划分为m个片区;
步骤A2)通过计算机计算m个供电片区进行单源连续选址(
Figure 870035DEST_PATH_IMAGE007
),计算m个配电变压器的初始位置
Figure 154386DEST_PATH_IMAGE008
,i=1,2,….,m;其中:
Figure 566913DEST_PATH_IMAGE004
为标志量;为第i个配电变压器在几何坐标系中的坐标;
步骤A3)计算每个负荷点到各个配电变压器的距离
Figure 635549DEST_PATH_IMAGE009
,取最短距离,将m个片区进行重新划分,直到负荷点的归属没有变化的时候计算结束,转入步骤B;
步骤B:对已确定初始位置的配电变压器进行单源连续选址优化:包括以下步骤:
步骤B1)在确定某个配电变压器供电范围内负荷点的坐标位置、负荷量以及线路修正系数的基础上计算配电变压器的地理位置,通过计算机建立目标函数为:
Figure 90801DEST_PATH_IMAGE010
其中:
Figure 52941DEST_PATH_IMAGE002
为馈线网损因数,
Figure 681368DEST_PATH_IMAGE003
为个负荷点的功率;
Figure 717457DEST_PATH_IMAGE004
为标志量;
Figure 405928DEST_PATH_IMAGE005
为第j个基于实际地形地貌的负荷点的线路修正系数,
Figure 793047DEST_PATH_IMAGE006
为第j个负荷点到第i个配电变压器的直线距离;其中
Figure 959586DEST_PATH_IMAGE011
步骤B2)对C求极小值解为:
Figure 115761DEST_PATH_IMAGE012
通过计算机利用迭代算法求解此函数表达式;
步骤B3)取初值(u(0),v(0)),为k=0时刻的各个负荷点坐标的加权平均值,即
Figure 975132DEST_PATH_IMAGE013
步骤B4)计算各个负荷点距离配电变压器坐标的距离
Figure 583968DEST_PATH_IMAGE014
,即
  
Figure 822707DEST_PATH_IMAGE015
计算
Figure 833389DEST_PATH_IMAGE016
若迭代某过程出现变压器计算位置与某一负荷点位置重合时,即
Figure 863661DEST_PATH_IMAGE017
,迭代公式修正为:
Figure 959793DEST_PATH_IMAGE018
Figure 405818DEST_PATH_IMAGE019
其中:
步骤B5)若
Figure 800076DEST_PATH_IMAGE021
,其中ε为地理位置计算的精确度,则迭代结束,配电变压器最优位置为
Figure 383504DEST_PATH_IMAGE022
,否则,k=k+1,转到步骤B4)。
本发明的有益效果是:
本方法在设计过程中利用了改进迭代优化算法,求解过程中在考虑到各个负荷点的地理位置以及负荷量的同时,考虑到了基于各个负荷点实际地形地貌的线路修正系数,其优化结果更具有实用性;求解过程比较方便。
本发明的其他优点、目标和特征在某种程度上将在随后的说明书中进行阐述,并且在某种程度上,基于对下文的考察研究对本领域技术人员而言将是显而易见的,或者可以从本发明的实践中得到教导。本发明的目标和其他优点可以通过下面的说明书和权利要求书来实现和获得。
具体实施方式
以下将对本发明的优选实施例进行详细的描述。应当理解,优选实施例仅为了说明本发明,而不是为了限制本发明的保护范围。
本发明的采用改进迭代算法,并结合基于各个负荷点实际地形地貌的线路修正系数实现配电变压器优化选址的方法,包括以下步骤:
步骤1:首先结合配电变压器及其供电网的数学模型,求解规划区的最优配电变压器个数、配电变压器供电半径以及配电变压器的经济容量;配电变压器个数的确定是配网规划设计中的一个具有普遍意义的技术经济问题,是后期配电变压器优化规划的前提。
步骤2:以得到的配电变压器最优供电半径以及个数为依据对配电变压器进行优化选址,优化算法的目标函数为:
其中:为馈线网损因数,
Figure 990569DEST_PATH_IMAGE003
为个负荷点的功率;
Figure 123610DEST_PATH_IMAGE004
为标志量;
Figure 177017DEST_PATH_IMAGE005
为第j个负荷点的基于实际地形地貌的线路修正系数,
Figure 79114DEST_PATH_IMAGE006
为第j个负荷点到第i个配电变压器的直线距离;
优化计算包括A和B两个步骤:
A:配电变压器安装位置的初始多源连续选址优化,包括以下步骤:
步骤A1)首先结合配电变压器及其供电网的数学模型计算最优器个数m及经济容量,根据配电变压器的个数以及经济容量将规划区负荷划分为m个片区;
步骤A2)通过计算机计算m个供电片区进行单源连续选址(),计算m个配电变压器的初始位置
Figure 914532DEST_PATH_IMAGE008
,i=1,2,….,m;其中:为标志量;
Figure 525303DEST_PATH_IMAGE008
为第i个配电变压器在几何坐标系中的坐标;
步骤A3)计算每个负荷点到各个配电变压器的距离
Figure 176864DEST_PATH_IMAGE009
,取最短距离,将m个片区进行重新划分,直到负荷点的归属没有变化的时候计算结束,转入步骤B;
步骤B:对已确定初始位置的配电变压器进行单源连续选址优化:包括以下步骤:
步骤B1)在确定某个配电变压器供电范围内负荷点的坐标位置、负荷量以及线路修正系数的基础上计算配电变压器的地理位置,通过计算机建立目标函数为:
其中:
Figure 679707DEST_PATH_IMAGE002
为馈线网损因数,
Figure 290817DEST_PATH_IMAGE003
为个负荷点的功率;
Figure 378858DEST_PATH_IMAGE004
为标志量;为第j个负荷点的基于实际地形地貌的线路修正系数,
Figure 641530DEST_PATH_IMAGE006
为第j个负荷点到第i个配电变压器的直线距离;其中
Figure 372725DEST_PATH_IMAGE011
步骤B2)对C求极小值解为:
Figure 631668DEST_PATH_IMAGE012
通过计算机利用迭代算法求解此函数表达式;
步骤B3)取初值(u(0),v(0)),为k=0时刻的各个负荷点坐标的加权平均值,即
步骤B4)计算各个负荷点距离配电变压器坐标的距离
Figure 185326DEST_PATH_IMAGE014
,即
  
Figure 708712DEST_PATH_IMAGE015
计算
Figure 935294DEST_PATH_IMAGE016
若迭代某过程出现配电变压器计算位置与某一负荷点位置重合时,即
Figure 176919DEST_PATH_IMAGE017
,迭代公式修正为:
Figure 157830DEST_PATH_IMAGE019
其中:
Figure 823823DEST_PATH_IMAGE020
步骤B5)若,其中ε为地理位置计算的精确度,则迭代结束,配电变压器最优位置为
Figure 693876DEST_PATH_IMAGE022
,否则,k=k+1,转到步骤B4)。
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本技术方案的宗旨和范围,其均应涵盖在本发明的权利要求范围当中。

Claims (1)

1.采用改进迭代算法实现配电变压器优化选址的方法,其特征在于:包括以下步骤:
步骤1:首先结合配电变压器及其供电网的数学模型,求解规划区的最优配电变压器个数、配电变压器供电半径以及配电变压器的经济容量;
步骤2:以得到的配电变压器最优供电半径以及个数为依据对配电变压器进行优化选址,优化算法的目标函数为:                                               
Figure 201110413637X100001DEST_PATH_IMAGE002
;根据各负荷点相对位置建立几何坐标系,获得各负荷点的坐标位置;
其中:
Figure 201110413637X100001DEST_PATH_IMAGE004
为馈线网损因数,
Figure 201110413637X100001DEST_PATH_IMAGE006
为个负荷点的功率;
Figure 201110413637X100001DEST_PATH_IMAGE008
为标志量;
Figure 201110413637X100001DEST_PATH_IMAGE010
为第j个负荷点的基于实际地形地貌的线路修正系数,为第j个负荷点到第i个配电变压器的直线距离;
优化计算的步骤包括:
步骤A:配电变压器安装位置的初始多源连续选址优化,包括以下步骤:
步骤A1)首先结合配电变压器及其供电网的数学模型计算最优器个数m及经济容量,根据配电变压器的个数以及经济容量将规划区负荷划分为m个片区;
步骤A2)通过计算机计算m个供电片区进行单源连续选址(
Figure 201110413637X100001DEST_PATH_IMAGE014
),计算m个配电变压器的初始位置,i=1,2,….,m;其中:为标志量;
Figure 364692DEST_PATH_IMAGE016
为第i个配电变压器在坐标系中的坐标;
步骤A3)计算每个负荷点到各个配电变压器的距离
Figure 201110413637X100001DEST_PATH_IMAGE018
,取最短距离,将m个片区进行重新划分,直到负荷点的归属没有变化的时候计算结束,转入步骤B;
步骤B:对已确定初始位置的配电变压器进行单源连续选址优化:包括以下步骤:
步骤B1)在确定某个配电变压器供电范围内负荷点的坐标位置、负荷量以及线路修正系数的基础上计算配电变压器的地理位置,通过计算机建立目标函数为:
其中:
Figure 269063DEST_PATH_IMAGE004
为馈线网损因数,
Figure 726589DEST_PATH_IMAGE006
为个负荷点的功率;
Figure 540962DEST_PATH_IMAGE008
为标志量;
Figure 425741DEST_PATH_IMAGE010
为第j个负荷点基于实际地形地貌的的线路修正系数,
Figure 692774DEST_PATH_IMAGE012
为第j个负荷点到第i个配电变压器的直线距离;其中
Figure DEST_PATH_IMAGE022
步骤B2)对C求极小值解为:
Figure DEST_PATH_IMAGE024
通过计算机利用迭代算法求解此函数表达式;
步骤B3)取初值(u(0),v(0)),为k=0时刻的各个负荷点坐标的加权平均值,即
Figure DEST_PATH_IMAGE026
步骤B4)计算各个负荷点距离配电变压器坐标的距离
Figure DEST_PATH_IMAGE028
,即
  
Figure 201110413637X100001DEST_PATH_IMAGE030
计算
Figure 201110413637X100001DEST_PATH_IMAGE032
若迭代某过程出现配电变压器计算位置与某一负荷点位置重合时,即
Figure 201110413637X100001DEST_PATH_IMAGE034
,迭代公式修正为:
Figure 201110413637X100001DEST_PATH_IMAGE036
Figure DEST_PATH_IMAGE038
其中:
Figure DEST_PATH_IMAGE040
步骤B5)若
Figure DEST_PATH_IMAGE042
,其中ε为地理位置计算的精确度,则迭代结束,配电变压器最优位置为,否则,k=k+1,转到步骤B4)。
CN201110413637.XA 2011-12-13 2011-12-13 采用改进迭代算法实现配电变压器优化选址的方法 Active CN102521509B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110413637.XA CN102521509B (zh) 2011-12-13 2011-12-13 采用改进迭代算法实现配电变压器优化选址的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110413637.XA CN102521509B (zh) 2011-12-13 2011-12-13 采用改进迭代算法实现配电变压器优化选址的方法

Publications (2)

Publication Number Publication Date
CN102521509A true CN102521509A (zh) 2012-06-27
CN102521509B CN102521509B (zh) 2014-09-24

Family

ID=46292420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110413637.XA Active CN102521509B (zh) 2011-12-13 2011-12-13 采用改进迭代算法实现配电变压器优化选址的方法

Country Status (1)

Country Link
CN (1) CN102521509B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103116812A (zh) * 2013-02-20 2013-05-22 重庆市电力公司电力科学研究院 一种新型的变电站布点方法
CN103500283A (zh) * 2013-10-11 2014-01-08 国家电网公司 基于故障树的电力变压器风险评估方法
CN104268336A (zh) * 2014-09-24 2015-01-07 国网上海市电力公司 一种基于Voronoi图的含DG配电网规划方法
CN106096106A (zh) * 2016-06-03 2016-11-09 江苏科技大学 静电除尘用高频高压变压器优化设计方法
CN107909203A (zh) * 2017-11-14 2018-04-13 南方电网科学研究院有限责任公司 一种考虑地理信息的多变电站选址优化方法与系统
CN108020752A (zh) * 2017-11-10 2018-05-11 国网浙江省电力公司电力科学研究院 一种基于多源贯通相关性的配线线损诊断方法及系统
CN108898239A (zh) * 2018-05-29 2018-11-27 贵州黔驰信息股份有限公司 一种基于数据分析的配电变压器选址方法
CN112070350A (zh) * 2020-08-04 2020-12-11 国家电网有限公司 一种基于重心回归算法的变电站选址方法
CN112231790A (zh) * 2020-08-27 2021-01-15 金华送变电工程有限公司 一种基于bim的工程建设中用电线路的布设方法
CN112803406A (zh) * 2021-03-09 2021-05-14 杭州电力设备制造有限公司 配电变压器位置容量优化方法、装置、设备和存储介质

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030052694A1 (en) * 2001-07-26 2003-03-20 Gokhan Dindis Identification of a distribution of transformers and fault location in primary underground loop systems
CN1825346A (zh) * 2006-04-07 2006-08-30 上海电力学院 基于逆向负荷预测的城镇配电网逆向网络规划方法
CN1828645A (zh) * 2006-04-07 2006-09-06 上海电力学院 城镇配电网多级同时率负荷预测方法
CN101561903A (zh) * 2009-06-02 2009-10-21 天津大学 计及地理信息的变电站全自动选址定容方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030052694A1 (en) * 2001-07-26 2003-03-20 Gokhan Dindis Identification of a distribution of transformers and fault location in primary underground loop systems
CN1825346A (zh) * 2006-04-07 2006-08-30 上海电力学院 基于逆向负荷预测的城镇配电网逆向网络规划方法
CN1828645A (zh) * 2006-04-07 2006-09-06 上海电力学院 城镇配电网多级同时率负荷预测方法
CN101561903A (zh) * 2009-06-02 2009-10-21 天津大学 计及地理信息的变电站全自动选址定容方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘文霞: "城市配网规划的优化算法、评价体系与智能技术的研究", 《中国博士学位论文全文数据库》 *
贾德峰: "基于GIS的变电所选址及馈线优化", 《中国优秀硕士学位论文全文数据库》 *
陈庆文: "基于最小覆盖圆及顶点加权V图的变电站优化选址研究", 《中国优秀硕士学位论文全文数据库》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103116812A (zh) * 2013-02-20 2013-05-22 重庆市电力公司电力科学研究院 一种新型的变电站布点方法
CN103500283A (zh) * 2013-10-11 2014-01-08 国家电网公司 基于故障树的电力变压器风险评估方法
CN104268336A (zh) * 2014-09-24 2015-01-07 国网上海市电力公司 一种基于Voronoi图的含DG配电网规划方法
CN104268336B (zh) * 2014-09-24 2017-06-16 国网上海市电力公司 一种基于Voronoi图的含DG配电网规划方法
CN106096106A (zh) * 2016-06-03 2016-11-09 江苏科技大学 静电除尘用高频高压变压器优化设计方法
CN106096106B (zh) * 2016-06-03 2019-04-23 江苏科技大学 静电除尘用高频高压变压器优化设计方法
CN108020752A (zh) * 2017-11-10 2018-05-11 国网浙江省电力公司电力科学研究院 一种基于多源贯通相关性的配线线损诊断方法及系统
CN108020752B (zh) * 2017-11-10 2020-03-27 国网浙江省电力公司电力科学研究院 一种基于多源贯通相关性的配线线损诊断方法及系统
CN107909203A (zh) * 2017-11-14 2018-04-13 南方电网科学研究院有限责任公司 一种考虑地理信息的多变电站选址优化方法与系统
CN108898239A (zh) * 2018-05-29 2018-11-27 贵州黔驰信息股份有限公司 一种基于数据分析的配电变压器选址方法
CN112070350A (zh) * 2020-08-04 2020-12-11 国家电网有限公司 一种基于重心回归算法的变电站选址方法
CN112231790A (zh) * 2020-08-27 2021-01-15 金华送变电工程有限公司 一种基于bim的工程建设中用电线路的布设方法
CN112231790B (zh) * 2020-08-27 2024-04-26 金华送变电工程有限公司 一种基于bim的工程建设中用电线路的布设方法
CN112803406A (zh) * 2021-03-09 2021-05-14 杭州电力设备制造有限公司 配电变压器位置容量优化方法、装置、设备和存储介质

Also Published As

Publication number Publication date
CN102521509B (zh) 2014-09-24

Similar Documents

Publication Publication Date Title
CN102521509B (zh) 采用改进迭代算法实现配电变压器优化选址的方法
Jahannoosh et al. New hybrid meta-heuristic algorithm for reliable and cost-effective designing of photovoltaic/wind/fuel cell energy system considering load interruption probability
Han et al. Hierarchical energy management for PV/hydrogen/battery island DC microgrid
CN109888835B (zh) 一种基于改进粒子群的分布式光伏配电网规划方法
Tanwar et al. Techno-economic and environmental approach for optimal placement and sizing of renewable DGs in distribution system
Syahputra et al. Reconfiguration of distribution network with distributed energy resources integration using PSO algorithm
Zhao et al. Reactive power control of wind farm made up with doubly fed induction generators in distribution system
CN104659816B (zh) 基于改进粒子群算法的分布式电源接入配电系统优配方法
Eid et al. Improvement of active distribution systems with high penetration capacities of shunt reactive compensators and distributed generators using Bald Eagle Search
Satyanarayana et al. Multiple DG placement and sizing in radial distribution system using genetic algorithm and particle swarm optimization
Ghaedi et al. Optimal placement and sizing of TCSC for improving the voltage and economic indices of system with stochastic load model
Inkollu et al. An Application of Hunter-Prey Optimization for Maximizing Photovoltaic Hosting Capacity Along with Multi-Objective Optimization in Radial Distribution Network.
Kumar et al. Optimal allocation of solar-PV and STATCOM using PSO with multi-objective approach to improve the overall system performance
Peng et al. Optimal locating and sizing of besss in distribution network based on multi-objective memetic salp swarm algorithm
CN110190615A (zh) 一种微网储能系统控制策略优化方法
CN110942186B (zh) 基于自适应粒子群算法的柔性交流输电设备优化配置方法
Zaki et al. Optimal sizing and sitting of electric vehicle charging station by using Archimedes optimization algorithm technique
Muthukumar et al. Opposition based differential evolution algorithm for capacitor placement on radial distribution system
Al-Sharo et al. Optimization of Stable Energy PV Systems Using the Internet of Things (IoT)
Gupta et al. Enhancement of power system loadability with FACTS devices
CN103490443A (zh) 在电网三级电压控制体系中对风电场进行电压控制的方法
SAINI et al. FACTS Devices Optimization for Optimal Power Flow Using Particle Swarm Optimization In Sulselrabar System
CN108053055A (zh) 基于支持向量机的大型城市中长期电力负荷组合预测方法
Sabri et al. Optimal Multi-Indices Application of Distributed Generations in Radial Distribuion Networks Based on Moth-Flame Optimizer
Mahdad et al. Optimal location and control of combined SVC–TCSC controller to enhance power system loadability

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121206

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121206

Address after: 404000 Chongqing city Wanzhou District Dragon Plaza No. 1

Applicant after: CHONGQING ELECTRIC POWER CORP. WANZHOU POWER SUPPLY BUREAU

Applicant after: State Grid Corporation of China

Address before: 404000 Chongqing city Wanzhou District Dragon Plaza No. 1

Applicant before: Chongqing Electric Power Corp. Wanzhou Power Supply Bureau

C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 404000 Chongqing city Wanzhou District Dragon Plaza No. 1

Patentee after: Wanzhou power supply branch of State Grid Chongqing Electric Power Co.

Patentee after: State Grid Corporation of China

Address before: 404000 Chongqing city Wanzhou District Dragon Plaza No. 1

Patentee before: Chongqing Electric Power Corp. Wanzhou Power Supply Bureau

Patentee before: State Grid Corporation of China

TR01 Transfer of patent right

Effective date of registration: 20151028

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Wanzhou power supply branch of State Grid Chongqing Electric Power Co.

Address before: 404000 Chongqing city Wanzhou District Dragon Plaza No. 1

Patentee before: Wanzhou power supply branch of State Grid Chongqing Electric Power Co.

Patentee before: State Grid Corporation of China