CN102505596A - Low-stand bikeway system based on side road - Google Patents

Low-stand bikeway system based on side road Download PDF

Info

Publication number
CN102505596A
CN102505596A CN2011103479673A CN201110347967A CN102505596A CN 102505596 A CN102505596 A CN 102505596A CN 2011103479673 A CN2011103479673 A CN 2011103479673A CN 201110347967 A CN201110347967 A CN 201110347967A CN 102505596 A CN102505596 A CN 102505596A
Authority
CN
China
Prior art keywords
bikeway
bridge
bypass
bicycle
passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103479673A
Other languages
Chinese (zh)
Other versions
CN102505596B (en
Inventor
曾攀
彭捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN201110347967.3A priority Critical patent/CN102505596B/en
Publication of CN102505596A publication Critical patent/CN102505596A/en
Application granted granted Critical
Publication of CN102505596B publication Critical patent/CN102505596B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a low-stand bikeway system based on a side road. The bikeway system comprises low-stand occupation road modules, a bike parking platform, an under-bridge motor park, a C-shaped bridge bypassing structure, inlet and outlet fences for limiting width and side channels for entering or leaving the bridge, wherein each low-stand occupation road module is composed of a door-shaped supporting frame, a frame panel, a frame cross beam, a frame supporting column, a cross beam and a supporting column connection plate. According to the invention, a pedestrian overpass is used to erect a bike channel with the same height so as to span a highway, a C-shaped bridge bypassing manner is used to bypass the pedestrian overpass, the lower side of the supporting frame is transparent, and a common temporary motor park can be built on one side of the bikeway; the bikeway is thoroughly separated from a motor vehicle lane, and an over-bridge bike parking platform adopts a lightweight steel structure or concrete support structure, thus the construction cost is greatly lowered; and in order to guarantee the safety of bike riders, increase the riding speed and providing technical guarantee for advocating environmentally-friendly traveling, a special bike leasing service system can be built by virtue of the low-stand bikeway system provided by the invention.

Description

Low frame bikeway system based on bypass
Technical field
The present invention relates to a kind of low frame bikeway system, belong to the graded crossing of road, the mutual connection technique field of overpass based on bypass.
Background technology
Current most of energy sources is a fossil fuel: coal, oil and natural gas, and with present operating speed, known residue colliery mineral reserve will run out after about 200 years, and oil and natural gas will use totally in less than 100 years.Fossil fuel can cause a large amount of environment pollutions in use, comprising the greenhouse gases that cause global warming.The permanent resident population of Beijing had reached 1,755 ten thousand people in 2009, had a net increase of 51.5 ten thousand on motor vehicle the whole year.By the end of the year 2010, nearly 5,000,000 of Beijing's motor vehicle, wherein the private car accounts for 80%; And private car's working strength is too high; Go 1.5 ten thousand kilometers every year, surpass the twice in Tokyo, Beijing traffic goes from bad to worse; Daily blocking up reaches 5 hours, and the annual loss that causes because of traffic jam is equivalent to 3.6% of the GDP of Beijing total amount; At present, though share of public transportation is carried to 38.9%, track traffic can't bear the heavy load.And the ratio of using cycling trip by 1986 62.7% drop to 2009 18.1%, also descending so far.
In recent years, popular along with the great development of China's automobile industry and car, the condition of cycling and environment are worse and worse.Along with the quickening of urban construction, motorway is repaiied wideer and wideer, but the nonmotorized vehicle lane more and more narrow; Even much all occupied, like the interim car park of half conduct of bypass, and second half is used for the turnover of car; If catch up with traffic congestion, automobile all occupies all roads, and bicycle can only bore in the automobile seam; Make that riding of bicycle is abnormally dangerous, even cause many traffic accidents.Simultaneously, the place of depositing bicycle is also fewer and feweri, and the quick growth of automobile makes the living space of bicycle receive serious extruding.
China is a bicycle big country, and the fifties in last century, the bicycle flow that springs up in the city was once likened to " Great Wall of moving " by the foreigner to the eighties; Even if bicycle still is the trip instrument that the common people be unable to do without now.For example, Beijing Municipal Government announces " building humane traffic, scientific and technological traffic, green traffic action plan (2009-2015) ", and the overall trip general layout of Beijing's traffic in 2015 will become; Public transport accounts for 45%; The car trip accounts for 22%, and taxi accounts for 8%, and bicycle will reach 23%.In order to alleviate the urban traffic congestion and to improve urban environment, Beijing will progressively build " slow-moving traffic system "; For this reason, public security and traffic control department are are studying and defining the administrative provisions that help bicycle traffic, simultaneously, revise and abrogate the administrative provisions that are unfavorable for bicycle traffic, include bicycle in whole city traffic programme.
Summary of the invention
For thoroughly changing the environment of metropolis cycling; Increase the utilization rate of road; The present invention provides a kind of low frame bikeway system based on bypass, bike lane is thoroughly separated with the motor vehicle track, to ensure cycling safety; Improve riding speed, for the environmental protection trip provides technical guarantee.
Technical scheme of the present invention is following:
A kind of low frame bikeway system based on bypass is characterized in that: this occupation road system comprises a plurality of bikeway modules, side bridge passage and cross street bicycle passage up and down; Each bikeway module contains a type support frame, bridge deck and load guardrail; Described door type support frame highly is the limit for height through the defined vehicle on the isolation strip at bypass two ends, the below is penetrating fully; This type support frame is made up of pillar, framework panel and cruciform bracing; Said bridge deck are fixedly connected with the framework panel of door type support frame, form bypass bicycle passage, are provided with at least one bicycle parking platform in bicycle passage one side, and this bicycle parking platform is arranged on adjacent two door type support frames; The bridge passage is located at the opposite side of bicycle passage about the described side; Described street bicycle passage excessively and overpass have equal height, are made up of bridge deck and load guardrail, support through the supporting bracket that is connected in overpass, are connected with bypass bicycle passage.The load guardrail adopts frame construction, and the center is higher, and both sides are lower.
Low frame bikeway system based on bypass also comprises the C type around bridge construction, and this C type adopts a plurality of occupation road modules to make up with forniciform mode around bridge construction, forms the low frame bikeway that side is walked around the street overline bridge.
Side up and down bridge passage upper end is provided with the discrepancy fence that electric vehicle that restriction exceeds width gets into, and the side platform is set behind the fence of coming in and going out supplies bicycle to circle round to get into the bicycle passage.
The present invention has following characteristics and high-lighting effect: 1. bike lane is thoroughly separated with the motor vehicle track, formed the occupation road of bicycle, for ensureing cycling safety, raising riding speed, promotion environmental protection trip technical guarantee is provided; 2. set up low frame bikeway system with the modular mode of occupation road, on the isolation strip at road bypass two ends, do not take special region based on bypass; Effectively utilized existing space; 3. through C type bridge passage about bridge mode, the passage that relies on overpass and side, make up the passage of the low frame bikeway of turnover, 4. adopt lightweight steel construction or concrete support structure and modular mode; Can reduce construction cost significantly; 5. construct car park under bicycle parking platform, the bridge, embody multi-functional, multipurpose better, 6. based on this system; Can set up and be used for the special leasing system of bicycle; The section that in the urban district, blocks up, the junction of subway station are provided with the passage and the Cycle Hire point of bridge up and down, make cycling trip easy more, with the operation that standardizes.
Description of drawings
Fig. 1 is the low frame bikeway system architecture sketch map based on bypass provided by the invention.
Fig. 2 is main road, overpass and low frame bikeway system schematic.
Among the figure: 1-door type support frame; 2-framework panel; The 3-cruciform bracing; The 4-frame pillar; 5-crossbeam and post patch; The 6-panel is connected side plate with pillar; The 7-bridge deck; 8-bridge floor and support connecting bolt; 9-load guardrail; 10-bicycle parking platform; Car park under the 11-bridge; The 12-parking management system; The 13-bypass; 14-bypass isolation strip; 15-bypass inlet; 16-hangs down frame bikeway module; The 17-C type is around bridge construction; The discrepancy fence of 18-Max. Clearance _M.; 19-street pedestrian overline bridge; 20-is the overpass stair up and down; 21-relies on the bicycle passage of overpass; The 22-supporting bracket; 23-main road central authorities jube; The 24-side is the bridge passage up and down; 25-side platform; 26-lateral channels support.
The specific embodiment
Below in conjunction with accompanying drawing principle of the present invention, structure and the specific embodiment are further described:
Fig. 1 is the low frame bikeway system architecture sketch map based on bypass provided by the invention, and this occupation road system comprises a plurality of bikeway module 16, side bridge passage 24 and cross street bicycle passage 21 up and down; Each bikeway module 16 contains a type support frame 1, bridge deck 7 and load guardrail 9; Described door type support frame 1 highly for the limit for height through the defined vehicle, is generally 3m-4.5m on the isolation strip at bypass two ends, the below is penetrating fully; The width of bridge deck is provided with as required, can only spread a side or the middle part of frame at door type support frame, the position of remaining support frame can be as reserving; Under the bypass bicycle passage car park under the bridge, parking management system can be set.This type support frame is made up of pillar 4, framework panel 2 and cruciform bracing 3; Said bridge deck 7 are fixedly connected with the framework panel of door type support frame, form bypass bicycle passage, are provided with at least one bicycle parking platform 10 in bicycle passage one side, and this bicycle parking platform 10 is arranged on adjacent two door type support frames 1; Bridge passage 24 is located at the opposite side of bicycle passage about the described side; The described street bicycle passage 21 of crossing has equal height with overpass, is made up of bridge deck 7 and load guardrail 9, supports through the supporting bracket 22 that is connected in overpass, is connected with bypass bicycle passage.
Load guardrail 9 adopts the lower frame construction in higher both sides, middle part, to increase the rigidity of bridge floor, plays the effect of safety barrier simultaneously.Side up and down bridge passage 24 upper ends is provided with the discrepancy fence 18 that electric vehicle that restriction exceeds width gets into, and side platform 25 is set behind the fence 18 of coming in and going out supplies bicycles to circle round to get into the bicycle passage.
Fig. 2 is main road, overpass and low frame bikeway system schematic.By overpass 19, make up with overpass has an equal height and cross street bicycle passage 21, to cross street bicycle passage and forms by bridge deck 7 and load guardrail 9, supporting bracket 22 supports through being connected in overpass are connected with bypass bicycle passage.Adopt the C type around bridge construction 17 at the overpass side, form the low frame bikeway that side is walked around the street overline bridge, this C type adopts a plurality of occupation road modules 16 to make up with forniciform mode around bridge construction.
In loop wire or the highway section that the traffic in city is comparatively blocked up; Can adopt low frame bikeway provided by the present invention system; On bypass, set up; According to the discharge value size of bicycle, can only set up on the side bypass of main road or on the bypass in both sides, the part of the bypass of its underpart can also be set up the automobile short term parking.By existing overpass; Set up and cross street bicycle designated lane accordingly; Simultaneously, need to adopt a plurality of occupation road modules provided by the present invention to make up, set up the low frame bikeway that side is walked around the street overline bridge around bridge construction with the C type with forniciform mode; For solving the storage problem of bicycle; Correct position at low frame bikeway is provided with the bicycle parking platform, and for ensureing the specificity of bicycle passage, the electric vehicle that adopts the restriction of discrepancy fence to exceed width gets into the special bicycle passage.When passing light rail overhead pedestrian crossing beam, can adopt the mode that reduces low frame bikeway height, half sinking mode or insert ground for needs.Can set up the comparatively green traffic system of sealing based on low frame bikeway; The section that in the urban district, blocks up, the junction of subway station are provided with the Cycle Hire point; Set up bicycle rental system, for Green Travel provides more perfect technology and handling facility.

Claims (4)

1. low frame bikeway system based on bypass is characterized in that: this occupation road system comprises a plurality of bikeway modules (16), side bridge passage (24) and cross street bicycle passage (21) up and down; Each bikeway module (16) contains a type support frame (1), bridge deck (7) and load guardrail (9); Described door type support frame (1) highly is the limit for height through the defined vehicle on the isolation strip at bypass two ends, the below is penetrating fully; This type support frame is made up of pillar (4), framework panel (2) and cruciform bracing (3); Said bridge deck (7) are fixedly connected with the framework panel of door type support frame; Form bypass bicycle passage; Be provided with at least one bicycle parking platform (10) in bicycle passage one side, this bicycle parking platform (10) is arranged on adjacent two door type support frames (1); Bridge passage (24) is located at the opposite side of bicycle passage about the described side; The described street bicycle passage (21) of crossing has equal height with overpass, is made up of bridge deck (7) and load guardrail (9), supports through the supporting bracket (22) that is connected in overpass, is connected with bypass bicycle passage.
2. according to the described low frame bikeway system based on bypass of claim 1, it is characterized in that: load guardrail (9) adopts frame construction, and the center is higher, and both sides are lower.
3. according to the described low frame bikeway system of claim 1 based on bypass; It is characterized in that: the low frame bikeway system based on bypass comprises that also the C type is around bridge construction (17); This C type adopts a plurality of occupation road modules (16) to make up with forniciform mode around bridge construction, forms the low frame bikeway that side is walked around the street overline bridge.
4. according to the described low frame bikeway system of claim 1 based on bypass; It is characterized in that: side bridge passage (24) end up and down is provided with the discrepancy fence (18) that restriction exceeds the electric vehicle entering of width, and behind the fence (18) of coming in and going out, side platform (25) is set.
CN201110347967.3A 2011-11-07 2011-11-07 Low-stand bikeway system based on side road Expired - Fee Related CN102505596B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110347967.3A CN102505596B (en) 2011-11-07 2011-11-07 Low-stand bikeway system based on side road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110347967.3A CN102505596B (en) 2011-11-07 2011-11-07 Low-stand bikeway system based on side road

Publications (2)

Publication Number Publication Date
CN102505596A true CN102505596A (en) 2012-06-20
CN102505596B CN102505596B (en) 2014-07-16

Family

ID=46217725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110347967.3A Expired - Fee Related CN102505596B (en) 2011-11-07 2011-11-07 Low-stand bikeway system based on side road

Country Status (1)

Country Link
CN (1) CN102505596B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276648A (en) * 2013-05-23 2013-09-04 苏州荣生大方路桥建设工程有限公司 Prefabricated three-dimensional urban road system and quick installation construction method
CN103696354A (en) * 2013-12-31 2014-04-02 中铁第一勘察设计院集团有限公司 Corridor and viewing platform integrated composite bridge structure
CN103835218A (en) * 2013-12-26 2014-06-04 郑东武 Gallery bridge type multifunctional skywalk
CN107190625A (en) * 2017-05-24 2017-09-22 中建钢构有限公司 The waterproof and drainage system of a kind of bicycle expressway surface
CN113944106A (en) * 2021-10-28 2022-01-18 中铁二十局集团有限公司 Steel trestle bridge channel for upper bridge of land short pier bridge and construction method of steel trestle bridge channel

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201099826Y (en) * 2007-08-24 2008-08-13 李慧欣 Moveable urban bicycle elevated dedicated passage
CN201671031U (en) * 2010-05-12 2010-12-15 陶红明 Closed special overheaded passageway for bicycle
EP2278070A2 (en) * 2009-07-21 2011-01-26 Gerhard Brunner Traffic system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201099826Y (en) * 2007-08-24 2008-08-13 李慧欣 Moveable urban bicycle elevated dedicated passage
EP2278070A2 (en) * 2009-07-21 2011-01-26 Gerhard Brunner Traffic system
CN201671031U (en) * 2010-05-12 2010-12-15 陶红明 Closed special overheaded passageway for bicycle

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276648A (en) * 2013-05-23 2013-09-04 苏州荣生大方路桥建设工程有限公司 Prefabricated three-dimensional urban road system and quick installation construction method
CN103276648B (en) * 2013-05-23 2015-09-02 苏州荣生大方路桥建设工程有限公司 Assembled stereoscopic urban road system and installation construction
CN103835218A (en) * 2013-12-26 2014-06-04 郑东武 Gallery bridge type multifunctional skywalk
CN103835218B (en) * 2013-12-26 2016-01-20 郑东武 Pavement in covered bridge type Multifunctional air
CN103696354A (en) * 2013-12-31 2014-04-02 中铁第一勘察设计院集团有限公司 Corridor and viewing platform integrated composite bridge structure
CN103696354B (en) * 2013-12-31 2016-04-13 中铁第一勘察设计院集团有限公司 Merge the combined bridge structure of gallery, sightseeing platform
CN107190625A (en) * 2017-05-24 2017-09-22 中建钢构有限公司 The waterproof and drainage system of a kind of bicycle expressway surface
CN113944106A (en) * 2021-10-28 2022-01-18 中铁二十局集团有限公司 Steel trestle bridge channel for upper bridge of land short pier bridge and construction method of steel trestle bridge channel

Also Published As

Publication number Publication date
CN102505596B (en) 2014-07-16

Similar Documents

Publication Publication Date Title
CN1834354B (en) Ground saving and energy saving, unblocked ecological urban system with ordered space
CN102505596B (en) Low-stand bikeway system based on side road
CN2832895Y (en) Multi-deck easily-dismountable full-stereo road traffic system
CN101781873A (en) Convenient and smooth flyover crossroad traffic building without traffic light
US20120315084A1 (en) Elevated highway for movement and placement of vehicles at different levels
CN102587235A (en) Urban rapid transit network system
CN100425769C (en) Road system having man, bicycle lane and motor vehicle separated, and traffic method thereof
CN201695288U (en) Pedestrian and vehicular circulation separation crossed flyover
CN101870294A (en) Banded transportation junction formed by paralleling parallel elevated road stations and elevated railway stations
CN101851886A (en) Trinity overall-style three-dimensional public transport system
CN103643607B (en) Totally-enclosed full-overpass bus rapid transit approach system
CN102383348A (en) Urban multilayer stereoscopic public traffic line
CN111455799B (en) Double-layer assembled viaduct and construction method thereof
RU108046U1 (en) NETWORK OF TRANSPORT HIGHWAYS FOR LARGE CITIES AND THEIR SUBURBS
CN104213484A (en) Interlocking combined time-saving method for citizens' activities
CN202688814U (en) Traffic light-free fast transportation system arranged on city crossroad
CN104562880A (en) Interchange crossing designed for pedestrians walking on ground, cars running above or under ground level, and mutual accommodation only among cars on same road
CN204676382U (en) People walks level land car and walks up and down only this bus and to give in each other intersection
CN103898820A (en) Quasi rail transit road system
CN211547125U (en) Special lane of multi-functional bicycle under city overpass
CN102182125B (en) Balance bridge at entrance and exit of main and auxiliary roads and method for easing traffic jam
CN205368917U (en) City multilayer rotary island formula overpass
CN214193978U (en) Road intersection design structure capable of realizing man-vehicle shunting
CN202450404U (en) Pavement structure for evacuating traffic jams
CN102720105A (en) Method for building traffic light-free overpass at crossroad (T road)

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140716

Termination date: 20201107

CF01 Termination of patent right due to non-payment of annual fee